  • Meeting of the LDRRF Approval Committee

  • Urban Projects

  • Sandwip Municipality under Chittagong

    District

    Interventions Recommended By Municipality:

    1. RCC drain

    2. Re-excavation of road cum embankment

    Major Hazard: Tidal Flood

    Cyclone Prone

    Salinity intrusion

    Vulnerability Tidal flood causing

    water logging in the urban community

    Source : FTRA Report

    Existing Resources : Very fertile land

    Fish processing industry.

    Source : FTRA Report

  • Scheme Details Sandwip Municipality under Chittagong District

    District Municipality Scheme Code

    Project Title/Details Budget (BDT)

    Beneficiaries(Total)

    Design Details (m)

    Chittagong Sandip CTG0813002(a)

    Reconstruction of RCC U- Drain from Anam nahar to Saner hat on main road of Sandwip Pourashava

    21,990,735 3500 Length: 1300 m Width: 1.50m Height: 1.50m

    CTG0813002(b)

    Construction of RCC U-Drain Saner hat to Taltoli on main road of Sandwip Pourashava

    18,463,581 3500 Length: 1700m Width: 0.60m Height: 0.80m

  • Improved road

    communication

    Impact

    Water congestion will

    be reduced during

    monsoon or tidal flood

    Widening of the

    drainage will allow

    proper flow of

    water

    Sandwip Municipality under Chittagong District

    Expected

    Results

  • Alamdanga Municipality under Chuadanga

    District

    Interventions Recommended By Municipality:

    1. Non Structural

    Garbage van for disposal of waste

    2. Infrastructure

    Drain Construction

    Road reconstruction

    Canal Re-excavation

    Major Hazard:

    Monsoon Flood.

    Arsenic problems in few areas.

    Water logging.

    Vulnerability

    People gets stranded in houses and students face difficulties due to innudated roads during monsoon flood

    Source : FTRA Report

    Existing Resources : Few Cottage

    industries.

    Pucca/Semi pucca roads.

    Source : FTRA Report

  • Scheme Details

    Alamdanga Municipality under Chuadanga District

    District Municipality Scheme Code Project Title/Details

    Budget (BDT)

    Beneficiaries(Total)

    Design Details (m)

    Chuadanga Alamdanga CHU0314002 Canal Re-excavation

    4,061,565 4800

    L: 2893m Top Width: 7.9m Bot Width: 1.52m H: 2.53m

    Proposed canal Proposed canal

  • Proper disposal of

    waste reducing

    environmental polluttion

    Impact

    Canan rexcavation will

    allow monsoon flood to

    flow and reduce drainage

    congestion

    Good source of

    water for irrigation

    in the peri urban

    areas

    Alamdanga Municipality under Chuadanga District

    Expected

    Results

  • Rural Projects

  • Decreer Char Union of Faridpur Sadar Upazila under Faridpur District

    Major Hazard Flood & Sedimentation River Bank Erosion

    Vulnerabilities Crop loss in case of flash

    flood Heavy soil erosion of the

    village / settlements. Lack of permanent

    protection against flood .

    Interventions proposed by DMCs/Community people

    Killa/School Ground

    raising Plinth Raising Construction of Flood

    resilient house Embankment cum road

  • Decreer Char Union of Faridpur Sadar Upazila under Faridpur District

    Target Hazard Flood

    Existing Resources

    *Raised Ground

    *Embankments cum road

    Proposed DRR Interventions

    Construction of 80 Flood Resilient Houses with solar panel & Improved Woven

    Impacts & Expected Results

    80 ultra poor and vulnerable families will have safe flood resilient shelter on raised land with solar panel and Improved Woven.

  • Construction of 80 Flood Resilient house with Solar Panel and Improved Woven at Kazam Matabarar Dangi & Baparir Cluster Village

  • Improved Woven

  • Decreer Char Union of Faridpur Sadar Upazila under Faridpur District

    Scheme Name of the Scheme Estimated Budget-BDT (without 3%)

    Beneficiaries Design Data

    1 Construction of 80 Flood Resilient house with Solar Panel and Improved Woven at Kazam Matabarar Dangi & Baparir Cluster Village

    9,385,120

    435 Room size 15x 10 Verandah 15x4-7

  • Gaukandia Union of Durgapur Upazila under Netrokona District

    Major Hazard Flash Flood River Bank Erosion Flood

    Vulnerabilities Sudden heavy rainfall in the

    upstream inundate the vast area Gaukandia union through river Someshwari.

    Existing infrastructures wash away/breached due to heavy current.

    Damage of crops and silted cultivable lands.

    Interventions proposed by DMCs/Community people

    Killa/Ground raising

    Construction or extension of embankment cum road

    River bank protection work

  • Gaukandia Union in Durgapur Upazila under Netrokona District Target Hazards

    Flood,River Erosion,Flash Flood

    Existing Resources *Two Embankments *06 School used as temporary shelter. Proposed DRR Interventions One Embankment cum road

    Impacts & Expected Results

    @ Protect sand deposition on cultivable land @ Protect people and homestead from hilly flash flood @ Shelter for livestock on the embankment during disaster @ Develop communication network.

  • Construction of Embankment cum Road from Gaukandia primary School to adjacent dead Khal near H/O of Shorab at Biswanathapur Village

  • Gaukandia Union in Durgapur Upazila under Netrokona District

    Scheme Name of the Scheme Estimated Budget-BDT (without 3%)

    Beneficiaries Design Data

    1 Construction of Embankment cum Road from Gaukandia primary School to adjacent Mora Khal near H/O of Shorab at Biswanathapur Village

    3,767,278

    4,500 Length: 1215 m Top Width: 4.27 m Bottom Width: 16.27m Height: 3.0 m HFL: 2.25 m from base Soil Type : Sandy Clay Side Slope: 1:1.5

  • Poksia Union of Borhanuddin Upazila under Bhola District

    Major Hazard Cyclone Tidal Surge Flood River Bank Erosion Water logging

    Vulnerabilities Lack of permanent structures

    against cyclone Crop loss in case of flood Heavy soil erosion of the

    village / settlements. Un-availability of raised

    ground during flood .

    Interventions proposed by DMCs/Community people Cyclone Resilience Habitat Killa construction Raising of Graveyard for

    Burial Plinth Raising of Houses Embankment cum road

  • Poksia Union of Borhanuddin Upazila under Bhola District Target Hazard

    Flood

    Existing Resources *Embankments cum road *Cyclone Shelters * School & Madrasa fields Proposed DRR Interventions Earth raising for Graveyard near Keramotgonj Bazar

    Impacts & Expected Results

    People will have safe place for burial of dead bodies all the year round.

  • Poksia Union of Borhanuddin Upazila under Bhola District

    Scheme Name of the Scheme Estimated Budget-BDT (without 3%)

    Beneficiaries Design Data

    1 Earth raising for Graveyard near Keramotgonj Bazar

    220,677

    6060 Length: 71.0 m Width: 14.0 m Height: 2.3 m HFL: 1.0 m from base

  • Laxmitari Union of Gangachara Upazila under Rangpur District

  • Laxmitari Union of Gangachara Upazila under Rangpur District

    Major Hazard Flood River Bank Erosion Drought Tornado Water logging

    Vulnerabilities Crop loss in case of flash

    flood and water logging. Heavy soil erosion of the

    village / settlements. Lack of permanent

    protection against flood.

    Interventions proposed by DMCs/Community people Killa/School Ground

    raising Plinth Raising Embankment cum road

  • Laxmitari Union of Gangachara Upazila under Rangpur District Target Hazard

    Flood & River Bank Erosion

    Existing Resources *Raised Ground *Embankments cum road *River bank protection cum road *Groin Proposed DRR Interventions 2 Embankment cum road schemes

    Impacts & Expected Results

    140 ultra poor families and vulnerable people of the flood affected area covering 3500 Hector of land will be more resilient to disaster especially flood.

  • Embankment cum Road at Esli Bridge to Sonkar-dah Madrasa Mor under Laxitary UP

  • Embankment cum Road at Esli Karar Bridge to Bagarhat under Laxitary UP

  • Laxmitari Union of Gangachara Upazila under Rangpur District

    Scheme Name of the Scheme Estimated Budget-BDT

    Beneficiaries Design Data

    1 Embankment cum Road at Esli Bridge to Sonkar-dah Madrasa Mor under Laxitary UP

    2,596,266

    700 Length: 2165 m Top Width: 4.3 m Bottom Width: 10.7m Height: 1.6 m HFL: .7 m from base Soil Type : Sandy Side Slope: 1:2

    2 Embankment cum Road at Esli Karar Bridge to Bagarhat under Laxitary UP

    935,215

    400 Length: 1220 m Top Width: 4.3 m Bottom Width: 10.3m Height: 1.5 m HFL: .6 m from base Soil Type : Sandy Side Slope: 1:2

  • Bahara and Sullah Union of Shalla Upazila under Sunamganj District

    General Description of the Unions Villages are isolated and surrounded by

    Haor; locally named as AATI. After flash flood, the entire area gets inundated when erosion of soil takes place due to wave action causing damage of HH & disrupts livelihood.

    The only rice crop (Boro) is cultivated and harvest is subject to sudden flash flood and require high ground for storage.

    People use RCC roads for communication which remains submerged for more than 6 months.

    90% of inhabitants use open toilets. Within 4 to 5 km there is no markets or

    even graveyard for burial. No Electricity

  • Bahara and Sullah Union of Shalla Upazila under Sunamganj District

  • Bahara and Sullah Union of Shalla Upazila under Sunamganj District

  • Bahara and Sullah Union of Shalla Upazila under Sunamganj District

  • Bahara and Sullah Union of Shalla Upazila under Sunamgonj District

    Major Hazard Flash flood

    Wave action

    Inundation

    Sanitation

    Vulnerabilities Crop loss in case of flash flood

    Heavy soil erosion of the village / settlements.

    Lack of permanent/insufficient protection against wave.

    Un-hygienic toilet.

    Un-availability of drinking water.

    Village remains isolated from other villages, union, upazila.

    Interventions proposed by DMCs/Community people

    @Construction of Killa

    @Protection wall

    @Killa connecting road

    @Community Toilet & Sanitary latrine

    @Tube-well

    @Grave yard raising

    @Solar system

    @Tree plantation

  • Bahara and Sullah Union of Shalla Upazila under Sunamgonj District Target Hazard

    Flood Existing Resources Flood Shelters Submerged RCC roads constructed by LGED Embankment constructed by BWDB Proposed DRR Interventions Comprehensive scheme including

    @3 Nos of Killa @7 Village and Killa Protection Walls @One Killa connecting road @ 130 nos Sanitary latrine @10 nos Deep Tube-wells @Sultanpur,Bhatgaon,Kartikpur and Shobji Mohal grave yard raising @35 Solar system & Tree plantation @ One Foot bridge connecting

    village and High school

    Impacts & Expected Results

    Killa can be used as storage of crops and shelter for Livestock in high flood season, use as market place, religious and social gathering round the year. Village will be permanently protected from flood/Haor wave action. Graveyard will facilitate funeral during flood and in dry season as well. Improved WatSan .

  • Bahara Union of Shalla Upazila under Sunamgonj District

    Scheme Name of the Scheme Estimated Budget-BDT

    Beneficiaries Design Data

    1 Comprehensive scheme at Meda. Interventions: i) Construction of Killa, ii) Killa Protection wall, iii) Killa connecting road, iv) Community Toilet, v) Tube-well

    880,4625 3,000 As attached

    2 Comprehensive scheme at Shantipur. Interventions: i)Village Protection wall, ii) Sultanpur grave yard raising, iii) Sanitary latrine, iv) Tube-well, v) Solar system, vi) Tree plantation

    8,604,714 330

    3 Comprehensive scheme at Harinagar. Interventions: i) Killa Protection wall, ii) Construction of Killa, iii) Sanitary latrine, iv) Tube-well

    3,643,424 6000

    4 Comprehensive scheme at Bhatgaon. Interventions: i)Village Protection wall, ii)Bhatgaon grave yard raising

    4,383,660 1000

  • Sullah Union of Shalla Upazila under Sunamganj District

    Scheme Name of the Scheme Estimated Budget-BDT

    Beneficiaries Design Data

    1 Comprehensive scheme at Bolorampur. Interventions: i) Raise school field, ii) Foot bridge connect to school and village, iii) Tree plantation, iv) Solar panel

    788,340 420 As Attached

    2 Comprehensive scheme at Kartikpur (Notunhati). Interventions: i) Village protection wall, ii) Kartikpur Graveyard raising, iii) Sanitary latrine, iv) Tube-well

    3,914,857 230

    3 Comprehensive scheme at Rowa Notunhati (Bagerhat). Interventions: i) Village protection wall, ii) Sanitary latrine, iii) Tube-well

    4,663,902 300

    4 Comprehensive scheme at Graam Sullah. Interventions: i) Construction of Killa, ii) Raam shallah sbojimohol ghrave yard raising.

    2,183,323 7000

    5 Construction of village protection at Kandigaon by CC block.

    2,157,269 1800

  • Section of Brick Retaining Wall

    Detailed Drawing of Village protection wall at Kartikpur Notun Hati under Shalla

    Union of Shalla Upazila, Sunamganj.

    75mm BFS 150mm Sand Filling

    375

    500

    625

    750

    875

    1000

    Filter materials (Brick Bats)

    1300 mm

    300mm

    Earth side

    GL

    150mm CC

    Earth Filling

    Project type: Retaining Wall Comprehensive Disaster Management Program (CDMP-II)

    250

    300mm

    300mm

    300mm

    300mm

    300mm

    300mm

    300mm

    375mm

  • Thank you

    For more information contact:

    Comprehensive Disaster Management Programme (CDMP II)

    United Nations Development Programme (UNDP)

    Department of Disaster Management Bhaban (6th Floor)

    92-93 Mohakhali C/A, Dhaka-1212, Bangladesh, Tel: (+88 02) 989 0937, 882 1255 Website: www.cdmp.org.bd Pho

    to:

    Otin

    Dew

    an

    /CD

    MP

    Comprehensive Disaster Management Programme (CDMP II) Ministry of Disaster Management & Relief