LEVI PLAZA FOUNTAIN 6” PIPELINING PROJECT Nu Flow America November 2016 Dale Houts

Levi Plaza Fountain Return Line 6 PP

Embed Size (px)

Citation preview

Page 1: Levi Plaza Fountain Return Line 6 PP

LEVI PLAZA FOUNTAIN 6”

PIPELINING PROJECT

Nu Flow America

November 2016

Dale Houts

Page 2: Levi Plaza Fountain Return Line 6 PP

ACCESS POINTSAfterBefore

Page 3: Levi Plaza Fountain Return Line 6 PP

PREPARING THE FELT LINER

Verifying Air Pressure Combine Epoxy Mixing the epoxy

Page 4: Levi Plaza Fountain Return Line 6 PP

SATURATING THE EPOXY INTO THE FELT

Pour epoxy into felt Score felt Saturation complete

Page 5: Levi Plaza Fountain Return Line 6 PP

PROCESS CONTINUED

Install air bladder into felt Tape felt to make it narrower Cont.

Page 6: Levi Plaza Fountain Return Line 6 PP

INSTALL THE FELT LINER

Drop liner into pipe Expand air bladder with

air pressure Seal lip with excess epoxy

Page 7: Levi Plaza Fountain Return Line 6 PP

EXTRACT THE AIR BLADDER

Spout access point Pump room access point

Page 8: Levi Plaza Fountain Return Line 6 PP

FINISHED PRODUCT

From SpoutFrom Pump Room