Upload
deartora
View
222
Download
0
Embed Size (px)
Citation preview
8/2/2019 Lecture 1 - Introduction CPM
1/17
VBB 4063 CONSTRUCTION
PROJECT MANAGEMENT /
VAB 4043 OPERATION AND
CONSTRUCTION MANAGEMENT
Lecture by:
ASSOC. PROF. IR. DR.
ARAZI BIN IDRUSB Eng (Sheffield) M Sc (Cranfield)
PhD (London, Imperial)
8/2/2019 Lecture 1 - Introduction CPM
2/17
WELL-ROUNDED GRADUATES
8/2/2019 Lecture 1 - Introduction CPM
3/17
OUTCOME-BASED EDUCATION
(OBE)
http://obe%20awareness%20summmary.ppt/http://obe%20awareness%20summmary.ppt/http://obe%20awareness%20summmary.ppt/http://obe%20awareness%20summmary.ppt/http://obe%20awareness%20summmary.ppt/http://obe%20awareness%20summmary.ppt/http://obe%20awareness%20summmary.ppt/8/2/2019 Lecture 1 - Introduction CPM
4/17
Program Objectives and Program
Outcomes
http://po%20and%20po%20civil%20program+matrix%20ocm.doc/http://po%20and%20po%20civil%20program+matrix%20ocm.doc/http://po%20and%20po%20civil%20program+matrix%20ocm.doc/http://po%20and%20po%20civil%20program+matrix%20ocm.doc/8/2/2019 Lecture 1 - Introduction CPM
5/17
Construction Management
What is the subject all about?
Why is it an important subject to be taught
to civil engineer
http://po%20and%20po%20civil%20program+matrix%20ocm.doc/http://po%20and%20po%20civil%20program+matrix%20ocm.doc/http://po%20and%20po%20civil%20program+matrix%20ocm.doc/http://po%20and%20po%20civil%20program+matrix%20ocm.doc/http://po%20and%20po%20civil%20program+matrix%20ocm.doc/http://po%20and%20po%20civil%20program+matrix%20ocm.doc/8/2/2019 Lecture 1 - Introduction CPM
6/17
Syllabus
VAB 4063 CPM
VAB 4043 OCM
http://po%20and%20po%20civil%20program+matrix%20ocm.doc/http://po%20and%20po%20civil%20program+matrix%20ocm.doc/http://vbb4063%20construction%20project%20management.doc/http://cmpsyllabus.doc/http://cmpsyllabus.doc/http://vbb4063%20construction%20project%20management.doc/8/2/2019 Lecture 1 - Introduction CPM
7/17
8/2/2019 Lecture 1 - Introduction CPM
8/17
Assessment
A 3-credit compulsory subject
Final Sem Final year
Assessment is based on the following:(i) Tests 20%(ii) Assignments and quizzes 20 %(iii) Examination 60%
http://cmpsyllabus.doc/http://cmpsyllabus.doc/http://cmpsyllabus.doc/http://cmpsyllabus.doc/http://cmpsyllabus.doc/http://cmpsyllabus.doc/http://cmpsyllabus.doc/http://cmpsyllabus.doc/http://cmpsyllabus.doc/http://cmpsyllabus.doc/8/2/2019 Lecture 1 - Introduction CPM
9/17
Election
Class leader and
Assistant Class leader
http://cmpsyllabus.doc/http://cmpsyllabus.doc/http://cmpsyllabus.doc/http://cmpsyllabus.doc/http://cmpsyllabus.doc/8/2/2019 Lecture 1 - Introduction CPM
10/17
Lesson Plan
Lesson plan
GAs
http://cmpsyllabus.doc/http://cmpsyllabus.doc/http://lessonplan%20sept11.ppt/http://lessonplan%20sept11.ppt/8/2/2019 Lecture 1 - Introduction CPM
11/17
LECTURE 01
OVERVIEW OF THE CONSTRUCTGION
INDUSTRY AND PROJECT
DEVELOPMENT PROCESS
http://lessonplanjuly09.ppt/8/2/2019 Lecture 1 - Introduction CPM
12/17
1. OVERVIEW OF THE CONSTRUCTIONINDUSTRY
Though relatively small, important sector of nationaleconomy cos of linking to many other parts ofindustry
e.g. manufacturing, agriculture, electronics, etc.
Usually public sector (government) driven biggestconsumer
Cyclic and Unstable
1970s :growth stable
1980s :economic downturn1990-98: booming, 11-15th % growth
1998- 2000:major economic downturn
2000-now:recovering but very slowly (most mega
projects now already completed)
8/2/2019 Lecture 1 - Introduction CPM
13/17
Cont.
Growth (increase in the amount of the goods and services produced by acountry) in construction sector (source: CIDB):
1995: +20%1998: -24%2004: -1.9%2006: - 0.5 %2007: 3.7% :
2008 : 3%2009: 0.6 %2010: 14.2% (Due to stimulus package)
GDP in 2011 : RM766 Billion, GDP Growth rate : 4.6% (1st quarter)
(N.B. GDP=market value of goods and services produced per population in a country-relates to economic activity and economic health of a country
http://constructionsectorgrowth%26malaysian_copy.pdf/http://output%20construction.bmp/http://constructionsectorgrowth%26malaysian_copy.pdf/8/2/2019 Lecture 1 - Introduction CPM
14/17
Projects value completed /output (source: CIDB):
2005: RM 38 b (RM90m - O & G industry)2006: RM 30 b (world: USD 5 trillion)2007: RM 62 b2008 : RM 76.3 b
2009: RM 77.5 b (first quarter)
2010: RM 81.47 b2011: RM 24.26 b (first quarter)
For 10th Malaysia Plan (2011-2015) Malaysia to
spend USD 67.8b for infrastructure construction In 2012, RM43 billion new KL MRT project; the RM5 billion100-storey Warisan Merdeka tower in KL, etc., etc. (but IpohMedan Kidd will still be like that!)
http://work%20done_copy.pdf/http://work%20done_copy.pdf/8/2/2019 Lecture 1 - Introduction CPM
15/17
2. THE CIDB
Statutory body established in 1994 Purpose is to develop the construction industry so
that it can become one of the major contributingsectors of the national economy
Focuses on contractors, skills, materials andtechnology
Register contractors, impose and collect levy(0.125% of contract sum for projects >RM500,000)
Provides training, develop standards, conductR&D and explore foreign markets
Provide Construction Statistics
Qlassic
Shassic
8/2/2019 Lecture 1 - Introduction CPM
16/17
3. THE PROJECT DEVELOPMENTPROCESS
Project developmentprocess covers the stages in theproject life cycle , from inception to construction andhanding-over.
Three main activities involved:1.Planning and Design:
(i)Project planning (emphasis on pre-design stageplanning)Between inception feasibility studies stakeholderapprovaldevelopment order(ii) Design
(iii)Construction planning-between design tenderingconstruction-emphasis on post-design or pre-construction planning2. Construction Management
3. Handing Over
http://project%20life%20cycle.doc/http://project%20life%20cycle.doc/8/2/2019 Lecture 1 - Introduction CPM
17/17
4 Codes and Regulations related to
Development Process
STAGE EXAMPLE CODES/
REG. TO SATISFY
GOVERNING
BODY
Feasibility to
Preliminary Design
Env. Quality Act, UBBL,
National Land Code Elect.Supply Act, Water Supply
Act, Roads & Drainage Act
Local Authority,
Land Office
Detail Design MS, BS, UBBL 1994,Elect. Supply Act, Water
Supply Act, Roads &Drainage Act, Arahan
Teknik Jalan
Respective Govt.
Depts
Construction Green Card, OSH Act
1994, C.F.
CIDB, DOSH,
Local Auth.