S.NO. DATE 1 6th Aug, 2015 2 10th Aug, 2015 3 12TH Aug,2015 4 10th Aug, 2015 5 18th Aug, 2015 6 18th Aug, 2015 7 25th Aug, 2015 8 27th Aug, 2015

LETTER NO

Embed Size (px)

DESCRIPTION

letter no

Citation preview

Page 1: LETTER NO

TRANSMITTALS.NO. DATE

1 6th Aug, 20152 10th Aug, 20153 12TH Aug,20154 10th Aug, 20155 18th Aug, 20156 18th Aug, 20157 25th Aug, 20158 27th Aug, 2015

Page 2: LETTER NO

TRANSMITTALSUBJECT DOCUMENT NO

Submission of stressing report UB-P1 NAWRAS/036/2014-15Submission of stressing report UB-P2 NAWRAS/037/2014-15

DESIGN ELONGATION GROUND FLOOR 38Submission of stressing report UB-P2 39Submission of stressing report UB-P3 40Submission of stressing report UB-P3 41

Submission of stressing report GF-P6&P7 42Letter for PT Beam Availabe Anchor 43

`