KEYNSHAM RIVERSIDE REDEVELOPMENT LEISURE CENTRE CONSULTATION 2015 Summary of Consultation carried out in September 2015: • Good attendance •4 possible sites presented for public comment •Over 70% supported Riverside as preferred site •Ashton Way only achieved 6% support •Main concerns about the initial designs were: •Loss of Sports Hall •Loss of Squash Courts •Loss of spectator seating to main pool •Wanted the facility to have a central location Current Developed Leisure Centre Strategy June/July 2016: •The new strategy is to refurbish and extend the existing Riverside Leisure Centre •This will maintain existing facilities including the Sports Hall, Squash Courts and Pool Spectator Seating Area •It is also proposed to improve the existing centre by providing the following new facilities: • Fitness Suite • Fitness Studios • 10x13m Learner Pool •Soft Play area Temple Street Loading bay Bus stop relocated from Civic Centre Retail Old Snooker Club will be Refurbished to Expand Leisure Centre Facilities New Undercroft Bike stands New on-street disabled parking bays Loading bay Existing Multi Storey Car Park Potential link to park via new staircase Plant Room Plant Room Option 1: Ashton Way Option 3: Hawkswell Option 2: Riverside Option 4: St Keyna Parking zones Pedestrian movement Vehicle movement Old Fire Station Site Civic Centre Site Entrance lobby to upper floors Entrance lobby to upper floors

Leisure centre consu Ltation 2015 - Bathnes · 1 : 200 A Proposed Level -2 2015.01047.000 Keynsham Riverside BATH & NORTH EAST SOMERSET COUNCIL CC 16.05.16 AHR-AR-B01-20-098 AS Information

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Leisure centre consu Ltation 2015 - Bathnes · 1 : 200 A Proposed Level -2 2015.01047.000 Keynsham Riverside BATH & NORTH EAST SOMERSET COUNCIL CC 16.05.16 AHR-AR-B01-20-098 AS Information

KEYNSHAM RIVERSIDE REDEVELOPMENTLeisure centre consuLtation 2015

summary of consultation carried out in september 2015:•Goodattendance

•4possiblesitespresentedforpubliccomment

•Over70%supportedRiversideaspreferredsite

•AshtonWayonlyachieved6%support

•Mainconcernsabouttheinitialdesignswere:

•LossofSportsHall

•LossofSquashCourts

•Lossofspectatorseatingtomainpool

•Wantedthefacilitytohaveacentrallocation

current Developed Leisure centre strategy June/July 2016:•ThenewstrategyistorefurbishandextendtheexistingRiversideLeisureCentre

•ThiswillmaintainexistingfacilitiesincludingtheSportsHall,SquashCourtsandPoolSpectatorSeatingArea

•Itisalsoproposedtoimprovetheexistingcentrebyprovidingthefollowingnewfacilities:

•FitnessSuite

•FitnessStudios

•10x13mLearnerPool

•SoftPlayarea

TempleStreet

Loading bay

Bus stop relocated from civic centre

retail

old snooker club will be refurbished to expand Leisure centre Facilities

new undercroft Bike stands

new on-street disabled parking bays

Loading bay

existing Multi storey car Park

Potential link to park via new staircase

Plant room

Plant room

Option1:AshtonWay

Option3:Hawkswell

Option2:Riverside

Option4:StKeyna

Parking zones

Pedestrian movement

Vehicle movement

OldFireStationSite

CivicCentreSite

entrance lobby to

upper floors

entrance lobby to

upper floors

Page 2: Leisure centre consu Ltation 2015 - Bathnes · 1 : 200 A Proposed Level -2 2015.01047.000 Keynsham Riverside BATH & NORTH EAST SOMERSET COUNCIL CC 16.05.16 AHR-AR-B01-20-098 AS Information

KEYNSHAM RIVERSIDE REDEVELOPMENTLeisure centre oPtion 1

560 m²Sports Hall

65 m²Squash Court 2

65 m²Squash Court 1

125 m²Changing Rooms

Circulation

Circulation

508 m²Existing Swimming Pool

21 m²Circulation

75 m²Circulation

12 m²Circulation

355 m²Changing Village

274 m²Learners Pool

15 m²Pool Store

27 m²Sports Store

Room Schedule

CIRCULATION

DRY AREA

MEMBERS ACCESS

OFFICE

STORE

WET AREA

28 m²Pool Office

13 m²First Aid Room

Layout tobe

developed

17 m²Pool Store

6 m²

Accessible/Change WC

6 m²

Accessible/Change WC

Pool Plant onlevel below

49m2

Changing RoomLayout to bedeveloped

AHR Architects Ltd8th FloorClifton HeightsTriangle WestBristolBS8 1EJUnited Kingdom

T +44(0)117 9299146E [email protected]

original by

client name

project

drawing

computer file plot date

project number scale

drawing number rev issue status

This drawing is to be read in conjunction with all related drawings. All dimensions mustbe checked and verified on site before commencing any work or producing shopdrawings. The originator should be notified immediately of any discrepancy.This drawing is copyright and remains the property of AHR.

@A1

date created approved by

1 : 200

A

Proposed Level -2

2015.01047.000

Keynsham Riverside

BATH & NORTH EAST SOMERSET COUNCIL

CC

16.05.16

AHR-AR-B01-20-098

AS

Information

04/07/16

Rev Description Date Dr by App by

A Amendmends after latest DTM. 16.05.2016 CC AS

Level 0 Floor Plan

UP

UP

UP

UP

UP

UP

106 m²SOFT PLAY

143 m²STUDIO

250 m²FITNESS SUITE

62 m²CHANGING MALE

62 m²CHANGING FEMALE

10 m²OFFICE

17 m²STORE

8782

16282

97 m²RECEPTION

31 m²CIRCULATION

52 m

²C

IRC

ULA

TIO

N

NEW LEARNERPOOL ROOF

97 m²RECEPTION

97 m²RECEPTION

AS EXISTING

AHR Architects Ltd8th FloorClifton HeightsTriangle WestBristolBS8 1EJUnited Kingdom

T +44(0)117 9299146E [email protected]

original by

client name

project

drawing

computer file plot date

project number scale

drawing number rev issue status

This drawing is to be read in conjunction with all related drawings. All dimensions mustbe checked and verified on site before commencing any work or producing shopdrawings. The originator should be notified immediately of any discrepancy.This drawing is copyright and remains the property of AHR.

@A1

date created approved by

1 : 200

Option 2 Ground Floor

2015.01047.000

Keynsham Riverside

BATH & NORTH EAST SOMERSET COUNCIL

CC

2016.02.04

SK20160204-06

AS

SKETCH

02/03/16

Rev Description Date Dr by App by

1 : 200

Option 2 Level 00

Level -2 Floor Plan

Level -1 Floor Plan

•Existingstaircaseandliftisretained

•Newentrancefoyerwithreceptiondeskongroundflooriscreatedonthecor-ner

•NewGym&Studiowithmemberschangingarea

•SoftPlayarea

•Spectatorseatingretained

•NewSpinningStudio

•NewPartyRoomsforprivatehire

•New10mx13mlearnerpool

•EnlargedChangingVillagearea

new entrance

Extentofnewbuildlearnerpoolwithinpark

Page 3: Leisure centre consu Ltation 2015 - Bathnes · 1 : 200 A Proposed Level -2 2015.01047.000 Keynsham Riverside BATH & NORTH EAST SOMERSET COUNCIL CC 16.05.16 AHR-AR-B01-20-098 AS Information

KEYNSHAM RIVERSIDE REDEVELOPMENTLeisure centre oPtion 2

UP

UP

UP

Retail

Student Lobby &Circulation

Plant & Bin Store22 m²Circulation

31 m²Circulation

39 m²Circulation

174 m²Studio 1

159 m²Studio 2

61 m²

ChangingFemale

63 m²

ChangingMale

17 m²Store 1

70 m²Foyer

188 m²Circulation

As existing Room Schedule

CIRCULATION

DRY AREA

FOYER

MEMBERS ACCESS

OFFICE

PLANT

RECEPTION

RETAIL

STORE

WC

WET AREA

Town Council

Plant & Bin Store

Student Lobby &Circulation

Bike Stands

284 m²Fitness Suite

7 m²Cash Office

16 m²Staff Room

5 m²

AccessibleChanging

3 m²

AccessibleWC

Sales Area

6 m²Store 2

11 m²Store 3

5 m²Store 4

16 m²Lobby

Vend. m

achin

es

3 m²Store

13 m²Reception

Void overSoft Play

External Terrace

AHR Architects Ltd8th FloorClifton HeightsTriangle WestBristolBS8 1EJUnited Kingdom

T +44(0)117 9299146E [email protected]

original by

client name

project

drawing

computer file plot date

project number scale

drawing number rev issue status

This drawing is to be read in conjunction with all related drawings. All dimensions mustbe checked and verified on site before commencing any work or producing shopdrawings. The originator should be notified immediately of any discrepancy.This drawing is copyright and remains the property of AHR.

@A1

date created approved by

1 : 200

C

Proposed Ground Floor Plan

2015.01047.000

Keynsham Riverside

BATH & NORTH EAST SOMERSET COUNCIL

cc

08.04.16

AHR-AR-B01-20-100

AS

Information

18.03.16

Rev Description Date Dr by App by

A Amendments after latest DTM 04.04.16 CC AS

B Firestation Option added 08.06.16 CC AS

C Amendmends after latest DTM. 16.05.2016 CC AS

UP

Room Schedule

CIRCULATION

DRY AREA

OFFICE

PLANT

WC

Squash CourtVoid

Badminton CourtsVoid

Squash CourtVoid

54 m²AHU Plant

Circulation

71 m²Offices

164 m

²V

iew

ing P

latform

58 m²Main Electric Room

67 m²Wet Plant

51 m²Circulation

Swimming PoolVoid

75 m²SOFT PLAY

14 m²WC Male

14 m²WC Female 35 m²

Party Room49 m²

Party Room

Soft P

lay

seating a

rea

Vendin

gm

achin

es

57 m²AHU

Learners PoolVoid

New recessin Viewing

Area

AHR Architects Ltd8th FloorClifton HeightsTriangle WestBristolBS8 1EJUnited Kingdom

T +44(0)117 9299146E [email protected]

original by

client name

project

drawing

computer file plot date

project number scale

drawing number rev issue status

This drawing is to be read in conjunction with all related drawings. All dimensions mustbe checked and verified on site before commencing any work or producing shopdrawings. The originator should be notified immediately of any discrepancy.This drawing is copyright and remains the property of AHR.

@A1

date created approved by

1 : 200

A

Proposed Level -1

2015.01047.000

Keynsham Riverside

BATH & NORTH EAST SOMERSET COUNCIL

CC

16.05.16

AHR-AR-B01-20-099

AS

Information

04/07/16

Rev Description Date Dr by App by

A Amendmends after latest DTM. 16.05.2016 CC AS

560 m²Sports Hall

65 m²Squash Court 2

65 m²Squash Court 1

125 m²Changing Rooms

Circulation

Circulation

508 m²Existing Swimming Pool

21 m²Circulation

75 m²Circulation

12 m²Circulation

355 m²Changing Village

274 m²Learners Pool

15 m²Pool Store

27 m²Sports Store

Room Schedule

CIRCULATION

DRY AREA

MEMBERS ACCESS

OFFICE

STORE

WET AREA

28 m²Pool Office

13 m²First Aid Room

Layout tobe

developed

17 m²Pool Store

6 m²

Accessible/Change WC

6 m²

Accessible/Change WC

Pool Plant onlevel below

49m2

Changing RoomLayout to bedeveloped

AHR Architects Ltd8th FloorClifton HeightsTriangle WestBristolBS8 1EJUnited Kingdom

T +44(0)117 9299146E [email protected]

original by

client name

project

drawing

computer file plot date

project number scale

drawing number rev issue status

This drawing is to be read in conjunction with all related drawings. All dimensions mustbe checked and verified on site before commencing any work or producing shopdrawings. The originator should be notified immediately of any discrepancy.This drawing is copyright and remains the property of AHR.

@A1

date created approved by

1 : 200

A

Proposed Level -2

2015.01047.000

Keynsham Riverside

BATH & NORTH EAST SOMERSET COUNCIL

CC

16.05.16

AHR-AR-B01-20-098

AS

Information

04/07/16

Rev Description Date Dr by App by

A Amendmends after latest DTM. 16.05.2016 CC AS

•NewentrancethesameasOption1

•LargerGymwhichsitsontopofthenewLearnerPool

•2FitnessSuitesinsteadof1

•DoubleheightSoftPlayarea

•AsOption1butLearnerPoolisdoubleheighttomatchthemainpool

•SoftPlayaccessedfromthislevelanddoubleheight

•AsOption1

BiggerExtensionhasmorevisualimpactontheparklandbutprovidesadditionalstudiofacilities

Doubleheightlearnerpoolmatchesmainpool

Level 0 Floor Plan

Level -2 Floor Plan

Level -1 Floor Plan

new entrance

Extentofnewbuildlearnerpoolwithinpark

Page 4: Leisure centre consu Ltation 2015 - Bathnes · 1 : 200 A Proposed Level -2 2015.01047.000 Keynsham Riverside BATH & NORTH EAST SOMERSET COUNCIL CC 16.05.16 AHR-AR-B01-20-098 AS Information

KEYNSHAM RIVERSIDE REDEVELOPMENTPossiBLe re-use oF riversiDe BuiLDing

Flat 1.4

Flat 1.1

Flat 1.3

Flat 1.5

Flat 1.6

Flat 1.8

Flat 1.9

Flat 1.7

Flat 1.2

47 m²Circulation

87 m²Circulation

15 m²Circulation

96 m²Circulation

29 m²Circulation

12 m²Circulation

AHR Architects Ltd8th FloorClifton HeightsTriangle WestBristolBS8 1EJUnited Kingdom

T +44(0)117 9299146E [email protected]

original by

client name

project

drawing

computer file plot date

project number scale

drawing number rev issue status

This drawing is to be read in conjunction with all related drawings. All dimensions mustbe checked and verified on site before commencing any work or producing shopdrawings. The originator should be notified immediately of any discrepancy.This drawing is copyright and remains the property of AHR.

@A1

date created approved by

1 : 200

H:\AR.BRS\2015\2015.01047.000 - Keynsham RiversideRedevelopment\10 BIM\10.0 WIP Data\01047-AHR-AR-Model.rvt

A

Proposed First Floor Plan

2015.01047.000

Keynsham Riverside

BATH & NORTH EAST SOMERSET COUNCIL

CC

05.04.16

AHR-AR-B01-20-101

AS

Information

18.03.16

Rev Description Date Dr by App byA Amendments after latest DTM 04.04.16 CC AS

Name Area

Room Schedule Level 1

Circulation

Flat 1.1

Flat 1.2

Flat 1.3

Flat 1.4

Flat 1.5

Flat 1.6

Flat 1.7

Flat 1.8

Flat 1.9

197 m

195 m

191 m

214 m

202 m

314 m

221 m

150 m

254 m

229 m

2

2

2

2

2

2

2

2

2

2

Total : 76 beds 2286m 2

Beds

7 beds

7 beds

8 beds

7 beds

12 beds

9 beds

5 beds

11 beds

10 beds

52.80 m²FLAT

66.81 m²FLAT

66.54 m²FLAT

36.32 m²STUDIO

51.92 m²FLAT

65.04 m²FLAT

63.89 m²FLAT

47.42 m²FLAT

55.04 m²FLAT

50.43 m²FLAT

60.66 m²FLAT

63.21 m²FLAT

47.95 m²FLAT

64.30 m²FLAT

48.44 m²FLAT

66.98 m²FLAT

52.24 m²FLAT

30.76 m²STUDIO

56.89 m²FLAT

58.43 m²FLAT

47.51 m²FLAT

69.91 m²FLAT

36.31 m²STUDIO 50.87 m²

FLAT46.09 m²FLAT

60.54 m²FLAT

64.31 m²FLAT

58.71 m²FLAT

282.05 m²CIRCULATION

52.50 m²FLAT

36.88 m²STUDIO

68.50 m²FLAT

37.68 m²STUDIO

199.49 m²CIRCULATION

N

5m 10m 15m 20m0m

50.89 m²FLAT

31.49 m²STUDIO

AHR Architects Ltd8th FloorClifton HeightsTriangle WestBristolBS8 1EJUnited Kingdom

T +44(0)117 9299146E [email protected]

original by

client name

project

drawing

computer file plot date

project number scale

drawing number rev issue status

This drawing is to be read in conjunction with all related drawings. All dimensions mustbe checked and verified on site before commencing any work or producing shopdrawings. The originator should be notified immediately of any discrepancy.This drawing is copyright and remains the property of AHR.

@A1

date created approved by

1 : 200

H:\AR.BRS\2014\2014.01095.000 - Redevelopement of Riverside,Keynsham Stages 1 & 2\10 BIM\10.0 WIP Data\Riverside BuildingProposed 080116.rvt

PROPOSED FIRST FLOOR PLAN

2014.01095.000

Former Keynsham Town Council Offices

EPISO 3 Tree Properties Tranche C Sarl

CC

24.09.15

AHR-AR-20-101

AS

PLANNING

09/21/15

Rev Description Date Dr by App by

1 : 200PROPOSED FIRST FLOOR PLAN1

FIRST FLOOR FLATS

Area

LEVEL 01FLAT 52.80 m²FLAT 66.81 m²FLAT 66.54 m²STUDIO 36.32 m²FLAT 51.92 m²FLAT 65.04 m²FLAT 63.89 m²FLAT 47.42 m²FLAT 55.04 m²FLAT 50.43 m²FLAT 60.66 m²FLAT 63.21 m²FLAT 47.95 m²FLAT 64.30 m²FLAT 48.44 m²FLAT 66.98 m²FLAT 52.24 m²STUDIO 30.76 m²FLAT 56.89 m²FLAT 58.43 m²FLAT 47.51 m²FLAT 69.91 m²STUDIO 36.31 m²FLAT 50.87 m²FLAT 46.09 m²FLAT 60.54 m²FLAT 64.31 m²FLAT 58.71 m²CIRCULATION 282.05 m²FLAT 52.50 m²STUDIO 36.88 m²FLAT 68.50 m²STUDIO 37.68 m²CIRCULATION 199.49 m²FLAT 50.89 m²STUDIO 31.49 m²

2299.81 m²1BEDS: 162BEDS: 103BEDS: 2STUDIOS: 6

TOTAL: 34

option 2: RefurbishRiversideupperlevelsas1-3bedroomFlats

option 1: RefurbishRiversideupperlevelsasStudentAccommodation

•UpperfloorsofRiversideworkwellasResidentialuses

•Option1istorefurbishthebuildingintoStudentFlatswith6-10bedroomsorganisedaroundasharedkitchen

•Option2istorefurbishthebuildingintoresidentialflats.ExistingentrancesoffTempleStreetwillbeusedtoaccesstheupperfloors

Nomarket inKeynshamfor largeofficespacesoanalternativeuseof theupperfloorshasbeeninvestigated.Anumberofoptionarebeingconsidered:

Page 5: Leisure centre consu Ltation 2015 - Bathnes · 1 : 200 A Proposed Level -2 2015.01047.000 Keynsham Riverside BATH & NORTH EAST SOMERSET COUNCIL CC 16.05.16 AHR-AR-B01-20-098 AS Information

KEYNSHAM RIVERSIDE REDEVELOPMENTPotentiaL LooK oF riversiDe BuiLDings

S

0.000 m

LEVEL 00

S

4.699 m

LEVEL 1

S

7.747 m

LEVEL 02

S

10.795 m

LEVEL 03

S

13.843 m

LEVEL 04

S

17.300 m

LEVEL 05

S

0.000 m

LEVEL 00

S

7.747 m

LEVEL 02

S

10.795 m

LEVEL 03

S

13.843 m

LEVEL 04

S

17.300 m

LEVEL 05

S

4.299 m

LEVEL 01

S

0.000 m

LEVEL 00

S

7.747 m

LEVEL 02

S

10.795 m

LEVEL 03

S

13.843 m

LEVEL 04

S

17.300 m

LEVEL 05

S

4.299 m

LEVEL 01

AHR Architects Ltd8th FloorClifton HeightsTriangle WestBristolBS8 1EJUnited Kingdom

T +44(0)117 9299146E [email protected]

original by

client name

project

drawing

computer file plot date

project number scale

drawing number rev issue status

This drawing is to be read in conjunction with all related drawings. All dimensions mustbe checked and verified on site before commencing any work or producing shopdrawings. The originator should be notified immediately of any discrepancy.This drawing is copyright and remains the property of AHR.

@A1

date created approved by

1 : 200

Existing Elevations Page 1

2015.01047.000

Keynsham Riverside

BATH & NORTH EAST SOMERSET COUNCIL

CC

AHR-AR-B01-10-300

AS

Information

04/22/16

Rev Description Date Dr by App by

1 : 200

West Elevation ( Temple Street) Existing1

1 : 200

South Elevation Existing2

1 : 200

South Elevation ( facing courtyard) existing3

S

0.000 m

LEVEL 00

S

7.747 m

LEVEL 02

S

10.795 m

LEVEL 03

S

13.843 m

LEVEL 04

S

17.300 m

LEVEL 05

S

-4.240 m

LEVEL-01

S

-8.480 m

LEVEL-02

S

4.299 m

LEVEL 01

S

0.000 m

LEVEL 00

S

4.299 m

LEVEL 1

S

7.747 m

LEVEL 02

S

10.795 m

LEVEL 03

S

13.843 m

LEVEL 04

S

17.300 m

LEVEL 05

S

-4.240 m

LEVEL-01

S

-8.480 m

LEVEL-02

S

4.299 m

LEVEL 01

Insulated Render

Insulated composite AluminiumPanel ( copper colored )

Existing concrete archesboxed out and claded withinsulated render

Concrete cladding panel

Insulated Render (grey colored )

Existing Stone

New Stone to match Existing

Existing Brick ( Retained & Cleaned)

New brick to mach Existing

E

E

F

F

N

AHR Architects Ltd8th FloorClifton HeightsTriangle WestBristolBS8 1EJUnited Kingdom

T +44(0)117 9299146E [email protected]

original by

client name

project

drawing

computer file plot date

project number scale

drawing number rev issue status

This drawing is to be read in conjunction with all related drawings. All dimensions mustbe checked and verified on site before commencing any work or producing shopdrawings. The originator should be notified immediately of any discrepancy.This drawing is copyright and remains the property of AHR.

@A1

date created approved by

As indicated

B

Proposed Elevations Page 2

2015.01047.000

Keynsham Riverside

BATH & NORTH EAST SOMERSET COUNCIL

CC

08.04.16

AHR-AR-B01-20-301

AS

Planning

22.03.16

Rev Description Date Dr by App by

A Amendments after latest DTM 04.04.16 CC AS

B Amendmends after latest DTM. 16.05.2016 CC AS

1 : 200

Elevation E-E (North)

1 : 200

Elevation FF (North- facing courtyard)

S0.000 m

LEVEL 00

S4.299 m

LEVEL 1

S7.747 m

LEVEL 02

S10.795 m

LEVEL 03

S13.843 m

LEVEL 04

S17.300 m

LEVEL 05

S-4.240 m

LEVEL-01

S-8.480 m

LEVEL-02

S4.299 m

LEVEL 01

S0.000 m

LEVEL 00

S4.299 m

LEVEL 1

S7.747 m

LEVEL 02

S10.795 m

LEVEL 03

S13.843 m

LEVEL 04

S17.300 m

LEVEL 05

S4.299 m

LEVEL 01

S0.000 m

LEVEL 00

S4.299 m

LEVEL 1

S7.747 m

LEVEL 02

S10.795 m

LEVEL 03

S13.843 m

LEVEL 04

S17.300 m

LEVEL 05

S4.299 m

LEVEL 01

AHR Architects Ltd8th FloorClifton HeightsTriangle WestBristolBS8 1EJUnited Kingdom

T +44(0)117 9299146E [email protected]

original by

client name

project

drawing

computer file plot date

project number scale

drawing number rev issue status

This drawing is to be read in conjunction with all related drawings. All dimensions mustbe checked and verified on site before commencing any work or producing shopdrawings. The originator should be notified immediately of any discrepancy.This drawing is copyright and remains the property of AHR.

@A1

date created approved by

1 : 200

H:\AR.BRS\2015\2015.01047.000 - Keynsham RiversideRedevelopment\10 BIM\10.0 WIP Data\01047-AHR-AR-Model.rvt

Existing Elevations Page 2

2015.01047.000

Keynsham Riverside

BATH & NORTH EAST SOMERSET COUNCIL

CC

AHR-AR-B01-10-301

AS

Information

04/22/16

Rev Description Date Dr by App by

1 : 200East Elevation (facing the park) Existing1

1 : 200North Elevation Existing2

1 : 200North Elevation (facing courtyard) existing3

ProposedElevation:TempleStreet

ExistingElevation:TempleStreet

ProposedElevation:North

ExistingElevation:North

InsulatedRender(White)

AluminiumPanel

InsulatedRender(Grey)

Existingconcretearchesover-cladwithnewRender

Extent of New Build Levels 1-3

Extent of New Build Levels 3-4

Existing Roof top Plant rooms are removed

PotentialNewCladding

Page 6: Leisure centre consu Ltation 2015 - Bathnes · 1 : 200 A Proposed Level -2 2015.01047.000 Keynsham Riverside BATH & NORTH EAST SOMERSET COUNCIL CC 16.05.16 AHR-AR-B01-20-098 AS Information

KEYNSHAM RIVERSIDE REDEVELOPMENTPotentiaL LooK oF riversiDe BuiLDings

view from temple street view from temple street

Low Level view from the park view from Market Walk within the new civic centre

aerial view from the park

Opportunities for upper floor balcony terraces with planters to ‘green’ the surrounding streets

Existing Rooftop Plant Rooms are removed

The ends of the upper floors are demolished to create a set-back which reduces the bulkiness of the building

A new staircase could link down to the park

New gym and studios are set back to reduce mass

Double height Learner pool matches and extends the existing pool

Page 7: Leisure centre consu Ltation 2015 - Bathnes · 1 : 200 A Proposed Level -2 2015.01047.000 Keynsham Riverside BATH & NORTH EAST SOMERSET COUNCIL CC 16.05.16 AHR-AR-B01-20-098 AS Information

KEYNSHAM RIVERSIDE REDEVELOPMENT

Temple Street

Vehicle Route

New Pedestrian Area

consuLtation next stePs:

•PublicFeedbacksession1:9thJune6:30-8:30

•PublicFeedbacksession2:14thJune2:00-4:00

•GLLtohost2sessionsinLeisureCentre:24thJune10-2pmand28thJune4-8pm

•PlanningApplication:August2016

•Construction2017/18

•CompletionSummer2018

Youarewelcometoprovideyourcommentsontheleisureproposalsviaarangeofroutes:

•Pleasecompleteoneofthefeedbackforms

•Emailyourcommentsandsuggestionsto:[email protected]

•VisittheB&NESwebsiteandcompletetheonlinefeedbackform

•Writeto:TheLeisureTeam,B&NES,LewisHouse,ManversStreet,BathBA11JG

•Pleasemakeyourcommentsandsuggestionsbycloseofplay1stJuly2016

Thank you for your response

•RedevelopmentoftheFireStationsiteofferstheopportunitytoimproveRetailandpublicrealm

•ThegroundfloorcouldcontainanewcoveredMarketHall

•AdditionalDisabledParkingspacesservingtheleisurecentrecouldbeprovided

•‘MarketWalk’inthenewCivicCentresitecouldbeextendedtolinkthroughtotheleisurecentreentrance

•NewretailfrontageonTempleStreetwouldlinkthetwoendsofTempleStreetandbringshoppersfurthertowardstheRiversideretail

Fire station site PossiBLe Future use

Potential Open Market Hall