LECTURE ON PILE FOUNDATIONS
BYDR.K.K.MOZA
SPECIAL ADVISORSIMPLEX INFRASTRUCTURES LIMITED
PILE FOUNDATIONPILES ARE COLUMN LIKE ELEMENTS IN A FOUNDATION WHICH HAVE THE FUNCTION OF TRANSFERRING LOAD FROM SUPER STRUCTURE THROUGH WEAK COMPRESSIBLE STRATA OR THROUGH WATER , ONTO STIFFER OR MORE COMPACT OR LESS COMPRESSIBLE SOILS OR ONTO ROCK.
THEY ARE STRUCTURAL MEMBERS OF RELATIVELY SMALL CROSS SECTIONAL AREA CAPABLE OF INTERACTING WITH SURROUNDING SOIL AND DEVELOPING SOIL SUPPORT.
PILES FIND APPLICATION IN FOUNDATIONS TO TRANSFER LOADS FROM A STRUCTURE TO COMPETENT SUBSURFACE STRATA HAVING ADEQUATE LOAD BEARING CAPACITY.
PILES TRANSFER AXIAL LOADS EITHER SUBSTANTIALLY BY FRICTION ALONG ITS SHAFT AND/OR SUBSTANTIALLY BY END BEARING.
THE INSTALLATION OF PILES DEMAND, CAREFUL CONTROL ON POSITION,ALIGNMENT AND DEPTH AND INVOLVE SPECIALISED SKILL AND EXPERIENCE.
HISTORICAL
• WOODEN PILES WERE DRIVEN INTO MIDDLE OF LAKE BOTTOM TO PROTECT HOUSES AND PROTECTION FROM INTRUDERS AND ANIMALS.
• IN BRITAIN THERE ARE NUMEROUS EXAMPLES OF TIMBER PILING IN BRIDGE WORKS AND RIVER SIDE SETTLEMENTS CONSTRUCTED BY ROMANS.
• TO TRANSFER LOADS FROM SUPERSTRUCTURE THROUGH WEAK COMPRESSIBLE STRATA OR WATER TO DEEPER SOIL STRATA CAPABLE OF WITHSTANDING THE LOADS WITH DESIRED F.O.S.
• TO CARRY UPLIFT LOADS WHEN USED TO SUPPORT TALL STRUCTURES SUBJECTED TO OVERTURNING FORCES FROM WINDS AND WAVES.
• TO CARRY LATERAL LOADS WHEN PILE IS SUBJECTED TO TRANSVERSE FORCES SUCH AS WIND , EARTHQUAKE, WATERCURRENT, EARTH PRESSURE MOVING VEHICLES, PLANT AND EQUIPMENT, IMPACT OF BERTHING SHIPS AND FROM WAVES.
• TO CARRY COMBINATIONS OF VERTICAL AND HORIZONTAL LOADS WHERE PILES ARE USED TO SUPPORT RETAINING WALLS,BRIDGE PIERS AND ABUTMENTS AND MACHINERY FOUNDATIONS.
FUNCTIONS OF PILES
LOAD TRANSFER MECHANISM IN PILES
Q=Qs+QbQ= ULTIMATE LOAD CARRYING
CAPACITY OF THE PILEQs= SHAFT RESISTANCEQb = END BEARINGAS = SURFACE AREA OF PILE SHAFT
Ab = CROSS SECTIONAL AREA OF PILE TOE
fs = UNIT SKIN FRICTION
qb = UNIT END BEARING RESITANCE
Qb = Ab. qb
Qs=fs.As
Q
PILE - TYPE & CLASSIFICATION
• BASED ON INSTALLATION– DRIVEN
» CAST IN-SITU CONCRETE» PRECAST CONCRETE» PRECAST JOINTED» PRECAST-PRESTRESSED CONCRETE» STEEL
– BORED» CAST IN-SITU CONCRETE» PRECAST CONCRETE GROUTED IN PRE-BORED
HOLES
PILE - TYPE & CLASSIFICATION
• BASED ON MATERIAL• CONCRETE, STEEL & TIMBER
• BASED ON FUNCTION• FRICTION, END BEARING OR COMBINATION
• BASED ON SHAPE• SQUARE, ROUND, HEXAGONAL OCTAGONAL, H OR I-
SECTION• BASED ON INCLINATION
• VERTICAL OR BATTERED (RAKER PILE)
Bored Cast-In-Situ Piles
Hydraulically Operated Rotary
Piling Rig Salient Features:
FACTORS GOVERNING CHOICE OF TYPE OF PILE
• SUBSOIL CONDITION• LOCATION AND TYPE OF STRUCTURE• LOAD CHARACTERISTICS• LIMITATION OF TOTAL & DIFFERENTIAL SETTLEMENT• REQUIREMENT ON ACCOUNT OF NEARBY EXISTING
STRUCTURES• TIME FRAME AVAILABLE• DURABILITY
CHOICE OF TYPE OF PILESTEEL PILE
• USEFUL WHERE VERY HARD DRIVING IS REQUIRED• DEEPER PENETRATION INTO BEARING STRATA• CAPABLE OF CARRYING HIGH COMPRESSIVE LOADS WHEN DRIVEN ON TO A HARD
STRATUM• FASTER INSTALLATION• ROBUST, LIGHT TO HANDLE • ADVANTAGEOUS IN SITUATIONS WHERE GROUND HEAVE AND LATERAL DISPLACEMENT
MUST BE AVOIDED.• CAN BE READILY CUT DOWN OR EXTENDED WHERE LEVEL OF THE BEARING STRATUM
VARIES
DISADVANTAGES
– SUSCEPTIBLE TO CORROSION IN FREE WATER NEAR AIR-WATER INTERFACE IN MARINE OR RIVER STRUCTURES.
– MATERIAL COST VERY HIGH– HIGHER NOISE GENERATION DURING INSTALLATION
CHOICE OF TYPE OF PILE
TIMBER PILE• HIGH STRENGTH TO WEIGHT RATIO• EASY TO HANDLE AND CAN BE READILY CUT TO LENGTH AND TRIMMED AFTER DRIVING• CAN BE DRIVEN TO VERY LONG LENGTHS IN SOFT OR FIRM CLAYS BY SPLICING AND
JOINING • HAS INDEFINITE LIFE IN FAVOURABLE CONDITIONS OF EXPOSURE• MOST ECONOMICAL
DISADVANTAGES– LIABLE TO DECAY IN THE PORTION ABOVE GROUND WATER LEVEL– LIABLE TO BE DAMAGED WHEN USED IN MARINE STRUCTURES BY THE MOLLUSC-
TYPE BORERS WHICH INFEST THE SEA WATER– LIMITATIONS OF MAXIMUM LOAD CARRYING CAPACITY– LIGHTNESS OF TIMBER PILE MAY CAUSE PROBLEMS WHEN DRIVING GROUP OF
PILES THROUGH CLAYS OR SILTS– HEADS OF TIMBER PILES NEED TO BE PROTECTED AGAINST SPLITTING DURING
DRIVING BY MEANS OF A MILD STEEL HOOP
CHOICE OF TYPE OF PILEPRECAST CONCRETE PILES
• VERY MUCH SUITABLE IN APPLICATIONS WHERE AGGRESSIVE SUB SOIL CONDITIONS PREVAIL
• PROVISION OF PROTECTIVE COATING OF PILE SURFACES POSSIBLE• ADVANTAGEOUS IN SITUATIONS WHICH DEMAND USE OF DENSE CONCRETE (MARINE
AND RIVER STRUCTURES). CAN BE PROJECTED ABOVE GROUND LEVEL.• FASTER INSTALLATION• CONCRETE IN PILE CAN BE CHECKED FOR QUALITY AND SOUNDNESS BEFORE DRIVING ,
BETTER QUALITY CONTROL DURING CASTING ,• INSTALLATION OF PILES NOT AFFECTED BY GROUND WATER• USEFUL IN SITUATIONS OF FLOWING WATER/ARTESIAN WATER FLOW CONDITIONS IN
SUBSTRATA.• VARYING LENGTHS CAN BE PROVIDED BY ADOPTING A JOINTED TYPE.• METAL SHOES ARE NOT REQUIRED AT THE TOES OF PILES DRIVEN THROUGH SOFT OR
LOOSE SOILS INTO DENSE SANDS AND GRAVELS OR FIRM TO STIFF CLAYS. A BLUNT POINTED END IS JUST SUFFICIENT.
DISADVANTAGES» ADDITIONAL REINFORCEMENT MUST BE PROVIDED TO WITHSTAND
HANDLING AND DRIVING STRESSES.» CAN BE CAST TO LENGTHS ONLY UP TO CERTAIN LIMIT. IN CASE OF LONGER
OR VARYING LENGTHS OF PILES,THEY HAVE TO BE CAST IN SEGMENTS ANDJOINTED TOGETHER.
» SPECIAL ARRANGEMENTS FOR CASTING,HANDLING AND TRANSPORTATION OF PRECAST SEGMENTS REQUIRED
» LIMITATIONS FOR LARGE SIZE PILES» UNSEEN BREAKAGE DUE TO HARD DRIVING CONDITIONS.» CANNOT BE DRIVEN IN CONDITIONS OF LOW HEAD ROOM» MORE NOISE /VIBRATION DURING INSTALLATION
CHOICE OF TYPE OF PILE
BORED CAST -IN-SITU CONCRETE PILES• ADVANTAGEOUS IN SUBSOILS WITH DEPOSITS OF LARGE SIZED GRAVELS OR BOULDERS OR
INTERVENING HARD STRATUM OR VERY STIFF TO HARD COHESIVE SOILS. • SOIL OR ROCK REMOVED DURING BORING CAN BE INSPECTED FOR COMPARISION WITH SITE
INVESTIGATION DATA.• LARGE DIAMETER PILES OF VARYING LENGTHS CAN BE INSTALLED TO SUIT VARIATION IN
LEVEL OF BEARING STATUM.• MATERIAL FORMING PILE IS NOT GOVERENED BY HANDLING OR DRIVING STRESSES.• CAN BE INSTALLED WITHOUT APPRECIABLE NOISE OR VIBRATION.• CAN BE INSTALLED IN CONDITIONS OF LOW HEAD ROOM.• DRILLING TOOLS CAN BREAK UP BOULDERS OR OTHER OBSTRUCTIONS WHICH CANNOT BE
PENETRATED BY DRIVING TECHNIQUES
DISADVANTAGES• SPECIAL CARE IS NEEDED IN SOFT OR LOOSE OR WATER BEARING GRANULAR SOILS TO
AVOID DEFECTS IN PILE SHAFT UNDER SUCH SITUATIONS. SPECIAL TECHNIQUES NEEDED FOR CONCRETING IN WATER BEARING SOILS.
• CONCRETE CANNOT BE INSPECTED AFETR INSTALLATION.• CONCRETE IN SHAFT LIABLE TO SQUEEZING OR NECKING IN SOFT SOILS WHERE
CONVENTIONAL TYPES ARE USED.• SPECIAL ARRANGEMENT REQUIRED FOR HANDLING AND DISPOSALOF MUCKGENERATED
DURING BORING OPERATION.• LOW END BEARING RESISTANCE IN LOOSE NON COHESIVE SOILS,• LIMITATIONS IN LOOSE NONCOHESIVE SOILS, USE OF TEMPORARY OR PERMANENT
LINER NECESSARY. • CANNOT BE EXTENDED ABOVE GROUND LEVEL WITHOUT SPECIAL ADAPTATION.• DRILLING A NUMBER OF PILES IN A GROUP CAN CAUSE LOSS OF GROUND AND
SETTLEMENT OF ADJACENT STRUCTURES.
BORED CAST-IN-SITU PILES USING HYDRAULIC DRILLING RIGS
DIAMETER UPTO 2 TO 2.5 M CAN BE INSTALLED UPTO A DEPTH OF 40 TO 60 M. ADOPTING SUITABLE TOOLS AND TECHNIQUES WITH HIGH POWERED DRILLING RIGS
THE SPEED OF INSTALLATION IS VERY FAST.
CAN BORE THROUGH ALL TYPES OF SOIL AND BOULDARY STRATA.
THE INTRICATE MECHANISM OF HYDRAULIC SYSTEM ENABLES TO MAINTAIN CONSTANT SPEED OF ROTATION UNDER HIGH TORQUE
THE ROTARY HAS SPECIAL ATTACHMENT TO INSTALL TEMPORARY CASING/PERMANENT LINER DURING BORING OPERATION.
CHOICE OF TYPE OF PILEDRIVEN CAST- IN- SITU PILES
•ADVANTAGEOUS IN LOOSE NON COHESIVE SOILS
•HIGHER COEFFICIENT OF EARTH PRESSURE AND CONSEQUENTLY HIGHER SKIN FRICTION ACHIEVABLE IN CASE OF NON COHESIVE STRATA
•ADJACENT GROUND GETS COMPACTED DUE TO LATERAL DISPLACEMENT OF SOIL
•FASTER PROGRESS
•NO MUCK GENERATION
•LENGTH CAN EASILY BE ADJUSTED TO SUIT VARYING LEVEL OF BEARING STRATUM
•ENLARGED BASE POSSIBLE
•MATERIAL IN PILE NOT GOVERNED BY HANDLING OR DRIVING STRESSES
DISADVANTAGES•PROPER DRIVING SEQUENCE IS REQUIRED TO AVOID GROUND HEAVE OR DAMAGE TO ADJACENT PILES AND STRUCTURES DEPENDING ON TYPE OF SOIL
•MORE NOISE/VIBRATION DURING INSTALLATION
•CONCRETE CANNOT BE INSPECTED AFTER INSTALLATION
•CANNOT BE DRIVEN WITH VERY LARGE DIAMETERS
•CANNOT BE USED IN RIVER OR MARINE STRUCTURES WITHOUT SPECIAL ADAPTATION
LOAD FROM SUPER STRUCTURE
• SHALL HAVE TO BE RESISTED BY GROUND
– SUPPORTING CAPACITY OF GROUND SHALL HAVE TO BE CHECKED W.R.T.
» SHEAR» SETTLEMENT TOTAL
DIFFRENTIALDISTORTION
SOIL INVESTIGATION• CARRIED OUT IN ADVANCE TO DEFINE
• STRATIFICATION• NATURE AND TYPE OF SOIL • VARIATION AND ITS EXTENT• DENSITY AND MOISTURE CONTENT• SHEAR STRENGTH• COMPRESSIBILITY• MODULUS
• GROUND WATER TABLE• SULPHATE/CHLORIDE/ANYOTHER
DELETERIOUS CHEMICAL• pH• SELECTION OF PILLING SYSTEM
SOIL INVESTIGATION
• NUMBER OF BORINGS AND INSITU TESTS• STRUCTURE TO BE CONSTRUCTED • EXTENT OF PILES• VARIATIONS IN SUB SURFACE CONDITIONS
• DEPTH OF BORINGS SHALL NOT BE LESS THAN• 1.5 TIMES ESTIMATED LENGTH OF PILE IN SOIL BUT
MINIMUM 30M• 8-10 TIMES DIAMETER OF PILE IN WEAK/JOINTED
ROCK < 6M• 3-5 TIMES DIAMETER OF PILE IN GOOD ROCK < 3M
• ACTUAL DEPTH IS GOVERNED BY LOAD DISTRIBUTION
SOIL INVESTIGATION PROGRAMME• FIELD TEST• BORING
• SHELL AND AUGER• DRILLING MACHINE
–MECHANICAL–HYDRAULIC
• SUBSURFACE PROFILE• CONDUCTING SPT 1.5 M INTERVAL OR CHANGE
OF STRATA• EVALUATING IN-SITU DENSITY AND MOISTURE
CONTENT• CONDUCTING VANE SHEAR TEST IN COHESIVE
SOIL AT REGULAR INTERVALS
SOIL INVESTIGATION PROGRAMME
• FIELD TEST• CONDUCTING PRESSURE
METER/ELECTROMETER/GOODMAN JACK TEST AS DESIRED LEVEL
• COLLECTING UNDISTURBED/REPRESENTATIVE SAMPLES FROM EVERY STRATA ENCOUNTERED FOR LABORATORY TESTING
• COLLECTING WATER SAMPLES FOR CHEMICAL ANALYSIS
• PLATE LOAD TEST FOR SUB GRADE MODULUS • DYNAMIC CONE PENETRATION TEST • STATIC CONE PENETRATION TEST
SOIL INVESTIGATION PROGRAMME• LABORATORY TESTS
• ON REPRESENTATIVE SAMPLES• GRAIN SIZE ANALYSIS• ATTERBERG LIMITS• SPECIFIC GRAVITY
• UNDISTURBED/REMOULDED SAMPLES• COMPRESSIBILITY TESTS• TRIAXIAL COMPRESSION TESTS
(UU/CU/CD)• UNCONFINED COMPRESSIVE STRENGTH
SOIL INVESTIGATION PROGRAMME
• LABORATORY TESTS
• ON ROCK CORES
• UNIAXIAL COMPRESSIVE STRENGTH• POINT LOAD INDEX TEST
CODE OF PRACTICE REQUIREMENTSIndian Standards
1. IS:2911 (Part I/Sec1)-1979- Indian Standard Code of Practice for Design and Construction of Pile Foundations Part-I Concrete Piles Section 1 Driven Cast in-Situ Concrete Piles
2. IS:2911 (Part I/Sec2)-1979- Indian Standard Code of Practice for Design and Construction of Pile Foundations Part-I Concrete PilesSection 2 Bored Cast in-Situ Piles
3. IS:2911 (Part I/Sec3)-1979- Indian Standard Code of Practice for Design and Construction of Pile Foundations Part-I Concrete Piles Section 3 Driven Pre Cast Concrete Piles
4. IS:2911 (Part I/Sec4)-1979- Indian Standard Code of Practice for Design and Construction of Pile Foundations Part-I Concrete Piles Section 4 Bored Pre Cast Concrete Piles
5. IS:2911 (Part 2)-1979- Indian Standard Code of Practice for Design and Construction of Pile Foundations Part-2 Timber Piles
6. IS:2911 (Part 3)-1979- Indian Standard Code of Practice for Design and Construction of Pile Foundations Part-3 Under Reamed Piles
7. IS:2911 (Part 4)-1979- Indian Standard Code of Practice for Design and Construction of Pile Foundations Part- 4 Load Test on Piles
British StandardsBS 8004: 1986 – British Standard Code of Practice for Foundations
∫ ⎟⎠⎞
⎜⎝⎛−=
dzdp
cdP
EASS czzoz
11 τ ∫−=z
z ZCdzPP0
Elements of Load Transfer
Ps
Z
γz σzPz
σz σz Sz τz Pz
Pp
P
L
Sz = Vertical displacement of any pile section at depth Z
MH S
deflection slope
Reese Matlock Analysisγ Mt
B.M Soil reactionpile S.F
M Elastic Condition
p = Ezyv+dv
M+dM
V
Pile element and forces
Fixed HeadFree Head
EITMB
EIHTA tYY
33
+EIHTF y
3
Deflection =
EITMB
EIHTA tss
33
+Slope =
HTBHTA mm +
TMBHA t
vv +
HTFmB.M =
S.F =
12tpp MB
THA
+ THF pS.R =
T = Relative Stiffness
51
h
EITη
= 41
sKEIT =For Sands For Clays
Cohesionless soil
Type of Soil ηh (kg/cm3)Dry Submerged
Loose sand 0.260 0.146Medium sand 0.775 0.525Dense sand 2.075 1.245
Very loose sand underRepeated loading or
Normally loading clays
- 0.040
Cohesive soil
CU (kg/cm2) Ks (kg/cm2)
0.2 to 0.4 7.751 to 2 48.802 to 4 97.75
More than 4 195.50
Piles Subjected to Downward Drag (Negative Skin Friction)
original
∆p
lowered
original
GW
GW
σx
Z
σx
Remoulded
σx
Z
p
Fill
Settlements in normally consolidated or preconsolidated soft clays due to an effective vertical stress generated by lowering of water table.
Remoulding of soft clay may cause consolidation resulting into negative drag.
Consolidation of soft layer around pile due to recent fill or deposit.
• Piles driving capacity mainly from friction:Negative drag taken as 0.2 to 0.3 times the Undrained
shear strength multiplied by the area of pile shaft embedded in compressible soil.
• End bearing Piles:Negative drag taken as 0.5 times the Undrained shear
strength multiplied by the area of pile shaft embedded in soil.
IMPORTANT PROVISIONS OFIS:2911 Spacing of Piles
In case of piles deriving their capacity mainly from end bearing minimum centre to centre spacing of pile shall be 2.5 times the diameter of the shaft. In case of piles deriving their capacity mainly from friction, spacing of piles shall not be less than 3 times the diameter of the shaft. In case of piles resting on rock, the spacing of 2D may be adopted.
Factor of Safety
Minimum factor of safety on ultimate bearing capacity computed by static formula shall be 2.5
Reinforcement in Pile
The minimum area of longitudinal reinforcement of any type or grade within the pile shaft shall be 0.4% of the sectional area calculated on the basis of outside area of the casing or the shaft.
Minimum clear cover to all main reinforcement in pile shaft shall not be less than 50 mm.
Minimum diameter of the links or spirals shall be 6 mm and their spacing shall not be less than 150 mm.Generally aspacing of 300mm is considered more appropriate and practical.
Design of pile cap
The clear overhang of the pile cap beyond outermost pile in the group shall normally be a minimum of 150mm.
The pile should project 500mm into the cap concrete
Temporary casing/Permanent liner
Minimum length of 2m of temporary casing shall be provided for each bored pile unless otherwise specifically desired. Additional length of temporary casing may be used depending on conditions of strata, GWL etc.
For aggressive action of ground water for marine situations piles shall be formed with permanent casing(liner)
Tremie Method
For 25mm down aggregate, the tremie pipe should have a diameter not less than 200mm. For 20mm down aggregate tremie pipe should have a diameter not less than 150mm.
All piling above 600mm diameter should however be done with 200mm diameter tremie pipe.
Drilling Mud (Bentonite)
Requirements of Bentonite suspension
Liquid limit: shall be 400% or more
Sand content of Bentonite powder:shall not be greater than 1%
Density of bentonite suspension:shall be between 1.03 and 1.05 g/ml for freshly prepared suspension. However the density of bentonitesuspension after mixing in the bore hole may rise upto 1.25g/ml and should be brought down to atleast 1.10 g/ml by flushing before concreting
Marsh Cone Viscocity : Shall be between 30 to 45 secs
pH Value : Shall be between 9 and 11.5.
Concrete
Minimum slump of concrete shall be 125mm and maximum of 180mm
Slump of concrete shall be between 150 to 200 mm for concreting under water by tremie method
Minimum grade of concrete shall be M-25 Minimum cement content in concrete shall be 400 kg/m3. When concreting under water or drilling mud, 10%additional cement shall be used.
Concreting operation should not be taken up when specific gravity of bottom slurry is more than 1.12
Where cut off level of pile is less than 1.5m below working level, the concrete shall be cast to minimum of 300mm above cut off level. For each additional 0.3m increase in cut off level below working level, an additional coverage of 50mm shall be allowed.
When concrete is placed by tremie method, concrete shall be cast to the piling platform level to permit overflow of concrete for visual inspection or to a minimum of 1m above cut off level.
Control of Alignment during Pile Installation
For vertical piles, an angular deviation of 1.5% in alignment and , for raker piles , a deviation of 4% should no be be exceeded.
Piles should not deviate more than 75 mm or D/4 whichever is less from their designed positions at the working level for piles upto 600 mm diameter ( 75 mm or D/10 whichever is more in case of piles greater than 600 mm diameter).
z
τc0 0
Very high
Very low strength
Y
P
Buckling
P
z
P
τc0 0
Y
P
Buckling in very weak surrounding soil
General shear in strong lower layer
τc0 0
Y
P
P
Z Uniform Strength
Z
τc0 0
Y
P
P
Skin Friction Predominant
ROCK ANCHORS / SOIL ANCHORS
504
200
Load Test Measurement by OsterbergCell.
• Osterberg Cell is a sacrificial jack like device attached to the reinforcing steel cage or other support structure.
• After the concrete reaches the desired strength the test is conducted by inducing hydraulic pressure to the cell.
underwater strain transducer and accelerometer mounted on pile
Pile Integrity Test
strain transducer and accelerometer mounted on a pile
Pile driving analyzer
Slide 212
SIL1 DR. K K MOZA, 25/03/2008