Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13 , 2014 CKC meeting , T. Camporesi 1 CMS: status

Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

Embed Size (px)

Citation preview

Page 1: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

Legacy from Run1Readiness for 2015Phase 1 upgradesPhase 2 upgrades

October 13 , 2014 CKC meeting , T. Camporesi 1

CMS: status

Page 2: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

CMS daily life

• Winding down exploitation of Run1 data• LS1 activities• Preparing for 2015 run: the top priority• Upgrade phase 1 • Upgrade phase2 : focus on technical

proposal and detailed cost estimation

October 13 , 2014 CKC meeting , T. Camporesi 2

Page 3: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

Legacy from Run1

3

+23 CRAFT based+27 in CWR/FR

335 papers submitted

Slope remains steady

October 13 , 2014 CKC meeting , T. Camporesi

Page 4: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

Top mass

4TOP-14-002,TOP-14-010, TOP-14-015

We have completed our top mass measurements using both the fully hadronic decays (TOP-14-002) and the fully leptonic ones (TOP-14-010), and produced the final Run 1 combination (TOP-14-015)

• 8 individual results are combined, including dilepton, lepton+jets, and all-hadronic channels, and data from all of “Run 1” (including 2010 data) are included

• The fully leptonic analysis is the first “blind” top mass measurement in CMS

• Precision now at the level of 0.38% !!

October 13 , 2014 CKC meeting , T. Camporesi

Page 5: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

Higgs : the final word from CMS

5

With the completion of the “big 5” we have produced a preliminary combination of all results (HIG-14-009), and work continues on the final publication➡The combination was made public concurrently to H→γγ paper

submission and presented for the first time in ICHEP.

𝜇=1.00±0.13mH=125.05±0.30 GeV

Goal: submission by mid-Dec fo final CMS combination paper

October 13 , 2014 CKC meeting , T. Camporesi

Page 6: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

A CMS milestone

October 13 , 2014 CKC meeting , T. Camporesi 6

Received on June 17th from Nature editorDear Author,

Your paper 'Evidence for the direct decay of the 125 GeV Higgs boson to fermions' has now been scheduled for Advance Online Publication (AOP) on Nature Physics's website on 22 June 2014 at 1800 London time / 1300 US Eastern time, which is when the embargo will lift. 

Page 7: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

CMS 2015 readiness: executive summary

• Detector:LS1 upgrades and repairs done • Recent ‘surprise’ : BPIX quarter with 47 modules (7% of total BPIX

modules) not responding. Repairs done : reassembling the detector and progressing in understanding causesCausing stress, but not affecting overall ‘ready-for-beam schedule’

• Commissioning and run: DAQ2 and new Timing and Control system (TCDS) deployed and being exercised in regular Mid Week Global Runs. Order for HLT PCs to be replaced being prepared.

• Software& Computing: summer challenge exercise just finished successfully

• Analysis, PHYS14 exercise planned: aim to prepare high priority analysis for speedy results on first 1-5 fb-1

October 13 , 2014 CKC meeting , T. Camporesi 7

Page 8: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

• Strips running at T=-15C; pixel pipes @-20C– final seal and final heater

configuration applied• Outside temperatures all OK• Inside humidities look great

• Next step is to test the sealing with B field on

October 13 , 2014 CKC meeting , T. Camporesi 8

Tracker @ P5

Page 9: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

4th muon wall completed in endcaps CSC and RPC

October 13 , 2014 CKC meeting , T. Camporesi 9

ME4/2

RE4

A Korean success

Page 10: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

Shielding disk (YE4) constructed in both endcaps

October 13 , 2014 CKC meeting , T. Camporesi 10

Page 11: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

New beampipe

October 13 , 2014 CKC meeting , T. Camporesi 11

New reduced Diam. Pipe ready for installation of upgraded pixel in 2017

Page 12: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

Pixel• 7% of BPIX modules were found unresponsive

(all in one quadrant) at final checkout time• The other ¾ of the BPIX are OK• The problem is an Ohmic short between wire-bond

pads with highest DV in proximity to SMD components on the High Density Interconnect (HDI) – The shorts look like “whiskers” or “dendrites” which can

be ‘scratched off– Short developed during LS1 (probably: moisture + flux

residue + applied voltage)• All BPIX modules have been repaired/replaced by new

modules as of last week• Plan to have BPIX back at CERN early November

• Consequence: re-optimization of LS1 schedule • We are proceeding now to close the detector

and power the magnet and re-open aiming to install pixels in DecemberOctober 13 , 2014 CKC meeting , T. Camporesi 12

Layer 3 with modules taken off

Reset2.5V

Aout~0.1V

SMD Capsolder footprintrosin based flux

Page 13: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

And more …

• New SiPM in outer hadron Calorimeter (done) • New Thin window,multianode PMT in HF (done)• New mTCA readout for HF (deployed)• ECAL endcap repairs, Preshower recommissioned after

dismounting to fix connector power non conformity • Muon barrel Drift tubes: repairs, relocation of sector collectors

in Service cavern, new Theta trigger board (done)• Major upgrades in Beam monitoring ( e.g.new silicon pixel based

lumi monitor ,PLT) in progress• Preparation for trigger upgrade ( optical splitting and so on)

(done)October 13 , 2014 CKC meeting , T. Camporesi 13

Page 14: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

14

Computing: resources and usage• CMS has consistently used essentially

all the capacity available plus some additional during 2014– Many simultaneous high priority

activities are on-going• Run1 samples, CSA14, upgrade samples

• CMS is systematically low on Tier-1 pledges– Tape is the lowest at -10%

• Tape is a cumulative capacity, the increase for 2015 was 19PB and we are 7PB short in the total

– Relative deficit is large

Jan-14 Feb-14 Mar-14 Apr-14 May-14 Jun-14 Jul-14 Aug-140

20

40

60

80

100

120

140

160

CMS Percentage of Pledge Used

T1T2

T0 CPU (H

EP-SP

EC06/1

0)

T0 Disk

(Tbyte

s)

T0 Ta

pe (Tb

ytes)

T1 CPU (H

EP-SP

EC06/1

0)

T1 Disk

(Tbyte

s)

T1 Ta

pe (Tb

ytes)

T2 CPU (H

EP-SP

EC06/1

0)

T2 Disk

(Tbyte

s)0

10000

20000

30000

40000

50000

60000

70000

80000

PledgedRequested

CMS 2015 Pledges/Requests

October 13 , 2014 CKC meeting , T. Camporesi

Page 15: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

Heavy ion in 2015

• The Ion Period in Run 2 will be the first high luminosity Pb run in the LHC Ion program

• Projected machine performance– Peak Lumi ~4 1027 cm-2s-1

• 4x LHC design value! – Max. Interaction rate ~30kHz

• 8x 2011 PbPb rate– Integrated lumi:

• 0.8nb-1 if optimized for ALICE (long fills)• Up to 1.5 nb-1 if optimized for CMS/ATLAS (short fills)• Negotiations with LPC ongoing

• Key hardware ingredient to coping with the high interaction rate is the L1 Calorimeter Upgrade

• HLT, Computing, Offline Software, DQM and Reconstruction project areas have been staffed with dedicated HI contact persons and support teams to improve communications with the corresponding CMS pp experts to ensure timely preparations for data takingOctober 13 , 2014 CKC meeting , T. Camporesi 15

Page 16: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

Phase 1 upgrades

• Executive summary– Pixel detector to be installed in shutdown 2016-2017:

pre-production of electronics components done, moving to production, assembly sites being qualified, sensors production ongoing

– Trigger: resources loaded planning validated, past milestones achieved in time. Stage 1 on track for usage at startup 2015.

– HCAL: HF PMT, HF mTCA backend, HO SiPMT deployed in LS1 as foreseen. On track for full deployment in LS2

October 13 , 2014 CKC meeting , T. Camporesi 16

Page 17: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

Phase 2 Upgrade

• Draft version of Technical proposal discussed with the LHCC: complete detector HW description and preliminary physics performance studies

• In order to properly document physics performance studies using full simulation and HL LHC environment, agreed to submit final version for approval in March 2015

• Improved cost estimate wrt to preliminary RRB document available.

October 13 , 2014 CKC meeting , T. Camporesi 17

Page 18: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

18

Trigger/DAQ• L1 (hardware) with tracks and rate up 500 kHz to 1 MHz∼• Latency ≥ 10µs• HLT output up to 10 kHzOctober 13 , 2014 CKC meeting , T. Camporesi

New Lumi and BCM

Page 19: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

Phase 2 Upgrade: timelines,cost

October 13 , 2014 CKC meeting , T. Camporesi 19

Technical proposal for phae 2 upgrade will be submitted to the April,2015 session of the RRB

Page 20: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

Korea and CMS

• We are grateful for the big contribution to the success of the RPC RE4 project

• We are impressed by the growing contribution of Korean colleagues to the Physics program of CMS

• In the last year we have seen a reduction of the EPR ( Experimental Physics Responsibility) tasks contributed with respect to the expected ones: we hope that the future operation budget will allow to correct this

October 13 , 2014 CKC meeting , T. Camporesi 20

Page 21: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

The future is bright ( and VERY busy)!

• We have exploited the run1 data : our legacy for the Higgs results is published, the majority of searches analysis are published or being published, Top physics results are beyond expectations, B rare decays an evidence of CMS global performance from trigger to reconstruction.. and more

• We are now concentrating on the preparation for the 2015 run: we will again explore new frontiers

• We have defined the technical proposal for our High Lumi Detector. Next step will be the choice of the forward calorimeter and the preparation of the TDRs

• We have witnessed a clear ramp-up in the quality and quantity of Physics contributions from Korea

• We are starting the process to idenitfy the key actors for the Phase 2 upgrade program and we count on Korea being one of them

October 13 , 2014 CKC meeting , T. Camporesi 21

Page 22: Legacy from Run1 Readiness for 2015 Phase 1 upgrades Phase 2 upgrades October 13, 2014CKC meeting, T. Camporesi1 CMS: status

Summary

CKC meeting , T. Camporesi 22