farmpond_reservoir
Citation preview
RecommendationsLowcostwaterharvestingstructures
Lowcostwaterharvestingstructures
LDPEFilmLinedTank
Toincreasetheirrigationpotentialinhills,itisnecessarytodevelopthewaterresourcesbymeansofsmalltanks(capacityupto100m3).Thecriterionforthedesignoftanksshouldbesuchthat itnotonlyreducestheseepage lossesbut it iscosteffectiveaswell.Thecementtankforinstanceisabletochecktheseepagelossesbutthecostbecomesthelimitingfactorineconomicexploitationofwaterresources.Ontheotherhandunlinedtankspronetoheavyseepage losses (300400 litre per day per m2) and may not be able to supply water forirrigation during stress. Thus, for the effective water storage, the tank should be withminimumseepagelossandcosteffective.
Lowdensitypolyethelene (LDPE) filmhasbeen successfullyused toeffectively control theseepagelossatmuchlowercostthanthecementtanks.Thefilmusedshouldhaveminimumthicknessof200,otherwiseitbecomespronetophysicaldamage.Enhancementofeffectivelifeofplasticfilmandtoavoidthephysicaldamagetheprotectionofthefilmisnecessitatedwhichcanberealizedthroughpitching.
Benefitsofpondliningwithplasticfilms
Reductioninseepagelossestothemaximumextent(95%)
Harvestingandstoringofrainwaterfromearlymonsoons.
Utilizationofharvestedrainwaterforshortduringcropsaswellasduringoffseason.
Lining of ponds and reservoirs with plastic film improve water availability over alongerperiodoftime.
Itishighlyusefulinporoussoilswhereretentioninpondsandwaterharvestingtanksisminimal.
Economicalandeffectivemethodofstoringwater.
Eliminateswaterloggingandpreventsupwardintrusionofsaltsintostoredwater.
Usefulforthepurposeofstorageofdrinkingwater,forpiscicultureandforprovidingsupplementaryirrigation.
Preventssoilerosion.
Techniqueisalsosuitableforliningofeffluentpondsandchannelstoreducesoilandgroundwatercontamination.
It can also be used in the lining of saltpans for improving productivity aswell asqualityofsalt.
Thedetailsofsubsidyareasunder:
Item Maximum permissiblecost*
PatternofAssistance*
(a) Communitytanks/on farmponds/onfarmwaterreservoirswithuse ofplastic/RCClining.
Rs. 15 lakh/unit inplain areas, Rs. 17.25lakh/unitinhillyareas.
100%of cost for 10haof command area,withpondsizeof100mx100mx3moranyothersmaller size on pro rata depending upon thecommand area, owned & managed by acommunity/farmer group. Cost for nonlinedponds/tanks (only in black cotton soils)will be33% less. Assistance under NHM will berestricted to the cost of plastic/RCC lining.However, for non MNREGS beneficiaries,assistance on entire cost including constructionof pond/tank as well as lining can be availedunderNHM.
(a) Waterharvestingsystem forindividuals for storage ofwater in20mx20mx3mponds/dugwells @ Rs.100/cum
Rs. 1.20 lakh/unit inplain areas, Rs. 1.38lakh/unit inhillyareasfor maximumcommandareaat2ha
50%ofcostincludinglining(inplains)and75%ofcost i.e. Rs. 1.03 lakhs per beneficiary in hillyareas. For smaller size of the ponds/dugwells,cost will be admissible on pro rata basis.Maintenancetobeensuredbythebeneficiary.
*Subsidies are liable to be changed from time to time and please consult your local horticultureofficersforlatestpatterns.
Layout,Shape,sizeandstoragecapacity
Shapedependsonthesoiltype,whichdictatesthemaximumpossibleslopethatwillstayinplacewithoutfalling in.normally,theshape iskeptastrapezoidalwithsideslopesof1:1to1:2andeffectivedepth1.5to5m.Thesideslopesshouldhavearatioof1:1and1:2forstableandunstablesoils,respectively.Thepondshouldbeconstructedintheformoffrustumofan
invertedpyramid(Fig.1&2).Thesizeofwaterharvestingstructuresisimportant,butmoreimportant is its sustainability, efficiency and appropriateness. The demand dictates therequiredstoragecapacity.Thecatchmentareaandrainfalldeterminethesupplyandstoragecapacityarenecessaryforachievinghigherwaterproductivity.Thebasicprincipleforsizinganyrainwatersystem isthatvolumeofwaterthatcanbecapturedandstored(thesupply)mustequalorexceedthevolumeofwaterrequired(thedemand).Thewaterstoragecapacityofpond(V,volume)having1:1sideslopescanbecalculatedwithfollowingformula:
V=H/2[(W2F)(L2F)+(L2H2F)(W2H2F)
Where,L=Toplength(m);W=Topwidth(m);H=Depthoftank(m);F=Freeboard(m)
Note:LandHcanbedecideddependinguponsiteconditions.However,Hshouldnotbelessthan1.5mandmore than5m.normally, freeboard (F) for the smallpondsmaybekeptbetween0.1to0.3m.unitsofmeasurementscanbetakeninfeetormeters.
Analternativeandsimplifiedformulaforcomputingthevolume(V)oftrapezoidshapepondswith1:1slope(Fig.2)is:
V=[L1XW1+L2XW2+(L1XW2+L2XW1)/2]H/3
Where,L1=Toplength,W1=Topwidth,L2=Bottomlength,W2=Bottomwidth,H=Effectivedepth
Thecostmayvaryfromsitetositeasperheadload,sizeofpondetc.andsiteconditions.Acontingency,excavationprovisionextrarateconsideredforestimationarecurrentpertainingtomarketrate.Thedetailsofcalculatingpondsof100x100x3mand20x20x3misgivenattheendofthischapter.
Computationof requirementofmaterial:Thematerial for trapezoidalshaped farmpondwithsideslopesof1:1canbecalculatedasunder:
Areaoftheliningsheet =[22(H+F)+1.0+(W2H2F)]x[(22(H+F)+1.0+(L2H2F)]
Areaofbrick/stonepitching =[22(H+F)x(W+L2F2H)]+[(L2H2F)x(W2H2F)]
(Excludingperipheralpath)
Thumbruleforcomputingareaoftheliningsheet:
Lengthofsheet:[2xPathwidth(m)+2xSlanteddepth(m)atcorner+Bottom(floor)length(m)+2(0.5m)forsheetanchoringintheperipheraltrench]
Widthofsheet:[2xPathwidth(m)+2xslanteddepthatcorner(m)+Bottom(floor)width(m)+2(0.5m)forsheetanchoringintheperipheraltrench]
Areaofsheet=Lengthofsheetxwidthofsheet
Approximately4.5m2LDPEsheet(250micron)weighsabout,1.0kg
Weight(kg)ofblackLDPEsheet= Areaofthesheet
4.5
Weight(kg)ofcrosslaminated= Areaofthesheet
Silpaulinsheet(200gsm) 5
ThethicknessofLDPEsheetshouldbe200250microns(8001000gauge)andshouldconformtoBISstandard2508/1977.For largesizefarmpondsofcapacitymorethan1000m3,1000gaugesheetshouldbeused.
Constructionoffarmpond
Theconstructionprocess includes (i)Selectionofsite (iiExcavation (iii)Liningofpondwithsealants.
Selectionofsite:Thesiteshouldbeselectedkeepinginviewthefollowingissues:
Thepondshouldreceivesufficientrunoff.
Thesiteshouldbesuchthathigherstorageexcavationratiocanbeachieved.
The site should not have hard rocks which would require blasting consequentlyincreasingthecostofconstruction.
Thepondshouldbeclosetothecommandareatoensureeaseofirrigationpreferablythroughgravityflow.
Thesiteshouldnotbeveryclosetotheexistingsprings,ifany;otherwiseexcavationmaydisruptthecapillarylinesofthespringresultinginreduceddischarge.
Thepondshouldnotbeconstructedoverthenaturalwatersourceiffoundduringtheexcavationprocess.
Thereshouldnotbeanylargetreenearthesite.
Excavation :Firstofall,theponddimensions(L,W,Dandsideslope) identifyandthenmarkthe top level (outer rectangle/trapezium) as well as the bottom level (innerrectangle/trapezium)lengthandwidthclearlyontheground(Fig.3).Putpegsatthecornersofboththerectanglesandtiearopetodemarcateponddimensions.Startdiggingtheareaofthe innerrectangletilldesireddepth isachieved.Excavatedsoilcanbekeptnearthepondaroundtheperipheryandusedlaterfollowingtheprincipleofcutandfillratio.Give1:1slopeby digging the side walls of outer rectangle for better stability of walls and pitching of
stones/bricks. This is readily ascertainedby joining the top cornersof theouter rectanglewiththeadjacentandnearestbottomcornersofinnerrectanglewithawoodenframe.
Finishingofpondbedandsidewalls:Afterexcavation,thesideslopesofpondaremadesmoothandcompactedbyremovingangularprojections,protrudingstones,pebbles,rootsetc.Before layingthesheet,apply thin layerofslurryofclayandcowdungorplacea thin layerofusedgunnybags/softgrassbetween the sheet and thewallsof thepond to avoiddamageby [email protected]/m2 isgivenonthesidewallsafterapplyingslurryforcontrollingweeds.Ifneeded,simplepipe(5cmdiameter)spillwaymaybeprovidedtoregulatetheoutflow.
Liningofpondwithsealants:Thepondsarelocatedonavarietyofsoiltypeswhichexhibitwide range of seepage characteristics. The pondmust be linedwith a suitable sealant tominimize seepage losses and to improve storage efficiency. Different sealants have beenevaluatedbydifferent institutes inthestate(Table1).BothblackLDPEandSilpaulinsheetswere found equally good. The black LDPE sheet has been proved to bemore appropriateowing to its low costand reliability.The Silpaulin sheet is costlier than theblack LDPE. Inaddition,Tarfeltandothersheetsarealsoavailablewhichcanbeusedforlining.
JoiningofLDPEsheet:Generallyplasticsheetsareavailableupto14mwidth.Ifpossible,joiningofsheetsshouldbeavoidedbyprocuringsheetofrequiredwidth.Ifjoiningrequired,bitumenheatedto1000Cisspreadover30cmwidestripononesheetandthispaintedportionofthesheetisputoverthecounterpartandispressedbyasmoothobject.Itisthenallowedtocool.Sheetcanalsobejoined/repairedwithsyntheticrubberadhesive.
LayingofLDPEsheetandfixingoutletpipe:Theplasticsheetisspreadoverthedugoutareaafterensuring that thereareno sharp stones,pebbles,etc.on the side slopes.Anchor theliningsheetedgesinasmalltrench(0.25x0.25m) dugaroundtheexternalperipheryofthepondtoensurethatsheet liessmoothlyonthesidewallsofthepond andfirmlyheld.Thetrenchcanbeapproximately0.5mawayfromtheexternalperipheryofthepond.Theliningsheetshouldfit inthepondarea looselysothat itdoesnotbreakwhen it isanchored.Thesheetshouldnotbeplacedonaveryhotandwindyday.Forfixingtheoutletpipethroughthe sheet,aholeof5 cmdiameter, slightly larger than thatofoutletpipe ismade in thesheet. The sheet is then embedded with pipe in the embankment by pouring additionalcementconcrete(1:3:6)overthesurfaceadjacenttohole.
Stone/brickpitching:Thestone/brickpitchingimpartslongevitytothesheetaswellaspondandbothare importantconsiderationsoffarmers.BothblackLDPEandSilpaulinsheetsareUV resistantbut thesearedamagedby sunlight ifexposed for longerduration.Theplasticsheetmustbeprotectedbycoveringwithinertmaterialsuchassoil,bricks,stones,etcwhichis not damaged byUV rays. Pitchingwith bricks/stones also protects the sheet from anyaccidentalphysicaldamagebysharpobjects.Thebrickpitchingofbottomofthepondcanbeavoidedandsheetiscoveredwithabout15cmsoillayer.Ifsoilisnottobeused,atoewallisessentialtosupportthebricksinthesideslopes.Forthisatrench(about5x5cm)istobedugalong the bottom periphery of the pond.Once the toewall is constructed then the brickpitching of the sides should be done from bottom to top. In areas,where bricks are not
readilyavailable,flatstoneswithbluntedgescanbeused.Stonepitchingisstartedbyplacingbiggerdiameterstones(about20cm)atthebottomoftheslope.Thediameterofthestonesshouldbegraduallyreduced(about10cm)asthepitchingworkproceedstowardsthetopofthesideslopes.Thebricks/stonesarearrangedinamannerthatprovidesgriptoeachother.The gap between the bricks/stones may be then filled with cement mortar (1:8) forstrengthening the pond. The top 30 cmwidth of stone pitching is plasteredwith cementmortar(1:4).Ifdepthofpondismorethan2.0m,30cmwideverticalbondbycementmortarmaybeprovidedatanintervalof0.6m.
Siltretentiontrench:Constructsiltretentiontrench(2x1m)alongtheinletchannelnearthepondtopreventsiltgettingintothepondincaseofsurfacerunoffharvesting.Thetrenchisdividedinto23segmentstolowerdownthevelocityofrunoffandtoallowmoretimeforthesilttosettledown.ThesiltretentiontrenchshouldalsohaveproperLDPEsheetliningandbrickpitchingtoavoidseepage.Therunoffwaterisfirstdirectedtosiltretentiontrenchandtheinletchannelfromthistrenchisconnectedthereaftertothestoragepond.
Table1.CostofdugoutLDPEfarmpond(20x20x3mwitheffectivecapacityof650m3)withdifferentliningmaterials
Sr.No. Liningmaterial Approx. cost ofconstruction(Rs.inlakh)
Cost (Rs/m3 ofwaterharvested)
Expected life(years)
1. Kaccha pond withoutsealant
0.31 48.00
2. BlackLDPEsheetlining 0.61 78.38 57
3. BlackLDPEsheetlining&pitchingwithbricks
2.34 299.50 20+
4. Silpaulinsheet lining (UVresistant)
0.70 82.30 57
5. Silpaulinsheet lining (UVresistant)&pitchingwithbricks
2.85 351.00 20+
6. Masonry cement/RCCtank
16.00 2462.00 20+
Irrigationpotential
Pondsof50200m3capacitycanbeeasilyconstructedon individualfarmerbasiswhicharesufficient for vegetable cultivation in aboutone kanal area.A 100m3 capacitypondoncefilledcanprovidefiveirrigationsthroughtraditionalsystemseachof5cmtoonekanalarea(400 m2). The irrigation potential can be increased upto 56 times if hightech irrigationsystemslikedriporsprinklerirrigationsystemsaretobeused.Itispertinenttomentionherethat rooftop area of polyhouses can be effectively used for rain water harvesting. Apolyhouseof200m3rooftopareacanyieldupto160m3water intheareahavingaverageannualrainfall100cmwhichcanfullymeetthewaterrequirementofcropsgrowninsidethepolyhouse.
Protectionandmaintenance
Trespassingbyanimalsshouldbeavoided.
In case the sheet ispuncturedordamaged,paste required sizeofLDPE sheetusingheatedbitumenatdamagedportion.
Clean the silt retention trench regularly. Inspect inlet channel and collecting arearegularly.Periodicallycleanthepondandremoveaccumulatedsilt/algae.
Storageofwateroffirst12monsoonshowersshouldbeavoidedforpreventingquicksedimentationofsiltationtank.
Thedos&dontsinLDPEfarmpond
Dos
Ensuregooddressingbeforelayingthesheet.
Jointingofthesheet,ifrequired,isdonebyheatsealing/syntheticrubberadhesiveatthesiteitself.
Directtherainwatertothepondthroughasinglepoint.
Recommendedcement:sandratiois1:4forbricksjoiningatthetop30cm.
Ensure a systematicprocedural followup and theuseof rightqualitymaterialandgoodworkmanship.
Donts
Dontusehooksandalsodontdragthesheet.
Dontwalkonthesheetwhileitisbeinglaid.
Dontuseroughtoolsorequipmentsforcleaning.
Whileconstructingpond,makesuretherearenotreesnearthepond.
Costestim
Topleng
Topwidt
Widthof
Areaofs
No.ofbr
Costofs
Costofb
Costofe
Totalcos
Unitcost
Continge
Unitcost
mateofLDPE
gth=20m
th=20m
Lengthof
fLDPEsheet
sheet=676m
ricksrequire
heet=150x2
bricks=28,80
arthwork5
st=Rs.2,34,
twithbrick
ency,excava
twithoutbr
Elinedfarmp
Bo
Bo
fLDPEsheet
=11+12.72
=Lengtho
m2=150kg
dforlining=
200=30,000
00x6=1,72
0%cutfill@
2
060/
lining =
=
=0
tioncharges
ricklining
= 61,
pondsize20x
ottomLength
ottomwidth
=11+2(6.36)
+2 =25.72
ofsheet=25
(BlackUV20
=24x24x50=
0
2,800
@Rs.80/m3=
2,34,06
7,81.5
Rs.299
0.30Paisape
s10to15%e
,260
x20x3m(Top
h=11m
=11m
+1+1
2m
5.72(say26
0micron)
=28,800
=781.5x80
60
9.5perm3
erlitreorRs
extra(unitc
=Rs.0.078p
pDimension)
mtr)
=Rs.31,
s.300perm
costmayvar
perlitreorR
260.00
m3
yasperhea
Rs.78.38per
adloadatsit
rm3
te)
781.5
Unitcostmayvaryaspersiteconditionasescalationcharges(Therateconsideredarecurrentprevailingtomarketrate)