TFMA Fall 2012 Wesley Young, P.E., CFM CPY Jeff Wouters, P.E. CPY Leon Creek WRC Interconnect Aerial Crossing Impact Analysis September 20, 2012

Leon Creek WRC Interconnect Aerial Crossing Impact Analysis€¦ · TFMA Fall 2012 Wesley Young, P.E., CFM CPY Jeff Wouters, P.E. CPY Leon Creek WRC Interconnect Aerial Crossing Impact

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Leon Creek WRC Interconnect Aerial Crossing Impact Analysis€¦ · TFMA Fall 2012 Wesley Young, P.E., CFM CPY Jeff Wouters, P.E. CPY Leon Creek WRC Interconnect Aerial Crossing Impact

TFMA Fall 2012

Wesley Young, P.E., CFM CPY

Jeff Wouters, P.E. CPY

Leon Creek WRCInterconnect

Aerial CrossingImpact Analysis

September 20, 2012

Page 2: Leon Creek WRC Interconnect Aerial Crossing Impact Analysis€¦ · TFMA Fall 2012 Wesley Young, P.E., CFM CPY Jeff Wouters, P.E. CPY Leon Creek WRC Interconnect Aerial Crossing Impact

September 20, 2012

Leon Creek WRC Interconnect Impact AnalysisLeon Creek WRC Interconnect Impact Analysis

Agenda

• Project purpose and overview

• Hydraulic Results

• Impact Analysis

• Conclusions

Page 3: Leon Creek WRC Interconnect Aerial Crossing Impact Analysis€¦ · TFMA Fall 2012 Wesley Young, P.E., CFM CPY Jeff Wouters, P.E. CPY Leon Creek WRC Interconnect Aerial Crossing Impact

September 20, 2012

Leon Creek WRC Interconnect Impact AnalysisLeon Creek WRC Interconnect Impact Analysis

Project Purpose

• Divert flows from SAWS’ Leon CreekWater Recycling Center (WRC) to SAWS’Dos Rios WRC via the Southwest BexarSewer Pipeline

• Eliminate a sewage lift station currentlyserving Texas A&M-San Antonio

Page 4: Leon Creek WRC Interconnect Aerial Crossing Impact Analysis€¦ · TFMA Fall 2012 Wesley Young, P.E., CFM CPY Jeff Wouters, P.E. CPY Leon Creek WRC Interconnect Aerial Crossing Impact

September 20, 2012

Leon Creek WRC Interconnect Impact AnalysisLeon Creek WRC Interconnect Impact Analysis

Project OverviewLIFT

STATION

Page 5: Leon Creek WRC Interconnect Aerial Crossing Impact Analysis€¦ · TFMA Fall 2012 Wesley Young, P.E., CFM CPY Jeff Wouters, P.E. CPY Leon Creek WRC Interconnect Aerial Crossing Impact

September 20, 2012

Leon Creek WRC Interconnect Impact AnalysisLeon Creek WRC Interconnect Impact Analysis

Project Benefits

• Eliminates the need for a costly expansionof the Leon Creek WRC

• Elimination of lift station reduces potentialfor odors near Texas A&M-San Antonio

• Accommodates future flows from theTexas A&M and Verano developments

Page 6: Leon Creek WRC Interconnect Aerial Crossing Impact Analysis€¦ · TFMA Fall 2012 Wesley Young, P.E., CFM CPY Jeff Wouters, P.E. CPY Leon Creek WRC Interconnect Aerial Crossing Impact

September 20, 2012

Leon Creek WRC Interconnect Impact AnalysisLeon Creek WRC Interconnect Impact Analysis

Proposed Pipeline Alignment

Location Map

LEGEND

Leon Creek WRCInterconnect to the SBSP

Southwest Bexar SewerPipeline

Leon Creek WRC

Texas A&M

Verano

Lift Station

Cook Memorial Trusts

Toyota Manufacturing

City of SanAntonio

Page 7: Leon Creek WRC Interconnect Aerial Crossing Impact Analysis€¦ · TFMA Fall 2012 Wesley Young, P.E., CFM CPY Jeff Wouters, P.E. CPY Leon Creek WRC Interconnect Aerial Crossing Impact

September 20, 2012

Leon Creek WRC Interconnect Impact AnalysisLeon Creek WRC Interconnect Impact Analysis

Siphon Crossing Disadvantages

• Odor from septic conditions during periodsof no-flow and low-flow

• Hydrogen sulfide gas creating a morecorrosive environment inside the structure

• Solids settlement within the siphon

• Excavation or boring required

Page 8: Leon Creek WRC Interconnect Aerial Crossing Impact Analysis€¦ · TFMA Fall 2012 Wesley Young, P.E., CFM CPY Jeff Wouters, P.E. CPY Leon Creek WRC Interconnect Aerial Crossing Impact

September 20, 2012

Leon Creek WRC Interconnect Impact AnalysisLeon Creek WRC Interconnect Impact Analysis

Diversion Solution with AerialCrossing

• Simplified configuration

• Reduced structural improvements

• Minimal mechanical requirements

• No additional bar screens

• Grit removal not required

• Reduced capital and O&M costs

Page 9: Leon Creek WRC Interconnect Aerial Crossing Impact Analysis€¦ · TFMA Fall 2012 Wesley Young, P.E., CFM CPY Jeff Wouters, P.E. CPY Leon Creek WRC Interconnect Aerial Crossing Impact

September 20, 2012

Leon Creek WRC Interconnect Impact AnalysisLeon Creek WRC Interconnect Impact Analysis

Design Mitigation Actions

• 72-inch diameter steel carrier pipe that is ¾-inch thick

• 60-inch glass fiber reinforced plastic (FRP) wastewaterpipeline

• Annular space between steel carrier pipe and FRP pipefilled with high density polyurethane foam grout todistribute impact forces

• Concrete footings set 15-ft deep on 60-inch drilled shaftsubstructures into clay stone

• Each footing will be supported by a 24-inch concretecradle to hold the carrier pipe

Page 10: Leon Creek WRC Interconnect Aerial Crossing Impact Analysis€¦ · TFMA Fall 2012 Wesley Young, P.E., CFM CPY Jeff Wouters, P.E. CPY Leon Creek WRC Interconnect Aerial Crossing Impact

September 20, 2012

Leon Creek WRC Interconnect Impact AnalysisLeon Creek WRC Interconnect Impact Analysis

Page 11: Leon Creek WRC Interconnect Aerial Crossing Impact Analysis€¦ · TFMA Fall 2012 Wesley Young, P.E., CFM CPY Jeff Wouters, P.E. CPY Leon Creek WRC Interconnect Aerial Crossing Impact

September 20, 2012

Leon Creek WRC Interconnect Impact AnalysisLeon Creek WRC Interconnect Impact Analysis

Pipeline Crossing Hydraulics

0 100 200 300 400 500500

505

510

515

520

525

530

535

540

LeonComancheCreek20110929 Plan: AerialCrossWGradenew 12/1/2011RS = 3870 BR

Station (ft)

Ele

vation

(ft)

Legend

WS 100Future

Ground

BankSta

.1 .05 .065 .1

Page 12: Leon Creek WRC Interconnect Aerial Crossing Impact Analysis€¦ · TFMA Fall 2012 Wesley Young, P.E., CFM CPY Jeff Wouters, P.E. CPY Leon Creek WRC Interconnect Aerial Crossing Impact

September 20, 2012

Leon Creek WRC Interconnect Impact AnalysisLeon Creek WRC Interconnect Impact Analysis

Hydraulic Study Results

• Pipeline modeled as a bridge deck

• 100-Year Flood WSELs Impinge on the Carrier Pipe

• Increases in WSELs mitigated by channel shaping at thecrossing

• Pipeline is approximately 1000-ft downstream ofMauermann Road

• Big Question – What if an SUV washed off Mauermann?

Page 13: Leon Creek WRC Interconnect Aerial Crossing Impact Analysis€¦ · TFMA Fall 2012 Wesley Young, P.E., CFM CPY Jeff Wouters, P.E. CPY Leon Creek WRC Interconnect Aerial Crossing Impact

September 20, 2012

Leon Creek WRC Interconnect Impact AnalysisLeon Creek WRC Interconnect Impact Analysis

steelcasing pipe

FRPcarrier pipe

drilledshaft

concretecradle

concretepier cap

Aerial Crossing

concreteheadwall

Page 14: Leon Creek WRC Interconnect Aerial Crossing Impact Analysis€¦ · TFMA Fall 2012 Wesley Young, P.E., CFM CPY Jeff Wouters, P.E. CPY Leon Creek WRC Interconnect Aerial Crossing Impact

September 20, 2012

Leon Creek WRC Interconnect Impact AnalysisLeon Creek WRC Interconnect Impact Analysis

72” steelcasing pipe

Typical Cross Section At Spacers

intermittentspacers

polyurethanegrout

60” FRPcarrier pipe