26
[email protected] William Berg 10.31. 07 Beam Loss Monitor LCLS Undulator Systems Beam Loss Monitor William Berg ANL/APS Diagnostics Group

LCLS Undulator Systems Beam Loss Monitor

Embed Size (px)

DESCRIPTION

LCLS Undulator Systems Beam Loss Monitor. William Berg ANL/APS Diagnostics Group. Introduction. Physics Requirements Document: Heinz-Dieter Nuhn 9-28-07 (prd: 1.4-005-r0 undulator beam loss monitor). Scope Reduction : diagnostic to mps detector. Purpose and Requirements. - PowerPoint PPT Presentation

Citation preview

Page 1: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

LCLS Undulator SystemsBeam Loss Monitor

William Berg ANL/APS Diagnostics Group

Page 2: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

Introduction• Physics Requirements Document: Heinz-Dieter Nuhn 9-28-07

(prd: 1.4-005-r0 undulator beam loss monitor).

• Scope Reduction: diagnostic to mps detector. • Purpose and Requirements.

• Budget: M&S 500k (325k detector, ctls/mps 175k).

• Schedule: (design: nov-mar, test: feb-mar, fab: mar-jun, inst: july).

• Organization: 4 groups.

• Group Definition: controls, detector, simulation, test & calibration.

• Design Highlights and System Overview (detectors: dynamic 33, static: 2, r&d fiber:1).

• Detector design details and focus topics.

• Funds are limited and efforts need to be focused to minimize costs (h-dn).

• Simulation of losses and damage in the undulator will proceed in parallel with the present effort (pk).

Page 3: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

BLM Purpose h-dn

The BLM will be used for two purposes:

A: Inhibit bunches following an “above-threshold” radiation event.B: Keep track of the accumulated exposure of the magnets in each undulator.

Purpose A is of highest priority. It will be integrated into the Machine Protection System (MPS) and requires only limited dynamic range from the detectors.

Purpose B is also desirable for understanding long-term magnet damage in combination with the undulator exchange program but requires a large dynamic range for the radiation detector (order 106 ?) and much more sophisticated diagnostics hard and software.

Page 4: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

BLM requirements pk

Primary function of the BLM is to indicate to the MPS if losses exceed preset thresholds.

MPS processor will rate limit the beam according to which threshold was exceeded and what the current beam rate is.

The thresholds will be empirically determined by inserting a thin obstruction upstream of the undulator.

Simulation of losses and damage in the undulator will proceed in parallel with the present effort.

Page 5: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

Draft Budget Breakdown

500k M&S Total325k Detector Development 25k Interface Box150k Control and MPS integration

25k link node chassis 25k long haul cables 50k davis bacon labor 15k ctl modules and signal conditioning electronics 25k clean power distribution 10k racks

Page 6: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

Draft scheduledetector nov dec jan feb march april may june july aug septdetector design prototype x xprototype fabrication x x xprototype testing (beam) x xdetector design lock xdetector fabrication x xdetector assembly xship to slac xinstallation x x

interface boxprototype xtesting x xdesign lock x

custom control/sc boardsckt brd prototype design x xckt brd prototype fabrication x xcontrol/sc prototype test xcontrol/sc proto test (beam) x xdesign lock xfabrication x xsystem build xinstallation x x

mps and infrastructurecable plant (utility bldg) xcable plant (tunnel) xrack power xtunnel racks xmps system x x

calibration planstart xfinish x

simulation (ongoing effort)

Page 7: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

LCLS MPS Beam Loss Monitor

System Engineer: W. Berg

Cost Account Manager: G. Pile Technical Manager: D. Walters

Scientific advisor: P. Krejcik* FEL Physics: H. Nuhn* Scientific advisor: B. Yang FEL Physics: P. Emma*

Controls/MPS Group Lead (ctls) : J. Stein Lead (mps): A. Alacron*

Detector Group

Lead: W. Berg

Simulations and analysis Group

Lead: M. White

Testing and Calibration Group

Lead: B. Yang

M. Brown *R. Diviero E. NorumS. Norum *B. LairdJ. Dusatko*

A. BrillL. ErwinR. KeithleyJ. Morgan

J. DoolingB. Yang

W. BergJ. Bailey J. DoolingL. MoogE. NorumM. White

* Slac employee

Page 8: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

MPS Beam Loss Monitor Group Functions

Controls Group: J stein, A. Alacron

Develop BLM control and mps system:Interface Box and Control.

PMT Signal Conditioning.

Control and MPS Integration and User Displays.

Detector Group: W. Berg

Develop Detector and Interface.

Simulations and Analysis Group: M. White

Provide collaborative blm simulation support and test analysis.

Test and Calibration Group: B. Yang

Provide beam based hardware testing programs and calibration plan.

Page 9: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

Design Highlights33 distributed detectors (one preceding each undulator segment), two static units (up and downstream of undulator hall).

One additional channel reserved for r&d fiber based system.

Dynamic detector (tracks with undulator) 100mm stroke. Undulator position (in/out) detection will be used to set the corresponding mps threshold levels.

Large area sensor (coverage of the full horizontal width of top and bottom magnet blocks).

Manual insertion option via detachable arm for special calibration and monitoring.

Fiber Out for low gain upgrade (full integration and dyn range diagnostic), system expandable to 80 channels.

MPS threshold detection and beam rate limiting.

Single pulse detection and mps action up to max 120Hz beam rep rate via dedicated mps link.

Monitoring of real time shot to shot signal levels and record integrated values up to one second.

Heart beat led pulser for system validation before each pulse up to full rep rate (pseudo calibration).

Remote sensitivity adjust (dynamic range) by epics controlled PMT dc power supply (600-1200V).

Calibrated using upstream reference foil (initial use cal will be determined from simulation studies).

Radiation hard detector (materials and electronics).

Page 10: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

BLM Controls Architecture pk

The BLM PMT interfaces to the MPS link node chassis.

The IO board of the MPS link node chassis provides the ADC & DAC for the PMT.

A detector interface box (pmt, led pulser, sig con?) is the treaty point between the MPS and the undulator BLM.

There are 5 link node chasses serving up to 8 BLMs along the undulator (expandable from 8 to16 channels).

Page 11: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

Undulator Hardware

LINKNODE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

LINKNODE

LINKNODE

LINKNODE

LINKNODE

SparesSpares

Page 12: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

Beam Loss Monitors with Link Nodes

Use Link Node tosupport analog I/O IndustryPack modules

provide analog readouts to control system

set threshold levels

control HV power supplies

control LED Pulser

Page 13: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

Segment Design Layout m. brown

MPS Link

Node

Page 14: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

BLM Interconnect Diagram m. brown

Page 15: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

Interface Box Location

Page 16: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

Plan View of Short Drift

Page 17: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

BFW Pump Out Port Relocation

Page 18: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

Removable Pin for Manual Insertion

Page 19: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

Undulator Inserted Position

Page 20: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

Undulator Retracted Position

Page 21: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

Magnet Block Sensor Coverage

Page 22: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

Rendering of Detector

Page 23: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

Cross Section of BLM Detector

Page 24: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

Proposed PMT Device -04 (420nm)

Page 25: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

BLM System Support Focus Topics1. Assignment of Eric Norum to controls design oversight and testing.

2. Funding of beam based prototyping and test program.

3. Group Leaders to significantly step up direct involvement in system oversight, program implementation, and schedule tracking (controls: n. arnold, diag: g. decker, lcls: g. pile, ops/analysis: m. borland).

4. Active participation in simulations and simulation priority from slac.

5. Implementation of upstream profile monitor (halo or at min. cal foil).

6. Adequate analysis and shielding of upstream beam dump.

7. Develop long term collaboration plan for the pursuit of determining magnet damage mechanisms and thresholds via empirical methods.

8. Determine need and priority of BLM signal integration (diagnostic).

Page 26: LCLS Undulator Systems Beam Loss Monitor

[email protected]

William Berg10.31.07

Beam Loss Monitor

Summary Undulator magnets protection is critical for machine commissioning period.

Schedule for development of the blm program is very aggressive and Funding is limited.

System design and fabrication must go in parallel with simulation and testing program.

Consider Minimum requirements for first level implementation. Taking advantage of existing mps infrastructure.

BLM system is now defined as a component of the mps with an upgrade path to a diagnostic (low gain detector).

36 distributed channels (2 static devices) capable of single pulse detection and rate limiting reaction.

Detectors track with undulator position with detach option for manual operation.

Calibration plan and hardware is vital to proper system operation (threshold detection will use empirically derived levels).