35
Summer Training Project On TO STUDY THE INDUSTRIAL RELATIONS IN BHILAI STEEL PLANT

LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Embed Size (px)

DESCRIPTION

Uploaded from Google Docs

Citation preview

Page 1: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Summer Training Project

On

TO STUDY THE INDUSTRIAL RELATIONS IN

BHILAI STEEL PLANT

Page 2: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

OBJECTIVES

To study the Industrial Relation of BSP.To study the factors which are affecting Industrial Relation.To study the worker’s satisfaction level regarding facilities.

Page 3: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Steel Authority of India Ltd.

Leading steel-making company in IndiaRanked amongst the top ten public sector companies in India SAIL manufactures and sells a broad range of steel products, including hot and cold rolled sheets and coils, galvanized sheets, electrical sheets, structural, railway products, plates, bars and rods, stainless steel and other alloy steels

Page 4: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Steel Authority of India Ltd.Integrated Steel Plants

Bhilai Steel Plant (BSP) in Chhattisgarh

Durgapur Steel Plant (DSP) in West Bengal

Rourkela Steel Plant (RSP) in Orissa

Bokaro Steel Plant (BSL) in Jharkhand

IISCO Steel Plant (ISP) in West Bengal

Special Steel Plants

• Alloy Steels Plants (ASP) in West Bengal

• Salem Steel Plant (SSP) in Tamil Nadu

• Visvesvaraya Iron and Steel Plant (VISL) in Karnataka

Page 5: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Bhilai Steel PlantA symbol of indo-soviet techno-economic

collaboration, is one of the first three integrated steel plants set up by government of india to build up a sound base for the industrial growth of the countrySeven - time winner of Prime Minister's Trophy for best Integrated Steel Plant in the countryIndia's sole producer of rails and heavy steel plates and major producer of structuralBSP is accredited with ISO 9001:2000 Quality Management System Standard, all saleable products of Bhilai Steel Plant come under the ISO umbrella

Page 6: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

CORPORATE SOCIAL RESPONSIBILTY OF BSP

The Plant took up the task of development work in its periphery very seriously and with great zeal, concentrating on developing rural infrastructure, literacy programs and community health programs Creation of Model Steel Villages Providing Free Education & Treatment Bhilai Ispat Vikas Vidyalaya Ispat Kalyan ChikitsalayaSports & CultureRecreation

Page 7: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Concept of Industrial Relations The field of industrial relations (also called labour relations) looks at the relationship between management and workers “Industry” refers to “any productive activity in which an individual (or a group of individuals) is (are) engaged”. By “relations” we mean “the relationships that exist within the industry between the employer and his workmenindustrial relation encompasses all such factors that influence behavior of people at work. A few such important factors are below

Page 8: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Concept of Industrial Relationsindustrial relation encompasses all such factors that influence behavior of people at work. A few such important factors are below Institution

ContentsMethodsCharacters

Page 9: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

MODEL OF THE STUDY

I. R.Welfare Factors

WorkEnvironment

CanteenFacilities

EducationFacilities

MedicalFacilities

HousingFacilities

Page 10: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

INDUSTRIAL RELATIONS IN BSPINDUSTRIAL RELATIONS DEPARTMENTIR department play a crucial role in establishing and maintaining industrial democracy. A number of factors-social, Economic and political have influenced industrial relation department

GRIEVANCE CELLIn their working lives, employees occasionally have cause to be uncomfortable, disappointed or aggrieved either about certain managerial decisions, practices or service conditions.

Page 11: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

INDUSTRIAL RELATIONS IN BSPFINAL SETTLEMENT SECTION (FSS)An exclusive section named final settlement section has been formed to ensure prompt settlement of dues in separation cases

COUNSELING“Counseling” is a human approach to human problem. Counseling Section of Bhilai Steel plant has been rendering a unique service in the filed of social mediator ship, de-addiction, child guidance and training programs on counseling skills

Page 12: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

INDUSTRIAL RELATIONS IN BSP

TOWN SERVICES IN BHILAI STEEL PLANTThe ISO 14001 certified Bhilai Township is maintained and managed by Town Services Department, which caters to housing, maintenance; education, environmental, hygiene and civic amenities need of the residents of township. Its main objective is to serve employees to live a pleasurable and peaceful family life. Its motto , “Service with Smile”

Page 13: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Research Methodology

Research DesignExploratory, Descriptive

Data Source Primary data, Secondary data

Research Instrument Questionnaire

Sampling design Simple random design

Sample size 100

Sample location Bhilai Steel Plant

Sample element Employees of BSP

Page 14: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Data AnalysisAnd

Interpretation

Page 15: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Q1. Do you think that proper work environment increases production?

SR.NO

PERCEPTION

%

1 YES 822 NO 103 CAN’T SAY 08

TOTAL 100 0

10

20

30

40

50

60

70

80

90

YES NO CAN’TSAY

INTERPRETATION

The respondents are happy with the work environment.

Page 16: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Q2. Does BSP provide pure drinking water at your work place?

INTERPRETATION

There is need to provide this facility equally in all places and some of them should be aware about water quality at their work place.

SR.NO

PERCEPTION

%

1 YES 78

2 NO 14

3 CAN’T SAY 08

TOTAL 100

0

10

20

30

40

50

60

70

80

90

YES NO CAN’TSAY

Page 17: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Q3. Does BSP provide rest rooms with sufficient lights and fans?

INTERPRETATION

management should look to provide equal facility at all places

SR.NO PERCEPTION %1 YES 78

2 NO 16

3 CAN’T SAY 06

TOTAL 100

0

10

20

30

40

50

60

70

80

90

YES NO CAN’TSAY

Page 18: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Q4. Are you satisfied with the housing facility provided by BSP?

INTERPRETATION

24 % of the respondents are satisfied with the house facility of the organization

SR.NO PERCEPTION %

1 YES 24

2 NO 68

3 CAN’T SAY 08

TOTAL 100 01020304050607080

YES NOCAN’T SAY

Page 19: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Q5. Is there any discrimination in quarter allotment?

INTERPRETATION

About 64% of the respondents find discrimination in the system.Therefore, there is need to eliminate the discrimination factors so that the employees are highly satisfied.

SR.NO PERCEPTION %

1 YES 64

2 NO 26

3 CAN’T SAY 10

TOTAL 1000

10

20

30

40

50

60

70

YES NO CAN’TSAY

Page 20: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Q6. Is there adequate supply of electricity and water supply?

INTERPRETATION

The organization is fully accountable for the fulfillment of better welfare facilities to the employees by means of providing water, electricity.

SR.NO PERCEPTION %

1 YES 70

2 NO 16

3 CAN’T SAY 14

TOTAL 100

0

10

20

30

40

50

60

70

80

YES NO CAN’TSAY

Page 21: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Q7. Do you rely on health services provided by BSP hospital?

INTERPRETATION

respondents are very positive in the favor of the health services provided by BSP to the employees

SR.NO PERCEPTION %

1 YES 80

2 NO 13

3 CAN’T SAY 07

TOTAL 1000

10

20

30

40

50

60

70

80

90

YES NO CAN’TSAY

Page 22: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Q8. Whether good quality of medicine is provided by BSP?

INTERPRETATION

About 41% respondents are satisfied with quality of the medicines provided to them but 50% of the respondents are not satisfied with the quality of the medicine

SR.NO PERCEPTION %

1 YES 41

2 NO 50

3 CAN’T SAY 09

TOTAL 100

0

10

20

30

40

50

60

YES NO CAN’TSAY

Page 23: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Q9. In BSP hospitals doctors are available duty time?

INTERPRETATION

The increasing number of patients creates big problem to other patients as well as to doctor. The doctors are overcrowded by patients making the availability of the doctors more difficult to the patients.

SR.NO

PERCEPTION

%

1 YES 52

2 NO 40

3 CAN’T SAY 08

TOTAL 1000

10

20

30

40

50

60

YES NO CAN’TSAY

Page 24: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Q10. Do you think Hindi and English medium school is given equal imp?

INTERPRETATIONAbout 62% have opined that equal attention is not

given.And there is discrimination between the English and Hindi medium schools. Only 24% of the respondents agreed & 14% couldnot give their opinion.

SR.NO

PERCEPTION

%

1 YES 242 NO 62

3CAN’T

SAY14

TOTAL 100 0

10

20

30

40

50

60

70

YES NO CAN’TSAY

Page 25: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Q11. Do you find education system of BSP is satisfactory?

INTERPRETATION

the respondents are not satisfactory as 54% are highly dissatisfied with quality and standard of BSP schools

SR.NO PERCEPTION %

1 YES 36

2 NO 54

3 CAN’T SAY 10

TOTAL 100

0

10

20

30

40

50

60

YES NOCAN’T SAY

Page 26: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Q12.Is quality of education in BSP schools better than private schools?

INTERPRETATION

In BSP, parents can avail any of the facility as per their choice and capacity. In this regard, the replies of the respondents are not in favor of the BSP schools.

0

10

20

30

40

50

60

70

YES NO CAN’TSAY

SR.NO

PERCEPTION

%

1 YES 36

2 NO 58

3 CAN’T SAY 06

TOTAL 100

Page 27: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Q13.How often do you avail canteen facilities?

INTERPRETATION

Most of the respondents rarely use the canteen facilities.

0

10

20

30

40

50

60

70 SR.NO

PERCEPTION

%

1 Regularly 12

2 Often 18

3 Rarely 66

4 Never 04

TOTAL 100

Page 28: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Q14.Is canteen services of BSP excellent?

INTERPRETATION

About 72% of the respondents have responded that the canteen facilities are not to the expectation of them

SR.NO

PERCEPTION

%

1 YES 20

2 NO 72

3 CAN’T SAY 08

TOTAL 1000

10

20

30

40

50

60

70

80

YES NO CAN’TSAY

Page 29: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Q15. Are you satisfied with the quality of food available in BSP canteens?

INTERPRETATION

In this regard it is matter of rate concern that the quality of tea or breakfast is also poor and employees are dissatisfied

SR.NO PERCEPTION %

1 YES 38

2 NO 52

3 CAN’T SAY 10

TOTAL 1000

10

20

30

40

50

60

YES NO CAN’TSAY

Page 30: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Hypothesis Testing

Chi-Square Test-: Null Hypothesis: Ho : Workers Perception of Work Environment in BSP Is -veAlternat Hypothesis Ha : Workers Perception of Work Environment in BSP Is +ve

Page 31: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

Oi Ei Oi-Ei (Oi-Ei)2 (Oi-Ei)2 / Ei

Yes 82 33.33 51.67 2669.7889 80.10

No 10 33.33 -23.33 544.2889 16.33

Can't Say 08 33.33 -25.33 641.6089 19.25

Total 100 100 115.68

Degree of Freedom –N – 13 – 1 = 2

Table Value of d.f. 2 at 5% level of Significance is 5.991

Since the Calculated value of chi square is grater then the table value, Null Hypothesis is Regected and Alternate Hypothesis is accepted and We can say workers have a +ve perception of Work Environment in BSP

Page 32: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

FINDINGS the Workers of BSP are Satisfied with the work Environment of the PlantThe Workers are Not Satisfied with the Housing Facility and conditions of Company Quarters Workers relay on medical Facility of BSP Workers are not satisfied with education facility , they would switch to Private Schools for their wards is PossibleThe Canteen of BSP is Lacking in Providing the Workers with Quality food and Services

Page 33: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

RECOMMENDATIONS

To improve the welfare condition in BSP adequate budget should be allotted.House allotment system should be simplified & more transparent.Availability of medicines should be improvedParents and children should be made aware towards educations facility.More emphasis should be given on cleanliness of the canteen

Page 34: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt

CONCLUSION

Bhilai Steel Plant is very serious in providing all these facilities to each of the employee as well as to the family members of the employees by providing better infrastructure facilities, education facilities, and medical facilities etc equally to the all employees. To same extent there may result some discrimination on these issues or employee’s perception can be different but the basic principle or key element is to provide excellent welfare facilities to the employees.

Page 35: LCM Summer Training Project INDUSTRIAL RELATIONS IN BSP.ppt