AECOM Asia Company Ltd. In Associat ion with AECOM India Private Ltd., BCL Associates& STERLING Indo Tech Consultants (P) Ltd. Head Office:3 rd Floor, Building no-8, Tower-A, DLF Cyber City, DLF Phase 2, Gurgaon-122002; T: +91 124 4871400; Email: [email protected]; [email protected]; Resident Engineer Office: 2 nd Floor, Chakarpur Road, Near Dr. Pandey Kothi, Bazpur -262401 Udham Singh Nagar, U.K, T; +91 5949 281124; Email: [email protected] CSC2/RE/C-1/CON/2015/163 June 08, 2015 The Project Manager ZEL-CDS (JV) Plot No. 517 First Floor – 9 Industrial Area Mohali - 160062 Kind Attention:-Mr. Chandan Kumar Email:[email protected] Sub: - Improvement and Strengthening of Roads under Package No C 1 in Udham Singh Nagar District of Uttarakhand Cleaning of WMM Top surface before Priming. Sir, During the site visit of Bajpur - Beriadaulat Motor Road, it was noticed that the WMM Top surface prepared by the Contractor for receiving Prime Coat is not in accordance to clause no 501.8 of MORT&H. Photographs depicting the same are enclosed. Main reasons behind this are:- 1. Engagement of only 5 labours for cleaning and Page 1 of 3

letter 164.doc

Embed Size (px)

Citation preview

AECOM Asia Company Ltd.In Association withAECOM India Private Ltd.,

BCL Associates&STERLING Indo Tech

Consultants (P) Ltd.

Head Office:3rd Floor, Building no-8, Tower-A, DLF Cyber City, DLF Phase 2, Gurgaon-122002; T: +91 124 4871400; Email: [email protected]; [email protected]; Resident Engineer Office: 2nd Floor, Chakarpur Road, Near Dr. Pandey Kothi, Bazpur -262401 Udham Singh Nagar, U.K, T; +91 5949 281124; Email: [email protected]

CSC2/RE/C-1/CON/2015/163

June 08, 2015The Project Manager

ZEL-CDS (JV)

Plot No. 517

First Floor 9

Industrial Area

Mohali - 160062

Kind Attention:-Mr. Chandan Kumar

Email:[email protected]

Sub: - Improvement and Strengthening of Roads under Package No C 1 in Udham Singh Nagar District of Uttarakhand Cleaning of WMM Top surface before Priming.Sir, During the site visit of Bajpur - Beriadaulat Motor Road, it was noticed that the WMM Top surface prepared by the Contractor for receiving Prime Coat is not in accordance to clause no 501.8 of MORT&H. Photographs depicting the same are enclosed.Main reasons behind this are:-1. Engagement of only 5 labours for cleaning and

2. Un-availability of broomer.Although on several occasions, CSC pursuant to clause no 502.4.1 of MORT&H requested the Contractor to carefully swept clean of dust and loose particles without disturbing the interlocked aggregates.CSC once again reiterates to make proper arrangement for cleaning the surface of WMM top before priming so that under stated objectives of application of prime coat are met with:-a. Capillary voids in the base course are plugged.

b. Loose particles if any on the base course are bonded.

c. Surface of the base course is sealed and becomes water resistant.

d. Base course becomes hard and tough.

e. Proper adhesion between base course and bituminous coat in conjunction with tack coat is achieved.

Please be guided accordingly and submit the method statement of bituminous works. Refer clause no 114.1 page 182 and 115.1 page no 217 of technical specification.Thank You

Yours Truly

Manoj Tiwari

Resident Engineer

Package 1

Bajpur Udham Singh Nagar (UK)

Enclosure:-As stated above. Copy to:-

1.) Superintending Engineer PWD (ADB) Pithoragarh.2.) Executive Engineer, (In charge PIU), Udham Singh Nagar. 3.) Engineer CSC 2 Gurgaon 4.) Team Leader CSC 2 Almora.4.) Office Copy.