Page 2: Lee County Electric Cooperative 2007 Hurricane Preparedness Activities

Collier

HendryLee

GladesCharlotte

Broward

Monroe

Miami-Dade

Lee

State Highway 74

Sta

te H

igh

way

29

River

I

Joel

Corkscrew

State Highway 80

Veteran's

Ort

iz

United States Highway 27

San Marco

15

th

Colonial

Bu

rnt

Sto

re

Va

nd

erb

ilt

Daniels

Bu

rnt

Sto

re

Ta

mia

mi

Sta

te H

igh

way

29

I-7

5

River

LCEC Service Territory

Page 3: Lee County Electric Cooperative 2007 Hurricane Preparedness Activities

Restoration Plan

• Plan Update – Began February 2007– Complete May 2007

• Employee Training– May 7th through June 8th

Page 4: Lee County Electric Cooperative 2007 Hurricane Preparedness Activities
Page 5: Lee County Electric Cooperative 2007 Hurricane Preparedness Activities

Transmission Preparation

Activity Percent Complete of YTD Goal (May)

Bucket/ Climbing Inspection of Each Pole 93%

Flying Patrol 100%

Infra-Red Inspections 100%

Water Crossing Inspections 100%

GOAB Switch Adjustments 100%

Page 6: Lee County Electric Cooperative 2007 Hurricane Preparedness Activities

Substation Preparation

Activity Percent Complete of YTD Goal (May)

Monthly Substation Inspections 95%

230 kV Breaker Maintenance 100%

Transformer Maintenance 400%

(Note: Moved Transformer Maintenance to Spring)

Substation Switch Maintenance 30%

(Note: Moved Switch Maintenance to Fall)

Distribution Breakers 80%

Infra-Red Inspections 100%

Page 7: Lee County Electric Cooperative 2007 Hurricane Preparedness Activities

Distribution Preparation

Activity Percent Complete of YTD Goal (May)

Three Phase Mechanical 100%

Single Phase Mechanical 75%

Single Phase Visual 100%

Distribution Switches 250%

Reclosers 195%

Infra-Red Inspection 100%

Avian Protection 100%

Page 8: Lee County Electric Cooperative 2007 Hurricane Preparedness Activities

Vegetation Management Preparedness

Activity Percent Complete of YTD Goal (May)

230 kV Transmission 100%

138 kV Transmission 100%

Transmission ROW Mowing 100%

Three Phase Distribution 100%

Single Phase Distribution 95%

Page 9: Lee County Electric Cooperative 2007 Hurricane Preparedness Activities

Governmental Coordination

• Employee Liaison's staff the following Emergency Operations Centers in LCEC’s Service Area for Coordination of Activities:– Lee County– Collier County– City of Cape Coral– City of Marco Island– City of Sanibel Island

Page 10: Lee County Electric Cooperative 2007 Hurricane Preparedness Activities

Standards of Construction

• LCEC's construction standards, policies, guidelines, practices, and procedures comply with the National Electrical Safety Code (ANSI C-2) [NESC]. Electrical facilities constructed through December 31, 2006 comply with the edition of the code in effect at the time of the facility’s initial construction.

Page 11: Lee County Electric Cooperative 2007 Hurricane Preparedness Activities

Standards of Construction

• LCEC has construction standards, for required facilities, that meet the extreme wind loading standards specified by Figure 250-2(d) of the 2002 edition of the NESC.

• LCEC is an active participant in the Utility Sponsor Steering Committee on collaborative research efforts associated with storm hardening.

Page 12: Lee County Electric Cooperative 2007 Hurricane Preparedness Activities

Standards of Construction

• Although not waterproof, LCEC's equipment and constructed facilities are designed to be water resistant. The majority of our underground facilities (excluding conduits and cables) are at or above existing/surrounding grade. Even with these design and installation considerations, LCEC experienced some significant damage to our underground facilities as the result of flooding and storm surges. On the other hand, it has been LCEC's experience that flooding and storm surges have little effect on overhead facilities whether part of an underground or overhead system.

Page 13: Lee County Electric Cooperative 2007 Hurricane Preparedness Activities

Standards of Construction

• LCEC's standards for joint use provide clearances (distances) for conductors, equipment, and risers. The joint use agreements that are entered into with pole attachment parties detail the process for evaluating pole loading capacity. Additionally, the agreements define the responsibilities for pole reliability and upgrading. Currently, LCEC does not permit attachments to transmission poles.

Page 14: Lee County Electric Cooperative 2007 Hurricane Preparedness Activities

Joint Use Survey

• LCEC is in the process of doing a System Wide Joint Use Survey– Verify Attachments– Identify any Clearance Violations– Identify any uncompleted field work