16
For discussion on 24 February 2015 LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT 666CL – Formation, roads and drains in Area 54, Tuen Mun – phase 1 681CL – Formation, roads and drains in Area 54, Tuen Mun – phase 2 PURPOSE This paper seeks Members’ views on our proposals to – (a) upgrade part of 666CL, entitled “Formation, roads and drains in Area 54, Tuen Mun – phase 1 stage 1 works” to Category A at an estimated cost of $493.4 million; and (b) upgrade part of 681CL, entitled “Formation, roads and drains in Area 54, Tuen Mun – phase 2 stages 3 and 4A works” to Category A at an estimated cost of $553.1 million, both in money-of-the-day (MOD) prices to carry out site formation works and associated infrastructure works in Area 54, Tuen Mun. PROJECT SCOPE Phase 1 stage 1 works in Area 54, Tuen Mun 2. The part of 666CL which we propose to upgrade to Category A comprises(a) formation of about 2.9 hectares (ha) of land for a public housing development; (b) construction of the following road works – (i) a new local distributor road, Road L54D, comprising a section of dual two-lane carriageway and a section of CB(1)546/14-15(04)

LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT...Tuen Mun District Council (TMDC) on 30 June 2012 and 23 November 2012 respectively on the proposed development in Area 54 of Tuen Mun. Whilst

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT...Tuen Mun District Council (TMDC) on 30 June 2012 and 23 November 2012 respectively on the proposed development in Area 54 of Tuen Mun. Whilst

For discussion on 24 February 2015

LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT

666CL – Formation, roads and drains in Area 54, Tuen Mun – phase 1

681CL – Formation, roads and drains in Area 54, Tuen Mun – phase 2 PURPOSE This paper seeks Members’ views on our proposals to –

(a) upgrade part of 666CL, entitled “Formation, roads and drains in Area 54, Tuen Mun – phase 1 stage 1 works” to Category A at an estimated cost of $493.4 million; and

(b) upgrade part of 681CL, entitled “Formation, roads and drains in

Area 54, Tuen Mun – phase 2 stages 3 and 4A works” to Category A at an estimated cost of $553.1 million,

both in money-of-the-day (MOD) prices to carry out site formation works and associated infrastructure works in Area 54, Tuen Mun. PROJECT SCOPE Phase 1 stage 1 works in Area 54, Tuen Mun 2. The part of 666CL which we propose to upgrade to Category A comprises–

(a) formation of about 2.9 hectares (ha) of land for a public housing development;

(b) construction of the following road works – (i) a new local distributor road, Road L54D, comprising a

section of dual two-lane carriageway and a section of

CB(1)546/14-15(04)

Page 2: LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT...Tuen Mun District Council (TMDC) on 30 June 2012 and 23 November 2012 respectively on the proposed development in Area 54 of Tuen Mun. Whilst

- 2 -

single three-lane carriageway, with a total length of about 450 metres (m); and

(ii) widening of a section of Hing Fu Street.

(c) construction of cantilevered noise barriers of about 250 m long and about 5 m to 5.5 m high;

(d) construction of associated footpaths, cycle tracks, slopes, retaining walls, drainage, sewerage, landscaping works and other ancillary works; and

(e) implementation of environmental mitigation measures and an Environmental Monitoring and Audit (EM&A) programme for the works mentioned in 2(a) to 2(d) above.

Phase 2 stages 3 and 4A works in Area 54, Tuen Mun 3. The part of 681CL which we propose to upgrade to Category A comprises–

(a) formation of about 4.5 ha of land in total for a public housing development and a government, institution and community (G/IC) site;

(b) construction of the following road works – (i) a new local distributor road, Road L54A, comprising a

section of dual two-lane carriageway and a section of single four-lane carriageway, with a total length of about 700 m;

(ii) widening of a section of Tsz Tin Road; (iii) re-provisioning of a section of Tong Hang Road for

connection to Road L54A; and (iv) a public transport interchange.

(c) construction of the following –

Page 3: LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT...Tuen Mun District Council (TMDC) on 30 June 2012 and 23 November 2012 respectively on the proposed development in Area 54 of Tuen Mun. Whilst

- 3 -

(i) foundation of noise barriers1 of about 155 m long; and (ii) vertical noise barriers of about 640 m long and about 1 m

to 5 m high; (d) construction of associated footpaths, cycle tracks, slopes, retaining

walls, drainage, sewerage, landscaping works and other ancillary works; and

(e) implementation of environmental mitigation measures and an EM&A programme for the works mentioned in 3(a) to 3(d) above.

4. Layout plans showing the proposed works are at Enclosures 1 to 5. 5. Subject to funding approval of the Finance Committee, we plan to commence the construction in 2015 for completion in 2019. 6. After upgrading part of 666CL and 681CL as mentioned in paragraph 2 and 3 above, we will retain the remainders of 666CL and 681CL in Category B, which comprise the remaining site formation for public housing and school development sites, construction of roads, drainage, sewerage, slope, landscaping works and other ancillary works, and provision of noise mitigation measures in Area 54 of Tuen Mun. Funding for the remainders of 666CL and 681CL will be sought to dovetail with the implementation programme of the overall development in Area 54, Tuen Mun. JUSTIFICATION 7. Area 54 of Tuen Mun is situated at the north western part of Tuen Mun between Po Tin Estate and Siu Hong Court, which has been identified mainly for public housing development. In 1999, the then Territory Development Department (TDD) completed a “Planning and development study of potential housing site in Area 54, Tuen Mun” (the Study). The Study recommended a development proposal in Area 54 of Tuen Mun, which

____________________________ 1 Noise barriers under item c(i) of paragraph 3 are recommended along a section of Road L54A

adjacent to a planned school site under the approved Environmental Impact Assessment Review (the EIA Review) as part of the reviews of the Study mentioned in paragraph 8 of this paper. As the development programme of the school site is still uncertain, to avoid repeated road opening, we will complete the foundation of the noise barriers first and install the noise barrier panels later to tie in with the school site development programme.

Page 4: LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT...Tuen Mun District Council (TMDC) on 30 June 2012 and 23 November 2012 respectively on the proposed development in Area 54 of Tuen Mun. Whilst

- 4 -

included public housing, schools, G/IC facilities and the associated infrastructure works. 8. In 2005 and 2012, the Civil Engineering and Development Department (CEDD) conducted two reviews to update the recommendations of the Study taking into account changes in the development layout and parameters in Area 54 of Tuen Mun since the completion of the Study. The reviews confirmed the feasibility of the latest development proposal in Area 54, Tuen Mun. 9. Two public housing sites, Site 1&1A and Site 3/4 (East) under 666CL and 681CL respectively, are proposed to be formed in Area 54 of Tuen Mun. The Housing Department aims at providing at these sites about 4 000 public housing flats for population intake in 2020/21 and about 3 000 public housing flats for population intake in 2021/22 respectively. A community hall/sports centre site will also be formed at Site 4A (West) under 681CL. To cater for the anticipated traffic increase arising from the development proposal, we need to construct Roads L54A and L54D as well as to widen the existing Hing Fu Street and Tsz Tin Road. FINANCIAL IMPLICATIONS 10. We estimate the capital cost of the proposed works under 666CL and 681CL to be $493.4 million and $553.1 million respectively in MOD prices, broken down as follows –

$ million 666CL

(Part) 681CL

(Part)

(a) Site formation works

114.9 72.9

(b) Road works

108.2 89.8

(c) Noise barriers

52.0 58.6

(d) Ancillary works (i) Drainage and sewerage

works (ii) Landscaping and

irrigation works

56.5

19.9

77.1

156.3

21.1

178.5

Page 5: LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT...Tuen Mun District Council (TMDC) on 30 June 2012 and 23 November 2012 respectively on the proposed development in Area 54 of Tuen Mun. Whilst

- 5 -

$ million 666CL

(Part) 681CL

(Part)

(iii) Electrical and mechanical works for roads

0.7

1.1

(e) Environmental mitigation measures

2.2 2.4

(f) Consultants’ fees (i) Advisory services for

New Engineering Contract administration

(ii) EM&A programme

10.7

1.0

11.7

10.7

1.0

11.7

(g) Contingencies

31.1 32.5

Sub-total 397.2 446.4 (in September 2014 prices)

(h) Provision for price adjustment

96.2 106.7

Total

493.4

553.1

(in MOD prices)

PUBLIC CONSULTATION 11. We consulted the Tuen Mun Rural Committee and the Environment, Hygiene and District Development Committee (EHDDC) of the Tuen Mun District Council (TMDC) on 30 June 2012 and 23 November 2012 respectively on the proposed development in Area 54 of Tuen Mun. Whilst both committees had no objection in-principle to the proposed housing development, some members expressed their concerns on the sufficiency of the ancillary facilities for the housing development including the designed road capacities, anticipated traffic flows and junction arrangements or improvements. We have addressed their concerns. We have also reported to the Working Group on the Development and Complementary Facilities in Area 54 formed under the EHDDC of TMDC for monitoring progress of the development proposal on a regular basis.

Page 6: LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT...Tuen Mun District Council (TMDC) on 30 June 2012 and 23 November 2012 respectively on the proposed development in Area 54 of Tuen Mun. Whilst

- 6 -

12. We also consulted the Advisory Committee on the Appearance of Bridges and Associated Structures2 (ACABAS) on the aesthetic design of the noise barriers and retaining wall of the development proposal on 19 November 2013. The Committee accepted the proposed aesthetic design. 13. The road works were divided into two parts for gazetting under the Roads (Works, Use and Compensation) Ordinance (Cap. 370). The first part3 was gazetted on 28 March 2013 and 5 April 2013 while the second part4 was gazetted on 26 April 2013 and 3 May 2013. For the first part, no objection was received and the road scheme was authorized by the Secretary for Transport and Housing on 18 September 2013. For the second part, we received eleven objections during the objection-lodging period. Out of the eleven objections, four of them were unconditionally withdrawn and one of them was conditionally withdrawn. Notwithstanding our explanations, the remaining six objectors maintained their objections. On 11 March 2014, the Chief Executive-in-Council authorized the proposed works under Cap. 370 without modification, which was gazetted on 31 March 2014. 14. The sewerage works were divided into two parts for gazetting under the Water Pollution Control (Sewerage) Regulation (Cap. 358AL). The first part5 was gazetted on 28 March 2013 and 5 April 2013 while the second part6 was gazetted on 26 April 2013 and 3 May 2013. For the first part, no objection was received and the sewerage scheme was authorized by the Director of Environmental Protection (DEP) on 27 September 2013. For the second part, one objection was received during the objection-lodging period. Notwithstanding our explanations, the objector maintained his objection. On 11 March 2014, the Chief Executive-in-Council authorized the sewerage scheme under Cap. 358AL without modification, which was gazetted on 11 April 2014. ____________________________ 2 The ACABAS, which comprises representatives of the Hong Kong Institute of Architects, the

Hong Kong Institution of Engineers, the Hong Kong Institute of Planners, an academic institution, Architectural Services Department, Highways Department, Housing Department and CEDD, is responsible for vetting the design of bridges and other structures associated with the highway system, including noise barriers and enclosures, from the aesthetic and visual impact points of view.

3 The road scheme in this gazette relates to the construction of part of Road L54D associated with Site 1&1A under 666CL.

4 The road scheme in this gazette relates to the construction of part of Road L54D associated with Site 3/4 (East) and Site 4A (West) and the widening of Hing Fu Street under 666CL as well as the construction of Road L54A, widening of Tsz Tin Road and re-provisioning of Tong Hang Road under 681CL.

5 The sewerage scheme in this gazette relates to the sewerage works at part of Road L54D associated with Site 1&1A under 666CL.

6 The sewerage scheme in this gazette relates to (i) the sewerage works at part of Road L54D associated with Site 3/4 (East) and Site 4A (West) and Hing Fu Street to be widened under 666CL; and (ii) the sewerage works at Road L54A, Tsz Tin Road to be widened and Tong Hang Road to be re-provisioned under 681CL.

Page 7: LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT...Tuen Mun District Council (TMDC) on 30 June 2012 and 23 November 2012 respectively on the proposed development in Area 54 of Tuen Mun. Whilst

- 7 -

ENVIRONMENTAL IMPLICATIONS 15. The proposed works fall within the study area of the Study as mentioned in paragraph 7 above. The Study is a Designated Project under Schedule 3 of the Environmental Impact Assessment (EIA) Ordinance. 16. The then TDD completed the EIA report for the development in Area 54 of Tuen Mun, which covers the proposed works. The EIA report was approved by the DEP on 3 September 1999. The report concluded that there would not be any significant residual environmental impacts upon implementation of the recommended mitigation measures. The EIA recommendations were further reviewed and agreed by the DEP in September 2013 taking into account information on the latest development proposal. The EIA report, together with its review findings, concluded that with the implementation of the recommended mitigation measures and EM&A programme, the environmental impacts arising from the proposed works will be mitigated to ensure compliance with the statutory requirements. 17. We will incorporate the recommended mitigation measures into the works contract to control the environmental impact arising from the construction of the works to within established standard and guidelines. These measures include frequent watering of the site, provision of wheel-washing facilities, covering of materials on trucks, use of silenced construction plant, and provision of mobile noise barriers. We will also implement the EM&A programme recommended in the EIA report and the EIA review. We have included in paragraph 10(e) above a sum of $2.2 million and $2.4 million (in September 2014 prices) in the project estimates of the proposed works under 666CL and 681CL respectively for the implementation of environmental mitigation measures and the EM&A programme. 18. At the planning and design stages, we have designed the levels and layout of the proposed site formation works and road works to minimize generation of construction waste where possible. In addition, we will require the contractor to reuse inert construction waste (e.g. excavated soil) on site or in other suitable construction sites as far as possible, in order to avoid the disposal of inert construction waste to public fill reception facilities7. We will encourage the contractor to maximize the use of recycled or recyclable inert ____________________________ 7 Public fill reception facilities are specified in Schedule 4 of the Waste Disposal (Charges for

Disposal of Construction Waste) Regulation. Disposal of inert construction waste in public filling reception facilities requires a licence issued by the Director of CEDD.

Page 8: LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT...Tuen Mun District Council (TMDC) on 30 June 2012 and 23 November 2012 respectively on the proposed development in Area 54 of Tuen Mun. Whilst

- 8 -

construction waste, as well as the use of non-timber formwork to further reduce the generation of construction waste. 19. At the construction stage, we will require the contractor to submit for approval a plan setting out the waste management measures, which will include appropriate mitigation means to avoid, reduce, reuse and recycle inert construction waste. We will ensure that the day-to-day operations on site comply with the approved plan. We will require the contractor to separate inert portion from non-inert construction waste on site for disposal at appropriate facilities. We will control the disposal of non-inert construction waste at landfills through a trip-ticket system. 20. We estimate that the proposed works will generate in total about 322 278 tonnes of construction waste which will be disposed of as shown below –

666CL (Part)

681CL (Part)

Total

Tonnes

Tonnes

Tonnes

Inert construction waste to be reused on site

158 440 131 611 290 051 (90%)

Non-inert construction waste to be disposed of at landfills

17 604 14 623 32 227 (10%)

Total construction waste generated

176 044 146 234 322 278 (100%)

The total cost for accommodating construction waste at landfill sites is estimated to be $4,028,375 for the proposed works (based on a unit charge rate of $125 per tonne at landfills as stipulated in the Waste Disposal (Charges for Disposal of Construction Waste) Regulation). HERITAGE IMPLICATIONS 21. The projects will not affect all declared monuments, proposed monuments, graded historic sites/buildings, and government historic sites identified by the Antiquities and Monuments Office (AMO). Part of the proposed works are within the Siu Hang Tsuen and Kei Lun Wai Sites of Archaeological Interest (see Enclosures 2 and 4). We have conducted

Page 9: LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT...Tuen Mun District Council (TMDC) on 30 June 2012 and 23 November 2012 respectively on the proposed development in Area 54 of Tuen Mun. Whilst

- 9 -

archaeological investigation at the proposed works sites and no significant archaeological remains have been discovered. As a precautionary measure, the AMO should be informed immediately in case of discovery of antiquities or supposed antiquities during the course of construction works. Agreement from the AMO would be sought on the follow-up actions if required. LAND ACQUISITION 22. We have reviewed the design of the proposed site formation and road works to minimize the extent of land acquisition. All necessary land resumption for the proposed works was completed in July 2014 and clearance is ongoing. We have resumed about 92 011 square metres (m2) of private land (about 30 203 m2 for 666CL and 61 808 m2 for 681CL) and cleared 57 758 m2 of government land (about 33 306 m2 for 666CL and 24 452 m2 for 681CL) for the proposed site formation and road works. The cost of land resumption and clearance estimated at $1,178.89 million is charged to Head 701 – Land Acquisition. The land resumption and clearance affects 120 land owners and 231 households involving 432 persons. The affected land owners or households have been offered ex-gratia allowances and/or, where eligible, accommodation in public housing in accordance with the established rehousing policy. BACKGROUND 23. 666CL and 681CL were included in Category B in January 2000 and September 2000 respectively. 24. On 25 May 2001, we upgraded part of 681CL as 686CL – “Consultants’ fees and site investigation for site formation, roads and drains in Area 54, Tuen Mun – phase 2” to Category A, at an estimated cost of $25.9 million for carrying out site investigation and engagement of consultants to undertake detailed design of the site formation and infrastructure works for the phase 2 development in Area 54, Tuen Mun. 25. On 15 April 2011, we upgraded part of 681CL as 744CL – “Formation, roads and drains in Area 54, Tuen Mun – phase 2 stage 1 works” to Category A, at an estimated cost of $325.2 million for carrying out site formation works at Site 2 for public rental housing development and associated infrastructure works. The site formation works and associated infrastructure works commenced in September 2011 for completion in April 2015. 26. On 11 May 2012, we upgraded part of 681CL as 755CL – “Formation, roads and drains in Area 54, Tuen Mun – phase 2 stage 2 works”

Page 10: LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT...Tuen Mun District Council (TMDC) on 30 June 2012 and 23 November 2012 respectively on the proposed development in Area 54 of Tuen Mun. Whilst

- 10 -

to Category A, at an estimated cost of $178.9 million for construction of the Tuen Mun Area 54 sewage pumping station. Construction of the sewage pumping station commenced in October 2012 for completion in March 2016. 27. Of the 2 219 trees within the project boundary, 1 887 trees will be felled and 331 trees preserved. Besides, one important tree8 will be affected during the implementation of the proposed works. Details of the important tree affected are provided at Enclosure 6. We will incorporate planting proposals as part of the proposed works, including estimated quantities of 1 641 trees (including trees to be planted in housing Sites 1&1A and 3/4 (East) by Housing Department) and 76 193 shrubs. 28. We estimate that the proposed works under 666CL and 681CL will create about 150 jobs (125 for labourers and another 25 for professional/technical staff) and 170 jobs (140 for labourers and another 30 for professional/technical staff), providing a total employment of 6 400 and 7 240 man-months respectively. WAY FORWARD 29. We plan to seek funding approval from the Finance Committee for the proposed works under 666CL and 681CL in the second quarter of 2015 after consulting the Public Works Subcommittee.

-------------------------------- Development Bureau February 2015

____________________________ 8 “Important trees” refers to trees in the Register of Old and Valuable Trees, or any other trees

that meet one or more of the following criteria – (a) trees of 100 years old or above; (b) trees of cultural, historical or memorable significance, e.g. Fung Shui trees, trees as

landmark of monastery or heritage monument, and trees in memory of an important person or event;

(c) trees of precious or rare species; (d) trees of outstanding form (taking account of the overall tree sizes, shape and any

special features), e.g. trees with curtain like aerial roots, trees growing in unusual habitat; or

(e) trees with a trunk diameter equal to or exceeding 1.0 m (measured at 1.3 m above ground level), or with a height/canopy spread equal to or exceeding 25 m.

Page 11: LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT...Tuen Mun District Council (TMDC) on 30 June 2012 and 23 November 2012 respectively on the proposed development in Area 54 of Tuen Mun. Whilst

©m ¤éñ

¤é

­×

R TS

TSTS

R R

TSTS

R R TS

RRRR TS

R

R

RR

R

P

R

RR

TS

TSTS

RTS

TS

TSTS

TS

TS

TSTS TSTSTS

TSTSTS TS

TSR TS

TS TSTS TS

TS TSTS

TSTSTST

S

TSTSTS TSTS

TSTSTS TSTS

TSTS TS TS

TSTSTS

R TSTS

TS

TS TS TSTS

TS TS

TS TSTS

TSTSTSTS

TS

TSTST

S

TSTS

TSTS TS

TS

TSTSTS TS

PodiumTSR (Car Park under)

TSTS

TSTSTS TS

TS TSTS TS

TSTS

TSTS

TSTS

TS TSTSTS

TS

TSTS TSTS TSTS

TS

TSTSTS TSR

RTS TS

R TSTS TST

S

TSTS

TS

TS

TSTS

TSTS

TS

TS

R

TS

TS

TS

R

TS

TS

TS

R

TSTS

TS

TSP

TS

R

TS

TS

TSTS

TS

TS

TSTS

TS

TS

TSTS

TS

TS TS

TS

RCP

TS

PHPodium

Podium

Podium

Garage

Podium

Siu

Kei

House

Siu Lai

House

Siu

Lok

Hous

e

Siu Shun

House

Siu

Hang

Hous

e

Siu

Wah

House

Yung MukAncestral Hall

Siu

Win

g

House

Siu

Yan

House

Siu

Kin

Hous

e

Academia House (Block S)

Castle Peak HospitalBSU Substation

Allied Health Training Centre

Siu

Sun

Hous

e

Siu

Yin

Hous

e

Tuen Mun Hospital Rehabilitation Block

Brilliance House (Block E)

The Jockey ClubJubilation Hall (Block B)

Wisdom House (Block D)

Tuen M

un E.A.S.Y.

Service C

entre

Tuen Mun HospitalSchool of General Nursing

Block 14

B

The Jockey Club Perseverance Hall (Block A)

Block 14

A

Unity House (Block F)

Block A

228

39

A165B 7-6

196

40

39

B

202

541

229

A

59

164

42

62 43

28

16516

5A

229

227

63 4

481 26

26

45 21

80 25

82

22

1

78

24

66

210A

53

210

77 23

52

76

315

231

84

232

235

72

83

233

2368

5-87

312

96

311

213

127 310

128

309 250

254

252

308

A

308

25130

254

A

253

253A

254

B

273

307

31

306

272 2

59

32

33

305

34260

352713

05

A

274242

277

275

199A199

197

A

241297 281

197

240198A198

232

231276

282239

238

265

237230 196236 195

194229

228 235227 233 193

192191

226

225217223216 193A192A

191A

13

215206213205

203222202

221

212

211201

1A

158

2001

1

2-3

151

141

1A 4

156

6140 15

0

7139

5138 8

145

-14

6

136 6

135

9

7

148

149

10

134-13

2

5131

147

86

11

12-14

7

10

8 11127 9

1310

128 11

8-10

6 14

12

132

B

7

13

18-19

11

8-9

14

20127

A

13

21

1811 14

127

22

19

12

20

2313

21

2414

125

A

18-20

126

2212

2

125B

2523

262

4

21

27

120

17 22 2

82512

1

29

26

24 3027

31

23

28

25-27

2924

3028

31

25-26

24

29-30

28

25 31

29-30

32

33

3128 34

353

2 36

33 37-38

34

35

39

36

37

113

33

112

38-39

22

106

109

103

33

ESS

SIU HANG TSUEN

Po Wah Garden

Phase 3Unicorn Garden

Playground

Kei Lun WaiChildren'sPlayground

Playground

Open Stora

ge

Open Stora

ge

RCP

Basketball Court

KEI LUN WAIBasketball Court

SIU HONG COURT

Open Storage

Open Storage

Jockey ClubFarm House

SIU LAM HOSPITAL

New Life Organic Farm

CASTLE PEAK HOSPITAL

Tuen Mun GovernmentPrimary School

Playground Football FieldBasketball

Court

NicheN

iche

INC

NicheN

iche

Niche

INC

Nic

he

WIP Oct 2012

WIP Oct 2012

CUL

WIP Oct 2012

WIP

Jan

2013

G

WIP

Jan

2013

WIP Jan 2013

WIP Jan 2013

G

G

SHR

CUL

CUL

CUL

CUL

CUL

CUL

CUL

WT

CUL

U

G

G

G

G

G

G

G

SHR

W

W

W

Light Rail

LR

-Kei

Lun

Light Rail

Nullah

Nullah

PO

E

L

EH

L

LLEE

L

H

L

L

L L

L

EL H

E LELE L

E

LL E

LL

LLE

L LLEE L

L

LL

LE

HELL

L

EL L L

LEL

LL

L

L E

H L

LE

LLL

L

LLEL

L LEH

E

LE E

L

LL

LL

LL LE

LLL

EEE

L LE L

L LLEE

L

LL L

ET LL

L

HL

L

L

LL

EL

LE

EL

L

E L

E

H

L

L

L

LL

L

L E H

E LEL

L

E H

L

LL

LL

L

ELE

EEELET L L L

L LE HL

E

L

LE

L

L

L LL

LL

LLE E

LET

LL

L LH

LELL

LL

E L

EE L LL

LE L

LLL ET

EL

L HL L

EET LET

L

ELH

LL

HLL

LH

LLL

LE

LLLH

L

L

LLL

LL

LE

L L

LEL

E

L

LL L H

L

L

L LL L

L LL

L

LL

LLLE L

E LELL

L

L

H LL

EH

H LL LET

LL

E

L

LL

LL

LL

LLL

E

L LL LL

L HLE

LL

L L

L LHL L LL

L

LH

L

H

LL

H HL

L

L

L

LH L LL

H LL

L L

L

HL LL

LL

L LL

LL

LL

L

LLLL L H

HL

LL

HL

HH

L LL

LLH

LET

L

L

LL

L

HL

H

H

H

L

LL

H

HL

H H

H

L

TSZ TIN

RO

AD

TSI

NG

LU

NR

OA

D

1ST L

ANE

KEI L

UN

WAI

2N

D L

ANE

KEI L

UN

WAI

3R

D L

ANE

KEI L

UN

WAI

4T

H L

ANE

KEI L

UN

WAI

5T

H L

ANE

KEI L

UN

WAI

KEI T

SIN

G STREET

TSIN

G

LU

N

RO

AD

SAN FUK

ROAD

SAN FUK ROAD

FP

Road

FP

CW

FP

FP

Road

CW

FP

CWFP

CW

Ra

mp

CW

FP

FP

FP

FB

FP

FP

FP FB

FPFP

FP

FPFB FB

FB

FP

FP

CW

CW

FP

Road

Ramp

FP

CW

FP

FP

Track

Track

Road

FP

CW

FP

Road

CW

FP

Road

FP

FP

Road

FP Road

CW

CW

FP

CW

Road

CW

FP

Road

Road

Road

Road

CW

CW

Road

CW

FP

FP

Ramp

CW

CW

Road

CW

FP

FP

Road

CWCW

EW

Sub

way

CW

CW

CW EW

R

TS

TS

TS

TS

TSTSTS

TS

TS

TS

TS

R

TSTS

R

TS

TS

TS

TS

TS

TSTS

TS

TSTS

TS

TS

TSTS

TS TS

TS TSTS TS

TS

TS

TS TS

TS

TS

TS

TS

TS R

TSTS TS TS

TSTS

TSTSTS

TSTS

TS TSTS TS

TSTS

TSTSTS

R

82

87

A87B

130

87

115

121

169

158

159

167

Cemetery

¹Ó°

©´

°©´

¹Ó

«C¤s

½m¹

Graves

Burial

Urns

CUL

Graves

Tsin

g Shan Firin

g

Range

Boundary

G

WIPJan2013

G

G

GG

G

G

G

G

G

G

G

GG

G

GG

GG

GG

G G

G

G

G

G

G

G

G

G

G

G

G

U

G

UG

U

G

G GG

G

G

G

G

G

G

GG

GG

GG

GG

G G

GG G

G

W

RockyArea

RockyArea

Rocky Area

Rocky Area

PO

L

E

E

ET

L

EL

E

L

E

L

H L

L

E

E

L L

E

E

L

LE

EL

E

L

E

E

L

E

E LE ET

L

ETE

LE

L

E

EL

L

E

L

E

E

E

E

Tra

ck

FP F

P

Road

Road

Track

FP

FP

Track

FP

Track

FP

FP

FP

FP

FP FP

FP

FP

FPFP

FP

FP

FP

FP

FB

FP

RTSTS

TS TS

TS

TSTSTS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TSTSTS

TSTS

TS

TS

TS

TS TS

TS

TS

TS TS

TS

TS

TS

TS

TS

TS TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TSTSP

TS TS

P

TS

PH

TS

TS

RC

P

TS

TS

TS

Podiu

m(Bus Ter

min

us under)

Podium

TS

Podium

(Po Tin Market under)

PodiumP Podium

Block13

Block

15

Block

12

Block

19

Block

16

Block

11 Block

20

Block

17Block

10 Block

21

Block

2

Block

18

Block

1 Block

22

Block

3

Block

25

Block

5

Block

6

Block

23

Block

7 Block

40

Bloc

k

39

Bloc

k

9

Block

38

Bloc

k

36Bloc

k

8

Bloc

k

37

Block 7

Block 9

Block 8

Block 6

Block 5

Po TinShopping CentreBlock 4

Tsun Wen Road Substation

Block 10

H

Block 10G

Block 10

A

Block 10

B

Block 10

C

Block 10

D

148

150

159

147

166

149

146

152

15015

4

145

139149

B

144

149

A

138

143

142

141

136

135

130B

41

134

38

130

129

36

32

27

A

26

27

21

3

3

99

2

2

4

9

11

Pui LinGarden

Silcon Garden

Ming Wong Garden

Open Storage

Playground

ESS

BasketballCourt PlaygroundBasketball Court

BasketballCourt

Po Leung Kuk Horizon

East Primary School

Basketball Court

Car

Park

Pla

yground

PO TIN ESTATE

Cultivation

Pla

yground

¹Ó

«C¤s

½m¹

¬

G

Graves

ESS

Tsin

g Shan Firin

g

Range

Boundary

G

CUL

CULCULCUL

CUL

CUL

CUL

CUL

CUL

CUL

CUL

CUL

CUL

CUL

CUL

CUL

CULCUL

WIP Dec 2012

CUL

Tank

CUL

G

CUL

CUL

CUL

CUL

GG

U G GGG

GU

GU

G

G G

G

G

G

G

G

G

G

G

G

G

PO

PO

PO

EE

EE

L

L

L

L

E

H

EL

E

EL

E L

L

H

L

E

L

L

L

LL

E

E

E

L

E

HL

E

LL

E E

E

EH

L

L

L EL

L

E

L

L

E

LL

L

LL

EH

L

L

L HLL

LLL

L

L

L

L L

LL L

L LL

ELL L

LHL

LL

LL

L LLLL

LH

LL

L

LLLL

LL LL L

L L

LL

LL LH

LL

LLL

LL

LLL

LL

LLL LLLE

LLL

H

L LL L

L LL L LL LLL HLL L

LLLL L

E LL

LLL

L LEL L

L LLLL L

LL HLL

L

L LL

L

L

LL

LL L L

LE

L

LL

L

L H LL LL LHH

L

L LL LLL

LLL

LL

E

HL

LLL

E

LLL

LH

L

LE

L H LLE

L

L

L LL

LLL

EL

LLL

LL

HL L

L

E

LL H

L

LL

L

L LL

LL L

LL

L HLL

L L LL L L

LH LL

LLL LL

LL

LL L LHL LL LH

LL LLL LL LH

TO

NG

HA

NG

RO

AD

TO

N

GH

AN

GR

OA

D

HING FU STREET

HIN

G

KW

AI S

TR

EE

T

TS

UN

WE

NR

OA

D

MI

NG

KU

MR

OA

D

LE

UN

G

TAI L

AN

E

LEUNG TAK STREETS

AN FU

K R

OAD

Track

FP

Track

Track

Tra

ck

FP

FP

FP

FP F

P

Track

FB

FP

FP

Road

Road

Road

Road CW

Road

FP

Road

Cycling Track

Road

TrackCW

FP

FP

FP

FP

CW

FP

FP

FP

FP

FP

Road

Road

Cycling

Track

CW EW

EW

TS

TSTS

TSTS

TSTS

TS

TS TS

TSTSTS

TS TSTSTS

TSTS

TS TS TSTS

TSTSC

lub

House

TS

TSTSTS TS

TS

TS

TS

TSTS

TSTS

TS

TSRTS TSTS

TS

TS

TS R TSTSTSTS TS

TSTSTS

TS

TS

TSTS

TS

TSTSTS

TS

TS

TS

TS

TS

TS

TS

TS TSTS

TS

TS

TSTS

TS

TS

TSTS

TSTS

TS

TS

TS

TS

TSTS

R

TS TSTS

TSTS

TS TSTS

TS

TS

TSR

TS

TSTSTS TS

TSTS

TS

TSTS

TSTS

TS TS

TSTSTSTS T

STS

TS TS TSTS

TSR TS

R TS

R TS RCPTSRTS TS

TS

TS RTSTSTSR TS TS

RR

TSR TS

RTSTSTS

TS TSTS TS TSTS

TSTS

TSTS TS TS

TS TSTSTS

TS TS TS

TSTSTSR

TSTS

TS

TS TSTSRTS

TS TS TSTS

TSR

TS TSTS RTSTSTS TSTS

RRP

RTSTS

TS TS

TSR TSTS TS TSTS

VO

TS

TS

TSTSTS

TSTS

RTS TSTS

TSTS

R

R

TS

TS

TSTS

TSTS

TS

TS TS TS TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS VO

TS TSTS

BlockE

BlockD

BlockC

BlockB

BlockA

Bloc

k

G

Bloc

k

F

BlockA

Block

E

BlockB

Blo

ck

D

Block

H

Block

C

BlockI

Block

J

155

3

156

186

2

157

400

1

83

189

143

244

144

149

88

272

274

271

273

268

C

275

136

206200

201

207

300

199207

A130

202

205

204

198

151

203

197

154

196

206

A

131

192

193

194

19145C 2

10

259

45

B

190

175 17

4A17

6B

80 211

195

172

189

212

11

17357

C

176A

174

195

A

166

161

188

173

213

10

187

57A

171

61 18

6

28

57

D

228

40 13

9

184-18

5

52-53

17757B62

219

178

1539

222

179

5416

4A

27

17-16

5946

25

252215

166

47-4

8

57

E

60

55

181

229

256

58

22-24

182

216

23031

226

251

16337 167

217

16516

8

59

238

231

255

57

F

49

218

50

758A20

2

3

2

237

33 225

224

36162 2

36

2545

6

57

G

127

250

123

249 2

33

242

161

96

6 235

253

234

248

247 9

3

111-113

244

245

A

109 6

106

243

5

110 8 95

105

A

245

246

108 107

10598

105

5

9

84B

8

4A

103 8

4

401

3B

3A

153

402

85

10

152

37

83 8

6

403

101

102

193

191

151

82

91

1-3

192

112-115

405

190 13

87

81

194

150

14120

406

100

8019

5

15

407

191A 16

190

A

189

77

189

A

17

78

79

76

12

18

19

181

188

184

176

180

187 203

A

183

227

A

35

B

203

175 227

35

C

182

199

185

48D

170

205

A

35

A168

205

165C

228

A

38

168C

168B

Playgro

und

Open Storage

ESS

ET

RCP

PO TONG HA

Open StorageTSZ TIN TSUEN

Shun KingGarden

RCP

Po Wah Garden Grand Villa

Ming Wong Garden(Phase 2)

RCP

°©´

G

Burial Urns

CUL

CUL

CULWIP Sep 2012

WIP Oct 2012

CUL

ET

ET

SHR

WIPOct2012

WIP

Oct 2012

WIP Oct 2012

ETCUL

CUL

CUL

CUL

GG

G

G

G

G

G

G

G

G

GG

W

W

SHR

SHR

SHR

�»¿???????????

Proposed Public Rental Housing Development at Tuen Mun Area 54

E EE

H

L

L

E

EE

LET

E

EE

L

LHET

L LEE

LE

E ET LLH

L

E ETE

E

EE EETET

EET

LL

L

HE

E

ET

E

L

H

E

L

L E

ET

E

ET

EE

LL

E

L

LL

HE

LE E L

E E LET

EE

HHEL

EEL

EE

ET LL

L

LH

LL

E

ELL

E L

LL

E LET

H

E EE

LET

L

E LE

L

H

E

E

EE

LE

L

LE

LL

EL

LEE

E

EE

EE

ET LH L

HE E

EE

ET EE

LEE

EE

E

E

HE

L

E LE

L

EET

EH

EE

LE EL

ELELL

E

ETH E

E

LE

H

ETE

H

L EET

EE

LLL

EE

L

LE

L E

E

EE EELE E

EL

EL

L LLL LL

EL

HEE

ET

EL

LL

HE

LE E E

LL

L HEE

E H

EL

E

LE

LH

EL

L L

EEL

EL

EE

LLL

E

LL

L

EL

EL

E

LH L

ELHE

E

E

L L

H

EL

E

E L

LL

L E

LEE

LETH

HONG PO

ROAD

HONG PO ROAD

TSIN

G

LU

N

RO

AD

TSZ TIN R

OA

D

TONG HANG

ROAD

FP

Road

FP

FB

FP

Road

Track

FB

FP

FP

FP

FB

Track

FB

Track

FP

FP

FB

FB

Track

FB

FP

FB

Tra

ck

Track

FP

Ramp

FP

Road

FP

Road

FP

FB

FB

FP

FB

FP

Track

Road

FP F

P

FP

FP

FP

Road

FP

Road

FP

FB

FB

FP

FP

FB

FP

FBFP

FP

Road

FP

FP

FP

FB

FB

RCP

TS

P

P

Podium(Goodrich GardenShopping Arcade under)

Podium

Podium (Blossom Garden Shopping Arcade under)Podium

Block 10

FTower 1

Block 3

Block 2

Block 1

The Providence Gardenfor Rehab

Block 1

Block 2

Tai Hin

g

Div Police Stn Substatio

n

Leung Yin House

Tower 2

Block 3

Siu Lung Court

6

6

82

80

33 1

Playground

ESS

Car P

ark

Playground

Tai HingOperational Base

Goodrich Garden

Stand

Basketball Court

Playground

Tuen MunNorth West

Swimming Pool

Tennis Court

Sta

nd

Blossom Garden

LEUNG KING ESTATE

CUL

CUL

CUL

VS

VS

CUL

LR -

Tin King

L LL LL L L

LL

LLL

L LL L LL

LH

LLL HL LL

LL

LLL

LLL

LL

L LL

L L LL

L

LHL LL

L L LL L LLL LL

LL L LLL

LLL L

LL LLL

HLLL L L

LL

HL LL L LL L L

LLLL L

LLL L L

L LL

LL

LLL LLL

H

L LLL

H

LL

LLL L

L HL LL

LL

L

LL

HL L

LL

L L

L

L

LLL

H

L

LL L L

L

L

L LL

L

LL

L LL

L

LL LL

HL

LLL L

LL

LLLLL

L

SAN FUK ROAD

LEUNG HONG LANE

LE

UN

G

SH

UN

ST

RE

ET

TS

UN

WE

NROAD

LEUNG TAK STREET

Ra

mp

FP

CW

FP

FP

Cycling

Track

Road

FP

EW

Road

Road

RampFP

FPRamp

FP

EW

FP

³f

³f

TS

TS

TS

TS

TS

TS

TS

TS

TS

TSTS TSTS

TS TSTS

TS

TS

TS

TS

TS

TS

TS

TSTSTS

TS

TS

TS

TSTST

STS

TS

TS

TS

TSTS

TS

TS

TS

TS

TS

TSGodown

TS

TS

TS

TS

TSTSGodown

TSTSTS

TS

TSTS

TSTS

TSTSTS

TS

TS

TS

TS

TSTS

TSTS

TS

TS

TSTS

TS TS

TS

TS

TS

TSTS

TS

TS

TSTS

TS TS

TS

TS

TS

¢°®

¢°® ¢°

®¢°®

¢̧

¢· ¢¶¢µ¢́ ¢² ¢±¢°

·s

¼¦P

¼Öª

¢Õ ¢Ñ

¢Ô

¢Ð¢Ó

¢Ò¢Ï

197

196

200

179

202

203180

204205

206

79A

218

220

221

223 152

153

222

1

2

3

4

5

240

6-7

239 28

238

8

2731237

9

26 10

236

32

235

25 11

34 1223

1335 2

236 14

2137

20

38-39

19

40

76

267

271

77

273

79-8

0

2

68

275

103

272

101102

9799

309

96

303

312

A

311

313

314

314

A

324

315

323

325321

316

326

317

318

327

319

´r»

·s´

ÀA­

·s¼

Às¬

°±¨

´Ë¿

Äx²Äx²

ªFµØ¤T°|ªô¤ ¬Ý¨¬²

Äx²

Äx²

ESS

Hanison Garden

Sun KingGarden

ESS

SAN HING TSUEN

Car Park

Samui Village

ET

BasketballCourt

BasketballCourt

Tung Wah Group of Hospitals

Yau Tze Tin Memorial College

Stand

Football Field

BasketballCourt

BasketballCourt

CUL

CUL

CUL

WT

WT

W

W

PO

L

H

E

LHL

L

E

L

L

L

E

L

E

E

L

L

E

L

E

HL

H

L

L

L

L

H

EE

L

L

E

H

LE L

L

EH

L E

L

E

E

E

ET

EE

L E

H

EE

L

E

E

L

LL

EE

LEL

E

L

E

E

LLL

L

L

LLL

L

H

HLL

LL

L LL L

L

L

L

H

LL

LL

L

L

LL

L

LL

LL

L

L

LL

L

L

LL

LL

LL

L

SA

N

HIN

G

RO

AD

SAN T

AT LANE

SAN HING ROAD

HO

NG

PO

RO

AD

·s

¼

·s¹

·s¼

¤­¬

±×

°ª¬[

FP

FP

FP FP

Ramp

FP

FPFP

Elevated Road

¥­

¡]¤U¼h°

¥­

¤ë

¤ë

¤ë

¤ë

¤ë

¥­

¡]¤U¼h°

PH

VSPodium

(Car Park under)

PH

Podium

Platform

Platform

Platform

Platform

Podium

(Car Park under)

VS

VS

¥ü¹

¥ü®

¥ü¥

¥ü»

¥ü·

¥ü

©

¥ü±d

¥ü

±

¥ü°

¥ü³

¥ü

«

Siu

Ning

Hous

e

Siu

Tai

Hous

e

Siu Pin

g

House

Siu

Ho

Hous

e

Siu Fai

House

Siu

Cheong

House

Siu Hong Shopping Centre

Siu

Hong Statio

n

Siu

Wai

House

Siu

Kit

House

Siu

Chun

House

1

2-22

·È¦

¤Ú¤h

´ë°È¸p¥ü±

¤Æ®ð

¤Ùª

ù

¤Ùªù¥_·Ñ®ð½

Skating Rink

Bus Terminus

ET

Drainage Services DepartmentSiu Hong Sewage Pumping Station

Vaporizer Room

Fu Tei Fire Station

TU

EN

MU

N

RIV

ER

CH

AN

NE

L

Tuen Mun NorthOfftake and Pigging Station

WT

CUL

CUL

R

B

B

B

R

»´

»´

ÅK¡

Lig

ht Rail

LR - Siu

Hong

Outfall

L

LL

L

LL

L

LL

L

L

LL

L L L

H

L

L

L

L

L

L

HLL L

LL

HL

L

LL

L

L

L

L

L

LL

LL

L

L

L

LLLL L

L

LL

L

L

LL

L

L LL L

L

LH

LH

L L

LLL

H

L

L

L

L

L

L

L

L

L

L

L

L

L

L

H

LL

H

L

L

L

H

L

L

L

H

LL

L

L

H

L

L

LL L

L

L

L

L

HL

L

LL

L

L

L

L L H

L

L

LLH L

LL

L

L

L

L

L HL

L

L

L

L

LL

H

LL H

SIU HONG ROAD

TU

EN

MU

N

RO

AD

¥ü±

¤Ùª

ù

¤Ù´

±×

³æ¨

±×

±×

±×

±×

¦æ

¤H

±×

³æ¨

³æ¨

³æ¨

¹D

³æ¨

¹D

EW

CW

CW

Ra

mp

Cycling

Track

CWCW

CW

CW

CW

CW

EW

Ra

mp

EW

Ra

mp

Ramp

EW

FB

Ra

mp

EW

Sub

way

EW

Ramp

CW

Cycling

Track

CW

Cycling

Track

Cycling

Track

Cycling

Track

EW

Road

RCP

TS

TS

TS

Podium

TS

TSTS

LR - Tuen

Mun

Hospital

MT

R (

West Rail Line) under

Block 9A

Block 9

B

Tuen Mun Hospital Ambulatory Care CentreMind

set Club

Block 9C

The Jockey ClubSerene House (Block C)

Block 9

D

Block 8A

Block 8B

Block 6

Block 8C

Block 8D

Special Block

Block 5A

Block 4

Block 7

2A

20

18

16

13

4

2 8

16

2-6

158

16

2018

8

Niche

Niche

Niche

INCINC

Ching Chung

Sin Yuen

ESS

Car Park

ESS

Castle Peak Government Quarters

RCP

Long Stay Care Home

TWGHs Mr & Mrs Kwong SikKwan College

ESS

Basketball Court

Car Park

Castle Peak Hospital Nurses QuarterCar Park

CUL

CUL

CUL

CUL

CUL

CUL

CULCUL

CUL

CUL

WT

CUL

B

G

Light R

ail

LL H

L L LL

L

HH LL

HL

LLL L

LL

LH

L LLLH

L

LL

L

L L

LH LLL L

LL

L

H

LL LL

LH L

HLL

L

HL

LLL L

L

L

L L LL

L

HL

LLL L

LL

L L

LL H LL

L

L

L LLLL

L LL

L

LL

L

LL

L L

H LL

LLL

TSING CHUNG KOON ROAD

TSING

SAN PATH

LE

UN

G

HO

NG

LA

NE

TSI

NG

FU

KL

AN

E

CH

UN

GLI

NG

PAT

H

FP

EW

CW

EW

EW

EW

Road

Sub

way

FP

CW

FP

CW

RampRoad

EW

Ramp

CW CW

EWCW

EW

Road

CW

CW

CW

Road

Road

FP

FP

Cycling

Track

FP

FP

ESS

H

L

L

LL

LL

L

L L

LL

L LL

L

L

L

LL

L

L

H

L

L

TU

EN

MU

N

RO

AD

CASTLE

PE

AK

ROAD-

¤Ùª

ù

¹D

°ª¬[

³æ¨

³æ¨

EW

Road

Elevate

d Road

EW

Cycling

Track

EW

Cycling

Track

TSTS R

TSTS

TSTS TS

TSTS TS

TSTS

TS

TS TSRTSTS

TS

TS TSTS

TS RTSTSTS

¥ü§

10

9 150

8 151

7

152

6

153

GravesG

G

G

G

EE

E E

E

EE

L

EEL L

H

¹D

ªd

Road

FP

FP

R

TS

¤T¸

¢°® ¢°

®¢°®

¢°¢

BlockC Block

D

BlockBBlock

A

199

198

¬üª

Milan Court

L

H

TSTS

TSTS

TS

PO

L

LE

E

FB

FB

FP

HING FU STREET

HI

NG

KW

AI STREET

MI

NG

KU

M

RO

AD

TSUN WEN ROAD

ROAD

TONG HANG

PO TIN ESTATE

drawing no. scale

REVISION

NOTES :

no. date description checked approved

dateinitialname

date :

office

¤g¤ì¤uµ{³B

A3 420 x 297

COPYRIGHT RESERVED

ª© Åv ©Ò ¦³ , ¤£

CIVIL ENGINEERING OFFICE

LAND WORKS DIVISION

³]

designed

approved

ø

´y

®Ö

checked

drawn

traced

®Ö

¹Ï«h ¤ñ

¿ì¨

¤g¤ì¤uµ

DEVELOPMENT DEPARTMENT

CIVIL ENGINEERING AND

S:\

TM5

40

0\

DR

AWI

NG\

LW9

36

2.d

gn

R:\

PE

N_

TA

BL

E\filena

me

&date.tbl

12/2/2

01

5

µù

TSI

NG L

UN

RO

AD

drawing title¹Ï«h

Chief Engineer

( WOO Tai-on, Gabriel)

TONG HANG ROAD

OF A SECTION OF

REPROVISIONING

LW 9362

PUMPING STATION

ROAD L7

¤é½s ¤º®e ®Ö ®Ö

3.9

3.9

4.0

4.5

4.6

4.9

5.0

5.0

5.0

5.0

5.1

5.1

5.1

5.1

5.2

5.2

5.2

5.3

5.3

5.3

5.3

5.4

5.4

5.4

5.5

5.5

5.5

5.5

5.5

5.7

5.8

5.8

5.8

5.8

5.8

5.9

5.9

6.0

6.0

6.0

6.0

6.0

6.0

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.2

6.2

6.2

6.2

6.2

6.5

6.5

6.5

6.5

6.5

6.5

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.6

6.7

6.7

6.7

6.8

6.8

6.8

6.8

6.8

6.8

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

6.9

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.0

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.1

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.2

7.3

7.3

7.37.3

7.3

7.3

7.3

7.3

7.3

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.4

7.5

7.5

7.5

7.5

7.5

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.6

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.7

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.8

7.9

7.9

7.9

7.9

7.9

7.9

7.9

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.0

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.1

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.2

8.3

8.3

8.3

8.3

8.3

8.3

8.3

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.4

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.5

8.6

8.6

8.6

8.6

8.6

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.7

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.8

8.9

8.9

9.0

9.0

9.0

9.0

9.0

9.0

9.0

9.1

9.1

9.1

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.2

9.3

9.3

9.3

9.3

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.4

9.5

9.5

9.5

9.5

9.5

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.6

9.7

9.7

9.7

9.7

9.7

9.7

9.7

9.7

9.7

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.8

9.9

9.9

9.9

9.9

9.9

9.9

9.9

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.0

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.1

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.2

10.3

10.3

10.3

10.3

10.3

10.3

10.3

10.4

10.4

10.4

10.4

10.4

10.4

10.4

10.5

10.510.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.5

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.6

10.7

10.7

10.7

10.7

10.7

10.7

10.7

10.7

10.8

10.8

10.8

10.8

10.8

10.810.8

10.8

10.8

10.8

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

10.9

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.0

11.1

11.1

11.1

11.1

11.1

11.1

11.1

11.1

11.1

11.1

11.1

11.1

11.1

11.1

11.1

11.1

11.1

11.2

11.2

11.2

11.2

11.2

11.2

11.2

11.2

11.2

11.2

11.2

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.3

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.4

11.5

11.5

11.5

11.5

11.6

11.6

11.6

11.6

11.6

11.6

11.6

11.6

11.6

11.7

11.7

11.7

11.7

11.7

11.7

11.8

11.8

11.8

11.8

11.8

11.8

11.8

11.8

11.9

11.9

11.9

11.9

11.9

11.9

11.9

11.9

11.9

12.0

12.0

12.0

12.012.0

12.0

12.0

12.0

12.0

12.0

12.0

12.0

12.0

12

12.1

12.1

12.1

12.112.1

12.1

12.1

12.1

12.1

12.2

12.2

12.2

12.2

12.2

12.2

12.2

12.2

12.2

12.3

12.3

12.3

12.3

12.4

12.4

12.4

12.4

12.4

12.4

12.4

12.4

12.5

12.5

12.5

12.5

12.5

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.6

12.7

12.7

12.7

12.7

12.7

12.7

12.7

12.7

12.7

12.7

12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.8

12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

12.9

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.0

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.1

13.2

13.2

13.2

13.2

13.2

13.2

13.2

13.3

13.3

13.3

13.3

13.3

13.3

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.4

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.6

13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.7

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.8

13.9

13.9

13.9

13.9

13.9

13.9

13.9

14.0

14.0

14.0

14.0

14.1

14.1

14.1

14.1

14.1

14.1

14.1

14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.2

14.3

14.3

14.3

14.314.3

14.3

14.3

14.4

14.4

14.4

14.4

14.4

14.4

14.4

14.4

14.4

14.4

14.4

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.5

14.6

14.6

14.6

14.6

14.6

14.6

14.6

14.7

14.7

14.7

14.7

14.7

14.7

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.8

14.9

14.9

14.9

14.9

14.9

14.9

14.9

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.0

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.1

15.2

15.2

15.2

15.2

15.2

15.2

15.2

15.3

15.3

15.3

15.3

15.3

15.4

15.4

15.4

15.4

15.4

15.4

15.4

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.5

15.6

15.6

15.6

15.6

15.6

15.6

15.6

15.7

15.7

15.7

15.7

15.7

15.7

15.8

15.8

15.8

15.8

15.8

15.8

15.8

15.8

15.8

15.8

15.9

15.9

15.9

15.9 15.9

16.0

16.0

16.0

16.0

16.0

16.1

16.1

16.1

16.1

16.2

16.2

16.2

16.2

16.3

16.4

16.4

16.4

16.4

16.4

16.5

16.5

16.5

16.5

16.5

16.5

16.6

16.6

16.6

16.6

16.6

16.6

16.6

16.6

16.6

16.6

16.7

16.7

16.7

16.7

16.7

16.7

16.7

16.8

16.8

16.8

16.8

16.8

16.8

16.8

16.9

16.9

16.9

16.9

16.9

16.9

16.9

17.0

17.0

17.0

17.0

17.0

17.1

17.1

17.1

17.2

17.2

17.2

17.2

17.2

17.3

17.3

17.3

17.3

17.3

17.4

17.4

17.4

17.4

17.4

17.4

17.4

17.4

17.4

17.4

17.4

17.5

17.5

17.5

17.5

17.5

17.5

17.5

17.5

17.5

17.5

17.6

17.6

17.6

17.6

17.6

17.7

17.7

17.7

17.7

17.7

17.7

17.7

17.7

17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.8

17.9

17.9

17.9

17.9

17.9

17.9

17.9

17.9

17.9

17.9

18.0

18.0

18.0

18.0

18.0

18.0

18.0

18.0

18.1

18.1

18.1

18.1

18.1

18.218.2

18.2

18.2

18.3

18.3

18.3

18.3

18.3

18.3

18.4

18.5

18.5

18.5

18.5

18.5

18.5

18.6

18.6

18.7

18.7

18.7

18.7

18.7

18.8

18.8

18.8

18.8

18.9

18.9

19.0

19.1

19.1

19.1

19.1

19.1

19.2

19.2

19.2

19.2

19.3

19.3

19.4

19.4

19.5

19.5

19.5

19.5

19.5

19.7

19.8

19.9

19.9

20

20

20

20

20

20

20

20.0

20.0

20

20

20.1

20.1

20.1

20.1

20.2

20.2

20.2

20.2

20.2

20.3

20.3

20.3

20.4

20.5

20.5

20.6

20.7

20.7

20.9

21.0

21.1

21.1

21.2

21.2

21.3

21.3

21.3

21.4

21.5

21.5

21.6

21.6

21.6

21.8

21.8

21.8

21.9

22.1

22.2

22.2

22.5

22.6

22.6

22.7

22.9

23.0

23.1

23.3

23.4

23.5

23.5

23.6

23.8

23.8

L7¸

24.2

24.4

24.4

24.4

24.5

24.6

24.8

24.8

24.9

24.9

25.0

25.0

25.0

25.2

25.5

25.6

25.6

25.7

25.7

25.8

25.8

25.825.9

25.9

26.1

26.1

26.5

26.5

26.6

26.7

26.7

26.9

26.9

27.0

27.2

27.3

27.3

27.4

27.8

27.9

28.0

28.0

28.1

28.3

28.4

28.5

28.6

28.7

28.7

29.0

29.0

29.3

29.3

29.6

29.7

30.1

30.7

31.0

31.0

31.3

31.9

32.1

32.8

32.8

33.2

33.4

33.9

34.0

34.1

34.7

34.9

35.3

35.3

35.4

35.5

36.6

36.6

36.6

36.7

37.2

37.7

37.9

37.9

38.3

38.5

38.6

38.7

38.8

40

40

40

40

40

40

40

40

40

40.2

40.2

40.4

43.1

LEGEND

ªº¤uµ¦V°]°È©e­û·|«

¹Ï

7666CL - ²Ä1´Á²Ä1¶

²Ä4A¶¥¬7681CL - ²Ä2´Á²

¨ü¼vÅTªº­«

¤Ùªù²Ä54°Ïªº¨

44.4

45.0

45.1

46.2

46.9

47.8

48.4

49.5

49.8

49.8

50.4

51.2

51.2

53.6

7666CL - PHASE 1 STAGE 1 WORKS

STAGES 3&4A WORKS

7681CL - PHASE 2

54.2

55.7

56.7

59.5

60

60

60

60

60

60

60

80

80

80

80

80

80

80

80

80

81.4

84.5

3.5

3

3.5

3

1.6

3.5

3

3.5

3

3

7.3

13.5

LA

LA

LA

LA

LA

15.8

3.5

3.5

7.3

¿³´

SITE 1 & 1A

TSUEN

SIU HANG

TSUEN

TSZ TIN

SIU HONG ROAD

COURT

SIU HONG

KEI LUN WAI

ROAD L5

4A

(WEST)

SITE 4A

(EAST)

SITE 3/4

SITE 5

RO

AD L54

D

ESTATE

PO TIN

FARM

NEW LIFE

PO TONG HA

HONG

PO ROAD

1:5000

±

Ä_

¤p§

Ä_¶

Ä_¥·s¥Í

ȕ

µ

¾_

¾

ÄQÅ¥ü±

«C

Å

¥ü±

µµ¥

²Ä4A(¦è)¸

L54A¸

²Ä5¸¹

¸¹¦²Ä1¸¹¤

¸¹¦²Ä3¤Î4(

TSZ TI

N R

OA

D

µµ

¥

­«¸m¤@¬

STREETHI

NG FU

W K YUEN

S C FUNG

L T LAW

SITE 2

²Ä2¸¹

¦Ã¤ô

ROADL54B

L54B̧

²Ä4A(ªF)¸

(SOUTH)

SITE 4A

LOCATION PLAN

TUEN MUN AREA 54

¤Ùªù²Ä54°

THIS FUNDING APPLICATION

TO CATEGORY A UNDER

PROJECT TO BE UPGRADED

AFFECTED

LOCATION OF IMPORTANT TREE

AREA 54

OTHER PROJECTS IN TUEN MUN

L54

100

100

100

100

100

100

SITE 4A (EAST)

¦a²Ä4A(«n

MI

NG

KU

M

RO

AD

TSUN WEN ROAD

120

120

120

120

0 50

1 : 5 000 SCALE BAR

250 m200150100

05

0 1 : 5 000

SC

AL

E

BA

R

250

m200

150

100

140

140

140

140

160

160

160

160

180

180

180

180

200

200

200

220

220

220

240

240

240

260

260

280

285.5

289.3

fungpsc
Typewriter
附件一 ENCLOSURE 1
Page 12: LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT...Tuen Mun District Council (TMDC) on 30 June 2012 and 23 November 2012 respectively on the proposed development in Area 54 of Tuen Mun. Whilst

©m ¤éñ

¤é

­×

¥­­

¤Î´ë°È¤uµ{²Ä

¤Ùªù²Ä54°Ï¤g¦

¤u°È¤uµ{­p¹º -

LAYOUT PLAN

TUEN MUN - PHASE 1 STAGE 1

DRAINS IN AREA 54,

FORMATION, ROADS AND

PWP ITEM - 7666CL

TS

TS

TS

TS

TS

TS

TS

TSTS

TS

TS

TS

TS

TSTS

TS

TS

TS

R

TS

TS

R

165

B

164

165

165

A

84

85-87

96127

128

305

305A

277

297

281

282

13

Po Wah Garden

Phase 3

G

LL

EE

L

L

E

L

EL

E

L

E

L

EFP

87

A

87B

130

87

115

121

169

167

Cemetery

WIPJan2013

U

U

GU

W

E

E

L

L

E

E

L

L

E

E

L

E

L

E

E

L

E

L

E

ET

ETE

L

E

E

L

E

LE

E

E

FP

FP

FP

FP

FP

FP

FB

FP

Block

13

Blo

ck

15

Block

12

Blo

ck

19

Blo

ck

16

Blo

ck

11

Blo

ck

20

Blo

ck

17

Blo

ck

10

Blo

ck

21

Block

2

Blo

ck

18

Block

1

Blo

ck

22

Block

3

Block

25

Block

5

Blo

ck

6

Block

23

Blo

ck

7

Block

40Bloc

k

39

Block

9

Block

38

Block

36

Block

8

Block

37

Block 7

Block 9

Block 8

Block 6

Block 5

Po Tin

Shopping Centre

148

150

147

166

149

146

150

145

139

149B

144

149A

138

143

142

141

136

135

130B

41

134

38

130

129

36

3227

A

26

27

21

3

3

99

Pui LinGarden

Silcon Garden

Ming Wong Garden

Open Storage

Playground

ESS

BasketballCourt

Playground

Basketball Court

BasketballCourt

Po Leung Kuk Horizon

East Primary School

Basketball Court

Open Storage

Car Park

Pla

yground

PO TIN ESTATE

Playgro

und

¬

ESS

G

CUL

CUL

CUL

CULCULCUL

CUL

CUL

CUL

CUL

CUL

CUL

Tank

CUL

G

G

U

G

U

G

G

PO

E

E

L

L

L

E

H

E

L

E

E

L

EL

L

H

L

E

L

L

L

L

L

E

E

E

L

E

H

L

EL

L

E

E

E

E

H

L

L

L

E

L

L

E

L

L

E

L

L

L

L

L

E

H

L

L

H

L

L

L

L

LL

L

L

L L

L

L

L

L

L

L

E

L

L

L

L

H

L

L

L

LL

L

L

L

L

H

L

L

L

L

LL

L

L

L

L

L

L

L

L

L

L

L

L

L

LL

L

L

L

L

L

L

L

L

L

L

LL

L

L

L

H

LL

L

L

L

L

L

L

L

L

L

H

L

L

L

L

L

L

L

L

L

L

L

L

L

E

L

L

L

L

L

L

L

L

L

HL

L

L

L

LL

L

L

LL

L

L

E

L

L

L

L

L

L

L

L

H

H

L

L

L

L

L

L

L

L

L

L

E

H

L

L

L

E

L

L

L

H

L

L

H

L

L

E

L

L

L

L

L

L

L

LH

L

L

TO

NGHANG

ROAD

TONGHANG

ROAD

HIN

G F

U ST

REET

HIN

G

KW

AI S

TREET

MI

NG

KU

MR

OA

D

LE

UN

G

TAI L

AN

E

Track

FP

Tra

ck

Track

Track

FP

FP

FP

FP

FP

Track

FB

FP

FP

Road

Road

CW

Road

FP

Cyclin

g Tra

ck

Tra

ck

CW

FP

CW

FP

Cycling Track

EW

TS

120

170

168

165

C

168C168B

L

L

HING FU STREET

HING

KWAI S

TREET

MING KU

M ROAD

TS

UN

WE

N R

OA

D

ROADTONG HANG

PO TIN ESTATE

¤ñ

¦ì¸ LOCATION PLANSCALE 1:20 000

TSUEN

TSZ TINPO TONG HA

WAI

KEI LUNMI

NG

KU

M

RD.

ESTATE

PO TIN

TSUEN

SIU HANG

OR

AS SHOWN

drawing title

1 : 2500

A

A

¶í¦

¿³´

µµ¥

814800 E

815000 E

814600 E

814600 E

830200 N

830400 N

830600 N

LEGEND :¹Ï

¹Ï«h

HING FU STREET

PO TIN ESTATE

NEW LIFE FARM

TONG HANG

ROAD

SIU HANG TSUEN

ÄQÅ

¤p§

Ä_¶

ȕ

µ

¤p§

0387

0387

寶田邨

·s¥Í

©

¹Ï

830800 N

0387

0387

B

B

ROAD L54D

W K YUEN

L T LAW

Chief Engineer

( WOO Tai-on, Gabriel)

SITE 1 & 1A

(PROPOSED PUBLIC HOUSING

DEVELOPMENT)

(ÀÀ§@¤½¦@©²Ä1¸¹¤Î1A

L54

D ̧

LW 9358

S C FUNG

ÀÀ«Ø¦æ¤

ÀÀ«Ø¨®½ø

¹j­µÀÀ«Ø1¦Ì¦Ü5

¹j­µÀÀ«Ø5¦Ì¦Ü5.5

ÀÀ«Ø¾×

ÀÀ«Ø

«Ø³yª©ó¤u°È­p¹º76

ªL¦a¸É

ÀÀ«Øªá¼Ñ/

ÀÀ«Ø³

ÀÀ«Ø¦

ÀÀij·s«Ø¤Î

ÀÀ«Ø¤g¦a

¤p§|§ø¦

ÀÀ«Ø¤u

PROPOSED PEDESTRIAN CROSSING

PROPOSED RUN-IN

BARRIER OF 1m TO 5m HIGH

PROPOSED VERTICAL NOISE

BARRIERS OF 5m TO 5.5m HIGH

PROPOSED CANTILEVERED NOISE

PROPOSED RETAINING WALL

PROPOSED SLOPE

UNDER PWP ITEM 7681CL

WORKS TO BE CARRIED OUT

PLANTING

COMPENSATORY WOODLAND

LANDSCAPING AREA

PROPOSED PLANTER /

PROPOSED CYCLE TRACK

PROPOSED FOOTWAY

CARRIAGEWAY

PROPOSED NEW OR WIDENED

PROPOSED SITE FORMATION WORKS

INTEREST

SITE OF ARCHAEOLOGICAL

SIU HANG TSUEN

PROPOSED SITE LIMIT

drawing no. scale

REVISION

NOTES :

no. date description checked approved

dateinitialname

date :

office

¤g¤ì¤uµ{³B

A3 420 x 297

COPYRIGHT RESERVED

ª© Åv ©Ò ¦³ , ¤£

CIVIL ENGINEERING OFFICE

LAND WORKS DIVISION

³]

designed

approved

ø

´y

®Ö

checked

drawn

traced

®Ö

¹Ï«h ¤ñ

¿ì¨

¤g¤ì¤uµ

DEVELOPMENT DEPARTMENT

CIVIL ENGINEERING AND

S:\

TM5

40

0\

DR

AWI

NG\

LW9

35

8.d

gn

R:\

PE

N_

TA

BL

E\filena

me

&date.tbl

12/2/2

01

5

µù

ROAD L54D

0 50 100 m

1 : 2500 SCALE BAR

05

0100

m

1 : 2

50

0

SC

AL

E

BA

R

¤é½s ¤º®e ®Ö ®Ö

寶田邨

100

HospitalTuen Mun

HospitalCastle Peak

HospitalSiu Lam

20

20

100

40

40

40

40

40

60

fungpsc
Typewriter
附件二 ENCLOSURE 2
Page 13: LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT...Tuen Mun District Council (TMDC) on 30 June 2012 and 23 November 2012 respectively on the proposed development in Area 54 of Tuen Mun. Whilst

³æ¨ ¤À¹

¹D¸ô

¦æ¨ ¦æ¨ ¦æ¤¦æ¤

¤Á­± A -

SECTION A-A

FOOTPATH TRACK

CYCLEFOOTPATHDIVIDER

CENTRAL

CARRIAGEWAY CARRIAGEWAY

FOOTPATH FOOTPATH TRACK

CYCLE

RETAINING WALL

ºØ´Ó¦æ¤

ºØ´Ó

CARRIAGEWAY CARRIAGEWAY

¦æ¨ ¦æ¨¤À¹

¹D¸ô

DIVIDER

CENTRAL ¦æ¤³æ¨ ¦æ¤ ºØ´Ó

LAY-BY

BUS

PATH

FOOT

¤Á­± B -

SECTION B-B

ºØ´Ó

ºØ´Ó

¤Ú¤h°

RETAINING WALL

AREA

LANDSCAPING

AREA

LANDSCAPING

AREA

LANDSCAPINGAREA

LANDSCAPING

AREA

LANDSCAPING

¹j­µ

NOISE BARRIER





L T LAW

W K YUEN

CROSS SECTION

TUEN MUN - PHASE 1 STAGE 1

DRAINS IN AREA 54,

FORMATION, ROADS AND

PWP ITEM - 7666CL

¤Á­

¤Î´ë°È¤uµ{²Ä

¤Ùªù²Ä54°Ï¤g¦

¤u°È¤uµ{­p¹º -

S C FUNG

DIAGRAMMATIC

drawing title¹Ï«h

¥Ü·

©m ¤éñ

¤é

­×

drawing no. scale

REVISION

NOTES :

no. date description checked approved

dateinitialname

date :

office

¤g¤ì¤uµ{³B

A3 420 x 297

COPYRIGHT RESERVED

ª© Åv ©Ò ¦³ , ¤£

CIVIL ENGINEERING OFFICE

LAND WORKS DIVISION

³]

designed

approved

ø

´y

®Ö

checked

drawn

traced

®Ö

¹Ï«h ¤ñ

¿ì¨

¤g¤ì¤uµ

DEVELOPMENT DEPARTMENT

CIVIL ENGINEERING AND

S:\

TM5

40

0\

DR

AWI

NG\

LW9

35

9.d

gn

R:\

PE

N_

TA

BL

E\filena

me

&date.tbl

12/2/2

01

5

µù

Chief Engineer

( WOO Tai-on, Gabriel)

LW 9359

¤é½s ¤º®e ®Ö ®Ö

fungpsc
Typewriter
附件三 ENCLOSURE 3
Page 14: LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT...Tuen Mun District Council (TMDC) on 30 June 2012 and 23 November 2012 respectively on the proposed development in Area 54 of Tuen Mun. Whilst

100

HospitalTuen Mun

HospitalCastle Peak

HospitalSiu Lam

100

©m ¤éñ

¤é

­×

Yung Muk

Ancestral Hall

Academia House (Block S)

Castle Peak Hospital

BSU Substation

228

165

B

202

229

A

165

A

229

26

21

22 1

24

210A210

23

52

315

231

232

235

72

83

233

236

85-87

312

311

213

127

310

128

309

250

254

252

308

A

308

251

30

254

A

253

253

A

254B

273

307

31

306

272

259

3233

305

34

260

271

305A

274

242

277

275

241

297

281

240

232

231

276

282

239

238

265

237

230

236

229

228

235

227

233

191

226

225

217

223

216

191A

13

215

206

213

205

203

222

202

221

212

211

201

1A

158

200

1

1

2-3

151

141

1A

4

156

6

140

150

7

139

5

138

8

145

-146

136

6

135

9

7

148

149

10

134-13

2

5

131

147

8

6

11

12-14

7

10

8

1112

7

9

13

10

128

11

8-10

6

14

12

132B

7

13

18-19

11

8-9

14

20

127

A

13

21

18

11

14

127

22

19

12

20

23

13

21

24

14

125A

18-20

126

22

122

125B

25

23

26

24

21

27

120

17

22

28

25

121

29

26

24

30

27

31

23

28

25-27

29

24

30

28

25-26

24

29-30

28

25

28

113

33

SIU HANG TSUEN

Po Wah Garden

Phase 3

Unicorn Garden

Kei Lun Wai

Children'sPlayground

Open

Stor

age

Open

Stor

age

Basketball Court

KEI LUN WAI

Basketball Court

Ope

n St

orag

e

Open Storage

Jockey Club

Farm HouseNew Life Organic Farm

WIP Oct 2012

CUL

WIP Oct 2012

WIP

Jan 2

013

G

WIP

Jan 2

013

WIP Jan 2013WIP Jan 2013

GG

CUL

CUL

CUL

CUL

CUL

WT

G

G

G

G

G

G

SHR

W

W

W

E

E

H

L

E

E

L

L

L

L

H

L

E

L

L

L

E

L

L

E

L

L

L

E

L

L

E

L

L

L

E

L

L

E

L

E

E

L

L

L

L

L

E

L

L

H

E

E

L

L

E

L

E

L

E

E

L

L

ET

L

L

EL

L

E

E

L

E

E

L

L

L

L

E

E

L

E

L

L

E

HL

L

L

L

L

E

L

E

E

E

E

L

ET

L

L

L

L

E

H

L

E

L

E

L

L

L

L

L

L

E

E

ET

L

H

E

L

L

L

E

E

E

L

L

L

E

L

L

ET

E

L

L

E

ET

ET

L

E

L

H

L

L

L

L

L

L

E

L

L

L

E

L

L

E

L

L

L

E

EL

L

E

H

ET

L

E

L

L

L

HLL

H

LL

TS

Z

TIN

RO

AD

1ST

LA

NE

KEI L

UN

WAI

2N

D

LA

NE

KEI L

UN

WAI

3R

D

LA

NE

KEI L

UN

WAI

4T

H

LA

NE

KEI L

UN

WAI

5T

H

LA

NE

KEI L

UN

WAI

SAN FUK ROAD

Road

FP

FP

FP

Road

FP

FP

FP

FP

FP

FB

FP

FP

FP

FB

FP

FP

FP

FB

FB

FB

FP

FP

FP

Road

RampFP

FP

Trac

k

Tra

ck

Road

FP

FPRoad

FP

Roa

d

Road

CW

FP

FP

Road

Road

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

R

115

169

158

159

167

POE

L

E

L

ETE

L

E

L

E

E

L

L

E

LE

E

E

E

FP

FP

FP

FB

FP

R

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TSTS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TS

TSTS

Block

13

Blo

ck

15

Block

12

Blo

ck

19

Blo

ck

16

Blo

ck

11

Blo

ck

20

Blo

ck

17

Blo

ck

10

Blo

ck

21

Block

2

Blo

ck

18

Block

1

Blo

ck

22

Block

3

Block

25

Block

5

Blo

ck

6

Block

23

Blo

ck

7

Block

40Bloc

k

39

Block

9

Block

38

Block

36

Block

8

Block

37

148

150

159

147

166

149

146

152

150

154

145

139

149B

144

149A

138

143

142

141

136

135

130B

41

134

38

130

129

36

3227

A

26

27

21

Pui LinGarden

Silcon Garden

Ming Wong Garden

Open Storage

Open Storage

ESS

CUL

G

G

G

PO

E

E

E

E

L

L

L

L

E

H

E

L

E

E

L

EL

L

H

L

E

L

L

L

L

E

E

L

H

EL

E

E

E

H

L

L

L

L

E

L

L

TO

NGHANG

ROAD

TONGHANG

ROAD

Track

FP

Tra

ck

Track

Track

FP

FP

FP

Track

TS

TS

TS

TS

TS

TS

86

87

81

80

15

16

17

78

79

1819

RCP

WIPOct2012

L

E

E

L

L

E

E

E

L

L

E

ET

TS

Z

TIN

RO

AD

FB

FB

ROADTONG HANG

3

3.537.3

LA

¤ñ

¦ì¸ LOCATION PLANSCALE 1:20 000

TSUEN

TSZ TINPO TONG HA

WAI

KEI LUN

MI

NG

KU

M

RD.

ESTATE

PO TIN

TSUEN

SIU HANG

OR

AS SHOWN

©

¹Ï

drawing title

1 : 2500

¶í¦

µµ¥

830200 N

830400 N

830600 N

¹Ï«h

B

B

ÄQÅ

LEGEND :¹Ï

814800 E

815000 E

815200 E

815600 E

¤p§

ȕ

µ

寶田邨

Ä_¶

¤p§

ÄQÅ

815400 E

TONG HANG

ROAD

SIU HANG TSUEN

UNICORN GRADEN

KEI LUN WAI

ÄQÅï

DRAINAGE RESERVE

0389

0389

0389

0389

A

A

Åé¨|À](ÀÀ§@ªÀ°Ï·²Ä4A(¦è)¸¹

´ë°È«

ROAD L54A

TSZ TI

N

RO

ADµ

µ¥

L T LAW

W K YUEN

Chief Engineer

( WOO Tai-on, Gabriel)

(UNDER CONSTRUCTION)

SITE 2

BOX CURVERT UNDER

TO BE CONNECTED TO

INTERCHANGE

PUBLIC TRANSPORT

¤½¦@¥æ³

SITE 3 / 4 (EAST)

(PROPOSED PUBLIC HOUSING

DEVELOPMENT)

¿³«Ø¤¤ªº±µ»é©¹²Ä

³W¹º§@¾Ç®

SCHOOL DEVELOPMENT

SITE PLANNED FOR

­«¸m¤@¬

F

(ÀÀ§@¤½¦@©²Ä3¤Î4(ªF)

¥­­

¤Î´ë°È¤uµ{²Ä2´Á²

¤Ùªù²Ä54°Ï¤g¦

¤u°È¤uµ{­p¹º -

LAYOUT PLAN

- PHASE 2 STAGES 3&4A

DRAINS IN AREA 54, TUEN MUN

FORMATION, ROADS AND

PWP ITEM - 7681CL

L54A̧

SITE 4A (WEST) (PROPOSED

COMMUNITY HALL / SPORTS

CENTRES DEVELOPMENT)

TONG HANG ROAD

A SECTION OF

REPROVISING OF

ÀÀ«Øªº¹j­

ÀÀ«Ø¾

ÀÀ«Ø½c

ÀÀ«Ø

«Ø³yª©ó¤u°È­p¹º76

ÀÀ«Øªá¼Ñ/

FOUNDATION

PROPOSED NOISE BARRIER

PROPOSED RETAINING WALL

PROPOSED BOX CULVERT

PROPOSED SLOPE

UNDER PWP ITEM 7666CL

WORKS TO BE CARRIED OUT

LANDSCAPING AREA

PROPOSED PLANTER /

WALL

PROPOSED 1m HIGH PLANTER

CROSSING

PROPOSED PEDESTRIAN

PROPOSED RUN-IN

1m TO 5m HIGH

NOISE BARRIER OF

PROPOSED VERTICAL

5m TO 5.5m HIGH

NOISE BARRIERS OF

PROPOSED CANTILEVERED

ÀÀ«Ø1¦Ìª

ÀÀ«Ø¦æ¤

ÀÀ«Ø¨®½ø

¹j­µÀÀ«Ø1¦Ì¦Ü5

¹j­µÀÀ«Ø5¦Ì¦Ü5.5

ÀÀ«Ø³

ÀÀ«Ø¦

ÀÀij·s«Ø¤Î

ÀÀ«Ø¤g¦a

¤p§|§ø¦

ÄQÅï³ò¦

ÀÀ«Ø¤u

PROPOSED CYCLE TRACK

PROPOSED FOOTWAY

CARRIAGEWAY

PROPOSED NEW OR WIDENED

WORKS

PROPOSED SITE FORMATION

SITE OF ARCHAEOLOGICAL INTEREST

SIU HANG TSUEN

SITE OF ARCHAEOLOGICAL INTEREST

KEI LUN WAI

PROPOSED SITE LIMIT

S C FUNG

LW 9360

0 50 100 m

1 : 2500 SCALE BAR

050

100

m

1 : 2

500

SC

AL

E

BA

R

drawing no. scale

REVISION

NOTES :

no. date description checked approved

dateinitialname

date :

office

¤g¤ì¤uµ{³B

A3 420 x 297

COPYRIGHT RESERVED

ª© Åv ©Ò ¦³ , ¤£

CIVIL ENGINEERING OFFICE

LAND WORKS DIVISION

³]

designed

approved

ø

´y

®Ö

checked

drawn

traced

®Ö

¹Ï«h ¤ñ

¿ì¨

¤g¤ì¤uµ

DEVELOPMENT DEPARTMENT

CIVIL ENGINEERING AND

S:\

TM5

40

0\

DR

AWI

NG\

LW9

36

0.d

gn

R:\

PE

N_

TA

BL

E\filena

me

&date.tbl

12/2/2

01

5

µù

F

F

F

¤é½s ¤º®e ®Ö ®Ö

6.9

7.3

8.3

8.7

9.2

9.2

9.4

9.5

9.8

9.8

10.1

10.3

10.4

10.5

10.8

11.0

11.0

11.3

11.6

11.9

11.9

12.2

12.5

14.1

14.5

14.7

14.9

15.0

15.0

15.0

15.1

15.1

15.1

15.1

15.215.2

15.2

15.3

15.4

15.5

15.7

16.2

16.6

16.9

17.3

17.5

17.6

17.8

17.8

17.9

17.9

18.1

18.3

18.3

18.4

18.6

18.7

18.7

18.7

18.8

18.8

18.8

18.9

19.0

19.1

19.1

19.1

19.2

19.5

20

20

20.0

20.2

20.3

20.3

20.3

20.5

20.7

21.1

21.5

21.6

22.5

22.6

23.4

23.6

24.4

24.9

25.0

25.2

25.6

25.6

25.7

25.8

25.9

26.1

26.5

26.9

27.4

27.8

28.0

28.0

29.6

31.0

fungpsc
Typewriter
附件四 ENCLOSURE 4
Page 15: LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT...Tuen Mun District Council (TMDC) on 30 June 2012 and 23 November 2012 respectively on the proposed development in Area 54 of Tuen Mun. Whilst

¦æ¤

³æ¨

¦æ¨ ¦æ¤¦aºØ

ºØ´ÓºØ´Ó

2.5¦Ì°ªx3.6¦

¡]¤º³¡¤Ø¤o

½c«¬

¦æ¤³æ¨ ¦a

ºØºØ´Ó

¦æ¤¦æ¨

2.5¦Ì°ª4¦

¡]¤º³¡¤Ø¤o

½c«¬

FOOTPATH TRACK

CYCLE

FOOTPATH

FOOTPATH TRACK

CYCLE

FOOTPATH

(2.5mH x 3.6mW)

BOX CULVERT

(2.5mH x 4mW)

BOX CULVERT

CARRIAGEWAY

CARRIAGEWAY

RETAINING WALL

¤Á­± B -

SECTION B-B

SECTION A-A

¤Á­± A -

RETAINING WALL

AREA

LANDSCAPING

AREA

LANDSCAPING

AREA

LANDSCAPING

AREA

LANDSCAPING

LANDSCAPING AREA

¹j­µ

NOISE BARRIER





¹j­µ«Ì

FOUNDATION

NOISE BARRIER

ªáÁV³

PLANTER WALL

W K YUEN

S C FUNG

L T LAW

drawing title¹Ï«h

¤Á­

¤Î´ë°È¤uµ{²Ä2´Á²

¤Ùªù²Ä54°Ï¤g¦

¤u°È¤uµ{­p¹º -

CROSS SECTION

- PHASE 2 STAGES 3&4A

DRAINS IN AREA 54, TUEN MUN

FORMATION, ROADS AND

PWP ITEM - 7681CL

DIAGRAMMATIC

©m ¤éñ

¤é

­×

drawing no. scale

REVISION

NOTES :

no. date description checked approved

dateinitialname

date :

office

¤g¤ì¤uµ{³B

A3 420 x 297

COPYRIGHT RESERVED

ª© Åv ©Ò ¦³ , ¤£

CIVIL ENGINEERING OFFICE

LAND WORKS DIVISION

³]

designed

approved

ø

´y

®Ö

checked

drawn

traced

®Ö

¹Ï«h ¤ñ

¿ì¨

¤g¤ì¤uµ

DEVELOPMENT DEPARTMENT

CIVIL ENGINEERING AND

S:\

TM5

40

0\

DR

AWI

NG\

LW9

36

1.d

gn

R:\

PE

N_

TA

BL

E\filena

me

&date.tbl

12/2/2

01

5

µù

Chief Engineer

( WOO Tai-on, Gabriel)

¥Ü·LW 9361

¤é½s ¤º®e ®Ö ®Ö

fungpsc
Typewriter
附件五 ENCLOSURE 5
Page 16: LEGISLATIVE COUNCIL PANEL ON DEVELOPMENT...Tuen Mun District Council (TMDC) on 30 June 2012 and 23 November 2012 respectively on the proposed development in Area 54 of Tuen Mun. Whilst

Enclosure 6

Species Measurements Amenity value (3) Form Health

conditionStructural condition Suitability for transplanting (4)

Conserva-tion status

(5)

Recommend-ation

Tree no. (1) Scientific

name Chinese

name height (m)

DBH (2) (mm)

crown spread

(m) (good/fair/poor) (high/med-

ium/low) Remarks (Retain/trans

-plant/fell)

Department to provide

expert advice to LandsD

Additional Remarks

A128 Delonix regia

鳳凰木 13 1335 10 Poor Fair Poor Poor Low The tree belongs to species with brittle wood structure, and is prone to branch or trunk failure.

Due to poor health with large cavities, serious decays, peeled off barks and broken main limb, the tree is not suitable for transplanting.

Due to old age, large size and declining health condition, the tree is not likely to recover from significant crown and root pruning if it is to be transplanted.

No Fell AFCD The tree is in conflict with the proposed road alignment.

If the proposed road is to be realigned in order to avoid affecting the tree, much more land resumption is required which is not cost effective.

Even if the tree could be retained in-situ, it will be very close to the future road and sidewalk and will impose high risk to the safety of pedestrians/motorists.

Since retention of the tree is considered impracticable because the survival rate after transplanting is low (please refer to ‘Remarks’), the tree is proposed to be felled.

(1) The subject tree is not in the Register of Old and Valuable Trees. (2) Diameter at Breast Height (DBH) of a tree refers to its trunk diameter at breast height (i.e. measured at 1.3 m above ground level).

(3) Amenity value of the tree is assessed by its functional values for shade, shelter, screening, reduction of pollution and noise and also its fung shui significance, and classified into the following categories. Good : important trees which should be retained by adjusting the design layout accordingly. Fair : trees that are desirable to be retained in order to create a pleasant environment, which includes healthy specimens of lesser importance than “Good” trees. Poor : trees that are dead, dying or potentially hazardous and should be removed. (4) Assessment has taken into account conditions of the tree at the time of survey (including health, structure, age and root conditions), site conditions (including topography and accessibility), and intrinsic characters of tree

species (survival rate after transplanting). (5) Conservation status is based on the rarity and protection status of the species under relevant ordinances in Hong Kong, such as Rare and Precious Plants of Hong Kong, the IUCN Red List of Threatened Species and the

Forests and Countryside Ordinance.