41
Letter of Intent/Part I: Agency Administrative Review Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1

Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Letter of Intent/Part I:Agency Administrative ReviewTechnical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE

1

Page 2: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

AgendaIntroduction

LOI/Part I Process Review

Submittal Sample

Exhibits Review

Attachments Review

One – on – One Technical Assistance

Questions

2

Page 3: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

IntroductionsNAME, TITLE, AGENCY

3

Page 4: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

LOI/Part I Process ReviewT EC H N I CA L R EQ U I R EM EN T S

D O C U M E N T P R ES E N TAT I O N R EQ U I R EM EN T S

P O I N T R E D U C T I O N S

R EA L LO CAT I O N O F U N S P E N T F U N D S

E VA LUAT I O N O F A P P L I C AT I O N CO M P O N E N T S

4

Page 5: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Technical RequirementsPaper Submittal

◦ Original and Copy, both clearly labeled

◦ Dividers between each exhibit, attachment, and required documents.

◦ Diver must be labeled.

◦ Reference Submittal Sample

USB Submittal◦ Each Exhibit, Attachment, and Required

Documents must be its own file.

5

Page 6: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

USB Submittal Sample

6

Page 7: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Document Presentation Requirements1. Clearly identify which version is the original and which is the copy on the cover page of the

submittal.

2. Tab Dividers will be clearly labeled between each exhibit and attachment.

3. All sections will be numbered separately within tab dividers, in accordance with the Supporting Documents Checklist.

4. Most recent documentation is submitted for each Exhibit and Attachment.

5. Complete all attachments and exhibits per LOI requirements. Do not leave any blank responses without an explanation (e.g., if the question is not applicable, indicate N/A).

6. All documents with a signature block must be signed by the authorized officer(s).

7. All supporting documents must be included in the submission.

8. All supporting documents must be legible.

9. Double-sided.

10. Timely submittal.

7

Page 8: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Point ReductionsIn the event that the LOI/ Part I submittal does not meet the Technical Requirements and/or Document Presentation Requirements, the overall score of the Agency Administrative Review will be negatively impacted.

The following is a list of the possible reductions an Agency may receive in their overall submittal of LOI/Part I.

•3 point reduction for late applications.

•3 point reduction for not meeting the Technical and Document Presentation Requirements for original and copy submittal.

•3 point reduction for not meeting the Technical and Document Presentation Requirements for electronic copy on USB flash drive.

•3 point reduction for each incomplete or missing exhibit and/or attachment.

8

Page 9: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

ReallocationReallocation is a process allowed by HUD that allows CoC to improve its effectiveness by strategically aligning limited funding. The Commission to End Homelessness (C2eH) Executive Committee approved the following Reallocation Policy recommendations on Friday, April 22, 2016:

1. Reallocation from Agency Administrative Review – Projects not able to proceed to LOI/Part II

2. Reallocation of Unspent Funds (review of 3 years of funding/expenditures with 10% or more unexpended)

3. Reallocation of low performing projects – Permanent Supportive Housing (PSH), Rapid Rehousing (RRH), and Transitional Housing (TH)

9

Page 10: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Evaluation of Application ComponentsEach project will be rated and ranked per the C2eH approved policy, HUD requirements, and guidelines from the 2016 HUD NOFA .

The following application components will be utilized in this scoring process:

1. Board of Director’s Roster and Resolution (Exhibit 1: Attachment 2)

2. HUD Monitoring letters (Exhibit 1: Attachment 6)

3. Project Performance Review (Exhibit 4)

4. Participation in Local Continuum of Care

5. Leverage & Match (LOI/Part II)

6. Agency Fiscal Audits (Exhibit 3: Attachment 8)

7. Housing First Model Assessment (Exhibit 5)

8. Other HUD requirements, as required by 2016 HUD CoC NOFA

10

Page 11: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Submittal Sample

11

Page 12: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Exhibits Review

12

Page 13: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Exhibit 1: Lead Agency Information FormNumber of Projects

◦ Equivalent to the number of Project applications (e-SNAPs) submitted during 2015 HUD NOFA Cycle.

◦ Equivalent to the number of Project Information Charts to be completed

Total grant Amount for all Project Renewals◦ Equivalent to the grant amounts for all Project

applications (e-SNAPs) submitted during 2015 HUD NOFA Cycle.◦ Example:

Grant A $ 5

Grant B $ 6

Total $ 11

HMIS Agency Contact Person ◦ Person from your agency

◦ Not Rosa Durham or any 2-1-1 Orange County Staff

◦ Should be your Agency Administrator Information

13

Page 14: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Exhibit 1: Lead Agency Information Form

Project Information Chart must be completed for each CoC project for which a Project application (e-SNAPs) submitted during 2015 HUD NOFA Cycle. Duplicate Project Information Chart as needed (copy and paste).

• Grant Name of Project and Grant Amount: Same as e-SNAP application

• Program Type: PSH, RRH, TH

• Primary Population Served/Population Preference: Same as e-SNAP application - 3b. Project Description, Question 3 and 3a.

14

Page 15: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Exhibit 1: Lead Agency Information Form

There may be duplicate signatures ◦ Example: Person authorized to sign the HUD

application is also the Executive Director of the agency.

Page with signatures should be last page of Exhibit 1.

15

Page 16: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Exhibit 2: Terms and Conditions

There may be duplicate signatures ◦ Example: Person authorized to sign the HUD

application is also the Executive Director of the agency.

16

Page 17: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Exhibit 3: Financial Assessment

17

Page 18: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Exhibit 3: Financial Assessment If No, no further action is required

If Yes, the chart must be completed for each CoC project in which funds were returned in the last 3 years.

◦ Example, if you returned funds in 2012 but not 2013 or 2014 the appropriate answer to select is Yes.

Duplicate charts as needed (copy and paste).

18

Page 19: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Exhibit 4: Project Performance Review Acknowledgement

There may be duplicate signatures ◦ Example: Person authorized to sign the

HUD application is also the Executive Director of the agency.

19

Page 20: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Exhibit 5: Housing First Model Assessment

Complete the chart for each CoC Project.

The same number of charts that are completed for Exhibit 1 should be completed for Exhibit 5.

These questions are a combination of questions from e-SNAPS from the 2015 CoC NOFA and other CoC in the country.

20

Page 21: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Exhibit 5: Housing First Model Assessment

There may be duplicate signatures ◦ Example: Person authorized to sign the

HUD application is also the Executive Director of the agency.

21

Page 22: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Exhibit 6: Letter of Intent to Participate in Request for Proposal for New Projects

If No, the following four questions may be left blank.

If Yes, please answer the following four questions.

Regardless of your answer to the first question, ensure that the signatures on the back are complete.

22

Page 23: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Exhibit 6: Letter of Intent to Participate in Request for Proposal for New Projects

There may be duplicate signatures ◦ Example: Person authorized to sign the

HUD application is also the Executive Director of the agency.

23

Page 24: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Attachments Review

22

Page 25: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Attachment 1: Organizational ChartShould include:◦ Board of Directors (in relation to the

organization)

◦ Titles and Names of staff employed by the agency

25

Page 26: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Attachment 2:Board of Director’s Roster and ResolutionRoster to include:◦ Name

◦ Position on the Board

◦ Note changes in key members

◦ Include and identify currently homeless or previously homeless individual per HEARTH Act requirement

Resolution must provide authorization to apply for and receive funding from your Board.

26

Page 27: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Attachment 3: State Certificate of Status

27

Page 28: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Attachment 4: Organization’s Code of ConductCode of Conduct should include HUD required information.

If Code of Conduct has been submitted to HUD prior to November 23, 2015

provide page number of the California look-up listing document

If no Code of Conduct has been submitted to HUD or if the name of the organization or authorized official has changed

include Code of Conduct as Attachment 4

28

Page 29: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Attachment 5: 501 (c)3 Certification

29

Page 30: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Attachment 6: HUD Monitoring Letter and Close Out Letter

Monitoring Letter lists out of compliance findings.

Close Out Letters list that out of compliance findings have been resolved.

30

Page 31: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Attachment 7: A-133 auditApplicable if◦ Agency receives more than $750,000 in federal funding during a fiscal year

If not applicable◦ Still include a tab in the binder labeled Attachment 7 with a note stating “Not Applicable.”

31

Page 32: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Attachment 8: Agency Financial Audits by Certified CPA

Exhibit 3 contains the information listed above. If there are no concerns in the financial audits, there is no need to write an explanation.

32

Page 33: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Attachment 9: LOCCS screenshots for current Grant (per CoC Project)Include screenshot of Grant Portfolio General Grant Information

◦ Include screenshot for each CoC project for current grant year

33

Page 34: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Attachment 9: LOCCS screenshots for current Grant (per CoC Project)

For assistance reference the eLOCCS Getting Started Guide, Section 4.0 eLOCCSScreens

◦ https://portal.hud.gov/hudportal/documents/huddoc?id=eloccsguide.pdf

If eLOCCS does not display the last three years then submit for the years available and indicate what years you were unable to submit.

eLOCCS is not accessible after 5:00pm PST.

34

Page 35: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Attachment 10: Close- Out letters from HUD for (3) grants (per CoC Project)

35

Page 36: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Attachment 11: Documents supporting Housing First ModelAgency must demonstrate a commitment to the Housing First Model and projects implement a Housing First Model. Please submit the following documents to demonstrate whether your program adheres to a Housing First Model: ◦ Program Rules

◦ Service Plans

◦ Applicable Documents

36

Page 37: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

One – on – One Technical AssistanceLOI/PART I DRAFT SUBMITTAL REVIEWS

37

Page 38: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

One – on – One Technical AssistanceCall or email Zulima Pelayo to make an appointment

[email protected]

◦ 714-589-2358

Appointments will not exceed 30 minutes.

Appointments are available on the following dates/time*:◦ Tuesday, May 3rd from 11:00am to 2:00pm

◦ Wednesday, May 4th from 8:00am to 11:00am

◦ Thursday, May 5th from 12:00pm to 3:00pm

*If all appointment slots are filled, we will schedule additional appointments outside of these timeframes.

One – on – One Technical Assistance does not guarantee invitation to participate in LOI/ Part II.

It is the agency’s sole responsibility to submit a complete and accurate LOI/Part I in accordance with the guidelines

38

Page 39: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Deadline for LOI/Part IDeadline: Monday, May 9, 2016 by 3:00 pm Pacific Standard Time (PST)

Grace Period: Monday, May 9, 2016 from 3:00pm to 4:00pm PST

Late with Penalty: Monday, May 9, 2016 after 4:00pm PST

Hand delivered to 2-1-1 Orange CountyAttention: Zulima Pelayo1505 E. 17th Street, Suite 108Santa Ana, Ca 92705

LOI/Part I will not be accepted after the end of business day on Monday, May 9, 2016. 211OC’s hour of operation are 8:00am to 5:00pm

39

Page 40: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

More InformationEmail or call Zulima Pelayo◦ [email protected]◦ 714-589-2358

HUD Exchange:◦ https://www.hudexchange.info/

Specific questions regarding your HUD grant amount, HUD guidelines, etc. should be directed to your local HUD field office representative.

Do not contact the HUD office regarding Orange County’s local application deadlines or process.

40

Page 41: Letter of Intent/Part I Technical Assistance Workshop...Technical Assistance Workshop 2016 CONTINUUM OF CARE FUNDING CYCLE 1. Agenda Introduction LOI/Part I Process Review ... Leverage

Questions

41