From To K.Sasidhar, The Dy.Executive Engineer, Assistant Engineer, Public Health Sub- Division, Public Health Section, Bhimavaram. Tanuku. Lr.No . / PKL /MPLADS, /Dt. -08-.2014. Sir, Sub :- Incompletion of Construction of Community hall Building for fishermen in Palacole Municipality under MPLADS 2009-10 grant of Sri.Kanumuri.Bapi Raju,Hon’ble M.P(L.S),Narsapuram.Submission of report – Regarding. Ref :- 1. D.E.R (PH) Elr No.24/2009-10 Dt.16-02-2010.For Rs.2, 80,000.00 2. Proceedings .No.372/ DySO/KBR/MPLADS/2009 Dt.12-01-2010 of District Collector west Godavari, Eluru. --o0o-- With reference to the above cited, it is to submit that Construction of Community hall Building for fishermen in Palacole Municipality under MPLADS 2009-10 grant of Sri.Kanumuri.Bapi Raju,Hon’ble M.P(L.S),Narsapuram (Est Cost:Rs.3,00,000.00) was carried out by the Contractor Sri.K.srinivas,Palacole.The contractor has stopped further construction work after raising all columns upto slab level. The frame work will be completed only after casting of roof beams and slab concrete.

Letter on fishermen community hall in palacole on 16-12-2013.doc

Embed Size (px)

Citation preview

FromTo

K.Sasidhar,The Dy.Executive Engineer,

Assistant Engineer,Public Health Sub-Division,

Public Health Section,Bhimavaram.Tanuku.

Lr.No . / PKL /MPLADS, /Dt. -08-.2014.

Sir, Sub:- Incompletion of Construction of Community hall Building for fishermen in Palacole Municipality under MPLADS 2009-10 grant of Sri.Kanumuri.Bapi Raju,Honble M.P(L.S),Narsapuram.Submission of report Regarding.Ref:- 1. D.E.R (PH) Elr No.24/2009-10 Dt.16-02-2010.For Rs.2, 80,000.00 2. Proceedings .No.372/ DySO/KBR/MPLADS/2009 Dt.12-01-2010 of District Collector west Godavari, Eluru. --o0o--

With reference to the above cited, it is to submit that Construction of Community hall Building for fishermen in Palacole Municipality under MPLADS 2009-10 grant of Sri.Kanumuri.Bapi Raju,Honble M.P(L.S),Narsapuram (Est Cost:Rs.3,00,000.00) was carried out by the Contractor Sri.K.srinivas,Palacole.The contractor has stopped further construction work after raising all columns upto slab level. The frame work will be completed only after casting of roof beams and slab concrete.

This is submitted for favor of information and further necessary action.

Yours faithfully,

Assistant Engineer (PH),

.