Daikin Europe, Consulting sales section
1
D a i k i n E u r o p e A c a d e m y
Learning, our way
Understanding Client’s Needsand best Daikin solution
Daikin Europe, Consulting sales section
2
D a i k i n E u r o p e A c a d e m y
Learning, our way
Purpose of Workshop
Land availablewith Building Idea !
Design TeamAppointed
Main BuilderAppointed
ConsultantSpecification
BuildingConceptReviews
NegotiateOrder with M & E
Contractor
Project Life Span – Concept to Order (1 month – 2 Years)
Specification Tender Stage
Daikin Europe, Consulting sales section
3
D a i k i n E u r o p e A c a d e m y
Learning, our way
Consultant Visit – Invitation
Tool Box•Splits•SKY•VRV•Chillers•Controls
Daikin Europe, Consulting sales section
4
D a i k i n E u r o p e A c a d e m y
Learning, our way
Preparation before the visit
•Plan your Visit and Technique•Collect Project Information•Identify Key Daikin Factors
Daikin Europe, Consulting sales section
5
D a i k i n E u r o p e A c a d e m y
Learning, our way
When you say *********** WHAT DO YOU MEAN ?
When you say High Level Interface what do you mean ?
When you say noise level is important what do you
mean ?
When you say Energy Efficiency what do you
mean ?
Avoid asking – Yes/No Questions
BE GENUINE AND SINCERE
Daikin Europe, Consulting sales section
6
D a i k i n E u r o p e A c a d e m y
Learning, our way
Specific needs
• Each building is different• The legislation varies from country to
country.• However, we may group common needs for:
– Office– Hotel– Shops– Residential
Daikin Europe, Consulting sales section
7
D a i k i n E u r o p e A c a d e m y
Learning, our way
Residences: specific needs
• Small capacity indoor units• Small ducted indoor units to
perfectly integrate in interior• Silent outdoor units especially
during night-time• Quick answer to demand• Small and simple refrigerant
piping• Simple remote control in each
room• Central control for total house• Single phase power supply
Daikin Europe, Consulting sales section
8
D a i k i n E u r o p e A c a d e m y
Learning, our way
Fresh-air legislation
Low energy consumption
Variable occupancy
Electronic devices
Easy to maintain
Office buildings: specific needsSame comfort all over the year
Flexible zoning
Independent metering of energy consumption
Daikin Europe, Consulting sales section
9
D a i k i n E u r o p e A c a d e m y
Learning, our way
Hotels: specific needs
Integrated in the interior design
No noise and draft
Connectable to Hotel BMS
Refrigerant legislation
Pleasant indoor environment
No temperature variations
Different solutions for rooms and public areas
Low operation costs
Daikin Europe, Consulting sales section
10
D a i k i n E u r o p e A c a d e m y
Learning, our way
Escalators
Air curtains
Special equipment for Food / wine storage
Shops: specific needs
Big variation of people occupancy
Fresh air legislation
Low energy consumption
Lights
Daikin Europe, Consulting sales section
11
D a i k i n E u r o p e A c a d e m y
Learning, our way
EXAMPLE
9 Storey office Building – Daikin Sales Engineer 1st Appointment
with Consultant Engineer
Daikin Europe, Consulting sales section
12
D a i k i n E u r o p e A c a d e m y
Learning, our way
Consultant Overview
• 30 years old building• Nine Floors• Refurbishment• Existing CW Central
System• Vacant Property• VRV Option ?
Daikin Europe, Consulting sales section
13
D a i k i n E u r o p e A c a d e m y
Learning, our way
Inside Building
Daikin Europe, Consulting sales section
14
D a i k i n E u r o p e A c a d e m y
Learning, our way
Key Information to Discuss
• Who will be occupying the building – One tenant or Multi Tenants ?• What is the planned floor zoning ?• Will the building be refurbished in stages ?• What are your time commitments for this project ?
• Are you considering VRV for this project ?• Is it possible to refurbish the existing Chiller Plant ?• If yes, are you considering Chilled Water Fan coils (2 pipe / 4 pipe)?• What model of fancoils (indoor units) are you thinking of?• How will the Fresh Air be treated ?• Are you considering a central BMS control systems?• Have you calculated Heat Loads?• Are the specification documents and drawings already available?
Daikin Europe, Consulting sales section
15
D a i k i n E u r o p e A c a d e m y
Learning, our way
Information required for VRV Proposal
FLOOR PLAN / HEAT LOADS / ZONING
9.2 kW
7.9 kW
7.4 kW
10.2 kW
8.2 kW
7.2 kW
7.2 kW
8.2 kW
7.5 kW
Sensible or Total Heat Loads !!!!!!
Daikin Europe, Consulting sales section
16
D a i k i n E u r o p e A c a d e m y
Learning, our way
Preference for Indoor Units ?
Ceiling Height – only 380mm
Daikin Europe, Consulting sales section
17
D a i k i n E u r o p e A c a d e m y
Learning, our way
Clarify Zoning of each Floor Level
Daikin Europe, Consulting sales section
18
D a i k i n E u r o p e A c a d e m y
Learning, our way
Heat Recovery – OPTION 1
Daikin Europe, Consulting sales section
19
D a i k i n E u r o p e A c a d e m y
Learning, our way
Heat Recovery – OPTION 2
Daikin Europe, Consulting sales section
20
D a i k i n E u r o p e A c a d e m y
Learning, our way
Heat Pump / 2 Pipe
Daikin Europe, Consulting sales section
21
D a i k i n E u r o p e A c a d e m y
Learning, our way
Pipe runs and Outdoor Unit Locations
Daikin Europe, Consulting sales section
22
D a i k i n E u r o p e A c a d e m y
Learning, our way
Units Located on Roof
Daikin Europe, Consulting sales section
23
D a i k i n E u r o p e A c a d e m y
Learning, our way
1st Refnet1st Refnet
100m length
40m length
Daikin Europe, Consulting sales section
24
D a i k i n E u r o p e A c a d e m y
Learning, our way
Control System
• Often avoided by new Sales Engineers• Recent Developments are not
understood by consultant• Requires practical application
knowledge• Can be the difference between winning
or loosing your project at tender stage
Daikin Europe, Consulting sales section
25
D a i k i n E u r o p e A c a d e m y
Learning, our way
Centralised Control
A/C side
What is purpose of centralised control?
Daikin Europe, Consulting sales section
26
D a i k i n E u r o p e A c a d e m y
Learning, our way
A/C side
COMMANDON-OFF
Status ON-OFF
Centralised Control
Daikin Europe, Consulting sales section
27
D a i k i n E u r o p e A c a d e m y
Learning, our way
Status Malfunction
A/C side
Code
Centralised Control
Daikin Europe, Consulting sales section
28
D a i k i n E u r o p e A c a d e m y
Learning, our way
A/C side
COMMAND MODE
STATUS MODE
Centralised Control
(Heating/cooling/Fan only)
Daikin Europe, Consulting sales section
29
D a i k i n E u r o p e A c a d e m y
Learning, our way
STATUS
Room Temperature
A/C side
COMMAND TEMPERATURE
SET
Centralised Control
Daikin Europe, Consulting sales section
30
D a i k i n E u r o p e A c a d e m y
Learning, our way
STATUS
AIR FLOW RATE
A/C side
COMMAND AIR FLOW
RATECentralised
Control
Daikin Europe, Consulting sales section
31
D a i k i n E u r o p e A c a d e m y
Learning, our way
A/C side
Remote Control
OperationCentralised
Control
Daikin Europe, Consulting sales section
32
D a i k i n E u r o p e A c a d e m y
Learning, our way
Power Proportional Distribution
Electricity
Consumption
Billing information
Electricity
Consumption
Electricity
Consumption
Electricity
Consumption
Daikin Europe, Consulting sales section
33
D a i k i n E u r o p e A c a d e m y
Learning, our way
Office buildings In Japan in 2000
0 5 10 15 20 25 30
VRV
Heat source Unit Pipe DuctVentilation Fire prevention Wire & Control others
5%
Initial cost 1000 yen/m2
VRV Controls impact on total price
Daikin Europe, Consulting sales section
34
D a i k i n E u r o p e A c a d e m y
Learning, our way
Salesman Checklist
• Have you understood the Project Concept?• Have you understood Consultant requests?• Have you got the drawings?• Have you got the Heat Loads?• Did you received enough elements to build the
Control Strategy?• Building Schedule• Project Leader / Key Persons• Preference for installation contractors• Next meeting schedule
• File all collected information
Daikin Europe, Consulting sales section
35
D a i k i n E u r o p e A c a d e m y
Learning, our way
Problem AreasProblem Areasor, “things to watch out for” when working a solutionor, “things to watch out for” when working a solution
• Poor Comfort• Bad zoning• Inappropriate capacity index• Wrong indoor units (draft or noise)• Oversize units• RA sensor position
• Price• Too many, or wrong indoor unit type.• Too many zones on heat recovery unit
Daikin Europe, Consulting sales section
36
D a i k i n E u r o p e A c a d e m y
Learning, our way
Reasons for losing a Daikin spec-in project
• Insufficient Budget (not qualified properly)• Budget over-run (poor design or estimating)• Poor relationships • Poor follow-up and planning• Service• Credit• Extended delivery periods