LC -‐ 285
www.linkedindustries.com.au
-‐
Position
HDD Supervisor
Location England, FIFO Worldwide
Personal Summary
I am an experienced, self-‐motivated, well organised, multi-‐disciplined, reliable and hardworking HDD Operator / Supervisor, with over 20 year experience in the Industry. I have the ability and confidence to communicate and liaise both efficiently and effectively with other disciplines, Consultants and the Clients. I am able to work individually without supervision or within a team environment effectively at all times.
Over the years I have worked for numerous clients in the functions of either a HDD Operator or Supervisor. My duties have included but are not limited to:
• Walk over locating systems • WireLine guidance systems • Mud recycling • Trenching, Pipe Bursting, Guided Auger boring, Pipe Ramming, Pipe Fusion and Pressure testing • Site and staff planning • Site investigations • Assessing potential risks and implementing controls • Managing budgets • Ordering materials • Hiring equipment • Communicating effectively with engineers and other project personnel • Checking and approving reports • Company health and safety • Daily reviews of site activities • Reporting on all Construction Progress Controlling • Weekly and Monthly Progress Reports
www.linkedindustries.com.au
LC -‐ 285
Qualifications and Memberships
Basic Offshore Safety Induction and Emergency Training (Euro) Minimum Industry Safety Training (M.I.S.T) Certification NVQ Level 2 Horizontal Directional Drilling City and Guilds Horizontal Directional Drilling Certification Vermeer HDD Operator Certificate Ditch Witch HDD Operator Certificate Astec / American Augers HDD Operator Certificate Lorry Mounted Crane (Hiab) Licence CCNSG Safety Passport Basic First Aid Level 1 JCB 360 Excavator Operator Certificate Health and Safety Representative Course Basic Fire And Prevention Course Safe Stacking and Storage Certification Incident Investigation Certification Introduction to Occupational S.H.E Certification
Industry Experience
Job Title Driller / Supervisor Dates Company Various
HDI Lucas -‐ Papa New Guinea
October 2019
Using HK250 for 1200m pipe extraction shore approach
HDD Thailand -‐ Thailand
2018-‐2019
14” And 18” pipelines using D1000 DD625 Hk400 800m-‐1500m
HDD Thailand -‐ Nigeria
July 2017 – 2018
Client NNPC -‐ Various crossings using DD1100rs and DD625 36” steel various lengths.
www.linkedindustries.com.au
LC -‐ 285
Fabricom / Engie – Belgium
September 2016 – 2017
Various crossings using Vermeer D80 and Drill Guide Gyro steering tool.
HDD Thailand – Nigeria
January 2016 – July 2016
Client Shell and Contractor Saipem
Escavros River Crossing Project -‐ 2736m 12” steel pipe. Intersect with Prime Horizontal using DD625 pipe side and DD1100rs rig side.
Client NIPCO 400m 12’’ in Lagos.
Client Con Oil 1700m 12” shore approach, beach/pipe side rig DD1100, Jack up barge rig set in the ocean DD625.
Flow Tex – Egypt
December 2015 – January 2016
Project 1000m of 630mm water pipe
Suez Canal Crossing Port Said using a Rig HK250
Flow Tex International – Mexico
May 2015-‐ July 2015
Project Transcanada El Encino to Topolobambo 30” gas pipeline.
Contractor Saipem – Used a HK250 Rig with pipe lengths 1 x 400m-‐ 1 x 500m 30”.
HDD Thailand
September 2014-‐ April 2015
PTT Forth transmission 2 project 42” gas pipe.
Lengths up to 1400m for contractor McConnel Dowell
Rigs used included HK400, American Augers DD440T DD625, Vermeer D1000 and Laney JV9 rig.
www.linkedindustries.com.au
LC -‐ 285
Azmeel Contracting Co -‐ Saudi Arabia
April 2014-‐ September 2014
Project Saudi Aramco 30” -‐ Contractor Bonatti
Rig used American Augers DD440T for a 300m crossing
Auger boring 48” 2 crossings 80m
Pipe ramming 48” 3 crossings 80m
Enikkom Drilling Services – Nigeria
May 2009 -‐ 2013
Swamps, river and road crossing for Oil and Gas pipelines
Clients include Shell, Oando, Total Oil, NNPC, and Oilserve
Role Driller and teaching HDD
Rigs used American Augers DD440T, DD625
Steel pipe sizes of 8” 12” 18” 40” over lengths up to 950m
Melcar Underground Inc. -‐ United States of America
Feb 2014-‐ April 2014
Drilling rock with air hammers 2 crossings 4x4” 300m and 210m using a Vermeer D100x120 and D100x140
Anabeeb (Arabian Pipeline Contractor) -‐ Saudi Arabia
January 2012 -‐ April 2012
Client Saudi Aramco
Road, Pipeline and Sand Dune Crossings
Oil pipeline 30” 400m and 46” 350m using American Augers DD625.
Britanica HDD Ltd – Nigeria
June 2013-‐ December 2013
Client Total Oil and NNPC -‐ Contractor Saipem
Role Project Manager / Supervisor
Swamps and river crossings for oil and gas pipelines.
Rigs used Vermeer D330x500 and mud recycling systems pipe installed 24” 700m.
www.linkedindustries.com.au
LC -‐ 285
Gulf British Drilling -‐ Bahrain/Saudi Arabia
December 2011-‐November 2012
Client Saudi Aramco
Role Manager / Driller
Road crossings for Oil and gas pipelines, installed using Astec DD8.
Pipe sizes 26” up to 150m and 48” up to 110m.
Pipe Ramming 40”and 48”with Grundoram Taurus.
Directional Drilling Projects -‐ South Africa/Botswana
May 2012-‐ June 2013
Role Supervisor / Driller and Teaching HDD.
Telecomms work for the fibre routes up to 5 way 110m installed with Vermeer D36x50, D100x120 Astec DD4045 and American Augers DD10.
Mincon Air hammers used for pilot bores due to Rock conditions.
Also completed 350m 18” in Durban with DD10 currently the longest steel pipe in SA with a small rig.
FMQ -‐ Saudi Arabia
2012
Client Saudi Aramco
Role Consultant
DD1100rs 1400m 16” under a sand dune almost 200m high.