Upload
arunava-sarkar
View
219
Download
0
Embed Size (px)
Citation preview
8/10/2019 Lecture2_social Infrastructure Planning
1/26
A31034: INFRASTRUCTURE SERVICES (2012)
Lecture 02 Social infrastructure planing
Post Graduate Lecture, GATEWAY COLLEGE ,SONEPAT
8/10/2019 Lecture2_social Infrastructure Planning
2/26
8/10/2019 Lecture2_social Infrastructure Planning
3/26
CONTENTS
Social Infrastructure planning (for Housing ):
Integrated Township at Atali-Dahej Phase II
Integrated Township on the banks of Narmada River
8/10/2019 Lecture2_social Infrastructure Planning
4/26
8/10/2019 Lecture2_social Infrastructure Planning
5/26
CONTENTS
Location
Dahej PCPIROne of the countrys largest Petrochemical Region
8/10/2019 Lecture2_social Infrastructure Planning
6/26
CONTENTS
The region
7 notified SEZs within the catchment area, including functional Dahej SEZ of 1,719 ha
with processing area of 1698 ha without any provision for housing
DMIC corridor is passing through Bharuch (Bharuch-Dahej Investment Region and
Vadodara-Ankleshwar Industrial Area are planned for development)
8/10/2019 Lecture2_social Infrastructure Planning
7/26
CONTENTS
The region
Project site is strategically located in Vagra Taluka,
Dahej along 4 lane SH-6 in Dahej PCPIR ,
Bharuch district, GujaratOffsite trunk infrastructure already in place.
8/10/2019 Lecture2_social Infrastructure Planning
8/26
CONTENTS
The site
Site Details
Site Area is 292.93 Ha
Area under canals5.3 Ha
Land Status
Land acquisition is under progress
8/10/2019 Lecture2_social Infrastructure Planning
9/26
CONTENTS
The site
11 KVA Transmission line along the SH-6
Gas pipeline passing through the site
ONGC pipeline passing through the site
Water supply line along SH-6 (8 MGD-
additional 17 MGD pipeline is along the
other side of SH-6)
Narmada Canal passing through the site
8/10/2019 Lecture2_social Infrastructure Planning
10/26
CONTENTS
The brief :Demand Supply
Only Industrial township project within PCPIR to be developed on PPP format.
Considering a catchment area of 20 25km(4notifiedSEZs, PCPIR region and Dahej
Industrial Estate including functional SEZ in Dahej), there is a dire need of housing in
Dahej due to following r reasons
Large no of Employees working in Industries within Dahej PCPIR commute from nearby
urban areas like Bharuch (42km),Ankleshwar(56km)and Vadodara(111km)The proposedAtali
Township will substantially reduce their commuting time.
Initially township of 293 ha has been earmarked at Atali and Kaladara villages for
residential and other supporting facilities to fulfill the housing requirement of the entirePCPIR region of 453 sqkm.
As per PCPIR Master Plan, the total investments worth Rs. 50,000 crores are expected
to generate employment of around 8 lakh people and housing demand of 1 lakh
Dwelling Units.
This township is proposed to accommodate around 15000 Dwelling Units
8/10/2019 Lecture2_social Infrastructure Planning
11/26
Total housing demand of around 25000 Dwelling housing units in base case scenario
and 39000DUs in optimistic scenario. This demand has been estimated based onprimary market survey, stakeholder consultations, and industry assessment, analysis of
employment pattern in existing and upcoming industries within PCPIR region. However
The proposed Township (293ha) shall accommodate around 15000 Dwelling Units
This demand does not include the current demand of Atali Township Phase I
(146ha)
This demand is spread across various housing typology: 4BHKBungalows,
3BHKBungalows, 3BHKRowHouses, 2BHKApartments, 1BHK Apartments, Economic
Housing (hostel/dormitory/1 RK apartment/ Studio Apartment)
CONTENTS
The brief :Demand Supply
8/10/2019 Lecture2_social Infrastructure Planning
12/26
8/10/2019 Lecture2_social Infrastructure Planning
13/26
CONTENTS
The brief :
Energy efficient buildinggreen architecture
Encourage use of green architecture in building
design for important buildings.
Eco-friendly transport System
Central Green Space and continuous green belt
along major transport corridor (Cycle Track &
Jogging Track)
Encourage Pedestrian Movement
Eco friendly public transport
Zero Waste
Sustainable treatment of solid wastesUse of recycled water for gardening (non-
potable water)
Community based Neighborhood Planning
Social Amenities within walking distanceCycle Track / Jogging Track
Central Green Park
8/10/2019 Lecture2_social Infrastructure Planning
14/26
CONTENTS
The concept:
8/10/2019 Lecture2_social Infrastructure Planning
15/26
CONTENTS
8/10/2019 Lecture2_social Infrastructure Planning
16/26
CONTENTS
The Masterplan
CONTENTS
8/10/2019 Lecture2_social Infrastructure Planning
17/26
CONTENTS
The Masterplan: Area statement
CONTENTS
8/10/2019 Lecture2_social Infrastructure Planning
18/26
CONTENTS
The Masterplan: Sector Level Standard Landuse Pattern
As per Regulation for Residential Township 2009Gujarat Government Notification (Department of Urban
Development & Urban Housing, GoG)
SourceUrban Development Plans Formulation and Implementation Guidelines (UDPFI)
CONTENTS
8/10/2019 Lecture2_social Infrastructure Planning
19/26
CONTENTS
The Masterplan: Draft Area Statement
CONTENTS
8/10/2019 Lecture2_social Infrastructure Planning
20/26
CONTENTS
The Masterplan
CONTENTS
8/10/2019 Lecture2_social Infrastructure Planning
21/26
CONTENTS
The Masterplan: City Level Social Infrastructure & Utilities
CONTENTS
8/10/2019 Lecture2_social Infrastructure Planning
22/26
CONTENTS
The Masterplan: City Level Social Infrastructure & Utilities
Total Area 38.55 ha
CONTENTS
8/10/2019 Lecture2_social Infrastructure Planning
23/26
CONTENTS
The Masterplan: Sector Level Social Infrastructure & Utilities
Total Area 4.7 ha per sector
CONTENTS
8/10/2019 Lecture2_social Infrastructure Planning
24/26
CONTENTS
The Masterplan: Physical Infrastructure Assessment
* Assuming Household size of 5
CONTENTS
8/10/2019 Lecture2_social Infrastructure Planning
25/26
CONTENTS
Role of Stakeholders
CONTENTS
8/10/2019 Lecture2_social Infrastructure Planning
26/26
CONTENTS
Norms and Standards