Leveraging SAP QM as an eLIMS Joe Weisburn [email protected] Mike Krug [email protected] April 16, 2014

Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

  • Upload
    vandan

  • View
    221

  • Download
    4

Embed Size (px)

Citation preview

Page 1: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Leveraging SAP QM as an eLIMS

Joe Weisburn – [email protected]

Mike Krug – [email protected]

April 16, 2014

Page 2: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

2

The Scotts Miracle Gro Company Facts

The world's largest marketer of branded

consumer products for lawn and garden

care.

~$3B in Sales, 8000+ associates globally

The Company's Scotts®, Miracle-Gro®

and Ortho® brands are market-leading in

their categories in the US.

In Europe, the Company's brands include

Weedol®, Pathclear®, Evergreen®,

Levington®, Miracle-Gro®, KB®,

Fertiligene® and Substral®.

Scotts LawnService is our “Do It For Me”

segment.

Page 3: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

SMG SAP History

▪ Implemented SAP 1998

▪ 2010 Upgrade to ECC6 using the following Modules

Page 4: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

ECC 6.0

PLM Project

- EHS&S

- DMS

- PPM

- cFolders

QM Replace Labware LIMS and Spreadsheets Globally

- 40 Manufacturing Plants

- Notifications

- Vendor Defects

- Material Waivers

2010 PLM Project

Page 5: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

QM Inspection Processes

▪ Material inspection and results recording at manufacturing plants

▪ Inspection for Goods Receipt of active/regulated materials

▪Certificate of Analysis recording and saving in DMS

▪ Inspection for R&D Materials

▪ Manufacturing In-Process inspection

▪ Mass Balance Calculations for Blending Plants

Page 6: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Challenges

▪ Organization Change Management

▪LIMS users used to interface and inspection flexibility

▪ Inspection results accessible to entire corporation

▪Record more information than before QM

▪Corporate means of controlling master data associated with inspections.

▪Hundreds of new SAP Users.

Page 7: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Challenges

▪ Fertilizer plant (~3000 Pallets/ day)

▪Serial process from raw materials to warehouse

▪ Inspect the intermediate material/ disposition the finished good material

▪Usage decision is after material is put in warehouse.

▪Quality controlled materials must be dispositioned with QM. (OCM for warehouse)

Page 8: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Challenges

▪ R&D Research Laboratory

▪OCM for Scientist to create Inspection Lots and Samples (20,000 samples/year)

▪Inspection Plans are different for most materials

▪Cannot change the inspection plan once results recording starts

▪Tabular Results Recording

▪Lab Technician inspects one characteristic for several samples and inspection lots

▪Monitoring service agreement performance for Lab

▪Stability Studies

Page 9: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Sample management - flexible

Bar codes

Stability studies

Supporting Laboratory processes

Worklist of their open inspections for lab

technician

Detailed documentation of results

Different ways of results recording (e.g.

across samples or inspection lots)

Calculated results

Interfacing with test equipments for

direct upload of results

Document management

Copy results from former tests

Change control and audit trail

Digital signatures

Flexible reporting capabilities

Detailed corrective and preventive actions

process for a detected issue

Certificates handling

Comprehensive authorization concept

Calibration of test equipments

Typical Requirements Towards a LIMS

Page 10: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Handling of Samples, Identification of Samples

Inspection Lots and Physical Samples in SAP

Lab 3 Lab 2 Lab 1

Different types of physical samples: primary,

pooled and reserve samples.

Results documentation for each physical

sample.

Sample records created with the inspection lot

or later.

Planned and unplanned physical samples.

Trigger additional inspection for existing

sample.

Bundling of samples via “physical sample

drawing”.

Dispatch of different samples to different labs.

Printing of barcode labels for further

identification.

Inspection

Lot

Page 11: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Sample Management at Goods Receipt Inspection

Physical Sample Labels

with barcodes for all physical

sample types

New Sample Drawing Instruction

with information about distribution

of samples

Page 12: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Flexibility in Triggering Laboratory processes

Service Entry

Request Flexible

Specifications

Sales Order

Service

Order

Planning Scheduling

Test

Schedule

Billing

and CoA

Sample

Executio

n

Inspection

Plan

Specification

Inspection

Method

Inspection

Plan

Specificatio

n

Inspection

Method

Sample

Management

Capacity-

Planning

Results

Recording

Validation

Certificate

of Analysis

Invoice

(or internal

activities)

Q-Data-

Exchange

Sample

Dispatch

Pla

nn

ed

U

np

la

nn

ed

Page 13: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Flexible Selection of Specifications During

Inspection Lot Creation

After assignment of inspection

plan manual sample calculation

to trigger flexible selection of

characteristics and

specifications.

Benefits:

For flexible adjustment of specification data before starting the actual test!

E.g. for service-based inspections.

Also applicable for results recording (adjustment of specs).

Page 14: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Bar Code Labels

Speed of Data Entry

Reduced Errors

Streamlined Process Flow

Page 15: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Stability Studies

Schedule

Strategy

Initial Sample

Test plan 1

with

inspection

series of 3,

6, 9, ...

months Test plan 2

with

inspection

series (3, 9,

12,...

month)

Inspectio

n Lot

Inspection

Lot

Inspection Lot manual

Bill of material

Inspectio

n Lot

Sample at 21°

Sample at 8°

GMP-Requirement: Stability test for new products

Continuous tests of durability

Research oriented tests

Available Objects

Scheduling

Flexible Assignment of

Specifications

3 Month 6 Month

3 Month

First

Investigation

Page 16: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Calculated Results

Idea of “Input Processing”:

Translation of entered results (average and single values) according to defined rules.

SAP Solution:

▪ Provided via an exchangeable program-part (Business Add-In)

▪Fields that can be changed: entered value, attribute, origin of results data, number of decimal places

▪ Entered value will be stored in the field “original value”.

▪ SAP standard procedures

▪Output according to input

▪Output of significant digits

▪Input date

Page 17: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Input Processing: Example

Procedure: Date

Page 18: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Results Copy Functionality

Option 1: Copy results automatically during

sample calculation

Option 2: Copy results automatically during

results recording

Transfer Log

Option 3: Manual selection of an inspection lot

during results recording

Page 19: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Test Equipment Interfacing

Possible Ways with SAP ERP

Simple Test Equipments (e.g. balances, colorimeter etc.

QM Data Exchange with consumer applications (e.g. SAP MII, 3rd party systems)

Complex Test Equipment (e.g. HPLC)

Steinwald interface box; Simple Test Equipments

QM with SAP ERP used as Enterprise LIMS

PCo

(Plant Connectivity)

QM-IDI

Interface

Enterprise Service

(SOA)

Simple Data

Transfer

Connectivity

Framework for

external devices

(PCo)

Data Agents

Complementary

Partner Product

(no full-blown LIMS,

e.g. IDOS,

Dr. Eilebrecht SSE *)

Direct integration,

e.g. with CDS

ES Bundles

“Integration of QM

Systems (IQM)” and

“Easy Inspection

Planning (EIP)”

Flexible Web

Services

RS232 serial interface

File transfer

Interface Boxes

(e.g. Steinwald)

Keyboard Wedges

Page 20: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Test Equipment Interfacing

Possible Ways with SAP ERP

Keyboard Wedge RS-232 & USB

Robust Interface

Page 21: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Web Based Results Recording - eQMS-RЯ

Page 22: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

eQMS-RЯ Features

Web Based User Interface (Web Dynpro)

Visual Color based cells for Pass/Fail

Configurable Tabs

DMS Integration for Displaying Documents

SPC Charts

Ability to Change Texts

Leverages standard SAP functionality

Copy Down Function

Mobile

And more!!!

Page 23: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

eQMS-RЯ - Selection Screen

Page 24: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

eQMS-RЯ - Recording Screen

Page 25: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Calibration (QM/PM)

Including …

Confirmation of used equipment => tracking of equipment (where used)

Update of equipment status incl. measurement info

Test before and after calibration

Audit trail and digital signature

Planning Scheduling Calibration

inspection

Inspection

lot creation

Order

Release

Release !

Maintenance

task list

Equipment,

Functional

location

Maintenance

plan

Insp.lot Insp.lot

PM order

CS order

Page 26: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Supporting regulatory compliance

▪ Digital Signature in QM

▪ Sample Drawing

▪ Results Recording

▪ Usage Decision

▪ Quality Notifications

▪ Multiple Signature Methods

▪ Signature Strategies

▪ Electronic Batch Record (EBR)

▪ Deviation Analysis

▪ Audit Trail Functionality

▪ Cross-Application

▪ Change Management

▪ Batch Traceability –

Batch Information Cockpit

Page 27: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Flexible Reporting Capabilities

Ad-hoc evaluations of quality notifications and results

Specific graphics types:

—Pareto Chart

—Scatter Plot

—Control Chart …

QM Cockpit for Evaluations

Analyze data from…

Notifications / Tasks

Audits

inspection lots

Predefined queries

Queries & figures via SAP NetWeaver BI

Quality of purchased parts

Quality Scores

Audit Results

Supplier evaluation

Page 28: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

QM Evaluation Cockpit

Two Examples

Pareto Chart to show

defect frequencies

Comparison of

characteristics

Page 29: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Quality Notifications

Problem and Complaint Management – CAPA

Process

Status Management

Tracking and Monitoring

Use of Catalogs

Workflow

Classification

Quality-related costs

Follow-up actions with standard examples

Solution Database

Web-based entry via SAP MII

Problem and

Complaint

Management

Corrective and

Preventive Action

QM Evaluation cockpit for ad-hoc reporting

Predefined queries and key figures in SAP NetWeaver BI

Supplier evaluation

Full-text search

Quality

Analytics

Page 30: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Certificate Process

Individual certificate profiles

Content and scope (characteristics)

Data origin (across supply chain)

Outbound certificates

For production batches

For deliveries (multi-level)

Inbound certificates from suppliers

Electronic quality data exchange options

Integrated with customer/supplier data

Archiving

Page 31: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

Implementation Best Practices

Page 32: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation

April 23,

2014 l Company Confidential © 2013 32

Organizational Change Management

Denial

Anger

Bargaining

Support Convert the Opinion Formers

Sell the Benefits

Sell the Rewards

Emotional

Response

to Change

Staff Response

Communication Training Coaching

Information Learning on the job

Monitoring

Enhanced Steady State

Trust Established

New Tools & Training

Experimenting with new

ways of working

Acknowledgement

& Reinforcement

Competence

& Confidence

Acceptance

of Change

Uncertainty &

Disorientation Stimulus

for Change

Activities Provide the Resources

Train and Develop

Provide the Evidence

Change Emotional Cycle

Source: A.T. Kearney analysis

Activities

Page 33: Leveraging SAP QM as an eLIMSfm.sap.com/data/UPLOAD/files/Scotts - Using QM as an eLIMS Final... · pooled and reserve samples. ... Capacity-Planning Results Recording Validation