LBT Q1 2008 LBT Q1 2008 Eng/SW ReviewEng/SW Review
MCSC – Mount Control SystemMCSC – Mount Control System
April 4th, 2008April 4th, 2008 LBT Q1 2008 Eng/SW ReviewLBT Q1 2008 Eng/SW Review 22
Highlights (Q1/2008)Highlights (Q1/2008)
Added Rotator and Cable Chain Added Rotator and Cable Chain support to MCSPUsupport to MCSPU
Added Dynamic Balance Added Dynamic Balance commands and display pages to commands and display pages to MCSPU MCSPU
Established communication Established communication between PCS and MCSPU for between PCS and MCSPU for rotator polynomialsrotator polynomials
April 4th, 2008April 4th, 2008 LBT Q1 2008 Eng/SW ReviewLBT Q1 2008 Eng/SW Review 33
ProgressProgress Repair ELRL read head (no progress)Repair ELRL read head (no progress) Work on punch list for commissioning Work on punch list for commissioning √√ Additional ProgressAdditional Progress
Added Rotator and Cable Chain support to MCSPU Added Rotator and Cable Chain support to MCSPU √√ Added Dynamic Balance commands and display pages to Added Dynamic Balance commands and display pages to
MCSPU MCSPU √√ Established communication between PCS and MCSPU for Established communication between PCS and MCSPU for
rotator polynomials rotator polynomials √√ Addressed issue 847 concerning Azimuth startup in the wind Addressed issue 847 concerning Azimuth startup in the wind √√ Procured and spare azimuth encoder tape Procured and spare azimuth encoder tape √√
April 4th, 2008April 4th, 2008 LBT Q1 2008 Eng/SW ReviewLBT Q1 2008 Eng/SW Review 44
Open IssuesOpen Issues TechnicalTechnical
Encoder reset is not as reliable as it should be (probably a Encoder reset is not as reliable as it should be (probably a hardware issue)hardware issue)
AZ/EL start-up procedure not as reliable as it should be AZ/EL start-up procedure not as reliable as it should be (probably a TPLC issue)(probably a TPLC issue)
ELRL main encoder read head signal/noise is poorELRL main encoder read head signal/noise is poor ELFR main encoder read head preload spring is missingELFR main encoder read head preload spring is missing Cleanup necessary for commissioningCleanup necessary for commissioning
ScheduleSchedule nonenone
FinancialFinancial nonenone
ResourceResource MCS competing for engineering resourcesMCS competing for engineering resources
April 4th, 2008April 4th, 2008 LBT Q1 2008 Eng/SW ReviewLBT Q1 2008 Eng/SW Review 55
PlanningPlanning
HBS and Rotator supportHBS and Rotator support Add variables to Data Dictionary to make available to TCSAdd variables to Data Dictionary to make available to TCS Add MCSPU commands to MCS to make available to TCSAdd MCSPU commands to MCS to make available to TCS
Numerous Events need to be defined for the Event Logging Numerous Events need to be defined for the Event Logging SystemSystem
Alter AZ/EL/ROT Hold commands to stop telescope more Alter AZ/EL/ROT Hold commands to stop telescope more gentlygently
Make existing AZ/EL software use/monitor newly available Make existing AZ/EL software use/monitor newly available information from the HPLCinformation from the HPLC
Repair ELRL read headRepair ELRL read head Install ELFR read head preload springInstall ELFR read head preload spring Work on punch list for commissioning Work on punch list for commissioning