LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
LCLS Linac Technical Design ReviewManagement
Eric Lind BongDecember 12, 2003
LCLS Linac Technical Design ReviewManagement
Eric Lind BongDecember 12, 2003
System DescriptionSystem Description
ProgressProgress
TimelineTimeline
OrganizationOrganization
Work Breakdown StructureWork Breakdown Structure
InterfacesInterfaces
RiskRisk
System DescriptionSystem Description
ProgressProgress
TimelineTimeline
OrganizationOrganization
Work Breakdown StructureWork Breakdown Structure
InterfacesInterfaces
RiskRisk
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
LCLS Linac System SchematicLCLS Linac System SchematicSingle bunch, 1-nC charge, 1.2-Single bunch, 1-nC charge, 1.2-m m sliceslice emittance, 120-Hz repetition rate… emittance, 120-Hz repetition rate…
(RF phase: (RF phase: rfrf = 0 at accelerating crest)= 0 at accelerating crest)
SLAC linac tunnelSLAC linac tunnel research yardresearch yard
Linac-0Linac-0L L =6 m=6 m
Linac-1Linac-1L L 9 m9 m
rf rf 25°25°
Linac-2Linac-2L L 330 m330 mrf rf 41°41°
Linac-3Linac-3L L 550 m550 mrf rf 10°10°
BC-1BC-1L L 6 m6 m
RR5656 39 mm39 mm
BC-2BC-2L L 22 m22 m
RR5656 25 mm25 mm LTULTUL L =275 m=275 mRR56 56 0 0
DL-1DL-1L L 12 m12 mRR56 56 0 0
undulatorundulatorL L =125 m=125 m
6 MeV6 MeVz z 0.83 mm 0.83 mm 0.05 %0.05 %
135 MeV135 MeVz z 0.83 mm 0.83 mm 0.10 %0.10 %
250 MeV250 MeVz z 0.19 mm 0.19 mm 1.6 %1.6 %
4.54 GeV4.54 GeVz z 0.022 mm 0.022 mm 0.71 %0.71 %
14.1 GeV14.1 GeVz z 0.022 mm 0.022 mm 0.01 %0.01 %
...existing linac...existing linac
newnew
rfrfgungun
21-1b21-1b21-1d21-1d XX
Linac-Linac-XXL L =0.6 m=0.6 mrfrf= =
21-3b21-3b24-6d24-6d
25-1a25-1a30-8c30-8c
Shamelessly Stolen from Paul EmmaShamelessly Stolen from Paul Emma
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
LCLS Linac System Summary LCLS Linac System Summary
L1L1 (Linac Sector 21)(Linac Sector 21)Modified S-Band StructuresModified S-Band Structures
New QuadrupolesNew Quadrupoles
BC1BC1 (Linac Sector 21)(Linac Sector 21)X-Band StructureX-Band Structure
Flexible Bunch Compressor Flexible Bunch Compressor ChicaneChicane
Diagnostics SectionDiagnostics Section
L2L2 (Linac Sector 21-24)(Linac Sector 21-24)New Wire ScannersNew Wire Scanners
BC2BC2 (Linac Sector 24)(Linac Sector 24)Flexible Bunch Compressor Flexible Bunch Compressor ChicaneChicane
Diagnostics SectionDiagnostics Section
L1L1 (Linac Sector 21)(Linac Sector 21)Modified S-Band StructuresModified S-Band Structures
New QuadrupolesNew Quadrupoles
BC1BC1 (Linac Sector 21)(Linac Sector 21)X-Band StructureX-Band Structure
Flexible Bunch Compressor Flexible Bunch Compressor ChicaneChicane
Diagnostics SectionDiagnostics Section
L2L2 (Linac Sector 21-24)(Linac Sector 21-24)New Wire ScannersNew Wire Scanners
BC2BC2 (Linac Sector 24)(Linac Sector 24)Flexible Bunch Compressor Flexible Bunch Compressor ChicaneChicane
Diagnostics SectionDiagnostics Section
L3L3 (Linac Sector 24-BSY)(Linac Sector 24-BSY)Remove NPI GunRemove NPI Gun
Install S-Band StructuresInstall S-Band Structures
Relocate Wire ScannersRelocate Wire Scanners
Transverse StructureTransverse Structure
LTU (C-Line – Research Yard)LTU (C-Line – Research Yard)New EnclosureNew Enclosure
Re-use FFTB MagnetsRe-use FFTB Magnets
Diagnostics SectionDiagnostics Section
Single Beam DumperSingle Beam Dumper
E-Dump (Inside Ring Road)E-Dump (Inside Ring Road)New EnclosureNew Enclosure
SpectrometerSpectrometer
Permanent Mag Safety BendsPermanent Mag Safety Bends
L3L3 (Linac Sector 24-BSY)(Linac Sector 24-BSY)Remove NPI GunRemove NPI Gun
Install S-Band StructuresInstall S-Band Structures
Relocate Wire ScannersRelocate Wire Scanners
Transverse StructureTransverse Structure
LTU (C-Line – Research Yard)LTU (C-Line – Research Yard)New EnclosureNew Enclosure
Re-use FFTB MagnetsRe-use FFTB Magnets
Diagnostics SectionDiagnostics Section
Single Beam DumperSingle Beam Dumper
E-Dump (Inside Ring Road)E-Dump (Inside Ring Road)New EnclosureNew Enclosure
SpectrometerSpectrometer
Permanent Mag Safety BendsPermanent Mag Safety Bends
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
Changes Since Spring ’03 Review Changes Since Spring ’03 Review
SC Wiggler EliminatedSC Wiggler EliminatedLongitudinal Space Charge Instability Longitudinal Space Charge Instability
Injector Laser HeaterInjector Laser Heater
DL2 Expanded to LTUDL2 Expanded to LTUAccommodates Future ExpansionAccommodates Future Expansion
Multiple UndulatorsMultiple Undulators
Dumpline RedesignDumpline RedesignRemove Permanent Magnets in Dump LineRemove Permanent Magnets in Dump Line
Accommodates Energy MeasurementAccommodates Energy Measurement
Place Permanent Magnets in Photon LinePlace Permanent Magnets in Photon Line
SC Wiggler EliminatedSC Wiggler EliminatedLongitudinal Space Charge Instability Longitudinal Space Charge Instability
Injector Laser HeaterInjector Laser Heater
DL2 Expanded to LTUDL2 Expanded to LTUAccommodates Future ExpansionAccommodates Future Expansion
Multiple UndulatorsMultiple Undulators
Dumpline RedesignDumpline RedesignRemove Permanent Magnets in Dump LineRemove Permanent Magnets in Dump Line
Accommodates Energy MeasurementAccommodates Energy Measurement
Place Permanent Magnets in Photon LinePlace Permanent Magnets in Photon Line
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
Technical Progress Technical Progress
Instability Studies & End to End SimulationsInstability Studies & End to End SimulationsSystem Re-optimizedSystem Re-optimized
Lower Injection EnergyLower Injection EnergyReduced Magnet TolerancesReduced Magnet Tolerances
Component Specification DatabaseComponent Specification DatabaseSystem LayoutsSystem Layouts
Generated From MAD in Solid EdgeGenerated From MAD in Solid EdgeBunch Compressor 1 Mechanics ConceptBunch Compressor 1 Mechanics Concept
DiagnosticsDiagnosticsEO Monitor Measurement in SPPSEO Monitor Measurement in SPPSSpectrometers Upbeam & Downbeam of UndulatorSpectrometers Upbeam & Downbeam of Undulator
WBS & Manpower Loaded ScheduleWBS & Manpower Loaded ScheduleComponent Counts from MAD DeckComponent Counts from MAD Deck
Operating Modes for Undulator Commissioning & ProtectionOperating Modes for Undulator Commissioning & Protection
Instability Studies & End to End SimulationsInstability Studies & End to End SimulationsSystem Re-optimizedSystem Re-optimized
Lower Injection EnergyLower Injection EnergyReduced Magnet TolerancesReduced Magnet Tolerances
Component Specification DatabaseComponent Specification DatabaseSystem LayoutsSystem Layouts
Generated From MAD in Solid EdgeGenerated From MAD in Solid EdgeBunch Compressor 1 Mechanics ConceptBunch Compressor 1 Mechanics Concept
DiagnosticsDiagnosticsEO Monitor Measurement in SPPSEO Monitor Measurement in SPPSSpectrometers Upbeam & Downbeam of UndulatorSpectrometers Upbeam & Downbeam of Undulator
WBS & Manpower Loaded ScheduleWBS & Manpower Loaded ScheduleComponent Counts from MAD DeckComponent Counts from MAD Deck
Operating Modes for Undulator Commissioning & ProtectionOperating Modes for Undulator Commissioning & Protection
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
Commissioning and Operations Scheduled DatesCommissioning and Operations Scheduled Dates
Decommission FFTBDecommission FFTB FY06 - Q1FY06 - Q1
L1-BC1 CommissioningL1-BC1 Commissioning FY07 - Q1FY07 - Q1
L2-BC2-L3 CommissioningL2-BC2-L3 Commissioning FY07 - Q4FY07 - Q4
LTU CommissioningLTU Commissioning FY07 - Q4FY07 - Q4
Undulator CommissioningUndulator Commissioning FY08 - Q1FY08 - Q1Rate Limited BeamRate Limited Beam
Beam to SBDBeam to SBD
Beam to StoppersBeam to Stoppers
Beam to Main DumpBeam to Main Dump
LCLS OperationsLCLS Operations FY08 - Q3FY08 - Q3
Decommission FFTBDecommission FFTB FY06 - Q1FY06 - Q1
L1-BC1 CommissioningL1-BC1 Commissioning FY07 - Q1FY07 - Q1
L2-BC2-L3 CommissioningL2-BC2-L3 Commissioning FY07 - Q4FY07 - Q4
LTU CommissioningLTU Commissioning FY07 - Q4FY07 - Q4
Undulator CommissioningUndulator Commissioning FY08 - Q1FY08 - Q1Rate Limited BeamRate Limited Beam
Beam to SBDBeam to SBD
Beam to StoppersBeam to Stoppers
Beam to Main DumpBeam to Main Dump
LCLS OperationsLCLS Operations FY08 - Q3FY08 - Q3
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
SLAC Operations Integration GoalsSLAC Operations Integration Goals
LCLS OperationLCLS OperationDedicated LCLS Running 75%Dedicated LCLS Running 75%
Main Linac OperationMain Linac OperationBeam Delivery to non-LCLS Experiments 25%Beam Delivery to non-LCLS Experiments 25%
ChangeoverChangeoverX-Band Structure in placeX-Band Structure in place 15 minutes15 minutes
High Charge BeamHigh Charge Beam 1 shift1 shift
LCLS OperationLCLS OperationDedicated LCLS Running 75%Dedicated LCLS Running 75%
Main Linac OperationMain Linac OperationBeam Delivery to non-LCLS Experiments 25%Beam Delivery to non-LCLS Experiments 25%
ChangeoverChangeoverX-Band Structure in placeX-Band Structure in place 15 minutes15 minutes
High Charge BeamHigh Charge Beam 1 shift1 shift
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
LCLS Linac Work Plan by AreaDesign, Design, Long Lead ProcurementLong Lead Procurement, , ConstructionConstruction, , Installation, Installation, Laser CommissioningLaser Commissioning
LCLS Linac Work Plan by AreaDesign, Design, Long Lead ProcurementLong Lead Procurement, , ConstructionConstruction, , Installation, Installation, Laser CommissioningLaser Commissioning
Fiscal Year
Quarter Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Project Engineering DesignLong-Lead ProcurementConstructionLaser Commissioning
Linac 1 PED
Bunch Compressor 1 PEDProcure-install
Linac 2 PED
Bunch Compressor 2 PEDProcure-install
Linac 3 PEDProcure-install
Dog Leg 2 PEDProcure-install
Electron Dump PEDProcure-install
Linac Coherent Light Source Project Time Line
LCLS Linac Summary by Area
Project Task2003 2004 2005 2006 2007 2008
SLAC Linac Downtime
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
LCLS Linac Long Lead Procurement ItemsLCLS Linac Long Lead Procurement Items
X-Band SystemX-Band SystemBunch Compressor Bend MagnetsBunch Compressor Bend MagnetsLong Lead Procurement Funds FY06, Construction Funds FY07Long Lead Procurement Funds FY06, Construction Funds FY07
X-Band SystemX-Band SystemBunch Compressor Bend MagnetsBunch Compressor Bend MagnetsLong Lead Procurement Funds FY06, Construction Funds FY07Long Lead Procurement Funds FY06, Construction Funds FY07
SLAC Linac Sector 21-1 & 21-2
X-Band Structure
SLAC Linac Sector 24-7, -8 & -9
BC2 Bend Magnets
BC1 Bend Magnets
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
LCLS Linac Organizational ChartLCLS Linac Organizational Chart
Installation ManagerInstallation ManagerCommissioning ManagerCommissioning ManagerFabrication CoordinatorFabrication Coordinator
Installation ManagerInstallation ManagerCommissioning ManagerCommissioning ManagerFabrication CoordinatorFabrication Coordinator
Eric BongLCLS Linac System
Manager
Leif ErikssonLCLS ME
L1 BC1 L2 BC2 L3
Tim MontagneLCLS ME
LTU, E-Dump
Paul EmmaLCLS Linac System
Liason
LCLS Linac Mechanical Engineering
Carl RagoLCLS ME
Data, Magnets, RF
LCLS Controls Manager
Mario OrtegaSLAC Controls
Wayne LinebargerSLAC Power Conv
Ponciano Rodriguez SLAC Cabling
Nick BraughtonLCLS MD
Compressors
Stephan DaviesLCLS MD
LTU, E-DUmp
Paul StephansLCLS MD
RFLinac Integraton
SLAC Mechanical Design
Manish NarulaStanford ME
Database
Patrick KrejcikLCLS ControlsSystem Liason
Zhirong HuangLSC/CSR
Inatabilities
SLAC Electronics and Software Engineering Department
Juhao WuLSC/CSR
Instabilities
Ron AkreRF Systems
Peter McINtoshRF Systems
Alan HillRF Systems
Klystron DEpartment
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
Project Work FlowProject Work Flow
Beam Requirements (FEL)Beam Requirements (FEL)
Optics DesignOptics Design
Diagnostics RequirementsDiagnostics Requirements
System RequirementsSystem Requirements
Component SpecificationsComponent Specifications
Mechanical Engineering Mechanical Engineering and Designand Design
Controls System Controls System Specification and DesignSpecification and Design
Device Control HardwareDevice Control Hardware
Device and System Device and System Control SoftwareControl Software
Beam Requirements (FEL)Beam Requirements (FEL)
Optics DesignOptics Design
Diagnostics RequirementsDiagnostics Requirements
System RequirementsSystem Requirements
Component SpecificationsComponent Specifications
Mechanical Engineering Mechanical Engineering and Designand Design
Controls System Controls System Specification and DesignSpecification and Design
Device Control HardwareDevice Control Hardware
Device and System Device and System Control SoftwareControl Software
Component Component Fabrication/AcquisitionFabrication/Acquisition
Component AssemblyComponent Assembly
Component TestingComponent Testing
Systems Assembly & Systems Assembly & InstallationInstallation
Systems Testing & Systems Testing & CheckoutCheckout
System CommissioningSystem Commissioning
Beam DeliveryBeam Delivery
MaintenanceMaintenance
System ImprovementsSystem Improvements
Component Component Fabrication/AcquisitionFabrication/Acquisition
Component AssemblyComponent Assembly
Component TestingComponent Testing
Systems Assembly & Systems Assembly & InstallationInstallation
Systems Testing & Systems Testing & CheckoutCheckout
System CommissioningSystem Commissioning
Beam DeliveryBeam Delivery
MaintenanceMaintenance
System ImprovementsSystem Improvements
Data generated and passed between disciplines and across organizational boundaries.
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
Technical Data ManagementTechnical Data Management
System DefinitionSystem DefinitionOptics DesignOptics DesignBeam StabilityBeam StabilityModeling CodesModeling Codes
Safety System (ES&H)Safety System (ES&H)Radiation SafetyRadiation SafetyHazardous EquipmentHazardous EquipmentBeam ContainmentBeam ContainmentPersonnel ProtectionPersonnel Protection
Component Component SpecificationsSpecifications
DefinitionDefinitionDesignDesignFabrication Fabrication TestingTestingInstallationInstallation
System DefinitionSystem DefinitionOptics DesignOptics DesignBeam StabilityBeam StabilityModeling CodesModeling Codes
Safety System (ES&H)Safety System (ES&H)Radiation SafetyRadiation SafetyHazardous EquipmentHazardous EquipmentBeam ContainmentBeam ContainmentPersonnel ProtectionPersonnel Protection
Component Component SpecificationsSpecifications
DefinitionDefinitionDesignDesignFabrication Fabrication TestingTestingInstallationInstallation
Mechanical Drawing DBMechanical Drawing DB
Controls SystemControls System
Power ConversionPower Conversion
System CommissioningSystem Commissioning
Beam DeliveryBeam Delivery
MaintenanceMaintenance
System ImprovementsSystem Improvements
Facility ExpansionFacility Expansion
Mechanical Drawing DBMechanical Drawing DB
Controls SystemControls System
Power ConversionPower Conversion
System CommissioningSystem Commissioning
Beam DeliveryBeam Delivery
MaintenanceMaintenance
System ImprovementsSystem Improvements
Facility ExpansionFacility Expansion
Centralized data management insures consistent information distributed across disciplines.
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
Work Breakdown StructureWork Breakdown Structure1.3 LINAC SYSTEM
1.3.1 System Management & Integration1.3.1.1 Linac Mechanical Integration 1.3.3 Linac Magnets & Supports
1.3.2.1.1 L01 System Integration 1.3.4 Linac Vacuum Subsystem1.3.2.1.2 BC1 System Integration 1.3.5 Linac Electron Diagnostics/Beam Dumps/Supts1.3.2.1.3 L02 System Integration 1.3.6 Linac RF Subsystem1.3.2.1.4 BC1 System Integration 1.3.7 Linac Installation1.3.2.1.5 L03 System Integration 1.3.7.1 L1 Installation1.3.2.1.6 LTU System Integration 1.3.7.2 BC1 Installation1.3.2.1.7 E-Dump System Integration 1.3.7.3 L2 Installation
1.3.1.2 Linac Controls Integration 1.2.7.4 BC2 Installaiton1.3.1.2.1 High Level Application Software 1.2.7.5 L3 Installation1.3.1.2.2 Feedback Software 1.2.7.6 LTU Installation1.3.1.2.3 Hardware (Computer Equipment) 1.2.7.7 E-Dump Installaion
1.3.1.3 Travel1.3.1.4 Linac Management
1.3.2 Linac Controls & Power Conv Subsystem 2 LCLS PROJECT - R&D, PRE-OPS, SPARES1.3.2.1 Personnel Protection System (PPS) 2.3 LINAC SYSTEM1.3.2.2 Beam Containment System (BCS) 2.3.1 System Management & Integration1.3.2.3 Machine Protection System (MPS) 2.3.2 Linac Controls & Power Conversion Subsystem1.3.2.4 Power Conversion 2.3.2.4 Linac Power Conversion Subsystem1.3.2.5 LLRF Controls 2.3.3 Linac Magnets & Supports1.3.2.6 E-Beam Diagnostics & Controls 2.3.4 Linac Vacuum Subsystem1.3.2.7 Laser Controls 2.3.5 Linac Electron Diagnostics/Beam Dumps/Supts1.3.2.8 Timing 2.3.6 Linac RF Subsystem1.3.2.9 Vacuum Controls 2.3.7 Linac Installation1.3.2.10 Software & Controls Infrastructure
WBS used to fund activities and control budget.
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
WBS Sample DetailWBS Sample Detail
1.3.2.6 E-Beam Diagnostics & Controls 1.3.3 Linac Magnets & Supports1.3.2.6.1 Controls - Wire Scanners 1.3.3.1 BX1_BC1_( )1.3.2.6.2 Controls - BPMs 1.3.3.2 BX3_LTU_( )1.3.2.6.3 Controls - Toroids 1.3.3.3 BX2_BC2_( )1.3.2.6.4 Controls - Stoppers 1.3.3.4 BY_LTU1.3.2.6.5 Controls - Profile Monitors 1.3.3.5 LTU Quad1.3.2.6.6 Controls - E/O Diagnostics 1.3.3.6 QM1_( )1.3.2.6.7 Controls - Bunch Length Monitors 1.3.3.7 QE_( )1.3.2.6.8 Controls - Beam Loss Monitors 1.3.3.8 Corr_(Type 4)1.3.2.6.9 Controls - Single Beam Dump 1.3.3.9 BYD_(Dump Bend)1.3.2.6.10 Controls - E Beam Dump 1.3.3.10 QA_( )1.3.2.6.11 Controls - Protection Collimator 1.3.3.11 BYPM_(Safety Dump)1.3.2.6.12 Controls - Movable Collimator 1.3.3.12 BYKIK_(Single Beam Kicker)1.3.2.6.13 Controls - X-Band Accel Structure 1.3.3.13 BYW_( )
Types and quantities of devices derived from MAD deck
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
WBS Manpower Loading Detail SampleWBS Manpower Loading Detail Sample
Activity ID# Title Duration WBSDSN
MATURITYJUDGE
FACTORFUND Resource Units
Budgeted Quantity
LN0304 BEND MAGNET (VB-2ea) SUMMARY 620 1030304 0.00 0.00 0
LN03040000 Define Magnet Requirements 4 1030304 0.00 0.00 PED SL_ME Hrs 16
LN03040005 Create ICD & Update LCLS Database 4 1030304 0.00 0.00 PED SL_ME Hrs 8
LN03040010 Review/Accept Reqmts, Update ICD & DB entries 1 1030304 0.00 0.00 PED SL_PM Hrs 8
LN03040015 Develop Preliminary Design - Magnet 20 1030304 0.00 0.00 PED SL_MDD Hrs 80
LN03040015 Develop Preliminary Design - Magnet 20 1030304 0.00 0.00 PED SL_ME Hrs 40
LN03040017 Develop Preliminary Dsn - Magnet Field Analysis 20 1030304 0.00 0.00 PED SL_PHSS Hrs 40
LN03040020 Conduct Preliminary Design Review (PDR) 1 1030304 0.00 0.00 PED SL_ME Hrs 8
LN03040020 Conduct Preliminary Design Review (PDR) 1 1030304 0.00 0.00 PED SL_MDD Hrs 8
LN03040025 Develop Final Design - Magnets 20 1030304 0.00 0.00 PED SL_MDD Hrs 80
LN03040025 Develop Final Design - Magnets 20 1030304 0.00 0.00 PED SL_ME Hrs 20
LN03040030 Conduct Final Design Review (FDR) 1 1030304 0.00 0.00 PED SL_ME Hrs 8
LN03040030 Conduct Final Design Review (FDR) 1 1030304 0.00 0.00 PED SL_MDD Hrs 8
LN03040035 Develop Magnetic Measurement Plan 4 1030304 0.00 0.00 PED SL_ME Hrs 8
LN03040040 COMP: VB Bend Magnet Design 0 1030304 0.00 0.00 PED 0
LN03040050 Prepare Bid Pak - Magnets 2 1030304 0.00 0.00 PED SL_ME Hrs 4
LN03040050 Prepare Bid Pak - Magnets 2 1030304 0.00 0.00 PED SL_MDD Hrs 8
LN03040055 RELEASE: RFP - VB Bend Magnets 0 1030304 0.00 0.00 CON 0
LN03040060 Vendors Prepare Proposals - Magnets 20 1030304 0.00 0.00 CON 0
LN03040065 RCV: Proposals from Vendors - Magnet 0 1030304 0.00 0.00 CON 0
LN03040070 Evaluate Vendor Proposals - Magnets 4 1030304 0.00 0.00 CON SL_ME Hrs 8
LN03040075 AWARD: Contract for Magnets 1 1030304 0.00 0.00 CON SL_AWARD $$ 10000
LN03040080 Vendor Fab 1st Lot - Magnets 20 1030304 0.00 0.00 CON SL_MTRL $$ 5000
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
LCLS Linac WBS SummaryDesign, Design, Long Lead ProcurementLong Lead Procurement, , ConstructionConstruction, , Laser CommissioningLaser Commissioning
LCLS Linac WBS SummaryDesign, Design, Long Lead ProcurementLong Lead Procurement, , ConstructionConstruction, , Laser CommissioningLaser Commissioning
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
TEC TEC
2,002 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 as spent
1.2.2 19,577 0 0 262 342 140 165 173 161 2,167 1,236 838 906 4,047 3,712 2,291 2,711 1,965 1,463 241 141 22,960
1.2.2.1 5,684 0 0 262 342 140 165 173 161 559 647 710 752 546 498 534 363 83 83 0 0 6,018
1.2.2.2 1,546 0 0 0 0 0 0 0 0 0 0 0 0 521 502 336 384 223 159 35 35 2,194
1.2.2.3 1,234 0 0 0 0 0 0 0 0 0 0 0 0 334 364 380 369 145 145 18 18 1,772
1.2.2.4 1,070 0 0 0 0 0 0 0 0 0 0 0 0 411 411 26 389 125 0 0 0 1,362
1.2.2.5 2,879 0 0 0 0 0 0 0 0 0 0 0 0 541 541 541 541 531 543 18 18 3,275
1.2.2.6 2,466 0 0 0 0 0 0 0 0 1,122 0 129 154 530 231 222 167 114 100 100 0 2,869
1.2.2.7 2,185 0 0 0 0 0 0 0 0 0 0 0 0 720 720 120 366 336 97 35 35 2,430
1.2.2.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
1.2.2.9 2,511 0 0 0 0 0 0 0 0 486 588 0 0 443 443 133 133 408 336 35 35 3,040
Mechanical
Quarter
Controls
PPS
ACCELERATOR
PED
RF
Vacuum
Diagnostics
Power Conversion
Magnets
2004
Linac Coherent Light Source Project Time Line
Project TaskFiscal Year 2003 2004 2005 2006 2007
2005 2006 2007
Project Engineering Design
Long-Lead Procurement
Construction
Laser Commissioning
DescriptionWBS2003
All costs $k
Data from DOE Critical Decision 1 Review
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
LCLS Linac System InterfacesLCLS Linac System Interfaces
LCLS SystemsLCLS SystemsInjectorInjector
LCLS UndulatorLCLS Undulator
LCLS X-Ray SystemsLCLS X-Ray Systems
LCLS Conventional FacilitiesLCLS Conventional Facilities
LCLS SystemsLCLS SystemsInjectorInjector
LCLS UndulatorLCLS Undulator
LCLS X-Ray SystemsLCLS X-Ray Systems
LCLS Conventional FacilitiesLCLS Conventional Facilities
SLAC SystemsSLAC SystemsTechnical DivisionTechnical Division
Experimental ProgramExperimental Program
Machine OperationsMachine Operations
Maintenance Maintenance OrganizationsOrganizations
SLAC SystemsSLAC SystemsTechnical DivisionTechnical Division
Experimental ProgramExperimental Program
Machine OperationsMachine Operations
Maintenance Maintenance OrganizationsOrganizations
Requires regular communication between LCLS system Requires regular communication between LCLS system managers physicists.managers physicists.
Requires regular design and construction progress Requires regular design and construction progress reports to SLAC Tech Division and Accelerator Dept.reports to SLAC Tech Division and Accelerator Dept.
Requires continued communications during operations.Requires continued communications during operations.
Requires regular communication between LCLS system Requires regular communication between LCLS system managers physicists.managers physicists.
Requires regular design and construction progress Requires regular design and construction progress reports to SLAC Tech Division and Accelerator Dept.reports to SLAC Tech Division and Accelerator Dept.
Requires continued communications during operations.Requires continued communications during operations.
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
Linac Controls SystemLinac Controls System
Use SLAC control system where it existsUse SLAC control system where it exists
EPICS where new systems are implementedEPICS where new systems are implementedMain Electron DumpMain Electron Dump
Linac to Undulator BeamlineLinac to Undulator Beamline
X-Band SystemX-Band System
Epics and SLAC Controls InterfaceEpics and SLAC Controls InterfaceLCLS InjectorLCLS Injector
Interface ModulesInterface Modules
SLAC TimingSLAC Timing
FeedbackFeedback
Use SLAC control system where it existsUse SLAC control system where it exists
EPICS where new systems are implementedEPICS where new systems are implementedMain Electron DumpMain Electron Dump
Linac to Undulator BeamlineLinac to Undulator Beamline
X-Band SystemX-Band System
Epics and SLAC Controls InterfaceEpics and SLAC Controls InterfaceLCLS InjectorLCLS Injector
Interface ModulesInterface Modules
SLAC TimingSLAC Timing
FeedbackFeedback
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
Technical RiskTechnical Risk
Low Risk Devices & SystemsLow Risk Devices & SystemsS-Band RF Configuration ChangesS-Band RF Configuration Changes
Beamline DesignBeamline Design
Vacuum SystemVacuum System
Standard Diagnostic DevicesStandard Diagnostic Devices
Medium Risk Devices & SystemsMedium Risk Devices & SystemsHigh Precision OTR ScreensHigh Precision OTR Screens
RF StabilityRF Stability
High Risk Devices and SystemsHigh Risk Devices and SystemsBunch Length Measurement DevicesBunch Length Measurement Devices
Bunch Length Based FeedbackBunch Length Based Feedback
Large Increase in Engineering Manpower in FY05Large Increase in Engineering Manpower in FY05
Low Risk Devices & SystemsLow Risk Devices & SystemsS-Band RF Configuration ChangesS-Band RF Configuration Changes
Beamline DesignBeamline Design
Vacuum SystemVacuum System
Standard Diagnostic DevicesStandard Diagnostic Devices
Medium Risk Devices & SystemsMedium Risk Devices & SystemsHigh Precision OTR ScreensHigh Precision OTR Screens
RF StabilityRF Stability
High Risk Devices and SystemsHigh Risk Devices and SystemsBunch Length Measurement DevicesBunch Length Measurement Devices
Bunch Length Based FeedbackBunch Length Based Feedback
Large Increase in Engineering Manpower in FY05Large Increase in Engineering Manpower in FY05
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
Open IssuesOpen Issues
LTU and DumplineLTU and DumplineDumpline Optics DesignDumpline Optics Design
Radiation Physics ApprovalRadiation Physics Approval
PPS BCS MPSPPS BCS MPS
Conventional Facilities ParametersConventional Facilities Parameters
Control SystemControl SystemControls System ManagerControls System Manager
System DefinitionSystem Definition
SLAC – EPICS InterfaceSLAC – EPICS Interface
LTU and DumplineLTU and DumplineDumpline Optics DesignDumpline Optics Design
Radiation Physics ApprovalRadiation Physics Approval
PPS BCS MPSPPS BCS MPS
Conventional Facilities ParametersConventional Facilities Parameters
Control SystemControl SystemControls System ManagerControls System Manager
System DefinitionSystem Definition
SLAC – EPICS InterfaceSLAC – EPICS Interface
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
ConclusionConclusion
WBS derived from MAD deck.WBS derived from MAD deck.
Main dump design immature (Rad Physics)Main dump design immature (Rad Physics)
Database will be used to manage technical Database will be used to manage technical information.information.
Shared role of Linac requires ongoing Shared role of Linac requires ongoing communication between LCLS and TD/AD.communication between LCLS and TD/AD.
Challenges in mixed control systemChallenges in mixed control system
Need more controls engineering involvement.Need more controls engineering involvement.
High risk devices and systems need R&D.High risk devices and systems need R&D.
WBS derived from MAD deck.WBS derived from MAD deck.
Main dump design immature (Rad Physics)Main dump design immature (Rad Physics)
Database will be used to manage technical Database will be used to manage technical information.information.
Shared role of Linac requires ongoing Shared role of Linac requires ongoing communication between LCLS and TD/AD.communication between LCLS and TD/AD.
Challenges in mixed control systemChallenges in mixed control system
Need more controls engineering involvement.Need more controls engineering involvement.
High risk devices and systems need R&D.High risk devices and systems need R&D.
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
End of Presentation
LCLS Linac TDR December 12, 2003LCLS Linac TDR December 12, 2003 Eric Bong, SLACEric Bong, SLAC
LCLS Linac System ManagementLCLS Linac System Management [email protected]@slac.stanford.edu
Linac Coherent Light Source Stanford Synchrotron Radiation LaboratoryStanford Linear Accelerator Center
0
2000
4000
6000
8000
10000
12000
FY03 FY04 FY05 FY06 FY07
PEDLLPConstrK$