  • RecommendationsLowcostwaterharvestingstructures

    Lowcostwaterharvestingstructures

    LDPEFilmLinedTank

    Toincreasetheirrigationpotentialinhills,itisnecessarytodevelopthewaterresourcesbymeansofsmalltanks(capacityupto100m3).Thecriterionforthedesignoftanksshouldbesuchthat itnotonlyreducestheseepage lossesbut it iscosteffectiveaswell.Thecementtankforinstanceisabletochecktheseepagelossesbutthecostbecomesthelimitingfactorineconomicexploitationofwaterresources.Ontheotherhandunlinedtankspronetoheavyseepage losses (300400 litre per day per m2) and may not be able to supply water forirrigation during stress. Thus, for the effective water storage, the tank should be withminimumseepagelossandcosteffective.

    Lowdensitypolyethelene (LDPE) filmhasbeen successfullyused toeffectively control theseepagelossatmuchlowercostthanthecementtanks.Thefilmusedshouldhaveminimumthicknessof200,otherwiseitbecomespronetophysicaldamage.Enhancementofeffectivelifeofplasticfilmandtoavoidthephysicaldamagetheprotectionofthefilmisnecessitatedwhichcanberealizedthroughpitching.

    Benefitsofpondliningwithplasticfilms

    Reductioninseepagelossestothemaximumextent(95%)

    Harvestingandstoringofrainwaterfromearlymonsoons.

    Utilizationofharvestedrainwaterforshortduringcropsaswellasduringoffseason.

    Lining of ponds and reservoirs with plastic film improve water availability over alongerperiodoftime.

    Itishighlyusefulinporoussoilswhereretentioninpondsandwaterharvestingtanksisminimal.

    Economicalandeffectivemethodofstoringwater.

    Eliminateswaterloggingandpreventsupwardintrusionofsaltsintostoredwater.

    Usefulforthepurposeofstorageofdrinkingwater,forpiscicultureandforprovidingsupplementaryirrigation.

    Preventssoilerosion.

    Techniqueisalsosuitableforliningofeffluentpondsandchannelstoreducesoilandgroundwatercontamination.

  • It can also be used in the lining of saltpans for improving productivity aswell asqualityofsalt.

    Thedetailsofsubsidyareasunder:

    Item Maximum permissiblecost*

    PatternofAssistance*

    (a) Communitytanks/on farmponds/onfarmwaterreservoirswithuse ofplastic/RCClining.

    Rs. 15 lakh/unit inplain areas, Rs. 17.25lakh/unitinhillyareas.

    100%of cost for 10haof command area,withpondsizeof100mx100mx3moranyothersmaller size on pro rata depending upon thecommand area, owned & managed by acommunity/farmer group. Cost for nonlinedponds/tanks (only in black cotton soils)will be33% less. Assistance under NHM will berestricted to the cost of plastic/RCC lining.However, for non MNREGS beneficiaries,assistance on entire cost including constructionof pond/tank as well as lining can be availedunderNHM.

    (a) Waterharvestingsystem forindividuals for storage ofwater in20mx20mx3mponds/dugwells @ Rs.100/cum

    Rs. 1.20 lakh/unit inplain areas, Rs. 1.38lakh/unit inhillyareasfor maximumcommandareaat2ha

    50%ofcostincludinglining(inplains)and75%ofcost i.e. Rs. 1.03 lakhs per beneficiary in hillyareas. For smaller size of the ponds/dugwells,cost will be admissible on pro rata basis.Maintenancetobeensuredbythebeneficiary.

    *Subsidies are liable to be changed from time to time and please consult your local horticultureofficersforlatestpatterns.

    Layout,Shape,sizeandstoragecapacity

    Shapedependsonthesoiltype,whichdictatesthemaximumpossibleslopethatwillstayinplacewithoutfalling in.normally,theshape iskeptastrapezoidalwithsideslopesof1:1to1:2andeffectivedepth1.5to5m.Thesideslopesshouldhavearatioof1:1and1:2forstableandunstablesoils,respectively.Thepondshouldbeconstructedintheformoffrustumofan

  • invertedpyramid(Fig.1&2).Thesizeofwaterharvestingstructuresisimportant,butmoreimportant is its sustainability, efficiency and appropriateness. The demand dictates therequiredstoragecapacity.Thecatchmentareaandrainfalldeterminethesupplyandstoragecapacityarenecessaryforachievinghigherwaterproductivity.Thebasicprincipleforsizinganyrainwatersystem isthatvolumeofwaterthatcanbecapturedandstored(thesupply)mustequalorexceedthevolumeofwaterrequired(thedemand).Thewaterstoragecapacityofpond(V,volume)having1:1sideslopescanbecalculatedwithfollowingformula:

    V=H/2[(W2F)(L2F)+(L2H2F)(W2H2F)

    Where,L=Toplength(m);W=Topwidth(m);H=Depthoftank(m);F=Freeboard(m)

    Note:LandHcanbedecideddependinguponsiteconditions.However,Hshouldnotbelessthan1.5mandmore than5m.normally, freeboard (F) for the smallpondsmaybekeptbetween0.1to0.3m.unitsofmeasurementscanbetakeninfeetormeters.

    Analternativeandsimplifiedformulaforcomputingthevolume(V)oftrapezoidshapepondswith1:1slope(Fig.2)is:

    V=[L1XW1+L2XW2+(L1XW2+L2XW1)/2]H/3

    Where,L1=Toplength,W1=Topwidth,L2=Bottomlength,W2=Bottomwidth,H=Effectivedepth

    Thecostmayvaryfromsitetositeasperheadload,sizeofpondetc.andsiteconditions.Acontingency,excavationprovisionextrarateconsideredforestimationarecurrentpertainingtomarketrate.Thedetailsofcalculatingpondsof100x100x3mand20x20x3misgivenattheendofthischapter.

    Computationof requirementofmaterial:Thematerial for trapezoidalshaped farmpondwithsideslopesof1:1canbecalculatedasunder:

    Areaoftheliningsheet =[22(H+F)+1.0+(W2H2F)]x[(22(H+F)+1.0+(L2H2F)]

    Areaofbrick/stonepitching =[22(H+F)x(W+L2F2H)]+[(L2H2F)x(W2H2F)]

    (Excludingperipheralpath)

    Thumbruleforcomputingareaoftheliningsheet:

    Lengthofsheet:[2xPathwidth(m)+2xSlanteddepth(m)atcorner+Bottom(floor)length(m)+2(0.5m)forsheetanchoringintheperipheraltrench]

    Widthofsheet:[2xPathwidth(m)+2xslanteddepthatcorner(m)+Bottom(floor)width(m)+2(0.5m)forsheetanchoringintheperipheraltrench]

    Areaofsheet=Lengthofsheetxwidthofsheet

  • Approximately4.5m2LDPEsheet(250micron)weighsabout,1.0kg

    Weight(kg)ofblackLDPEsheet= Areaofthesheet

    4.5

    Weight(kg)ofcrosslaminated= Areaofthesheet

    Silpaulinsheet(200gsm) 5

    ThethicknessofLDPEsheetshouldbe200250microns(8001000gauge)andshouldconformtoBISstandard2508/1977.For largesizefarmpondsofcapacitymorethan1000m3,1000gaugesheetshouldbeused.

    Constructionoffarmpond

    Theconstructionprocess includes (i)Selectionofsite (iiExcavation (iii)Liningofpondwithsealants.

    Selectionofsite:Thesiteshouldbeselectedkeepinginviewthefollowingissues:

    Thepondshouldreceivesufficientrunoff.

    Thesiteshouldbesuchthathigherstorageexcavationratiocanbeachieved.

    The site should not have hard rocks which would require blasting consequentlyincreasingthecostofconstruction.

    Thepondshouldbeclosetothecommandareatoensureeaseofirrigationpreferablythroughgravityflow.

    Thesiteshouldnotbeveryclosetotheexistingsprings,ifany;otherwiseexcavationmaydisruptthecapillarylinesofthespringresultinginreduceddischarge.

    Thepondshouldnotbeconstructedoverthenaturalwatersourceiffoundduringtheexcavationprocess.

    Thereshouldnotbeanylargetreenearthesite.

    Excavation :Firstofall,theponddimensions(L,W,Dandsideslope) identifyandthenmarkthe top level (outer rectangle/trapezium) as well as the bottom level (innerrectangle/trapezium)lengthandwidthclearlyontheground(Fig.3).Putpegsatthecornersofboththerectanglesandtiearopetodemarcateponddimensions.Startdiggingtheareaofthe innerrectangletilldesireddepth isachieved.Excavatedsoilcanbekeptnearthepondaroundtheperipheryandusedlaterfollowingtheprincipleofcutandfillratio.Give1:1slopeby digging the side walls of outer rectangle for better stability of walls and pitching of

  • stones/bricks. This is readily ascertainedby joining the top cornersof theouter rectanglewiththeadjacentandnearestbottomcornersofinnerrectanglewithawoodenframe.

    Finishingofpondbedandsidewalls:Afterexcavation,thesideslopesofpondaremadesmoothandcompactedbyremovingangularprojections,protrudingstones,pebbles,rootsetc.Before layingthesheet,apply thin layerofslurryofclayandcowdungorplacea thin layerofusedgunnybags/softgrassbetween the sheet and thewallsof thepond to avoiddamageby [email protected]/m2 isgivenonthesidewallsafterapplyingslurryforcontrollingweeds.Ifneeded,simplepipe(5cmdiameter)spillwaymaybeprovidedtoregulatetheoutflow.

    Liningofpondwithsealants:Thepondsarelocatedonavarietyofsoiltypeswhichexhibitwide range of seepage characteristics. The pondmust be linedwith a suitable sealant tominimize seepage losses and to improve storage efficiency. Different sealants have beenevaluatedbydifferent institutes inthestate(Table1).BothblackLDPEandSilpaulinsheetswere found equally good. The black LDPE sheet has been proved to bemore appropriateowing to its low costand reliability.The Silpaulin sheet is costlier than theblack LDPE. Inaddition,Tarfeltandothersheetsarealsoavailablewhichcanbeusedforlining.

    JoiningofLDPEsheet:Generallyplasticsheetsareavailableupto14mwidth.Ifpossible,joiningofsheetsshouldbeavoidedbyprocuringsheetofrequiredwidth.Ifjoiningrequired,bitumenheatedto1000Cisspreadover30cmwidestripononesheetandthispaintedportionofthesheetisputoverthecounterpartandispressedbyasmoothobject.Itisthenallowedtocool.Sheetcanalsobejoined/repairedwithsyntheticrubberadhesive.

    LayingofLDPEsheetandfixingoutletpipe:Theplasticsheetisspreadoverthedugoutareaafterensuring that thereareno sharp stones,pebbles,etc.on the side slopes.Anchor theliningsheetedgesinasmalltrench(0.25x0.25m) dugaroundtheexternalperipheryofthepondtoensurethatsheet liessmoothlyonthesidewallsofthepond andfirmlyheld.Thetrenchcanbeapproximately0.5mawayfromtheexternalperipheryofthepond.Theliningsheetshouldfit inthepondarea looselysothat itdoesnotbreakwhen it isanchored.Thesheetshouldnotbeplacedonaveryhotandwindyday.Forfixingtheoutletpipethroughthe sheet,aholeof5 cmdiameter, slightly larger than thatofoutletpipe ismade in thesheet. The sheet is then embedded with pipe in the embankment by pouring additionalcementconcrete(1:3:6)overthesurfaceadjacenttohole.

    Stone/brickpitching:Thestone/brickpitchingimpartslongevitytothesheetaswellaspondandbothare importantconsiderationsoffarmers.BothblackLDPEandSilpaulinsheetsareUV resistantbut thesearedamagedby sunlight ifexposed for longerduration.Theplasticsheetmustbeprotectedbycoveringwithinertmaterialsuchassoil,bricks,stones,etcwhichis not damaged byUV rays. Pitchingwith bricks/stones also protects the sheet from anyaccidentalphysicaldamagebysharpobjects.Thebrickpitchingofbottomofthepondcanbeavoidedandsheetiscoveredwithabout15cmsoillayer.Ifsoilisnottobeused,atoewallisessentialtosupportthebricksinthesideslopes.Forthisatrench(about5x5cm)istobedugalong the bottom periphery of the pond.Once the toewall is constructed then the brickpitching of the sides should be done from bottom to top. In areas,where bricks are not

  • readilyavailable,flatstoneswithbluntedgescanbeused.Stonepitchingisstartedbyplacingbiggerdiameterstones(about20cm)atthebottomoftheslope.Thediameterofthestonesshouldbegraduallyreduced(about10cm)asthepitchingworkproceedstowardsthetopofthesideslopes.Thebricks/stonesarearrangedinamannerthatprovidesgriptoeachother.The gap between the bricks/stones may be then filled with cement mortar (1:8) forstrengthening the pond. The top 30 cmwidth of stone pitching is plasteredwith cementmortar(1:4).Ifdepthofpondismorethan2.0m,30cmwideverticalbondbycementmortarmaybeprovidedatanintervalof0.6m.

    Siltretentiontrench:Constructsiltretentiontrench(2x1m)alongtheinletchannelnearthepondtopreventsiltgettingintothepondincaseofsurfacerunoffharvesting.Thetrenchisdividedinto23segmentstolowerdownthevelocityofrunoffandtoallowmoretimeforthesilttosettledown.ThesiltretentiontrenchshouldalsohaveproperLDPEsheetliningandbrickpitchingtoavoidseepage.Therunoffwaterisfirstdirectedtosiltretentiontrenchandtheinletchannelfromthistrenchisconnectedthereaftertothestoragepond.

    Table1.CostofdugoutLDPEfarmpond(20x20x3mwitheffectivecapacityof650m3)withdifferentliningmaterials

    Sr.No. Liningmaterial Approx. cost ofconstruction(Rs.inlakh)

    Cost (Rs/m3 ofwaterharvested)

    Expected life(years)

    1. Kaccha pond withoutsealant

    0.31 48.00

    2. BlackLDPEsheetlining 0.61 78.38 57

    3. BlackLDPEsheetlining&pitchingwithbricks

    2.34 299.50 20+

    4. Silpaulinsheet lining (UVresistant)

    0.70 82.30 57

    5. Silpaulinsheet lining (UVresistant)&pitchingwithbricks

    2.85 351.00 20+

    6. Masonry cement/RCCtank

    16.00 2462.00 20+

    Irrigationpotential

  • Pondsof50200m3capacitycanbeeasilyconstructedon individualfarmerbasiswhicharesufficient for vegetable cultivation in aboutone kanal area.A 100m3 capacitypondoncefilledcanprovidefiveirrigationsthroughtraditionalsystemseachof5cmtoonekanalarea(400 m2). The irrigation potential can be increased upto 56 times if hightech irrigationsystemslikedriporsprinklerirrigationsystemsaretobeused.Itispertinenttomentionherethat rooftop area of polyhouses can be effectively used for rain water harvesting. Apolyhouseof200m3rooftopareacanyieldupto160m3water intheareahavingaverageannualrainfall100cmwhichcanfullymeetthewaterrequirementofcropsgrowninsidethepolyhouse.

    Protectionandmaintenance

    Trespassingbyanimalsshouldbeavoided.

    In case the sheet ispuncturedordamaged,paste required sizeofLDPE sheetusingheatedbitumenatdamagedportion.

    Clean the silt retention trench regularly. Inspect inlet channel and collecting arearegularly.Periodicallycleanthepondandremoveaccumulatedsilt/algae.

    Storageofwateroffirst12monsoonshowersshouldbeavoidedforpreventingquicksedimentationofsiltationtank.

    Thedos&dontsinLDPEfarmpond

    Dos

    Ensuregooddressingbeforelayingthesheet.

    Jointingofthesheet,ifrequired,isdonebyheatsealing/syntheticrubberadhesiveatthesiteitself.

    Directtherainwatertothepondthroughasinglepoint.

    Recommendedcement:sandratiois1:4forbricksjoiningatthetop30cm.

    Ensure a systematicprocedural followup and theuseof rightqualitymaterialandgoodworkmanship.

    Donts

    Dontusehooksandalsodontdragthesheet.

    Dontwalkonthesheetwhileitisbeinglaid.

    Dontuseroughtoolsorequipmentsforcleaning.

    Whileconstructingpond,makesuretherearenotreesnearthepond.

  • Costestim

    Topleng

    Topwidt

    Widthof

    Areaofs

    No.ofbr

    Costofs

    Costofb

    Costofe

    Totalcos

    Unitcost

    Continge

    Unitcost

    mateofLDPE

    gth=20m

    th=20m

    Lengthof

    fLDPEsheet

    sheet=676m

    ricksrequire

    heet=150x2

    bricks=28,80

    arthwork5

    st=Rs.2,34,

    twithbrick

    ency,excava

    twithoutbr

    Elinedfarmp

    Bo

    Bo

    fLDPEsheet

    =11+12.72

    =Lengtho

    m2=150kg

    dforlining=

    200=30,000

    00x6=1,72

    0%cutfill@

    2

    060/

    lining =

    =

    =0

    tioncharges

    ricklining

    = 61,

    pondsize20x

    ottomLength

    ottomwidth

    =11+2(6.36)

    +2 =25.72

    ofsheet=25

    (BlackUV20

    =24x24x50=

    0

    2,800

    @Rs.80/m3=

    2,34,06

    7,81.5

    Rs.299

    0.30Paisape

    s10to15%e

    ,260

    x20x3m(Top

    h=11m

    =11m

    +1+1

    2m

    5.72(say26

    0micron)

    =28,800

    =781.5x80

    60

    9.5perm3

    erlitreorRs

    extra(unitc

    =Rs.0.078p

    pDimension)

    mtr)

    =Rs.31,

    s.300perm

    costmayvar

    perlitreorR

    260.00

    m3

    yasperhea

    Rs.78.38per

    adloadatsit

    rm3

    te)

  • 781.5

    Unitcostmayvaryaspersiteconditionasescalationcharges(Therateconsideredarecurrentprevailingtomarketrate)