Page 1: Lean Back Offices Project

Back Office Process“Key” Distribution Process at

WSU Engineering Business Office

Abishek Anand Shruti Baug

Joel Fortgang Kara Wandrie Parag Kapile

Page 2: Lean Back Offices Project

Engineering Business Office (EBO)• Key Distribution Process to give key to open

engineering rooms consists of 2 employees: 1. Kathryn- Primary contact with the system. 2.Eman- Student assistant. She is responsible for placing keys on and off the rack, maintaining inventory and filling in spreadsheets.• 10 keys are requested per week.• Heavy load during the commencement of

semester.

Page 3: Lean Back Offices Project

Purpose of the Project

• Kathryn who is the primary contact with the system has to spend too much time and too much effort on the system.

• The purpose of the project is find the root cause of the problem, find the appropriate solution for the problem and to make Kathryn work easy and efficient.

Page 4: Lean Back Offices Project

Flow Chart for “Key” Process

Page 5: Lean Back Offices Project

Process Overview

Page 6: Lean Back Offices Project

New Key Request• Completed Key Request Form is submitted to

EBO. (10 mins)• Information from the form is filled in the EBO

system, excel sheet and print out is taken and maintained in a file.(15 mins)

Page 7: Lean Back Offices Project
Page 8: Lean Back Offices Project

New Request cont..• Tag # is obtained by entering the room # from

the system. (2 mins)• Tag # is located in the key box.(10 mins)

Page 9: Lean Back Offices Project
Page 10: Lean Back Offices Project

New Key Request cont...

• Corresponding key from the Tag # is selected.• Key is put in the envelope.• Key # is filled in the form, and envelope is

stapled to the request form and passed to front desk. (5 mins)

• Customer is emailed to pick up the key.• Customer must show ID and sign request at

pick up.

Page 11: Lean Back Offices Project

Current State Value Stream MapSupplier/Customer

Receive Form Review One Card Information

Custom Software

Enter information into Software

Print Out Docs

Excel

Enter Key into Spreadsheet

Find Tag Take Key Return Tag Give Student Key File Paperwork

30 Seconds

0 Seconds

5 Seconds

14400 Seconds

360 Seconds

600 Seconds

180 Seconds

0 Seconds

360 Seconds

0 Seconds

600 Seconds

0 Seconds

30 Seconds

0 Seconds

20 Seconds

0 Seconds

5 Seconds

0 Seconds

120 Seconds

3600 Seconds

5 Sets of Paperwork

Value Added Time = 1710 Seconds

Total Lead Time = 18600 Seconds

C/T 5 Seconds

W/T 14400 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 5 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 3600 Seconds

U/P 100%

Shifts 1

Production Control

Intermittent when problems

Daily

De l

iver

y of

Key

s

Daily

Del

iver

y of

App

licati

ons

Daily Delivery of Applications Daily Delivery of Keys

Intermittent when problems

Intermittent

Page 12: Lean Back Offices Project

Current State Value Stream Map

Supplier/Customer

Receive Form Review One Card Information

Custom Software

Enter information into Software

Print Out Docs

Excel

Enter Key into Spreadsheet

Find Tag Take Key Return Tag Give Student Key File Paperwork

30 Seconds

0 Seconds

5 Seconds

14400 Seconds

360 Seconds

600 Seconds

180 Seconds

0 Seconds

360 Seconds

0 Seconds

600 Seconds

0 Seconds

30 Seconds

0 Seconds

20 Seconds

0 Seconds

5 Seconds

0 Seconds

120 Seconds

3600 Seconds

5 Sets of Paperwork

Value Added Time = 1710 Seconds

Total Lead Time = 18600 Seconds

C/T 5 Seconds

W/T 14400 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 5 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 3600 Seconds

U/P 100%

Shifts 1

Production Control

Intermittent when problems

Daily

De l

ive r

y o f

Ke y

s

Daily

Del

iver

y of

App

licati

ons

Daily Delivery of Applications Daily Delivery of Keys

Intermittent when problems

Intermittent

Supplier/Customer

Receive Form Review One Card Information

Custom Software

Enter information into Software

Print Out Docs

Excel

Enter Key into Spreadsheet

Find Tag Take Key Return Tag Give Student Key File Paperwork

30 Seconds

0 Seconds

5 Seconds

14400 Seconds

360 Seconds

600 Seconds

180 Seconds

0 Seconds

360 Seconds

0 Seconds

600 Seconds

0 Seconds

30 Seconds

0 Seconds

20 Seconds

0 Seconds

5 Seconds

0 Seconds

120 Seconds

3600 Seconds

5 Sets of Paperwork

Value Added Time = 1710 Seconds

Total Lead Time = 18600 Seconds

C/T 5 Seconds

W/T 14400 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 5 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 3600 Seconds

U/P 100%

Shifts 1

Production Control

Intermittent when problems

Daily

Del

ive r

y of

Key

s

Daily

Del

iver

y of

App

licati

ons

Daily Delivery of Applications Daily Delivery of Keys

Intermittent when problems

Intermittent

Supplier/Customer

Receive Form Review One Card Information

Custom Software

Enter information into Software

Print Out Docs

Excel

Enter Key into Spreadsheet

Find Tag Take Key Return Tag Give Student Key File Paperwork

30 Seconds

0 Seconds

5 Seconds

14400 Seconds

360 Seconds

600 Seconds

180 Seconds

0 Seconds

360 Seconds

0 Seconds

600 Seconds

0 Seconds

30 Seconds

0 Seconds

20 Seconds

0 Seconds

5 Seconds

0 Seconds

120 Seconds

3600 Seconds

5 Sets of Paperwork

Value Added Time = 1710 Seconds

Total Lead Time = 18600 Seconds

C/T 5 Seconds

W/T 14400 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 5 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 3600 Seconds

U/P 100%

Shifts 1

Production Control

Intermittent when problems

Dai ly

Del

i ver

y o f

Ke y

s

Daily

Del

iver

y of

App

licati

ons

Daily Delivery of Applications Daily Delivery of Keys

Intermittent when problems

Intermittent

Supplier/Customer

Receive Form Review One Card Information

Custom Software

Enter information into Software

Print Out Docs

Excel

Enter Key into Spreadsheet

Find Tag Take Key Return Tag Give Student Key File Paperwork

30 Seconds

0 Seconds

5 Seconds

14400 Seconds

360 Seconds

600 Seconds

180 Seconds

0 Seconds

360 Seconds

0 Seconds

600 Seconds

0 Seconds

30 Seconds

0 Seconds

20 Seconds

0 Seconds

5 Seconds

0 Seconds

120 Seconds

3600 Seconds

5 Sets of Paperwork

Value Added Time = 1710 Seconds

Total Lead Time = 18600 Seconds

C/T 5 Seconds

W/T 14400 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 5 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 3600 Seconds

U/P 100%

Shifts 1

Production Control

Intermittent when problems

Daily

Del

ive r

y o f

Key

s

Daily

Del

iver

y of

App

licati

ons

Daily Delivery of Applications Daily Delivery of Keys

Intermittent when problems

Intermittent

Supplier/Customer

Receive Form Review One Card Information

Custom Software

Enter information into Software

Print Out Docs

Excel

Enter Key into Spreadsheet

Find Tag Take Key Return Tag Give Student Key File Paperwork

30 Seconds

0 Seconds

5 Seconds

14400 Seconds

360 Seconds

600 Seconds

180 Seconds

0 Seconds

360 Seconds

0 Seconds

600 Seconds

0 Seconds

30 Seconds

0 Seconds

20 Seconds

0 Seconds

5 Seconds

0 Seconds

120 Seconds

3600 Seconds

5 Sets of Paperwork

Value Added Time = 1710 Seconds

Total Lead Time = 18600 Seconds

C/T 5 Seconds

W/T 14400 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 5 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 3600 Seconds

U/P 100%

Shifts 1

Production Control

Intermittent when problems

Daily

De l

ive r

y o f

Ke y

s

Daily

Del

iver

y of

App

licati

ons

Daily Delivery of Applications Daily Delivery of Keys

Intermittent when problems

Intermittent

Page 13: Lean Back Offices Project

KPI Metrics

• Labor time spent per key– Total labor hours spent per keys issued in a week

= Total # of minutes spent/ #of keys issued per week = 15 minutes (from Gemba walk)

Page 14: Lean Back Offices Project

• Average Lead time– Total time taken from the time student drops off

form until receiving the key – Measured in minutes– Average lead time is 28.5 minutes

KPI Metrics

Page 15: Lean Back Offices Project

• Average number of keys issued– Number of keys issued per week

= Total # of keys issued / # of weeks = 131/13 = 10

KPI Metrics

Page 16: Lean Back Offices Project

Key Request per week

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 130

5

10

15

20

25

30

24

16

11

3

810

12

6

1513

6

1

6

Gemba WalkKey Request/Week

Page 17: Lean Back Offices Project

• Takt time– Available time / Customer demand

= 40 hours / 10 keys per week = 4 hours per key per week

KPI Metrics

Page 18: Lean Back Offices Project

• Kathryn and Eman utilize a lot of time distributing, ordering keys, and entering data into system. This consumes a lot of time for personnel in the engineering office. Current labor time spent per key is 15 minutes and the desired labor time is under 6 minutes.

Problem Statement

Page 19: Lean Back Offices Project

● 5 Hypotheses○ The physical access to the keys is challenging.○ The record keeping takes up a lot of valuable time.○ Keys are not returned so new keys must continually be

made.○ Takes too long to procure keys for the students.○ Wayne States key ordering process takes too much effort.

Plan – 5 WhysWhy are Kathryn and Eman are spending to much of their day working on distributing keys?

Page 20: Lean Back Offices Project

● 5 Hypotheses○ The physical access to the keys is challenging.○ The record keeping takes up a lot of valuable time.○ Keys are not returned so new keys must continually be

made.○ Takes too long to procure keys for the students.○ Wayne States key ordering process takes too much effort.

● Evidence○ Value Stream: Record keeping is where most of the active

time is spent.● Controllable: No

Plan – 5 WhysWhy are Kathryn and Eman are spending to much of their day working on distributing keys?

Page 21: Lean Back Offices Project

● 4 Hypotheses○ The Paper work is not uniformed○ The recording system is convoluted○ Paper Binders are hard to work with○ Inaccurate Paper Work

Plan – 5 WhysWhy does the record keeping take so much time?

Page 22: Lean Back Offices Project

● 4 Hypotheses○ The Paper work is not uniformed○ The recording system is convoluted○ Paper Binders are hard to work with○ Inaccurate Paper Work

● Evidence○ Gemba Walk: Operators complain about software system

● Controllable: No

Plan – 5 WhysWhy does the record keeping take so much time?

Page 23: Lean Back Offices Project

● 3 Hypotheses○ There are multiple systems being used○ The excel spreadsheet is too complicated○ The software design is confusing

Plan – 5 WhysWhy is the recording system problematic?

Page 24: Lean Back Offices Project

● 3 Hypotheses○ There are multiple systems being used○ The excel spreadsheet is too complicated○ The software design is confusing

● Evidence○ Flow Chart-The same work is done three times

● Controllable - Yes

Plan – 5 WhysWhy is the recording system problematic?

Page 25: Lean Back Offices Project

Plan - 4S for Excess Time Consumption

Order

Skill Suppliers

SystemsSurrounding

s

Key manufacturer

Key delivery from the manufacturer

Unreadable Forms

Untrained Employee

Manpower Shortage

Software Duplication Software

Outdated

Sending Multiple Reminders/e-mails Concerned

customer not available

Disorganized key cabinet

Excess time consumption

Page 26: Lean Back Offices Project

Surrounding Suppliers

Systems

Delivering key without form

Customers Losing key

Customers returning key

Reordering new keys

Unassigned keysMismatch Keys

Untagged keys

Excess Cost

Plan- 3S for Excess Cost

Page 27: Lean Back Offices Project

Plan- Future State Value Stream MapSupplier/Customer

Receive Form Review One Card Information

Check software for Tag # and if Key is

AvailableCustom Software

Enter User info into Software

Find Tag Take Key Return Tag Give Student Key

30 Seconds

0 Seconds

5 Seconds

14400 Seconds

60 Seconds

600 Seconds

120 Seconds

0 Seconds

600 Seconds

0 Seconds

30 Seconds

0 Seconds

20 Seconds

0 Seconds

5 Seconds

0 Seconds

Value Added Time = 870 Seconds

Total Lead Time = 15000 Seconds

C/T 5 Seconds

W/T 14400 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 5 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

Production Control

Weekly

Daily

Del

iver

y of

Ke y

s

Daily

Del

iver

y of

App

licati

ons

Daily Delivery of Applications Daily Delivery of Keys

Intermittent when problems

Intermittent

Weekly

Page 28: Lean Back Offices Project

Plan- Future State Value Stream MapSupplier/Customer

Receive Form Review One Card Information

Check software for Tag # and if Key is

AvailableCustom Software

Enter User info into Software

Find Tag Take Key Return Tag Give Student Key

30 Seconds

0 Seconds

5 Seconds

14400 Seconds

60 Seconds

0 Seconds

120 Seconds

0 Seconds

60 Seconds

0 Seconds

30 Seconds

0 Seconds

20 Seconds

0 Seconds

5 Seconds

0 Seconds

Value Added Time = 340 Seconds

Total Lead Time = 14400 Seconds

C/T 5 Seconds

W/T 14400 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 5 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

Production Control

Weekly

Dail y

De l

ive r

y o f

Key

s

Daily

Del

iver

y of

App

licati

ons

Daily Delivery of Applications Daily Delivery of Keys

Intermittent when problems

Intermittent

Weekly

Supplier/Customer

Receive Form Review One Card Information

Check software for Tag # and if Key is

AvailableCustom Software

Enter User info into Software

Find Tag Take Key Return Tag Give Student Key

30 Seconds

0 Seconds

5 Seconds

14400 Seconds

60 Seconds

0 Seconds

120 Seconds

0 Seconds

60 Seconds

0 Seconds

30 Seconds

0 Seconds

20 Seconds

0 Seconds

5 Seconds

0 Seconds

Value Added Time = 340 Seconds

Total Lead Time = 14400 Seconds

C/T 5 Seconds

W/T 14400 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 5 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

Production Control

Weekly

Dail y

De l

ive r

y of

Key

s

Daily

Del

iver

y of

App

licati

ons

Daily Delivery of Applications Daily Delivery of Keys

Intermittent when problems

Intermittent

Weekly

Supplier/Customer

Receive Form Review One Card Information

Check software for Tag # and if Key is

AvailableCustom Software

Enter User info into Software

Find Tag Take Key Return Tag Give Student Key

30 Seconds

0 Seconds

5 Seconds

14400 Seconds

60 Seconds

600 Seconds

120 Seconds

0 Seconds

600 Seconds

0 Seconds

30 Seconds

0 Seconds

20 Seconds

0 Seconds

5 Seconds

0 Seconds

Value Added Time = 870 Seconds

Total Lead Time = 15000 Seconds

C/T 5 Seconds

W/T 14400 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 5 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

Production Control

Weekly

Dai ly

Del

ive r

y of

Key

s

Daily

Del

iver

y of

App

licati

ons

Daily Delivery of Applications Daily Delivery of Keys

Intermittent when problems

Intermittent

Weekly

Supplier/Customer

Receive Form Review One Card Information

Check software for Tag # and if Key is

AvailableCustom Software

Enter User info into Software

Find Tag Take Key Return Tag Give Student Key

30 Seconds

0 Seconds

5 Seconds

14400 Seconds

60 Seconds

600 Seconds

120 Seconds

0 Seconds

600 Seconds

0 Seconds

30 Seconds

0 Seconds

20 Seconds

0 Seconds

5 Seconds

0 Seconds

Value Added Time = 870 Seconds

Total Lead Time = 15000 Seconds

C/T 5 Seconds

W/T 14400 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 5 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

Production Control

Weekly

Dai ly

Del

i ver

y o f

Key

s

Daily

Del

iver

y of

App

licati

ons

Daily Delivery of Applications Daily Delivery of Keys

Intermittent when problems

Intermittent

Weekly

Page 29: Lean Back Offices Project

Plan- Improvements in Future State• Eliminated 2 process steps• Added 2 levels of status communication• Lead time

– Current State = 28.5 minutes– Future State = 14.5 minutes

• Labor time– Current State = 15 minutes– Future State = 3 minutes

Page 30: Lean Back Offices Project

Plan – Design Decisions To MergeRecording Processes

• Decision Variable– Time to Process Key– Cost in dollars– Training Requirements– Support / Stability– Data Import / Initial Data Entry– Oversight

Page 31: Lean Back Offices Project

Plan – Design Alternatives

• One System– Paper Only– Excel Spreadsheet Only– Existing Custom Software– New Software

Page 32: Lean Back Offices Project

Plan – New Software Alternatives

• Custom - $ Unknown• Key Wizard- $1200

– http://www.keywizard.net/• Tracer 9 - $900

– https://www.dlaco.com/tracerxt/• Key Organizer - $600

– https://www.aidex-software.com/en/key-organizer/

Page 33: Lean Back Offices Project

Plan – Evaluation Matrix

Criteria WeightPaper System

Spread Sheet

Existing Software

Custom Software

Key Wizard Tracer 9

Key Organizer

Process Time 5 1 2 2 4 4 3 3

Cost in dollars 8 4 4 4 1 3 3 2

Training 1 2 2 1 4 3 3 3

Support / Stability 2 1 1 2 2 3 2 4

Import / Initial 3 2 2 4 4 2 2 2

Oversight 3 1 1 1 4 3 4 3

Totals 50 55 61 68 77 69 70

Page 34: Lean Back Offices Project

Do - Method for Small Scale Test

• Obtain Key Wizard Trial Version• Train Eman (Student Assistant) in Key Wizard• For One Week • Enter Data into Both System• Record Time for Each System

Page 35: Lean Back Offices Project

Check - Small Scale Test• Compare Average Times to Process for Existing• Evaluation Time Savings per Week• Compute New KPI

– Average Labor Time Per Key• Determine ROI on Key Wizard• Present Findings to Lara (Office Manager)• Lara Determines if Plan should be

implemented, or go back to plan

Page 36: Lean Back Offices Project

Act - Full Implementation• Determine Week of Low Key Demand from

Historic Data• Convert Existing Data into Key Wizard• Train Staff (Kathryn, Lara and Eman)• Begin Processing Keys

Page 37: Lean Back Offices Project

Expected Results• Key Process Labor Time Reduction from 15

minutes to under 6 minutes• Greater Long Term Stability of System• Better Oversight for Office Manager (Lara)

Page 38: Lean Back Offices Project

Review/Loop-Do we need to Keep going• Ongoing

– Review Key Process Numbers Every Semester for Employee performance

– Contact Key Wizard Manufacturer for Updates Once a year

• Another PDCA Cycle– Look at all KPI’s – Revisit Customer Viewpoint– Determine if another Cycle is needed

Page 39: Lean Back Offices Project

A3- ReportProjected Business Performance Improvement Story [BPIS]

Prior State Problem Statement Process Analysis

Gemab Walk, Flow Chart, Current VSM Map

KPI Definitions, Key Performance Metrics 5 Why Analysis, Fishbone Diagram

Design Initiatives Implementation Results

Future Value Stream, Solution Criteria, Solution Alternatives, Evaluation Matrix

Do Explanation, Check Explanation, Act Explanation, Review and Loop

Expected Results Explanation, Process Labort Reduced 23 %

Page 40: Lean Back Offices Project

Questions• This is how we climb the Staircase

Page 41: Lean Back Offices Project

● Standardize Form● Place Forms On-Line● Review Software Alternatives with Staff for

better evaluation criteria● Organize Key Boxes● Replace Key Boxes

Appendix -Further Recommendations

Page 42: Lean Back Offices Project

● Develop Online Request System● Record phone number of student● Prevent graduation for non-return keys● Charge a deposit

Appendix -Further Recommendations

Page 43: Lean Back Offices Project

● http://www.prosystech.ca/overviewsk.aspx● http://www.keywizard.net/prices.html ● https://www.dlaco.com/tracerxt/tracer1.htm● http://www.instakey.com/key-control-software/● http://www.morsewatchmans.com/product/keywatcher/key-con

trol-software/● https://www.aidex-software.com/en/key-organizer/

https://www.keytracker.com/Product/Category/Key-Control-Software

● Software Written By Computer Science Class

Appendix - Software List

Page 44: Lean Back Offices Project

● Hypotheses○ The physical access to the keys is challenging.

■ Evidence - The key cabinet is hard to access and is very un-organized.○ The record keeping takes up a lot of valuable time.

■ Evidence - Value Stream: Record keeping is where most of the active time is spent.

○ Keys are not returned so new keys must continually be made.■ Evidence - They have a set process to follow if a key is requested and

cannot be found because someone else didn’t return it after use.○ Takes too long to procure keys for the students.

■ Evidence - They make the students come to the office just to fill out paper work then leave and make them come back when the key is ready.

○ Wayne States key ordering process takes too much effort.■ Evidence -he students have to come in to fill out forms and then later

have to come back to pick it up.

Appendix – 5 WhysWhy are Kathryn and Eman are spending to much of their day working on distributing keys?

Page 45: Lean Back Offices Project

● Hypotheses○ The Paper work is not uniformed

■ Evidence - Gemba Walk: Inspection of Paperwork○ The recording system is convoluted

■ Evidence- Gemba Walk: Operators complain about software system

○ Paper Binders are hard to work with■ Evidence- Gemba Walk: Photos of binders

○ Inaccurate Paper Work■ Evidence - Gemba Walk: Interview with Kathryn

Appendix – 5 WhysWhy does the record keeping take so much time?

Page 46: Lean Back Offices Project

● Hypotheses○ There are multiple systems being used

■ Evidence - Flow Chart: The same work is done three times

○ The excel spreadsheet is too complicated■ Evidence - Gemba Walk: Example of the spreadsheet

○ The software design is confusing■ Evidence - Gemba Walk: Photos of interface

Appendix– 5 WhysWhy is the recording system problematic?

Page 47: Lean Back Offices Project

Appendix- Key Order Flowchart

Page 48: Lean Back Offices Project

Appendix- Current Value Stream Map of all Processes

Value Added Time = 30065 Seconds

Total Lead Time = 7200 Seconds

30 Seconds

0 Seconds

30 Seconds

0 Seconds

60 Seconds

0 Seconds

Supplier

Online Form External Processing Key is Ready Email Key Pick Up

Key

Nee

ds

to b

e m

ade

Enter Key into Software

Enter Key into Spreadsheet

For S

tock

Put Key in EnvelopeFor Handing Out

Send Pick Up Email Pick up of Key

Key Exists

Receive Key After Use

Enter Key into Software

Enter Key into Spreadsheet

Find Tag Put Tag on Key Return Tag with Key

Key

Retu

rn

Go to Key Request Loop

Key D

oesn

’t Ex

ist

Find Tag Put Tag on Key Return Tag with Key

300 Seconds

14400 Seconds

28800 Seconds

0 Seconds

5 Seconds

0 Seconds

600 Seconds

3600 Seconds

120 Seconds

3600 Seconds

120 Seconds

0 Seconds

30 Seconds

0 Seconds

60 Seconds

0 Seconds

120 Seconds

14400 Seconds

Value Added Time = 30155 Seconds

Total Lead Time = 21600 Seconds

30 Seconds

14400 Seconds

120 Seconds

7200 Seconds

120 Seconds

0 Seconds

60 Seconds

0 Seconds

30 Seconds

0 Seconds

30 Seconds

0 Seconds

Value Added Time = 390 Seconds

Total Lead Time = 21600 Seconds

C/T 30 Seconds

W/T 14400 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 7200 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 14400 Seconds

U/P 100%

Shifts 1

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 3600 Seconds

U/P 100%

Shifts 1

C/T 600 Seconds

W/T 3600 Seconds

U/P 100%

Shifts 1

C/T 5 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 28800 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 300 Seconds

W/T 14400 Seconds

U/P 100%

Shifts 1

File Paperwork

120 Seconds

3600 Seconds

120 Seconds

3600 Seconds

C/T 120 Seconds

W/T 3600 Seconds

U/P 100%

Shifts 1

File Paperwork

C/T 120 Seconds

W/T 3600 Seconds

U/P 100%

Shifts 1

File Paperwork

C/T 120 Seconds

W/T 3600 Seconds

U/P 100%

Shifts 1

120 Seconds

3600 Seconds

Customer

PC = Manager

Intermittent

Intermittent

Intermittent

Find Tag Take Key Return Tag Give Student Key File Paperwork

600 Seconds

0 Seconds

30 Seconds

0 Seconds

20 Seconds

0 Seconds

5 Seconds

0 Seconds

120 Seconds

3600 Seconds

5 Sets of Paperwork

Value Added Time = 1710 Seconds

Total Lead Time = 18600 Seconds

C/T 60 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 5 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 3600 Seconds

U/P 100%

Shifts 1

Receive Form Review One Card Information

Custom Software

Enter information into Software

Print Out Docs

Excel

Enter Key into Spreadsheet

30 Seconds

0 Seconds

5 Seconds

14400 Seconds

360 Seconds

600 Seconds

180 Seconds

0 Seconds

360 Seconds

0 Seconds

C/T 5 Seconds

W/T 14400 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 30 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

C/T 120 Seconds

W/T 0 Seconds

U/P 100%

Shifts 1

Intermittent

Daily

Del

iver

y of

Key

s

Daily

Del

iver

y of

App

licati

ons

Intermittent When there is a Problem Intermittent When there is a Problem

Key

Requ

este

d

Page 49: Lean Back Offices Project

• Returned keys per week– Number of keys that are returned back to the

office per week • Keys ordered per week

– Number of keys ordered per week by back office when the keys requested are either unavailable or inventory for the key is low

Appendix - KPI Metrics