24
STATEMENT OF QUALIFICATIONS: LAW FIRMS

Law Firm Qualifications

Embed Size (px)

Citation preview

Page 1: Law Firm Qualifications

F E E M U N S O N E B E R T | A R C H I T E C T U R E + D E S I G N

500 MONTGOMERY STREET SAN FRANCISCO, C A 94111 -2 5 7 9

4 1 5 - 4 3 4 - 0 3 2 0 F X 4 1 5 - 4 3 4 - 2 4 0 9 W W W. F M E - A R C H . C O M

STATEMENT OF QUALIFICATIONS:

LAW FIRMS

Page 2: Law Firm Qualifications
Page 3: Law Firm Qualifications

CONTENTSPROFILE

PROCESS

RELEVANT EXPERIENCE

RELEVANT PROJECTS

RESUMES

Page 4: Law Firm Qualifications

BAKER & MCKENZIE

PROFILEFME, Architecture + Design is a San Francisco-based fi rm specializing in architecture and interior design. Our portfolio includes projects for offi ce, corporate interiors, business and industrial parks, research and development, retail, renovation, churches, schools, childcare and housing.

Since starting shop in 1980, we have made it our mission to fulfi ll our clients’ needs to the utmost. Whether they require new space, are relocating, expanding, or simply reconfi guring their spaces, we provide our clients with innovative high-quality design under strict adherence to scheduling and budgetary demands.

FME is a member of the US Green Building Council and has LEED Accredited Professionals on staff. We have incorporated sustainable design solutions into our projects throughout the fi rm’s history. Our portfolio includes LEED certifi ed projects.

For project documentation, FME utilizes Revit – a Building Information Modeling (BIM) software that combines 3D modeling and 2D drawings. This tool is fully compatible with AutoCAD and can produce photo-realistic point of view images, digital walkthroughs and 3D models.

Above all, we are passionate about our work and pride ourselves on giving our clients individual, personalized service with hands-on principal participation in all project phases.

Page 5: Law Firm Qualifications

PROCESSFME’S APPROACH TO VALUE

SCHNADER HARRISON SEGAL & LEWIS LLP

Page 6: Law Firm Qualifications

PROCESSFME’S APPROACH TO VALUE

SCHNADER HARRISON SEGAL & LEWIS LLP

Page 7: Law Firm Qualifications

SCHNADER HARRISON SEGAL & LEWIS LLP

RELEVANT EXPERIENCESELECTED LAW FIRM PROJECTS

New Location

Baker & McKenzie, San Francisco, CA50,000 sq. ft.

Pillsbury & Levinson LLP, San Francisco, CA7,000 sq. ft.

Kauff, McClain & McGuire LLP, San Francisco, CA7,000 sq. ft.

Schnader Harrison Segal & Lewis LLP, San Francisco, CA18,000 sq. ft.

Adams Nye Sinunu Bruni Becht LLP, San Francisco, CA17,000 sq. ft.

Fragomen, Del Rey, Bernsen & Loewy PC, San Francisco, CA10,500 sq. ft.

BAKER & MCKENZIEFME, Architecture + Design is a strong advocate for a functional and fl exible plan and also for the best use of the available budget – i.e. value by design. This process begins by discussing the overall project goals (project visioning) and determining a strategy to achieve those goals.

Once the project goals are established, programming provides a micro view of the growth, functional and fl exibility needs for the group and forms the planning criteria for further development. Our pre-lease services are designed to provide all the comparative information the client needs to make the best deal with the fewest surprises in regard to time and money.

Once the lease is signed, our task moves to the continuing development of the plans and the best use of the available funds. Throughout the process, our 3D technology allows for a new level of communication – fi rst with the client to understand the proposed solutions and fi nally with the contractor to both price and build the project.

FME’s entire process is dedicated to fi nding the best solutions, providing a full understanding of all decision points and providing a work space that improves productivity and encourages the retention of valuable employees.

Page 8: Law Firm Qualifications

PROJECT VISIONING

Establish overall project goals.

Pre-Lease Services

TOUR / SITE SELETION

Develop short list ofpotential sites.

BUILDING ANALYSIS

Perform due diligence. Investigate building

infrastructure / defi ciencies.

SITE COMPARISON

Compare planning effi cienciesand cost to build out space.

Select building.

LEASE NEGOIATIONS / LEASE SIGNATURE

Determine construction allowance & tenant vs. landlord

committments.

PROGRAMMING

Develop project criteria.Interview practice groups.

Establish growth & adjacencies.

TEST FIT

Perform test fi ts ofselected buildings.

PRICING PLAN

Prepare annotated plans for gen-eral contractor pricing.

DBI REVIEW

Perform code check before lease commitment.

PROJECT BUDGET & SCHEDULE

Review proposed budget& schedule.

GENERALCONTRACTOR PRICING

Develop project costs ineach building.

AAAMMMAMMAMM

VALUE BY DESIGN

MMAMM NGGG PLLG PG P BBBUDDBUDBUD

ERA

CCCC

PrPrrPr Pe

ttDe

Page 9: Law Firm Qualifications

PROJECT VISIONING

Establish overall project goals.

Pre-Lease Services

TOUR / SITE SELETION

Develop short list ofpotential sites.

BUILDING ANALYSIS

Perform due diligence. Investigate building

infrastructure / defi ciencies.

SITE COMPARISON

Compare planning effi cienciesand cost to build out space.

Select building.

LEASE NEGOIATIONS / LEASE SIGNATURE

Determine construction allowance & tenant vs. landlord

committments.

PROGRAMMING

Develop project criteria.Interview practice groups.

Establish growth & adjacencies.

TEST FIT

Perform test fi ts ofselected buildings.

PRICING PLAN

Prepare annotated plans for gen-eral contractor pricing.

DBI REVIEW

Perform code check before lease commitment.

PROJECT BUDGET & SCHEDULE

Review proposed budget& schedule.

GENERALCONTRACTOR PRICING

Develop project costs ineach building.

AAAMMMAMMAMM

VALUE BY DESIGN

MMAMM NGGG PLLG PG P BBBUDDBUDBUD

ERA

CCCC

PrPrrPr Pe

ttDe

Page 10: Law Firm Qualifications

DESIGN DEVELOPMENT

Further defi ne the plan details, fi nishes and materials.

PRICING W/ VALUEENGINEERING

Update andconfi rm budget.

CONTRACTDOCUMENTATION

Prepare drawings and specifi cations for bidding and permitting.

PERMIT APPLICATION

File for building permit.

CONSTRUCTIONADMINISTRATION

Support and monitor construction process.

BIDDING

Obtain bids from subcontractors.

CLIENT REVIEW& APPROVAL

Post-Lease Services

W/

CLIENT REVIEW& APPROVAL

DING

CONSTRUCTION

Construct interior improvements.

RUC

Construction

FF F FeePre

bObObObppppSup

ooCo

Page 11: Law Firm Qualifications

DESIGN DEVELOPMENT

Further defi ne the plan details, fi nishes and materials.

PRICING W/ VALUEENGINEERING

Update andconfi rm budget.

CONTRACTDOCUMENTATION

Prepare drawings and specifi cations for bidding and permitting.

PERMIT APPLICATION

File for building permit.

CONSTRUCTIONADMINISTRATION

Support and monitor construction process.

BIDDING

Obtain bids from subcontractors.

CLIENT REVIEW& APPROVAL

Post-Lease Services

W/

CLIENT REVIEW& APPROVAL

DING

CONSTRUCTION

Construct interior improvements.

RUC

Construction

FF F FeePre

bObObObppppSup

ooCo

Page 12: Law Firm Qualifications

SCHNADER HARRISON SEGAL & LEWIS LLP

RELEVANT EXPERIENCESELECTED LAW FIRM PROJECTS

New Location

Baker & McKenzie, San Francisco, CA50,000 sq. ft.

Pillsbury & Levinson LLP, San Francisco, CA7,000 sq. ft.

Kauff, McClain & McGuire LLP, San Francisco, CA7,000 sq. ft.

Schnader Harrison Segal & Lewis LLP, San Francisco, CA18,000 sq. ft.

Adams Nye Sinunu Bruni Becht LLP, San Francisco, CA17,000 sq. ft.

Fragomen, Del Rey, Bernsen & Loewy PC, San Francisco, CA10,500 sq. ft.

BAKER & MCKENZIEFME, Architecture + Design is a strong advocate for a functional and fl exible plan and also for the best use of the available budget – i.e. value by design. This process begins by discussing the overall project goals (project visioning) and determining a strategy to achieve those goals.

Once the project goals are established, programming provides a micro view of the growth, functional and fl exibility needs for the group and forms the planning criteria for further development. Our pre-lease services are designed to provide all the comparative information the client needs to make the best deal with the fewest surprises in regard to time and money.

Once the lease is signed, our task moves to the continuing development of the plans and the best use of the available funds. Throughout the process, our 3D technology allows for a new level of communication – fi rst with the client to understand the proposed solutions and fi nally with the contractor to both price and build the project.

FME’s entire process is dedicated to fi nding the best solutions, providing a full understanding of all decision points and providing a work space that improves productivity and encourages the retention of valuable employees.

Page 13: Law Firm Qualifications

Expansion within Existing Facilities

Baker & McKenzie, Palo Alto, CA35,000 sq. ft.

Stein & Lubin LLP, San Francisco, CA19,000 sq. ft.

Nossaman, Guthner, Knox & Elliott LLP, San Francisco, CA30,000 sq. ft.

Carroll, Burdick & McDonough LLP, San Francisco, CA50,000 sq. ft.

NOSSAMAN, GUTHNER, KNOX & ELLIOTT LLP

Page 14: Law Firm Qualifications

BAKER & MCKENZIESAN FRANCISCO, CALIFORNIA

As the client was renovating within the same building and occupied two fl oors with virtually unimpeded views located 14 fl oors above their new space, the objective and challenge was to design a space that could in some way compensate for the loss of premium view. This was to be done within a reasonable budget and time frame.

The project entailed full demolition and construction from the same shell. The project team used high quality materials and fi nishes and custom designed furniture and signage throughout the project, resulting in a unique, sophisticated environment. Our focus was on creating interior architecture that was intriguing, sculptural and incorporated a special quality of custom lighting.

Page 15: Law Firm Qualifications

Stepping from the elevator, acrylic babbled cove lighting immediately highlights the use of limestone, wood paneling and Venetian plaster. A curved backlit identity wall, composed of ribbed acrylic panels, screens the restroom entrances and provides an animated focal point for the elevator lobby. Just beyond the identity wall is the reception area which introduces the “public square”. A custom desk anchors this space and leads to the window lined seating area that takes full advantage of the views.

Expanding from the lobby, the square serves as a sophisticated public environment for lawyer-client interaction. In addition to the reception desk, the space is wrapped on two sides by conference rooms and by a marketing wall with a built-in fl at screen on the fourth side. The interior stair with its wood paneled divider and cove lighting serves as the center point of the public square, uniting the separate uses of the four sides.

Page 16: Law Firm Qualifications

Accessed from the public square, the state-of-the-art conference facility includes plug-ins for laptops, built-in microphones, A/V drop-down projector and screen, and centrally controlled lighting and shades. Custom etched glass walls on two sides maintain privacy while providing views and natural light.

A glass lined perimeter corridor provides ample natural light and leads into a room divided by a movable central wall that opens to form the largest meeting space. Modular tables in the room reconfi gure to serve a variety of meeting and training requirements. The lighting, A/V system and window shades are all centrally controlled.

Page 17: Law Firm Qualifications

“FME understands how to work with law fi rms and their evolving needs. Throughout our ongoing relationship, we’ve worked closely with them to maintain our aesthetic standards while making effi cient use of our space.”

- Eileen WinterExecutive DirectorBaker & McKenzie

Page 18: Law Firm Qualifications

STEIN & LUBINSAN FRANCISCO, CALIFORNIA

More than 15 years ago, FME worked with Stein & Lubin to build out their new space in the Pyramid Center. Then in 2001, the client embarked on a project to expand within their existing facility by maximizing the number of smaller offi ces within the fl oor that they occupied. Plans were generated for a phased project that provided for an 18% expansion of the quantity of perimeter offi ces. The size of the fl oor and the building module provided the opportunity for existing 3 bay offi ces to be reduced for 2 bay offi ces.

Extensive coordination of schedules and continuous on-site supervision by the general contractor provided for a successful solution to a very complex expansion within the occupied space.

Page 19: Law Firm Qualifications

SCHNADER HARRISON SEGAL & LEWISSAN FRANCISCO, CALIFORNIA

FME provided full interior design services in renovating the existing 18,000 sq. ft. offi ce space. The scope of work included furniture services.

Page 20: Law Firm Qualifications

NOSSAMAN, GUTHNER, KNOX & ELLIOTTSAN FRANCISCO, CALIFORNIA

This 30,000 sq. ft. client initially embarked on an analysis of similar available space and ultimately decided to “blend and extend” at their existing location of 50 California Street.

The project included an expansion of 10,000 sq. ft. (1/2 fl oor) above the existing space with the addition of an interior connecting stair, new admin workstations throughout and a new multi-purpose conference and training center within the interior space of the expansion fl oor. Cosmetic changes were made to the existing space in a series of phased efforts.

Page 21: Law Firm Qualifications

CARROLL, BURDICK & MCDONOUGHSAN FRANCISCO, CALIFORNIA

This project entailed a full fl oor expansion at 44 Montgomery Street of approximately 14,000 square feet. The challenge to provide a space that was compatible with the existing design aesthetic on the lower fl oors was achieved through a more modern design. Glass on the offi ce fronts provided an interesting contrast to the more traditional dark wood vernacular.

Page 22: Law Firm Qualifications

THINK PANMURESAN FRANCISCO, CALIFORNIA

This project entailed renovation from shell condition for a well known fi nancial services group in their Pyramid Center headquarters. The 12,000 sq. ft. space incorporated a new trading area, a training/broadcast facility and executive offi ces. The entrance focuses on the main reception area and conference room with innovative lighting solutions. The scope of work included specifi cation of new furniture and equipment.

Page 23: Law Firm Qualifications

GRYPHON INVESTORSSAN FRANCISCO, CALIFORNIA

A 15,000 sq. ft. build-out of a large open space trading fl oor used by the previous tenants, Deutsche Bank (a space FME also designed), to house the addition of perimeter and interior private offi ces and conference rooms. Extensive use of glass creates a sleek, modern aesthetic and takes advantage of the spectacular views of downtown San Francisco and the San Francisco Bay. Build-out also included the addition of an exercise area, locker room, restrooms and showers.

FME provided programming, building selection, space planning, interior design and furniture specifi cation for this well-respected private equity fi rm located on the 24th fl oor of One Market Plaza.

Page 24: Law Firm Qualifications

F E E M U N S O N E B E R T | A R C H I T E C T U R E + D E S I G N

500 MONTGOMERY STREET SAN FRANCISCO, C A 94111 -2 5 7 9

4 1 5 - 4 3 4 - 0 3 2 0 F X 4 1 5 - 4 3 4 - 2 4 0 9 W W W. F M E - A R C H . C O M

STATEMENT OF QUALIFICATIONS:

LAW FIRMS