1
DC LT PANEL- 3 DLM FEEDER CABLE OUTGOING-2 OUTGOING-1 200 kVA UPS-1 NO RATING 3 DLM TRIP ON MCCB, 4P LSI 3 DLM TRIP ON MCCB, 4P LSI 325A MCCB 325A MCCB 3 DLM TRIP ON MCCB, 4P LSI 63A MCCB UPS -MECHANICAL BYPASS INPUT BATTERY STATIC SWITCH RECTIFIER STATIC SWITCH INVERTER BATT MCCB MULTIPLE STRINGS BATTERY TO PROVIDE 15MIN. BACKUP 200 kVA UPS-1 OUTGOING-5 BYPASS INPUT BATTERY STATIC SWITCH RECTIFIER STATIC SWITCH INVERTER BATT MCCB MULTIPLE STRINGS BATTERY TO PROVIDE 15MIN. BACKUP 20 kVA UPS-3 UPS OUT PUT PANEL-2 FEEDER CABLE 100A AL. BUS BAR LM MCB,TPN,4A RS485 3 OUTGOING-1 RATING 100/5A CT CL:1,15VA TRIP ON OFF LSI 63A, 25KA MCCB. 4P OUTGOING-2 DRY COOLER OUTGOING-3 PUMP-1-PANEL OUTGOING-4 PUMP-2 PANEL OUTGOING-5 OUTGOING-6 BMS OUTGOING-7 LIGHTING DB PUMP - OUTGOING-3 MCCB, 4P LSI 325A MCCB MCCB, 4P LSI 325A MCCB LM MCB,TPN,4A RS485 3 100/5A CT CL:1,15VA TRIP ON OFF LSI 63A, 25KA MCCB. 4P LM MCB,TPN,4A CT 800/5A CL:1,15VA 800A, 50KA ACB 4P LSIG RS485 LVM 3 SPD MCB,TP,63A 1200A AL. BUS BAR TRIP ON OFF NOTES: The panels will be built to relevant IEC specification Unless otherwise stated and or where applicable : Construction : 1. The panels will be dust and vermin proof with gaskets of the doors Installed on the panel and not on door. The compartmentalized construction is required with extendable bus bars. The entire assembly must go through 7 tank process and will be oven baked . 2. Outdoor installation will be with IP55 enclosure 3. Bus bars will be tinned copper with current density of not more than 800A / Sq. inches. 4. Base frame of at-least 4" made out of steel sections is to be provided. 5. Panel will have : Top Entry Bottom Entry Floor Mounted Installation/Wall Mounted Installation 6. Bus bar system supports will be CPRI or equal test laboratory approved. 7. All panel compartments shall have identification etched on Aluminum strip. 8. All MCB DB will have each MCB identification 9. Stands should be provided for the installation of switch board matching to height of the false floor. 10. All VFDs shall have an active-front-end design 11. All UPSs shall have an active-front-end design 12. KVAR Requirement for each transformer is 400 KVAR steps size should be appropriate considering data centre application & to maintain p.f .98 to unity. Components : 1. MCCBs will be atleast 35 kA or as specified In SLD. 2. MCBs will be atleast 10 kA short circuit withstand of the curve to suit discrimination 3. ALL protections will be coordinated 4. The range of the instruments be such that the readings will shown the mid-range of the instrument. 5. The load manager will be installed with communication port and win95 or similar graphic OS based software. 6. All ACBs will be draw out type with static relays provided for over-curent, earth fault. For DG set protection restricted earth fault protection is required. 7. MCCB to have following : Shunt trip , fault indications, Electronics trip mechanism. Earthing : 1. All doors will have flying earth. 2. Copper earth bus is to be installed. 3. Where applicable UPS system, VS system and Raw power earth shall be separate. All the earth bus installed on suitable insulators Drawings and Tests : 1. Shop drawings are required to be submitted for the review and approval 2. Test certificates for all components and the panel's routine tests are required to be provided in triplicate 3. Panel is required to be tested at site and works 8. All Panel Should Have Tvss Protection BYPASS INPUT BATTERY STATIC SWITCH RECTIFIER STATIC SWITCH INVERTER BATT MCCB MULTIPLE STRINGS BATTERY TO PROVIDE 15MIN. BACKUP 200 kVA UPS-2 BYPASS INPUT BATTERY STATIC SWITCH RECTIFIER STATIC SWITCH INVERTER BATT MCCB MULTIPLE STRINGS BATTERY TO PROVIDE 15MIN. BACKUP 20 kVA UPS-4 200 kVA UPS-2 3 DLM TRIP ON MCCB, 4P LSI 63A MCCB PAC-1 OUTGOING-6 DLC-R2 DLC-R3 SERVICE RACK-RACK PDU STORAGE RACK-RACK PDU CU UNARMOURED 4 R ... SQMM DLM 3 OUTGOING-4 SPARE OUTGOING-7 UPS -MECHANICAL OUTGOING-8 3 DLM TRIP ON MCCB, 4P LSI 100 A MCCB EB POWER BY IIT MANDI DLC-R1 LOCT- DC ROOM 3 DLM TRIP ON MCCB, 4P MCCB 3 DLM TRIP ON MCCB, 4P 125 A MCCB 3 DLM TRIP ON MCCB, 4P 125A MCCB TRIP ON MCCB, 4P 63A MCCB 3 DLM TRIP ON MCCB, 4P 63A MCCB TRIP ON MCCB, 4P 63A MCCB PAC-2 OUTGOING-8 In Row Unit OUTGOING-9 SPARE OUTGOING-10 SPARE OUTGOING-11 OUTGOING-12 OUTGOING-13 SPARE SPARE 20 KVA 20 KVA 3 DLM TRIP ON MCCB, 4P 3 DLM TRIP ON MCCB, 4P OUTGOING-1 OUTGOING-2 OUTGOING-3 OUTGOING-4 OUTGOING-5 OUTGOING-6 OUTGOING-7 OUTGOING-8 OUTGOING-9 OUTGOING-10 OUTGOING-11 OUTGOING-12 OUTGOING-13 SPARE OUTGOING-14 SPARE OUTGOING-15 SERVICE RACK-RACK PDU STORAGE RACK-RACK PDU DLC-R2 DLC-R3 DLC-R1 DLC-R2 DLC-R3 DLC-R1 LOCATION OF IEC SOCKET BOX IS ABOVE FALSE CEILING ON CABLE TRAY 400 AMP 400 AMP LI LI UPS OUT PUT PANEL-1 63A MCB. 4P 32A MCB. 4P 32A MCB. 4P 32A MCB. 4P 32A MCB. 4P 32A MCB. 4P 32A MCB. 4P 32A MCB. 4P LOCATION- DC AREA LOCATION- DC AREA 32A MCB. 4P UPS POWER OUTGOING-9 SOCKET - DB SOFT STARTER SOFT STARTER PUMP-3-PANEL PUMP-4 PANEL VFD STARTER VFD STARTER SPARE 32A MCB. 4P OUTGOING-10 32A MCB. 4P OUTGOING-11 POWER INPUT LM MCB,TPN,4A CT 800/5A CL:1,15VA 800A, 50KA ACB 4P LSIG RS485 LVM 3 TRIP ON OFF CT 800/5A CL:1,15VA TRIP ON OFF 500 KVA DG SET-AMF PANEL ELECTRICAL/MECHANICAL INTERLOCK BOOSTER SPARE 200 kVA UPS-3 BYPASS INPUT BATTERY STATIC SWITCH RECTIFIER STATIC SWITCH INVERTER BATT MCCB MULTIPLE STRINGS BATTERY TO PROVIDE 15MIN. BACKUP CU UNARMOURED 4 R ...... SQMM 3 DLM TRIP ON MCCB, 4P 400 AMP LI 200 kVA UPS-3 OUTGOING-16 OUTGOING-37 OUTGOING-36 FOR NEW HPC ,ITC AND IT RACKS- IN THIS TENDER SCOPE , LOCATION OF THESE 5 PIN SOCKET WILL BE ABOVE FALSE CEILING IN CABLE TRAY 100 A OUTGOING-14 PAC-3 OUTGOING-15 PAC-4 OUTGOING-16 SPARE 3 DLM TRIP ON MCCB, 4P 100A MCCB 3 DLM TRIP ON MCCB, 4P 100A MCCB 3 DLM TRIP ON MCCB, 4P 100A MCCB 150 DLM OUTGOING-17 OUTGOING-18 OUTGOING-19 OUTGOING-20 OUTGOING-21 OUTGOING-22 OUTGOING-23 OUTGOING-24 OUTGOING-25 OUTGOING-26 OUTGOING-27 OUTGOING-28 OUTGOING-29 OUTGOING-30 OUTGOING-31 OUTGOING-32 OUTGOING-33 OUTGOING-34 OUTGOING-33 OUTGOING-34 OUTGOING-35 Power DB RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU RACK PDU SPARES POWER INPUT POWER INPUT - LINE VOLTAGE MONITOR & CONTROL FOR DIGITAL LOAD MONITOR - EM6436 LVM DLM MANUALLY OPERATED DRAWOUT (MDO) TYPE ACB CURRENT TRANSFORMER (CT) RESIN CAST POTENTIAL TRANSFORMER (PT) MINIATURE CIRCUIT BREAKER (MCB) LOAD BREAK SWITCH MANUALLY OPERATED FIXED TYPE MCCB MANUALLY OPERATED FIXED TYPE MCCB WITH O/L, S/C & E/F RELEASE (LSIG). WITH O/L & S/C RELEASE (LSI). MANUALLY OPERATED DRAWOUT (MDO) TP+N(100%) TYPE ACB WITH O/L, S/C & E/F RELEASE (LSIG). WITH O/L & S/C RELEASE (LSI). ELECTRICALLY OPERATED DRAWOUT (EDO) TYPE ACB WITH O/L, S/C & E/F RELEASE (LSIG). M ELECTRICALLY OPERATED DRAWOUT (ED0) TYPE ACB WITH O/L & S/C RELEASE (LSI). M LEGENDS TRANSIENT VOLTAGE SURGE SUPPRESSOR R,Y,B (RED,YELLOW,BLUE) INDICATING LAMPS TVSS R B Y TRIP OFF ON-OFF-TRIP INDICATING LAMPS MAIN SWITCH BOARD MOTOR CONTROL CENTRE MSB MCC TRANSFORMER TFR MAXIMUM DEMAND CONTROLLER - EM6400 MDC OVER, UNDER VOLTAGE, SINGLE PHASE & PHASE REVERSAL PROTECTION INTEGRATED BASIC POWER & ENERGY PARAMETERS CHANGEOVER SWITCH MOTOR PROTECTION CIRCUIT BREAKER (MPCB) RESIDUAL CURRENT CIRCUIT BREAKER (RCCB) BASIC ENERGY METER - A,kW,kWH kWH H ALARM - HOOTER / BUZZER MOE (MOTOR OPERATED) FIXED TYPE MCCB WITH O/L & S/C RELEASE (LSI). M ONAN 11KV/433V STEPDOWN TRANSFORMER AIR COOLED K-20 400/400V ISOLATION TRANSFORMER ABBREVIATIONS L S I G L : OVER CURRENT WITH TIMER DELAY S : SHORT CIRCUIT CURRENT WITH TIMER DELAY I : CONTINUOS SHORT CIRCUIT G : GROUND FAULT CURRENT WITH TIME DELAY 12 ANNUNCIATION PANEL WITH HOOTER HOOTER 1 2 3 4 5 6 7 8 9 10 11 12 MANUALLY OPERATED DRAWOUT (MDO) TYPE MCCB WITH O/L & S/C RELEASE (LSI). A/M AUTO MANUAL SELECTOR SWITCH FIXED TYPE MCCB WITH O/L & S/C RELEASE (LSIG). MANUALLY OPERATED MICROPROCESSOR BASED µP TNC SWITCH WITH SPRING RETURN TO NEUTRAL AUTO / MANUAL SELECTOR SWITCH ON MOTORISED LOAD BREAK CHANGEOVER SWITCH (ATS) ONAN 11KV/433V STEPDOWN TRANSFORMER WITH OLTC AIR COOLED K-20 400/400V ISOLATION TRANSFORMER BYPASS INPUT BATTERY STATIC SWITCH RECTIFIER STATIC SWITCH INVERTER BATT MCCB MULTIPLE STRINGS BATTERY TO PROVIDE 15MIN. BACKUP UNINTERRUPTED POWER SUPPLY (UPS) ATS ELECTRICAL SINGLE LINE DIAGRAM-SLD ISSUED FOR APPROVAL TITLE OWNER CONSULTANT DRAWING NO. DRAWN APPROVED REV SCALE CKD REV DESCRIPTION DATE NTS DATE R5 --- INDIAN INSTITUTE OF TECHNOLOGY MANDI 00 SUBMITTED FOR APPROVAL CENTER FOR DEVELOPMENT OF ADVANCED COMPUTING R1 FUTURE EXPANSION ADDED 14 SEP 2021 R2 FUTURE EXPANSION ADDED- Modified R3 FUTURE EXPANSION Removed- Modified R4 FUTURE EXPANSION - Modified

LEGENDS - cdac.in

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LEGENDS - cdac.in

DC LT PANEL-

3

DLM

FEEDER

CABLE

OUTGOING-2OUTGOING-1

200 kVA UPS-1

NO

RATING

3

DLM

TRIPON

MCCB, 4P

LSI

3

DLM

TRIPON

MCCB, 4P

LSI

325A

MCCB

325A

MCCB

3

DLM

TRIPON

MCCB, 4P

LSI

63A

MCCB

UPS -MECHANICAL

BYPASS IN

PU

T

BATTERY

STATIC SWITCH

RECTIFIER

STATIC SW

ITCH

INVERTER

BATT M

CCB

MU

LTIPLE STRIN

GS BATTERY

TO

PRO

VID

E 15M

IN

. BACKU

P

200 kVA

UPS-1

OUTGOING-5

BYPASS IN

PU

T

BATTERY

STATIC SWITCH

RECTIFIER

STATIC SW

ITCH

INVERTER

BATT M

CCB

MU

LTIPLE STRIN

GS BATTERY

TO

PRO

VID

E 15M

IN

. BACKU

P

20 kVA

UPS-3

UPS OUT PUT PANEL-2

FEEDER

CABLE

100A AL. BUS BAR

LM

MCB,TPN,4A

RS485

3

OUTGOING-1

RATING

100/5A

CT

CL:1,15VA

TRIPON OFF

LSI

63A, 25KA

MCCB. 4P

OUTGOING-2

DRY COOLER

OUTGOING-3

PUMP-1-PANEL

OUTGOING-4

PUMP-2 PANEL

OUTGOING-5 OUTGOING-6

BMS

OUTGOING-7

LIGHTING DB

PUMP -

OUTGOING-3

MCCB, 4P

LSI

325A

MCCB

MCCB, 4P

LSI

325A

MCCB

LM

MCB,TPN,4A

RS485

3

100/5A

CT

CL:1,15VA

TRIPON OFF

LSI

63A, 25KA

MCCB. 4P

LM

MCB,TPN,4A

CT 800/5A

CL:1,15VA

800A, 50KA

ACB 4P

LSIG

RS485

LVM

3

SPD

MCB,TP,63A

1200A AL. BUS BAR

TRIPON OFF

NOTES:

The panels will be built to relevant IEC specification

Unless otherwise stated and or where applicable :

Construction :

1. The panels will be dust and vermin proof with gaskets of the doors

Installed on the panel and not on door. The compartmentalized

construction is required with extendable bus bars. The entire

assembly must go through 7 tank process and will be oven baked .

2. Outdoor installation will be with IP55 enclosure

3. Bus bars will be tinned copper with current density of not more than

800A / Sq. inches.

4. Base frame of at-least 4" made out of steel sections is to be provided.

5. Panel will have :

Top Entry Bottom Entry

Floor Mounted Installation/Wall Mounted Installation

6. Bus bar system supports will be CPRI or equal test laboratory

approved.

7. All panel compartments shall have identification etched on Aluminum

strip.

8. All MCB DB will have each MCB identification

9. Stands should be provided for the installation of switch board

matching to height of the false floor.

10. All VFDs shall have an active-front-end design

11. All UPSs shall have an active-front-end design

12. KVAR Requirement for each transformer is 400 KVAR steps size

should be appropriate considering data centre application & to

maintain p.f .98 to unity.

Components :

1. MCCBs will be atleast 35 kA or as specified In SLD.

2. MCBs will be atleast 10 kA short circuit withstand of the curve to suit

discrimination

3. ALL protections will be coordinated

4. The range of the instruments be such that the readings will shown

the mid-range of the instrument.

5. The load manager will be installed with communication port and

win95 or similar graphic OS based software.

6. All ACBs will be draw out type with static relays provided for

over-curent, earth fault.

For DG set protection restricted earth fault protection is required.

7. MCCB to have following :

Shunt trip , fault indications, Electronics trip mechanism.

Earthing :

1. All doors will have flying earth.

2. Copper earth bus is to be installed.

3. Where applicable UPS system, VS system and Raw power earth shall

be separate. All the earth bus installed on suitable insulators

Drawings and Tests :

1. Shop drawings are required to be submitted for the review and

approval

2. Test certificates for all components and the panel's routine tests are

required to be provided in triplicate

3. Panel is required to be tested at site and works

8. All Panel Should Have Tvss Protection

BYPASS IN

PU

T

BATTERY

STATIC SWITCH

RECTIFIER

STATIC SW

ITCH

INVERTER

BATT M

CCB

MU

LTIPLE STRIN

GS BATTERY

TO

PRO

VID

E 15M

IN

. BACKU

P

200 kVA

UPS-2

BYPASS IN

PU

T

BATTERY

STATIC SWITCH

RECTIFIER

STATIC SW

ITCH

INVERTER

BATT M

CCB

MU

LTIPLE STRIN

GS BATTERY

TO

PRO

VID

E 15M

IN

. BACKU

P

20 kVA

UPS-4

200 kVA UPS-2

3

DLM

TRIPON

MCCB, 4P

LSI

63A

MCCB

PAC-1

OUTGOING-6

DLC-R2DLC-R3

SERVICE

RACK-RACK PDU

STORAGE

RACK-RACK

PDU

CU UNARMOURED

4 R ... SQMM

DLM

3

OUTGOING-4

SPARE

OUTGOING-7

UPS -MECHANICAL

OUTGOING-8

3

DLM

TRIPON

MCCB, 4P

LSI

100 A

MCCB

EB POWER BY IIT MANDI

DLC-R1

LOCT- DC ROOM

3

DLM

TRIPON

MCCB, 4P

MCCB

3

DLM

TRIPON

MCCB, 4P

125 A

MCCB

3

DLM

TRIPON

MCCB, 4P

125A

MCCB

TRIPON

MCCB, 4P

63A

MCCB

3

DLM

TRIPON

MCCB, 4P

63A

MCCB

TRIPON

MCCB, 4P

63A

MCCB

PAC-2

OUTGOING-8

In Row Unit

OUTGOING-9

SPARE

OUTGOING-10

SPARE

OUTGOING-11

OUTGOING-12

OUTGOING-13

SPARE

SPARE

20 KVA

20 KVA

3

DLM

TRIPON

MCCB, 4P

3

DLM

TRIPON

MCCB, 4P

OUTGOING-1OUTGOING-2 OUTGOING-3

OUTGOING-4 OUTGOING-5

OUTGOING-6

OUTGOING-7 OUTGOING-8

OUTGOING-9

OUTGOING-10OUTGOING-11

OUTGOING-12

OUTGOING-13

SPARE

OUTGOING-14

SPARE

OUTGOING-15

SERVICE

RACK-RACK PDU

STORAGE

RACK-RACK

PDU

DLC-R2DLC-R3

DLC-R1

DLC-R2DLC-R3

DLC-R1

LOCATION OF IEC SOCKET BOX IS ABOVE FALSE CEILING ON CABLE TRAY

400 AMP

400 AMP

LI

LI

UPS OUT PUT PANEL-1

63A

MCB. 4P

32A

MCB. 4P

32A

MCB. 4P

32A

MCB. 4P

32A

MCB. 4P

32A

MCB. 4P

32A

MCB. 4P

32A

MCB. 4P

LOCATION- DC AREA

LOCATION- DC AREA

32A

MCB. 4P

UPS POWER

OUTGOING-9

SOCKET - DB

SOFT STARTER SOFT STARTER

PUMP-3-PANEL PUMP-4 PANEL

VFD STARTER VFD STARTER

SPARE

32A

MCB. 4P

OUTGOING-10

32A

MCB. 4P

OUTGOING-11

POWER INPUT

LM

MCB,TPN,4A

CT 800/5A

CL:1,15VA

800A, 50KA

ACB 4P

LSIG

RS485

LVM

3

TRIPON OFF

CT 800/5A

CL:1,15VA

TRIPON OFF

500 KVA DG SET-AMF PANEL

ELECTRICAL/MECHANICAL INTERLOCK

BOOSTER

SPARE

200 kVA UPS-3

BYPASS IN

PU

T

BATTERY

STATIC SWITCH

RECTIFIER

STATIC SW

ITCH

INVERTER

BATT M

CCB

MU

LTIPLE STRIN

GS BATTERY

TO

PRO

VID

E 15M

IN

. BACKU

P

CU UNARMOURED

4 R ...... SQMM

3

DLM

TRIPON

MCCB, 4P

400 AMP

LI

200 kVA

UPS-3

OUTGOING-16

OUTGOING-37OUTGOING-36

FOR NEW HPC ,ITC AND IT RACKS- IN THIS TENDER SCOPE , LOCATION OF THESE 5 PIN

SOCKET WILL BE ABOVE FALSE CEILING IN CABLE TRAY

100 A

OUTGOING-14

PAC-3

OUTGOING-15

PAC-4

OUTGOING-16

SPARE

3

DLM

TRIPON

MCCB, 4P

100A

MCCB

3

DLM

TRIPON

MCCB, 4P

100A

MCCB

3

DLM

TRIPON

MCCB, 4P

100A

MCCB

150

DLM

OUTGOING-17OUTGOING-18 OUTGOING-19

OUTGOING-20OUTGOING-21

OUTGOING-22OUTGOING-23

OUTGOING-24OUTGOING-25

OUTGOING-26 OUTGOING-27OUTGOING-28

OUTGOING-29OUTGOING-30

OUTGOING-31

OUTGOING-32OUTGOING-33

OUTGOING-34 OUTGOING-33OUTGOING-34

OUTGOING-35

Power DB

RACK PDURACK PDU

RACK PDU

RACK PDURACK PDU

RACK PDU

RACK PDURACK PDU

RACK PDU RACK PDU

RACK PDURACK PDU

RACK PDU

RACK PDURACK PDU

RACK PDU

RACK PDU

RACK PDURACK PDU

RACK PDU

RACK PDURACK PDU

RACK PDU

RACK PDU

SPARES

POWER INPUTPOWER INPUT -

LINE VOLTAGE MONITOR & CONTROL FOR

DIGITAL LOAD MONITOR - EM6436

LVM

DLM

MANUALLY OPERATED DRAWOUT (MDO) TYPE ACB

CURRENT TRANSFORMER (CT) RESIN CAST

POTENTIAL TRANSFORMER (PT)

MINIATURE CIRCUIT BREAKER (MCB)

LOAD BREAK SWITCH

MANUALLY OPERATED FIXED TYPE MCCB

MANUALLY OPERATED FIXED TYPE MCCB

WITH O/L, S/C & E/F RELEASE (LSIG).

WITH O/L & S/C RELEASE (LSI).

MANUALLY OPERATED DRAWOUT (MDO) TP+N(100%) TYPE ACB

WITH O/L, S/C & E/F RELEASE (LSIG).

WITH O/L & S/C RELEASE (LSI).

ELECTRICALLY OPERATED DRAWOUT (EDO) TYPE ACB

WITH O/L, S/C & E/F RELEASE (LSIG).

M

ELECTRICALLY OPERATED DRAWOUT (ED0) TYPE ACB

WITH O/L & S/C RELEASE (LSI).

M

LEGENDS

TRANSIENT VOLTAGE SURGE SUPPRESSOR

R,Y,B (RED,YELLOW,BLUE) INDICATING LAMPS

TVSS

R BY

TRIPOFF

ON-OFF-TRIP INDICATING LAMPS

MAIN SWITCH BOARD

MOTOR CONTROL CENTRE

MSB

MCC

TRANSFORMERTFR

MAXIMUM DEMAND CONTROLLER - EM6400MDC

OVER, UNDER VOLTAGE, SINGLE PHASE &

PHASE REVERSAL PROTECTION

INTEGRATED BASIC POWER & ENERGY PARAMETERS

CHANGEOVER SWITCH

MOTOR PROTECTION CIRCUIT BREAKER (MPCB)

RESIDUAL CURRENT CIRCUIT BREAKER (RCCB)

BASIC ENERGY METER - A,kW,kWHkWH

H

ALARM - HOOTER / BUZZER

MOE (MOTOR OPERATED) FIXED TYPE MCCB

WITH O/L & S/C RELEASE (LSI).

M

ONAN 11KV/433V STEPDOWN TRANSFORMER

AIR COOLED K-20 400/400V ISOLATION TRANSFORMER

ABBREVIATIONS

L S I G L : OVER CURRENT WITH TIMER DELAY

S : SHORT CIRCUIT CURRENT WITH TIMER DELAY

I : CONTINUOS SHORT CIRCUIT

G : GROUND FAULT CURRENT WITH TIME DELAY

12 ANNUNCIATION PANEL WITH HOOTER

HOOTER

1 2 3 4

5 6 7 8

9 10 11 12

MANUALLY OPERATED DRAWOUT (MDO) TYPE MCCB

WITH O/L & S/C RELEASE (LSI).

A/M

AUTO MANUAL SELECTOR SWITCH

FIXED TYPE MCCB WITH O/L & S/C RELEASE (LSIG).

MANUALLY OPERATED MICROPROCESSOR BASED

µP

TNC SWITCH WITH SPRING RETURN TO NEUTRAL AUTO /

MANUAL SELECTOR SWITCH

ON

MOTORISED LOAD BREAK CHANGEOVER SWITCH (ATS)

ONAN 11KV/433V STEPDOWN TRANSFORMER WITH OLTC

AIR COOLED K-20 400/400V ISOLATION TRANSFORMER

BYPASS IN

PU

T

BATTERY

STATIC SWITCH

RECTIFIER

STATIC SW

ITCH

INVERTER

BATT M

CCB

MU

LTIPLE STRIN

GS BATTERY

TO

PRO

VID

E 15M

IN

. BACKU

P

UNINTERRUPTED POWER SUPPLY (UPS)

ATS

ELECTRICAL SINGLE LINE DIAGRAM-SLD

ISSUED FOR APPROVAL

TITLE

OWNERCONSULTANTDRAWING NO.

DRAWN

APPROVED

REV

SCALE

CKD

REV DESCRIPTION DATE

NTSDATE

R5

---

INDIAN INSTITUTE OF TECHNOLOGY MANDI

00 SUBMITTED FOR APPROVAL

CENTER FOR DEVELOPMENT OFADVANCED COMPUTING

R1 FUTURE EXPANSION ADDED

14 SEP 2021

R2 FUTURE EXPANSION ADDED- ModifiedR3 FUTURE EXPANSION Removed- ModifiedR4 FUTURE EXPANSION - Modified

AutoCAD SHX Text
RS485
AutoCAD SHX Text
OFF
AutoCAD SHX Text
ON
AutoCAD SHX Text
TRIP
AutoCAD SHX Text
OFF
AutoCAD SHX Text
ON
AutoCAD SHX Text
TRIP
AutoCAD SHX Text
RS485
AutoCAD SHX Text
RS485
AutoCAD SHX Text
RS485
AutoCAD SHX Text
3
AutoCAD SHX Text
=
AutoCAD SHX Text
=
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
=
AutoCAD SHX Text
=
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
=
AutoCAD SHX Text
=
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
=
AutoCAD SHX Text
=
AutoCAD SHX Text
3
AutoCAD SHX Text
RS485
AutoCAD SHX Text
RS485
AutoCAD SHX Text
RS485
AutoCAD SHX Text
RS485
AutoCAD SHX Text
RS485
AutoCAD SHX Text
RS485
AutoCAD SHX Text
RS485
AutoCAD SHX Text
RS485
AutoCAD SHX Text
RS485
AutoCAD SHX Text
MCCB 800 AMPS 4 POLE LSIG
AutoCAD SHX Text
4C 240 SQMM 3R A2XFY
AutoCAD SHX Text
3
AutoCAD SHX Text
=
AutoCAD SHX Text
=
AutoCAD SHX Text
3
AutoCAD SHX Text
RS485
AutoCAD SHX Text
RS485
AutoCAD SHX Text
RS485
AutoCAD SHX Text
RS485
AutoCAD SHX Text
RS485
AutoCAD SHX Text
T
AutoCAD SHX Text
N
AutoCAD SHX Text
C
AutoCAD SHX Text
A
AutoCAD SHX Text
M
AutoCAD SHX Text
3
AutoCAD SHX Text
=
AutoCAD SHX Text
=
AutoCAD SHX Text
3
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
3
AutoCAD SHX Text
4
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
8
AutoCAD SHX Text
7
AutoCAD SHX Text
6
AutoCAD SHX Text
5
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
C