PWR: Site electrical power, includes power install on levels 1, 3L, and 4, and power monitoring. LBT Q1 2007 Engineering Review. Highlights (Q1/2007). Instrument room power defined and designed Machine shop being moved to level 3L Power to 3L defined and layout designed Materials purchased - PowerPoint PPT Presentation
Citation preview
11
LBT Q1 2007 Engineering LBT Q1 2007 Engineering ReviewReview
PWR: Site electrical power, PWR: Site electrical power, includes power install on includes power install on
levels 1, 3L, and 4, and power levels 1, 3L, and 4, and power monitoringmonitoring
22
Highlights (Q1/2007)Highlights (Q1/2007)
Instrument room power defined and designedInstrument room power defined and designed Machine shop being moved to level 3LMachine shop being moved to level 3L Power to 3L defined and layout designedPower to 3L defined and layout designed Materials purchasedMaterials purchased Installation begunInstallation begun Power additions to level 4 have been designed to support Power additions to level 4 have been designed to support
LUCIFERLUCIFER Power monitoring begunPower monitoring begun Purchased a Power Quality AnalyzerPurchased a Power Quality Analyzer Monitoring PF on incoming switch gearMonitoring PF on incoming switch gear Phase imbalance noted on several 3 phase panelsPhase imbalance noted on several 3 phase panels
33
Open IssuesOpen Issues
TechnicalTechnical Rebalance 3 phase panelsRebalance 3 phase panels
ScheduleSchedule Scheduled for Q3 or Q4Scheduled for Q3 or Q4
FinancialFinancial NoneNone
ResourceResource Time to implement designTime to implement design
44
Progress (Q1/2007)Progress (Q1/2007)
Installation of the instrument room just beginningInstallation of the instrument room just beginning Power to level 3L is underway; panels, transformer, and Power to level 3L is underway; panels, transformer, and
most conduit is installedmost conduit is installed Boxes on 3L are being installed as time permitsBoxes on 3L are being installed as time permits Level 4 power expansion designedLevel 4 power expansion designed
55
Planning (Q2/2007)Planning (Q2/2007)
Finish power installation on 3LFinish power installation on 3L Organize machine shopOrganize machine shop Order materials for level 4 and start installationOrder materials for level 4 and start installation Continue monitoring power qualityContinue monitoring power quality Balance phasesBalance phases