Lessons Learnt and Experience Sharing

BY

FIDA HUSSAIN

(DIRECTOR ENGINEERING)

WASA, GDA, GUJRANWALA

PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT

Page 3: Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT

Contents

• Schemes of F.Y 2013-014• Implementation of ESMF 2013014• Lesson Learnt and Experience Sharing

Page 4: Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT

4ESMF

SUMMARY OF FY 2013-14

 Total ADP Schemes

 

 Total EEP’s

Schemes

 Application

of ESMF

Categorization of Schemes  

30 % of schemes

Target Achieved

(%)E-2 for EEPsschemes

E-3 for EEPs

schemes

E-3 for ADP

schemes

10 19 19 06 13 Nil 08 66%

Page 5: Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT

5

NO NAME OF SCHEME EXPENDITU

RE STATUS

1Repair and general overhauling of 5 sludge pumps (10 cusec) discharges each zone III

8.393 Completed

2Repair of general overhauling of 15 cusec pump at Khiali disposal station zone II

2.151 Completed

3Replacement of delivery pipes and other works at disposal stations Alam Chowk, no. 1 garjakh, mughal pura and liaqat chowk lift station zone iii 3.554 Completed

4Repair/const. Of additional manhole chambers and gully grating at papular nursery, amir park, shaheen abad g.T road, civil line, wahdat colony, peoples colony, arfat colony and farid town in zone I

1.443 Completed

5Replacement of sewer lines and construction of additional manholes at katcha khiali road, takia masoom shah, gala mehar bagoo wala, mehar noor wala, darbar qadria and allied areas zone II

1.910 Completed

6Replacement of old sewer lines in dhullay, shaheenabad and gurunanak pura i/c of const. Of additional manholes in zone III 4.596 Completed

7Desilting of sewer lines with winching machine along jinnah road from d.C road under pass to purani abadi jagna 2.988

Completed

SCHEMES OF FY 2013-14

Page 6: Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT

6

NO NAME OF SCHEME TOTAL EXPENDITURE STATUS

8Mechanical desilting of sewer lines through winching machine at bajwa road, hafizabad road and paru road 2.785 Completed

9Mechanical desilting of sewer lines through winching machine at hafizabadroad and gondalanwala road 2.465 Completed

10 Repair of utility vehicles 4.858 Completed

11Restoration of water supply network street no. 32 "y" block peoples colony and repair of 21 nos. Water works zone I 5.201 Completed

12Restoration of water supply network and renovation of 22 nos. Water works zone II 3.975 Completed

13Restoration of water supply network along g.T road small state no. 1 and renovation of 19 nos. Water works zone III 5.297 Completed

14 Repair of generators 2.193 Completed

SCHEMES OF FY 2013-14

Page 7: Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT

7

NO NAME OF SCHEME TOTAL EXPENDITURE STATUS

15

Rehabilitation of drain along G.T Road Easternside and dc road zone I

2.381 Completed

16

Rehabilitation of drain along western bypass from Alam Chowk to awan chowk and g.T road zone II 6.232  Completed

17

Rehabilitation of strom water drainage from general bus stand to 30ft bazar shaheen abad zone III 2.898 Completed

18 Manhole covers and frames 7.000 Completed

19 Articles for sewerage & water supply 8.700 Completed

SCHEMES OF FY 2013-14

Page 8: Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT

ESMF An Environmental & Social Management Framework

(ESMF) is prepared under PCGIP to ensure the

development schemes implemented by the

CDGs/WASA/City entities to be environmentally and

socially sustainable.

Page 9: Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT

APPLICATION OF ESMF

Environmental and Social Screening of PCGIP and ADP Schemes was carried out.

Environment and Social Management Plans: Prepared Environmental and Social Management

Plans (ESMPs) E-2 category Schemes EPA, Punjab accorded approvals of these ESMPs ESMP cost was included in cost estimates,

Procurement plan and Bidding Documents

Page 10: Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT

Environmental and Social Monitoring: ESMF Committee conducted environmental and social

monitoring of E-2 schemes Site visits, photographic records, public consultation

at each step, Lab analysis and development of monitoring report)

Page 11: Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT

SOME PICS DURING SURVEY MONITORING

Page 12: Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT
Page 13: Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT
Page 14: Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT
Page 15: Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT
Page 16: Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT
Page 17: Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT
Page 18: Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT
Page 19: Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT

Third Party Validation

For an independent assessment of the ESMF implementation, was held in Gujranwala on 3-5 July 2014. TPV team visited following 06 schemes of WASA-G.

1.  Restoration of water supply Network along G.T Road Small State No 1 and Renovation of 19 Nos water works Zone-III.

 2. Replacement of sewer lines and Construction of Additional Manholes at Katcha Khiali Road, Takia Masoom Shah, Gala Mehr Bagoo wala, Mehr Noor wala, Darbar Qadria and allied areas Zone-II.

 3. Replacement of old sewer lines in Dhullay, Shahenabad and Gurunanak Pura i/c of Construction of Additional Manholes in Zone-lll

 4. Restoration of water supply Network Street No. 32 "Y" Block Peoples Colony and Repair of 21 Nos water works Zone-I.

 5 Restoration of water supply Network and Renovation of 22 Nos Water Works Zone-II.

 6. Repair / Construction of Additional Manhole Chambers and Gully grating at Popular Nursery, Amir Park, Shaheen Abad G.T Road, Civil Line, Wahdat Colony, Peoples Colony, Arfat Colony and Farid Town in Zone-l

Page 20: Lessons Learnt and Experience Sharing BY FIDA HUSSAIN (DIRECTOR ENGINEERING) WASA, GDA, GUJRANWALA 2 PUNJAB CITIES GOVERNANCE IMPROVEMENT PROJECT

Lesson Learnt and Experience Sharing

Environmental and social Survey of M&R and ADP schemes by ESMF Committee which was not carried out before ESMF

Environmental and social monitoring of schemes by ESMF Committee during execution, which was not done before PCGIP

Public consultation before, during and after execution schemes

GRM and complaints Management System

Awareness about Punjab Environmental Protection Act 1997 (Amended 2012), Environmental Impact assessment and (EIA) and Initial Environmental Examination due to Workshops and training sessions organized by the Urban

WASA, Gujranwala conducted Environmental Assessment of JICA funded project "Up-Grading Mechanical System for Sewerage and Drainage Services in Gujranwala with the support of The Urban Unit and cases has been submitted with EPA, Punjab.

Environmental Impact Assessment of 04 ADP schemes is in progress

To resolve Gender issues raised during public consultation, there is need of Female staff