34
W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815 UNIVERSITY OF CALIFORNIA, SAN DIEGO PREQUALIFICATION QUESTIONNAIRE For W.M. KECK BUILDING MRI INSTALLATION UNIVERSITY OF CALIFORNIA, SAN DIEGO W9938679/P4S-815 SUBMITTED BY: < please enter your company name here > UNIVERSITY OF CALIFORNIA, SAN DIEGO FACILITIES DESIGN & CONSTRUCTION 10280 NORTH TORREY PINES ROAD LA JOLLA, CA 92037 ISSUE DATE: TUESDAY, NOVEMBER 18, 2014 MANDATORY PREQUALIFICATION MEETING: TUESDAY, DECEMBER 2, 2014 SUBMITTALS DUE: MONDAY, DECEMBER 8, 2014 General Contractor Page 1 of 34 Prequalification Questionnaire GC P/Q Quest (UCSD Rev. 07/2014)

LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

Embed Size (px)

Citation preview

Page 1: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

PREQUALIFICATION QUESTIONNAIREFor

W.M. KECK BUILDING MRI INSTALLATIONUNIVERSITY OF CALIFORNIA, SAN DIEGO

W9938679/P4S-815

SUBMITTED BY:

< please enter your company name here >

UNIVERSITY OF CALIFORNIA, SAN DIEGOFACILITIES DESIGN & CONSTRUCTION

10280 NORTH TORREY PINES ROADLA JOLLA, CA 92037

ISSUE DATE: TUESDAY, NOVEMBER 18, 2014MANDATORY PREQUALIFICATION MEETING: TUESDAY, DECEMBER 2, 2014

SUBMITTALS DUE: MONDAY, DECEMBER 8, 2014

General Contractor Page 1 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 2: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

(Where a time period is given, such as the last ten [10] years, the period is to be measured backwards from the date this prequalification questionnaire is required to be submitted to the University of California at San Diego.)

Note: Submission of an incomplete and/or unclear Prequalification Questionnaire may result in the determination of the prospective Contractor as NON-PREQUALIFIED.

SUBMITTED BY: (Name and Title) Printed or Typed

(Signature)

(Firm Name. If a Joint Venture, state name if JV Entity)

(Contact Name for all notices and correspondence)

(Address)

(City, State, Zip Code)

________________________ ________________________(Telephone Number) (Facsimile Number)

(E-mail Address)

Each prospective Contractor must have the following California General Building Contractor’s License, License Code: B, current, active and in good standing with the California Contractor’s State License Board on the date and time of the Prequalification Questionnaire submittal is due and must submit this Prequalification Questionnaire with all portions completed, including required attachments.

Each prospective Contractor must answer all of the following questions and provide all requested information, where applicable. Any prospective Contractor failing to do so may be deemed to be not responsive and not responsible with respect to this Prequalification at the sole discretion of the University. Each prospective Contractor must submit four (4) printed sets and one (1) flash drive with complete submittal of the questionnaire. All Contractors that have submitted a Prequalification Questionnaire will be notified in writing of either successfully or not successfully achieving prequalification status. The decision of the University is final and is not appealable within the University of California system.

General Contractor Page 2 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 3: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

All information submitted for Prequalification evaluation will be considered official information acquired in confidence, and the University will maintain its confidentiality to the extent permitted by law.

It is critical that the prospective Contractor fills out all information required accurately, completely, truthfully and to the best of their knowledge. Ambiguous or incomplete information may lead to an unfavorable rating and subsequent status as non-prequalified.

WHERE NECESSARY, COPY THE FORMS IN THIS PACKAGE. USE ONLY THESE FORMS.

1. PREQUALIFICATION DECLARATION

I, ________________________________________________, hereby declare that I am the(Printed Name)

_________________________________ of ____________________________________(Title) (Name of Firm)

submitting this Prequalification Questionnaire; that I am duly authorized to sign this Prequalification Questionnaire on behalf of the above-named firm; and that all information set forth in this Prequalification Questionnaire and all attachments hereto are, to the best of my knowledge, true, accurate and complete as of its submission date.

The undersigned declares under penalty of perjury that all of the prequalification information submitted with this form is true and correct and that this declaration was executed in

________________________________ (County), __________________________, (State)

on ______________________________ (Date).

____________________________________(Signature)

General Contractor Page 3 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 4: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

2. ATTENDANCE AT MANDATORY PREQUALIFICATION CONFERENCE

Did a representative of your firm attend the Mandatory Prequalification Conference at the University of California, San Diego, La Jolla?

YES NO

Name/names of those attending: _________________________________________

Date of Meeting Attended:____________________________________________

3. LICENSE

A. Does your firm hold the following California contractor's license, which is current, valid, and in good standing with the California Contractor's State License Board?

License Code: BLicense Classification: General Building Contractor

YES NO

1. If the entity submitting this prequalification questionnaire is a Joint Venture, does the Joint Venture entity itself currently hold a (B – General Building Contractor) California contractor's license, which is current, valid, and in good standing with the California Contractor's State License Board?

YES NO N/A

B. Provide the following information about your firm's contractor's license:

1. Name of license holder exactly as on file with the California Contractor's State License Board:__________________________________________________________________

2. License Classification: _______________________________________________

3. License Code: ______________________________________________________

4. License Number: _____________________________________________________

5. Date Issued: _______________________________________________________

6. Expiration Date: ____________________________________________________

General Contractor Page 4 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 5: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

C. Can you truthfully state that your firm's contractor's license hasn’t been suspended or revoked by the California Contractor's State License Board within the last five (5)

years?

YES NO

If answer is “No,” explain on attached additional sheets.

If the entity submitting this prequalification questionnaire is a Joint Venture, can the Joint Venture entity truthfully state that no member of the Joint Venture has ever had their firm's contractor's license suspended or revoked by the California Contractor's State License Board?

YES NO N/A

If answer is “No,” explain on attached additional sheets.

D. Has a complaint ever been filed with the Contractor’s State License Board against your company that required a formal hearing or inquiry?

YES NO

4. SURETY

Prospective Contractor desiring to be prequalified are informed that they will be subject to and must fully comply with all bid conditions including 100% payment and 100% performance bonds.

Prospective Contractor shall submit the below form, signed by representative of surety and notarized. If firm has used current surety for less than ten years, list surety(ies) previously used and indicate number of years used to demonstrate ten (10) complete years of surety history.

A. Is the surety to be used listed in the latest published State of California Department of Insurance list of Insurance Organizations Authorized by the Insurance Commissioner to Transact Business of Insurance in the State of California?

YES NO

B. Is the prospective Contractor able to obtain bonding up to and including the cost for this construction contract estimated at $380,000 of which no more than 50% is currently committed to other projects?

YES NO

1. If the entity submitting this prequalification questionnaire is a Joint Venture, is the Joint Venture entity itself able to obtain bonding up to and including the cost

General Contractor Page 5 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 6: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

for this construction contract estimated at $380,000 of which no more than 50% is currently committed to other projects?

YES NO N/A

C. Is it true that the surety has not paid out any monies for the construction activities of the prospective Contractor whatsoever within the last ten (10) years?

YES NO

If answer is “No,” explain on attached additional sheets.

1. If the entity submitting this prequalification questionnaire is a Joint Venture, is it true that the surety has not paid out any monies for the construction activities of any member of the Joint Venture within the last ten (10) years?

YES NO N/A

D. How long has the Prospective Contractor been with this surety? years

General Contractor Page 6 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 7: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

E. Surety Declaration:

Provide this Declaration of your surety(ies) for completion. Do not have the surety submit this information directly to the University.

The undersigned declares under penalty of perjury that all of the above surety information is true and correct and that this declaration was executed in

County, California, on (date).

(Signature)

(Name and Title - Printed or Typed)

(Representing [Surety Name])

(Surety License Number)

(Firm Name)

(Address) (City, State, Zip Code)

________________________________________________________________________________________________________(Telephone Number) (Facsimile Number)

(Email Address)

(ATTACH NOTARIZATION of SURETY REPRESENTATIVE’S SIGNATURE)

General Contractor Page 7 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 8: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

5. INSURER

Prospective Contractor desiring to be prequalified are informed that they will be subject to and must fully comply with all bid conditions including the following insurance coverage and associated limits.

Prospective Contractor shall submit the below form, signed by representative of insurer and notarized. If firm has used current insurer for less than ten years, list insurer(s) previously used and indicate number of years used to demonstrate ten (10) complete years of insurer history.

A. Is the insurer to be used listed by Best with a rating of A- or better and a financial classification of VIII or better (or an equivalent rating by Standard & Poor’s or Moody's)?

YES NO

Indicate Best Rating:

Indicate Best Financial Classification:

B. Is the prospective Contractor able to obtain insurance in the following limits for each of these construction contracts?

YES NO

1. If the entity submitting this prequalification questionnaire is a Joint Venture, is the Joint Venture entity itself able to obtain insurance in the following limits for each of these construction contracts?

YES NO N/A

MinimumComprehensive or Commercial Form General Liability Insur ance - Limits of Liability RequirementEach Occurrence - Combined Single Limit for Bodily Injury and Property Damage $1,000,000Products - Completed Operations Aggregate $2,000,000Personal and Advertising Injury $1,000,000General Aggregate - Not Applicable to Comprehensive Form $2,000,000

Business Automobile Liability Insurance - Limits of Liabil ity Each Accident - Combined Single Limit for Bodily Injury and Property Damage $1,000,000

C. How long has the Prospective Contractor been with this insurer? years

General Contractor Page 8 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 9: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

D. Insurance Declaration:

Provide this Declaration to your insurance carrier for completion. Do not have the carrier submit this information to the University.

The undersigned declares under penalty of perjury that all of the above insurer information is true and correct and that this declaration was executed in

County, California, on (date).

(Signature)

(Name and Title - Printed or Typed)

(Representing [Insurer Name])

(Insurer’s License Number)

(Firm Name)

(Address) (City, State, Zip Code)

(Telephone Number) (Facsimile Telephone Number)

(Email Address)

(ATTACH NOTARIZATION of INSURER REPRESENTATIVE’S SIGNATURE)

General Contractor Page 9 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 10: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

6. CONSTRUCTION EXPERIENCE

Submit Project Data on a minimum of two (2) and a maximum of five (5) comparable projects successfully completed within the last ten (10) years constructed in the United States of America one of which was constructed in the State of California.

A comparable project is defined as having a construction cost at the bid date of at least $400,000 or a total of $1.2M for the projects submitted, and the following example building types:

Commercial or institutional research laboratory Hospital or clinical medical facility Office building combined with one of the above Addition to an existing commercial or institutional research laboratory, hospital

or clinical medical facility while the facility remains in full operation Other facilities that contain a high degree of technical/aesthetic complexity and

Such projects should have possessed the following construction challenges: Institutional renovation work with limited construction and staging areas Repair of buildings requiring proactive and innovative solutions due to noise,

dust, and pedestrian traffic while building is occupied and research is ongoing Renovations/expansions requiring proactive and innovative solutions due to

unknown and/or unforeseen field conditions. Project complexity requiring critical path construction scheduling to complete on

time.

Such projects should include these specific components: Radio Frequency (RF) shielding with integration of ductwork and nonferrous

components. Skylight systems Relocation of electrical circuits and panels while research is ongoing Rooftop chiller and associated piping to technical electronic equipment.

A. If the entity submitting this prequalification questionnaire is a Joint Venture, the Joint Venture entity itself must demonstrate adequate previous construction experience. Joint Venture teams newly-formed to pursue this prequalification opportunity are not eligible for prequalification.

B. Listed projects must have been managed and constructed under the business name submitted for prequalification. Projects completed by employees for former employers are not acceptable.

C. Submit the following Project Data Sheets for each project submitted as evidence of your firm's Contractor expertise.

General Contractor Page 10 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 11: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

PROJECT DATA SHEET (A separate sheet must be prepared for each project submitted.)

1. Project Name: _________________________________________________________________

2. Project Location: ___________________________________________________________

3. Project Description: ___________________________________________________________

4. Constr. Type:

5. Size (gross square feet): ____________

6. What was your company’s role on this project?

Prime (General) Contractor Subcontractor to GC 2nd Tier Subcontractor 3rd Tier Subcontractor Prime Subcontractor to Owner Other: _________

List the Business Entity (name) your company used to perform work for this project: ____________________________________________________________________________________

7. If the entity submitting this prequalification questionnaire is a Joint Venture, did the Joint Venture entity itself construct and manage this project?

YES NO N/A

8. How is this project comparable to the W.M. Keck Building MRI Installation project? ______________________________________________________________________________

______________________________________________________________________________

9. Was the project completed within budget?

Cost At Bid: $

Cost At Completion: $

Explanation: ____________________________________________________________________

General Contractor Page 11 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 12: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

10. For any differing amount between cost at completion and cost at bid, distribute the sources and/or causes of these changes into the following categories:

Document Problems: $ Unforeseen Conditions: $ Owner Generated Scope: $ Regulatory Agency: $ Other: $

11. Was construction begun and completed within the last ten (10) years?

YES NO

12. Was the project completed within the original contract time or the adjusted contract time?

YES NO

If completion did not occur within the original or the adjusted contract time, indicate elapsed time in whole calendar days between original or adjusted contract time and actual final completion. For projects that have not reached final completion, indicate current status with respect to contract time:______________________________________________________________________________

13. Did the project include occupied facilities?

YES NO

14. What communications strategies were used by your firm to assist the project team in mitigating the impacts of construction on the occupied facilities? ______________________________________________________________________________

15. What Infection Control measures were carried out on the project? Describe Infection Control means and methods, types of containment barriers, ICRA Permit process, monitoring and maintenance of containment barriers for the project. Include whether infection control specialty subcontractor was used, or whether in-house personnel performed infection control.__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

16. Was the project for a university or public institution?

YES NO

General Contractor Page 12 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 13: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

17. What strategic decisions did your firm contribute to the project which supported the project’s success (e.g. value engineering, phasing, innovation, new technology, etc.)? ______________________________________________________________________________

18. Did the project include adherence to critical path scheduling?

YES NO

19. Did project include a rooftop chiller?

YES NO

20. Did project include Radio Frequency (RF) shielding?

YES NO

21. Did project include MRI installation?

YES NO

22. Did the project include a quality control/quality assurance program?

YES NO

If“Yes,” explain: _______________________________________________________________

23. Did the project include California State Fire Marshal review and approval (planning, scheduling and obtaining State Fire Marshal approval of materials, shop drawings, and systems testing)?

YES NO

24. Did the project include California Division of State Architect Handicapped Accessibility Compliance review and approval?

YES NO

25. Did the Owner assess any back-charges?

YES NO

If answer is “Yes,” explain:_______________________________________________________

26. Did the Owner assess any liquidated damages?

YES NO

General Contractor Page 13 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 14: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

If answer is “Yes,” explain: ______________________________________________________

27. Name of Project Executive:_____________________________________

Qualifications of this Project Executive:________________________________________________________________________________________________________

28. Name of Project Manager: ___________________________________________________

Qualifications of this Project Manager: _______________________________________________________________________________________________________________________

29. Name of Project Superintendent: ___________________________________________________

Qualifications of this Project Superintendent: _______________________________________________________________________________________________________________________

30. Name of Project Engineer: ________________________________________________________

Qualifications of this Project Engineer: ____________________________________________________________________________________________________________________________

31. Did your firm self-perform any of the work?

YES NO

If “Yes,” please specify the trades you self-performed or have the capability to self-perform:

__________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

General Contractor Page 14 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 15: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

Client Firm Name:

Client Contact: Title:

Client Address: City, State Zip

Client Phone: Client Fax:Client E-mail Address:Architect/Engineer/Consultants:Architect/EngineerContact Name: Phone:Architect/EngineerE-mail Address:

(Attach additional pages with other pertinent project information as necessary.)

General Contractor Page 15 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 16: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

7. NOT USED

8. NOT USED

9. STAFF EXPERIENCE AND PROJECT SAFETY

The Project Manager and Project Superintendent listed will be considered qualified only if he/she has successfully completed at least two (2) comparable projects.

A. Contractor hereby commits as a minimum to assignment of the specific field staff as outlined below. Contractor to submit a complete staffing chart as part of this package

One Project Manager (part-time) during construction

Contractor shall assign one Project Manager to oversee, manage and coordinate the project. The magnitude and complexity of the project will necessitate that this position manage the entire construction process. This position will need to be involved with all aspects of the project including but not limited to all scheduling and budgeting meetings, overall construction process development and execution, multi-staff operation management and coordination. The project manager will take the lead position in all Architect and University issues including overall contract administration, RFI, RFP and contract change order negotiations, campus and community relations. The project manager will be the main contact on behalf of the general contractor and will be responsible for guiding the construction development process to successful completion. The project manager will be responsible for budget, quality and schedule.

One Project Superintendent (full-time on site) during construction

The Contractor will assign one Project Superintendent to manage, coordinate and facilitate the field supervision staff for each of the various components of the project construction process. The major function of this position will be in addition to the normal superintendent’s daily workload, subcontractor interaction and production, and various field related coordination issues.

One Project Clerk (as needed) during construction

B. At the time of bid, the successful Contractor will be required to reconfirm staff assignments to the project based on this submittal. If any of the named staff submitted are no longer employed by the firm at the time the project starts, or are otherwise unavailable, the firm's bid may be considered non-responsive. Substitution of other individuals with equivalent experience may be considered by the University, however

General Contractor Page 16 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 17: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

resumes, comparable project history and other relevant information must be submitted to the University prior to the determination of the bid results.

C. Project Management -- This project may not require a project manager on site full time, but does require site visits and meetings as requested by the University Project Manager.

The Contractor shall keep on the job throughout its duration a competent Project Manager and Project Superintendent, all of whom must be satisfactory to the University. The Project Manager and Project Superintendent shall be the same individuals proposed by the Contractor during the procurement process for this project. The Project Manager shall represent the Contractor, and all communication given to the Project Manager shall be as binding as if given to the Contractor. The Contractor shall not change either the Project Manager or the Project Superintendent on the project from those originally proposed for the project without the prior written consent of the University. The University will only grant written consent for such change in the case of undue hardship on the individual or if the Project Manager and Project Superintendent shall leave the employ of the Contractor.

By submitting a proposal for this project, the Contractor agrees to pay a training fee of $10,000 should they change Project Manager or Project Superintendent without the written consent of the University.

D. Safety Program

The safety of the Contractor employees, employees of the University and other visitors to the Project are of the utmost importance to the University. The Contractor shall take whatever steps are necessary to maintain a clean and safe work environment for their employees, the employees of their Subcontractors and vendors, and any other visitors to the project.

E. Part-Time Project Manager: W.M. Keck Building MRI Installation Project

1. The name of the specific Project Manager to be committed to this project on a part-time basis and continuously retained throughout this project is:

(Attach resume)

2. Total years of experience: years

3. Years at this position: ______years

4. Years with this firm: years

General Contractor Page 17 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 18: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

5. The Project Manager named above was assigned to the following comparable projects for which data sheets have been included in this questionnaire:

Project: Construction Cost:

a.

b.

c.

6. The Project Manager named above worked on the following similar projects that are described in the attached resume:

a.

b.

c.

F. Full-Time Project Superintendent: W.M. Keck Building MRI Installation Project

1. The name of the specific Project Superintendent to be committed to this project on a full-time basis and continuously retained throughout this project is:

(Attach resume)

2. Total years of experience: years

3. Years at this position: years

4. Years with this firm: years

5. The Project Superintendent named above was assigned to the following comparable projects for which data sheets have been included in this questionnaire:

Project: Construction Cost:

a.

b.

c.

General Contractor Page 18 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 19: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

6. The Project Superintendent named above worked on the following similar projects that are described in the attached resume:

a.

b.

c.

10. ADDITIONAL GENERAL CONTRACTOR REQUIREMENTS

A. If fully prequalified and a successful fee bidder, the General Contractor will be required to use the following computer software programs: Microsoft Word Processing,

Microsoft Excel Cost Analysis, e-Builder Project Management and Control, Outlook Email, and Internet Explorer Web Browser.

11. SAFETY PROGRAM

A. Does your firm have a written Injury and Illness Prevention Program (IIPP) that complies with California Code of Regulations, Title 8, Sections 1509 and 3203?

YES NO

Brief Description: ________________________________________________________

B. Does your firm have a written safety program that meets CAL/OSHA requirements?

YES NO

C. Will your firm have personnel permanently assigned and dedicated to Safety on this project?

YES NO

D. If “Yes,” state the names of all such personnel who will be assigned and individually list their specific duties:

Name, Title Specific Duties___________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ___________________________________

Attach resumes (include certification and safety related training received.)

General Contractor Page 19 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 20: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

E. Have you had accidents, which resulted in a construction fatality on any of your projects over the last 2 years?

YES NO

If the answer is “Yes,” please explain.________________________________________________________________________________________________________________________________________________

F. Is your firm’s current Workers’ Compensation Experience Modification Rate (EMR) equal to 1.0 or less?

YES NO

Provide your California Workman’s Compensation Modifier for each of the last three (3) years. __________________________________________________________________

Provide EMR verification (regardless of whether EMR is under or over 1) from State of California or from insurance company for the most recently completed year.

G. Has your firm been cited by OSHA in the past 5 years?

YES NO

If the answer is “Yes,” please explain.________________________________________________________________________________________________________________________________________________

H. Does your firm have a Small Business/Underutilized Business Outreach Program?

YES NO

If “Yes,” please include a summary of your efforts (up to one [1] page).

12. QUALITY CONTROL/QUALITY ASSURANCE PROGRAM (QC/QA)

A. Does your firm have a written quality control/quality assurance program?

YES NO

B. Will your firm have personnel permanently assigned and dedicated to QC/QA on this project?

General Contractor Page 20 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 21: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

YES NO

C. If “Yes,” state the names of all such personnel who will be assigned and individually list their specific duties:

Name, Title Specific Duties___________________________________ ______________________________________________________________________ ______________________________________________________________________ ___________________________________

D. Provide brief description of your Quality Control/Quality Assurance Program:______________________________________________________________________________________________________________________________________________

E. Describe how your Program will be applied to this project:______________________________________________________________________________________________________________________________________________

13. BUSINESS CONSTRUCTION REVENUE

For the purposes of this prequalification questionnaire, "business construction revenue" shall be defined as payments to prospective Contractor for construction services as a General Contractor.

A. Can you truthfully state that your firm has had an annual business construction revenue of at least $1,500,000 (excluding any and all legal awards) for each and every one of the last five (5) consecutive years?

YES NO

B. If the entity submitting this prequalification questionnaire is a Joint Venture, can the Joint Venture entity truthfully state that each member of the Joint Venture has had an annual business construction revenue of at least $1,500,000 (excluding any and all legal awards) for each and every one of the last five (5) consecutive years?

YES NO N/A

C. Can you provide audited financial statements (if requested) for the last ten (10) years?

YES NO

DO NOT INCLUDE FINANCIAL STATEMENTS WITH THIS PREQUALIFICATION QUESTIONNAIRE.

General Contractor Page 21 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 22: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

D. List average yearly volume of work for each of the past 5 years (revenue and amount of reinvestment income).

YEAR REVENUE/VOLUME REINVESTED INCOME______________ __________________________ ______________________________________ __________________________ ______________________________________ __________________________ ______________________________________ __________________________ ______________________________________ __________________________ ______________________________________ __________________________ ________________________

E. List value of work currently on backlog, with percent complete, as appropriate.

WORK VALUE COMPLETE____________________________________ ____________ ________________________________________________ ____________ ________________________________________________ ____________ ________________________________________________ ____________ ________________________________________________ ____________ ________________________________________________ ____________ ____________

14. NOT USED

15. NOT USED

16. DISCIPLINARY MEASURES HISTORY

A. Can you truthfully state that your firm has not been disqualified or barred from doing business with a public agency (e.g., federal, state, county, city, University of California System, California State University System, etc.) within the last fifteen (15) years?

YES NO

1. If the entity submitting this prequalification questionnaire is a Joint Venture, can the Joint Venture entity truthfully state that no member of the Joint Venture has been disqualified or barred from doing business with a public agency (e.g., federal, state, county, city, University of California System, California State University System, etc.) within the last fifteen (15) years?

YES NO N/A

General Contractor Page 22 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)

Page 23: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/W9938679 P4S-815 …  · Web view(Where a time period is given, such as the last ten [10] years, the period is to be

W.M. KECK BUILDING MRI INSTALLATION PROJECT NO. W9938679/P4S-815UNIVERSITY OF CALIFORNIA, SAN DIEGO

17. MISCELLANEOUS REQUIREMENTS

A. Has your Firm ever refused to perform change order or warranty work requested by an Owner?

YES NO

If the answer is “Yes,” please explain.________________________________________________________________________________________________________________________________________________

B. What is your Firm’s procedure for answering an Owner’s request to perform warranty work? Please describe:________________________________________________________________________________________________________________________________________________

C. Describe your firm's claim-avoidance strategy and/or philosophy:________________________________________________________________________________________________________________________________________________

General Contractor Page 23 of 23 Prequalification QuestionnaireGC P/Q Quest(UCSD Rev. 07/2014)