85
WESTERN RAILWAY LAW BOOK 201516 ( May 2015 )

LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

WESTERN  RAILWAY

LAW BOOK 2015‐16

( May 2015 )

Page 2: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

Page No.

From To

1 Summary of Alloted Funds I -

2 Distribution of outlays for the Works under Board, GM & DRM's Power II IV

3 PH 16 - Traffic Facilities - Yard Remodelling & Others 1 3

4 PH 17 - Computerisation 3 5

5 PH 29 - Road Safety Works- Level Crossings 5 17

6 PH 30 - Road Safety Works- Road Over/Under Bridges 17 22

7 PH 31 - Track Renewals 22 49

8 PH 32 - Bridge Works 49 53

9 PH 33 - Signalling & Telecommunication Works 53 63

10 PH 36 - Other Electrical Works 63 64

11 PH 37 - Traction Distribution Works 64 66

12 PH 42 - Workshop - Including Production Units 66 68

13 PH 51 - Staff Quarters 68 70

14 PH 52 - Amenities for Staff 70 73

15 PH 53 - Passenger and Other Railway Users' Ameniites 73 76

16 PH 64 - Other Specified Works 76 78

17 Summary 79 -

I N D E X

Sr. Particulars

Page 3: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

Page No. : I

( Figures in thousands of Rs. )

Sr.No. Plan Heads Cap. DRF DF(1) DF(2) DF(3) DF(4) S.Fund OLWR Total

1 16- Traffic Facilities 32000 10000 61118 100 103218

2 17- Computerisation 60000 2500 62500

3 29- Road Safety Works - Level Crossings 110000 110000

4 30- Road Safety Works - ROB/RUB 200000 200000

5 31- Track Renewals 655200 655200

6 32- Bridge Works 70000 1000 1000 72000

7 33- Signalling & Telecommunication Works 29900 170000 30000 110000 339900

8 36- Other Electrical Works 45900 21000 66900

9 37- Traction Distribution Works 61670 14000 75670

10 42- Workshop - Including Production Units 6498 2500 20500 29498

11 51- Staff Quarters 40287 21000 61287

12 52- Amenities for Staff 45000 52200 26500 123700

13 53- Passenger Amenity 113401 465363 578764

14 64- Other Specified Works 2500 12100 8200 29800 100 52700

Total 156185 1273971 467863 34700 177418 111200 310000 2531337

WESTERN RAILWAY

Assets ‐ Acquisition, Construction and Replacement for 2015‐16

PLAN HEAD WISE SUMMARY OF ALLOTTED FUNDS WITH ALLOCATIONS

( Works costing below Rs. 2.5 crores )

Page 4: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

(Figures in thousands of Rs.)

Itemised Works Reserve

1 16- Traffic Facilities Cap. 8000 6664 1336 DRF 7000 2000 500 4500 DF(1)DF(3) 54218 14208 21847 10163 1000 1000 2500 2000 1500 DF(4) 100 100 OLWRTotal 69318 14208 28511 11499 1000 3100 3000 2000 4500 1500

2 17- Computerisation Cap.DRF 30000 5751 24249 DF(1) 2500 1 2499 DF(3)OLWRTotal 32500 5752 24249 2499

3 29- RSW-LC Gates S.Fund 100000 3800 84408 7792 800 800 800 800 800

4 30- RSW-ROB/RUB S.Fund 170000 155309 14691

5 31- Track Renewal DRF 339000 50000 249000 20000 1492 1459 2900 14149

6 32- Bridge Works DRF * * 69800 25672 32596 10910 122 500 DF(3) 1000 1000 DF(4) 1000 100 900 Total 71800 25672 32696 10910 122 500 900 1000

7 33- Signal & Telecom Works Cap. 20000 2739 17261 DRF 160000 150794 3656 1550 800 1900 1300 DF(3) 30000 21665 5835 1700 800 DF(4) 100000 74398 16667 1085 100 5600 1750 400 OLWRTotal 310000 249596 43419 1085 3350 6400 3650 2500

8 36- Other Electrical Works Cap.DRF 21000 11064 319 7442 899 60 1 500 715 DF(3) 18000 15000 552 1448 1000 OLWRTotal 39000 26064 319 7994 899 60 1449 500 1715

9 37- Traction Distribution Works Cap.DRF 58670 13672 26323 6620 5200 3255 3600 DF(3) 10000 7040 2960 OLWRTotal 68670 13672 33363 9580 5200 3255 3600

10 42- Workshop Cap. 5998 100 3613 1230 1055 DRF 2000 1003 758 239 DF(3) 20000 4001 12345 876 1778 1000 OLWRTotal 27998 4001 13448 5247 1778 2230 1294

11 51- Staff Quarters Cap. 20287 1 14801 5485 DRF 20000 4295 8350 7355 Total 40287 4296 23151 12840

12 52- Amenities for Staff Cap. 25000 2584 22416 DRF 50000 20500 17372 12028 100 DF(2) 22000 1700 14200 2803 1236 547 200 300 203 811 DF(3)Total 97000 22200 34156 37247 1236 547 200 300 203 911

13 53- Passenger Amenity DRF 77401 15000 5000 21501 5000 13700 3400 7800 6000 DF(1) 373238 110527 49473 60000 20000 60000 25000 20000 28238 DF(3)Total 450639 125527 54473 81501 25000 73700 28400 27800 34238

14 64- Other Specified Works Cap. 2100 432 1219 449 DRF 11900 1 6700 2593 606 2000 DF(1)DF(2) 8200 3200 3845 579 576 DF(3) 29400 1 14900 3999 4607 618 975 1727 1310 1263 DF(4) 100 100 OLWRTotal 51700 3202 25445 7703 6432 1194 975 1727 1310 3712

Grand Total 1867912 172867 1079178 236314 105925 38451 87568 47027 38763 60525 1294

LB 2015-16 : WORKS IN PROGRESSDistribution of outlays for the Works under Board's Power, GM's Power and DRM's Power

Sr No. Planhead Alocation Total Provision Under Board's Power

Under GM's Power Under DRM BCT

Under DRM BRC

Under DRM RTM

Under DRM ADI

Under DRM RJT

Under DRM BVP

Under CWM/PLW

Page N

o. II

Page 5: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

(Figures in thousands of Rs.)

Itemised Works Reserve

1 16- Traffic Facilities Cap. 24000 8500 15500 DRF 3000 500 500 500 500 500 500 DF(1)DF(3) 6900 3900 500 500 500 500 500 500 DF(4)OLWRTotal 33900 12400 15500 1000 1000 1000 1000 1000 1000

2 17- Computerisation Cap.DRF 30000 14491 15509 DF(1)DF(3)OLWRTotal 30000 14491 15509

3 29- RSW-LC Gates S.Fund 10000 100 1000 7700 200 200 200 200 200 200

4 30- RSW-ROB/RUB S.Fund 30000 1000 29000

5 31- Track Renewal DRF 316200 10000 306200

6 32- Bridge Works DRF * * 200 100 100 DF(3)DF(4)Total 200 100 100

7 33- Signal & Telecom Works Cap. 9900 1 9599 100 100 100 DRF 10000 8500 400 200 300 200 200 200 DF(3)DF(4) 10000 8900 400 100 300 100 100 100 OLWRTotal 29900 1 17400 9599 800 400 700 300 300 400

8 36- Other Electrical Works Cap.DRF 24900 20 15180 3000 1600 1400 1300 1000 800 600 DF(3) 3000 2500 500 OLWRTotal 27900 20 17680 3000 2100 1400 1300 1000 800 600

9 37- Traction Distribution Works Cap.DRF 3000 300 75 1470 471 514 170 DF(3) 4000 455 2003 629 686 227 OLWRTotal 7000 300 75 455 3473 1100 1200 397

10 42- Workshop Cap. 500 500 DRF 500 500 DF(3) 500 500 OLWRTotal 1500 1000 500

11 51- Staff Quarters Cap. 20000 8000 12000 DRF 1000 1000 Total 21000 9000 12000

12 52- Amenities for Staff Cap. 20000 100 16000 650 650 650 650 650 650 DRF 2200 40 1690 50 70 70 70 70 70 70 DF(2) 4500 100 3450 50 150 150 150 150 150 150 DF(3)Total 26700 240 5140 16100 870 870 870 870 870 870

13 53- Passenger Amenity DRF 36000 11000 5000 5000 3000 4000 3000 2500 2500 DF(1) 92125 41500 100 10000 10000 12500 8000 5000 5025 DF(3)Total 128125 52500 5100 15000 13000 16500 11000 7500 7525

14 64- Other Specified Works Cap. 400 400 DRF 200 150 50 DF(1)DF(2)DF(3) 400 350 50 DF(4)OLWRTotal 1000 500 500

Grand Total 663425 11761 466486 85963 23443 17970 21770 14767 10670 10595

Under CWM/PLW

LB 2015-16 : NEW WORKSDistribution of outlays for the Works under Board's Power, GM's Power and DRM's Power

Sr No. Planhead Alocation Total Provision Under Board's Power

Under GM's Power Under DRM BCT

Under DRM BRC

Under DRM RTM

Under DRM ADI

Under DRM RJT

Under DRM BVP

Page N

o. III

Page 6: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

Itemised Works Reserve

1 16 - Traffic Facility 103218 14208 40911 26999 2000 4100 4000 3000 5500 2500

2 17 - computerisation 62500 5752 38740 18008

3 29 - RSW - LC Gates 110000 3900 85408 15492 1000 200 1000 1000 1000 1000

4 30 - RSW - ROB/RUB 200000 1000 184309 14691

5 31 - Track Renewals 655200 60000 555200 20000 1492 1459 2900 14149

6 32 - Bridge Works 72000 25772 32796 10910 122 500 900 1000

7 33 - Signalling & Telecom. Works 339900 1 266996 53018 1885 3750 700 6700 3950 2900

8 36 - Other Electrical Works 66900 26084 17999 10994 2999 1460 2749 1000 1300 2315

9 37 - Other Traction Works 75670 13972 33438 455 13053 6300 4455 3997

10 42 - Workshops 29498 4001 14448 5747 1778 2230 1294

11 51 - Staff Quarters 61287 4296 32151 24840

12 52 - Amenities For Staff 123700 22440 39296 53347 2106 1417 1070 1170 1073 1781

13 53 - Passenger Amenity 578764 178027 59573 96501 38000 90200 39400 35300 41763

14 64 - Other Specified Works 52700 3202 25945 8203 6432 1194 975 1727 1310 3712

Grand Total 2531337 184628 1545664 322277 129368 56421 109338 61794 49433 71120 1294

LB 2015-16 : GRAND SUMMARY

Page N

o. IV

Distribution of outlays for the Works under Board's Power, GM's Power and DRM's Power (Works in Progress and New Works)

Sr No.Planhead Total Provision Under Board's Power

Under GM's Power Under DRM BCT

Under DRM BRC

Under DRM RTM

Under DRM ADI

Under DRM RJT

Under DRM BVP

Under CWM/PLW

Page 7: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   1     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

A ‐ Works in Progress

Mumbai

1 Bandra Terminus ‐ Provision of shunting neck at DF(3) 99,15  .. 30,00  69,15 

south of coaching yard.

2 Churchgate ‐ Construction of Guards & Motorman DF(3) 1,26,66  31,56  30,00  65,10 

lobby. (BCT/S/09‐10)

3 Bhestan:‐ Providing new foot over bridge. DF(3) 83,91  22,72  20,00  41,19 

4 Provision of approach road to Goods Shed at Surat DF(3) 82,02  80,75  1,27  ..

Vadodara

5 Godhara Phase‐II work: Making line No.2 as main Up DF(3) 95,45  8,50  15,45  71,50 

line and line No.4 as Dn main line for raising of

speed from 15 to 50 Kmph on main line throght yard

remodelling.

Ratlam

6 Nagda ‐ Piploda Bagla ‐ Providing intermediate DF(3) 2,21,24  1,37,05  30,00  54,19 

block section.

7 Dalauda:‐  Provision of direct reception & Cap. 96,11  59,67  2,63  33,81 

dispatch facility at DLD goods/ Ballast siding.

(RTM/S/10‐11)

8 Shambhupura :‐ Improvement to goods platform DF(3) 67,18  42,16  20,00  5,02 

surface. (RTM/U/11‐12)

Ahmedabad

9 Kankariya Goods shed :‐ Provision of CC approach DF(3) 89,87  .. 30,00  59,87 

road between out ward PF no.3 and cover goods shed

PF.

10 Provision of Intermediate Block stop signal DF(3) 2,38,79  1,69,83  57,82  11,14 

between Ambli road – Sanand – Ambli road section

(Both up and down lines).IBS to be planned in such

location on both the lines which will bifurcate

the block section almost halve.No such gradients

11 Maliya Miyana ‐ Extension of shunting neck to full DF(3) 1,85,26  1,00,36  54,26  30,64 

length loading spur.

12 VTA‐ Providing direct connectiviy from Down yard DF(3) 95,89  53,83  21,74  20,32 

to Common loop. Existing point no. 111/112  to be

reversed. A new point (1:12) to be provided to

give connectivity from UP main line to Diesel

shed. A Trap point to ensure isolation of Down

Rajkot

13 OKHA:‐ conversion of non running line 04 into DF(3) 83,86  .. 30,00  53,86 

running line by provision of cross over from main

line to shunting neck

TRAFFIC FACILITIES

15.03.16.14.3.

52.001

15.03.16.09.3.

52.001

15.03.16.10.3.

52.002

15.03.16.12.3.

52.001

15.06.16.12.3.

55.002

15.05.16.10.2.

54.001

15.05.16.10.3.

54.001

15.05.16.11.3.

54.001

15.01.16.14.3.

50.001

15.01.16.12.2.

13.001

15.01.16.10.2.

50.001

15.01.16.12.6.

50.001

15.04.16.14.3.

53.001

Page 8: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   2     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

14 Digsar ‐ Providing simultaneous reception DF(3) 76,55  48,29  1 28,25 

facility. (RJT/U/09‐10)

15 Okha :‐ Stabling line along side of pit line. Cap. 99,01  33,07  64,01  1,93 

(RJT/U/1‐12)

16 Rajkot : ‐ Improvement in existing Goods Yard to DF(3) 91,11  46,85  20,00  24,26 

make fit for  reception and     dispatch of

Passenger trains.(Main Line of Goods Yard)

Mumbai

17 Works costing below DRM's Power DF(3) 10,00  .. 10,00  ..

Vadodara

18 Works costing below DRM's Power DRF 20,00  .. 20,00  ..

DF(3) 10,00  .. 10,00  ..

DF(4) 1,00  .. 1,00  ..

Ratlam

19 Works costing below DRM's Power DRF 5,00  .. 5,00  ..

DF(3) 25,00  .. 25,00  ..

Ahmedabad

20 Works costing below DRM's Power DF(3) 20,00  .. 20,00  ..

Rajkot

21 Works costing below DRM's Power DRF 45,00  .. 45,00  ..

Bhavnagar

22 Works costing below DRM's Power DF(3) 15,00  .. 15,00  ..

TOTAL‐WORKS IN PROGRESS Cap. .. .. 66,64  ..

DRF .. .. 70,00  ..

DF(3) .. .. 4,40,55  ..

DF(4) .. .. 1,00  ..

B ‐ New Works

Mumbai

23 Boisar ‐ Provision of OHE wiring for 400 m towards Cap. 99,43  .. 20,00  79,43 

Tarapur siding to avoid main line blocking

24 Lower parel‐Removal of trap point and provision of DF(3) 94,49  .. 10,00  84,49 

dead end.

Vadodara

25 Anand:‐Direct Placement and Removal at goods Shed Cap. 88,08  .. 20,00  68,08 

Ahmedabad

26 Shirva‐ Provision of one interlocked cross over Cap. 97,96  .. 20,00  77,96 

between goods line No. 1 & 2 and Down main line.

27 Ahmedabad BG‐ Repair of PIT line no 4 catwalk and DF(3) 88,80  .. 15,00  73,80 

pillars and hydrant main water pipe line +

charging and precooling points needs replacement

as corroded badly at ADI BG pit lines.

Rajkot

28 Navlakhi :‐ Provision of Hepper key transmitters Cap. 32,56  .. 25,00  7,56 

at Navlakhi.

TRAFFIC FACILITIES

15.04.16.09.3.

53.002

15.04.16.11.3.

53.001

15.04.16.12.3.

53.001

15.03.16.15.3.

00.999

15.06.16.15.3.

00.999

15.05.16.15.3.

00.999

15.01.16.15.3.

00.999

15.04.16.15.3.

00.999

15.02.16.15.3.

00.999

15.03.16.15.3.

52.002

15.03.16.15.3.

52.001

15.06.16.15.3.

55.001

15.01.16.15.3.

50.002

15.01.16.15.3.

50.001

15.04.16.15.3.

53.001

Page 9: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   3     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

29 Hapa :‐ Improvement in C&W yard facility at Hapa. DF(3) 32,08  .. 14,00  18,08 

Mumbai

30 Works costing below DRM's Power DRF 5,00  .. 5,00  ..

DF(3) 5,00  .. 5,00  ..

Vadodara

31 Works costing below DRM's Power DRF 5,00  .. 5,00  ..

DF(3) 5,00  .. 5,00  ..

Ratlam

32 Works costing below DRM's Power DRF 5,00  .. 5,00  ..

DF(3) 5,00  .. 5,00  ..

Ahmedabad

33 Works costing below DRM's Power DRF 5,00  .. 5,00  ..

DF(3) 5,00  .. 5,00  ..

Rajkot

34 Works costing below DRM's Power DRF 5,00  .. 5,00  ..

DF(3) 5,00  .. 5,00  ..

Bhavnagar

35 Works costing below DRM's Power DRF 5,00  .. 5,00  ..

DF(3) 5,00  .. 5,00  ..

TOTAL‐NEW WORKS Cap. .. .. 85,00  ..

DRF .. .. 30,00  ..

DF(3) .. .. 69,00  ..

TOTAL‐Traffic Facilities Cap. .. .. 1,51,64  ..

DRF .. .. 1,00,00  ..

DF(3) .. .. 5,09,55  ..

DF(4) .. .. 1,00  ..

A ‐ Works in Progress

Headquarter

36 Replacement of 14nos. High Speed Dot Matrix DRF 9,03  7,06  .. 1,97 

Printers at various PRS locations.

37 Replacement of 464 UTS ticket printers DRF 41,50  39,64  1 1,85 

38 Replacement of 32 SMC at 28 suburban stations DRF 28,18  .. 28,18  ..

39 Replacement of heavy duty chart printers, desktop DRF 17,72  17,57  .. 15

computers, and laser printers

40 Provision of 31 nos of additional heavy duty chart DF(1) 54,73  49,93  .. 4,80 

printers (line) at various charting PRS locations

41 Western Railway ‐ Replacement of 263 nos. Ticket DRF 20,10  .. 4,02  16,08 

Printers at various PRS locations

42 Abstract Estimate of Replacement of 335 nos LCD DRF 95,34  .. 57,51  37,83 

Dumb Terminals with keyboards against existing

Terminal/keyboards at various PRS loacations

43 Replacement of CMS equipments of WR DRF 16,58  .. 16,58  ..

44 Replacement of Datacom Equipment of FOIS DRF 39,92  .. 39,92  ..

45 Replacement of Datacom equipment for FOIS at 10 DRF 22,71  .. 21,05  1,66 

locations

TRAFFIC FACILITIES

15.04.16.15.3.

53.002

15.03.16.15.3.

00.999

15.06.16.15.3.

00.999

15.05.16.15.3.

00.999

15.01.16.15.3.

00.999

15.04.16.15.3.

00.999

15.02.16.15.3.

00.999

COMPUTERISATION

15.00.17.12.3.

12.003

15.00.17.12.3.

12.004

15.00.17.12.3.

12.005

15.00.17.12.6.

12.001

15.00.17.13.2.

12.001

15.00.17.13.6.

12.003

15.00.17.14.2.

12.001

15.00.17.13.6.

12.001

15.00.17.13.6.

12.002

15.00.17.14.3.

12.001

Page 10: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   4     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Mumbai

46 Replacement of 220 high speed ticket printers for DRF 45,22  36,17  10 8,95 

Mumbai suburban on emergent basis

47 2 Nos. Xeon Servers for MMIS on reolacement DRF 9,00  .. 9,00  ..

account

48 One RISC base data base server for MMIS  on DRF 5,00  .. 5,00  ..

replacement basis.

49 20 Nos. Desktop Computers for smooth working of DRF 7,98  .. 7,98  ..

MMIS on replacement account.

50 Provision of 86 terminal servers DF(1) 35,00  22,91  .. 12,09 

51 Provision of 93 switches. DF(1) 29,00  21,20  .. 7,80 

52 Provision of 65 LAN extenders. DF(1) 10,00  7,31  .. 2,69 

53 Provision of 5, 2 MBPS routers. DF(1) 6,00  4,40  .. 1,60 

54 Provision of PC based charting. DF(1) 10,93  .. 1 10,92 

55 Replacement of 1 No. fast report printers. DRF 79 .. 1 78

56 Mumbai Division:‐ Replacement of existing out DRF 50,00  25,02  24,98  ..

dated computers & printers along with furniture of

Engineering department.

57 Replacement of equipments for FOIS Terminals – DRF 10,50  9,39  1 1,10 

Procurement of Computers, printers and

peripherals.

Vadodara

58 Chhota Udaipur:‐ Providing UTS. DF(1) 9,26  5,75  .. 3,51 

59 Vadodara Division:‐Replacement of FOIS and TMS DRF 13,32  .. 13,32  ..

computer system on BRC Division.

Ratlam

60 Ratlam Division‐Replacement of FOIS(TMS) equipment DRF 23,48  .. 23,48  ..

at various TMS Locations in Ratlam Divsion.

Ahmedabad

61 Ahemdabad Division ‐ Replacement of equipments for DRF 14,91  11,84  10 2,97 

FOIS Terminals – Procurement of Computers,

printers and peripherals.

62 Ahemdabad Division ‐ Replacement of equipments for DRF 27,51  .. 27,51  ..

FOIS Terminals – Procurement of Computers,

printers and peripherals.

Rajkot

63 Rajkot Division ‐ Procurement of 41 Nos. of PCs & DRF 19,20  .. 12,00  7,20 

38 Nos. Printers on replacement account for

Operating Department.

COMPUTERISATION

15.03.17.13.6.

12.001

15.03.17.14.6.

12.003

15.03.17.14.6.

12.001

15.03.17.14.6.

12.002

15.03.17.07.2.

12.003

15.03.17.07.2.

12.004

15.03.17.07.2.

12.002

15.03.17.07.2.

12.001

15.03.17.08.2.

12.003

15.03.17.08.3.

12.002

15.03.17.10.3.

52.001

15.03.17.10.3.

12.003

15.06.17.05.2.

12.001

15.06.17.13.6.

12.001

15.05.17.14.3.

12.001

15.01.17.10.3.

12.001

15.01.17.14.3.

12.001

15.04.17.13.6.

12.001

Page 11: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   5     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

64 Rajkot Division ‐ Procurement of 04 computers with DRF 2,38  .. 2,38  ..

UPS and printers on replacement account for

COIS/ICMS system.

65 Rajkot : Providing Compurasied system in wards of DRF 3,79  .. 3,79  ..

Divisional Hospital at.

Bhavnagar

66 Bhavnagar Division ‐Proposal for personal computer DRF 3,07  .. 3,07  ..

sets and UPS for FOIS work on replacement account.

TOTAL‐WORKS IN PROGRESS DRF .. .. 3,00,00  ..

DF(1) .. .. 1 ..

B ‐ New Works

Headquarter

67 Western Railway:‐ Replacement of PRS ticket DRF 21,15  .. 21,15  ..

printer at various locations.

68 Western Railway:‐ Replacement of 155 nos. LCD dumb DRF 44,71  .. 44,71  ..

terminals with keyboard at various PRS locations

(phase 1).

69 Ahmedabad and Ratlam Divisions:‐ Converting 9.6 DRF 31,79  .. 31,79  ..

Kbps and MUX based PRS locations with 2Mbps IP

based connectivity.

70 Replacement of over aged Datacom Equipment near of DRF 47,26  .. 47,26  ..

more than 8 year old installed at FOIS location

over Western Railway

TOTAL‐NEW WORKS DRF .. .. 1,44,91  ..

TOTAL‐Computerisation DRF .. .. 4,44,91  ..

DF(1) .. .. 1 ..

A ‐ Works in Progress

Mumbai

71 Virar‐Surat Section:‐ Improvement  of LC gates by  S.Fund 50,27  .. 10,00  40,27 

replacement of new PRC sleepers on various L.C. 

and paver block etc. under ADEN/DRD section.

(BCT/S/09‐10)

72 Mumbai Non‐Suburban Section:‐ Replacement  of 13 S.Fund 98,60  88,60  10,00  ..

Nos. of (Swing / flap) gates into Electrically /

Mechanically operated lifting barrier. 

(S&T/U/09‐10)

73 Virar‐Surat Section:‐ Rebuilding of gate lodge, S.Fund 96,30  8,53  10,00  77,77 

providing gang tool room &providing toilet with

sock pit etc. under various L.C Under ADEN DRD.

(BCT/U/10‐11)

74 Virar‐Surat Section:‐ Rebuilding of gate lodge, S.Fund 97,55  6,89  10,00  80,66 

providing gang tool room & providing toilet with

sock pit etc. under various L.C Under ADEN ST .

(BCT/U/10‐11)

COMPUTERISATION

15.04.17.14.3.

12.001

15.04.17.14.3.

12.002

15.02.17.13.6.

12.001

15.00.17.15.3.

12.002

15.00.17.15.3.

12.004

15.00.17.15.3.

12.003

15.00.17.15.3.

12.001

ROAD SAFETY ‐ LEVEL CROSSINGS

15.03.29.09.3.

52.005

15.03.29.09.3.

52.001

15.03.29.10.3.

52.015

15.03.29.10.3.

52.014

Page 12: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   6     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

75 Virar‐Surat Section:‐ Providing MS fencing to S.Fund 1,00,00  72,54  10,00  17,46 

protect cattle run over (2200 RM). (BCT/U/10‐11)

76 Udhna‐Jalgaon Section:‐ Interlocking of LC No. 5. S.Fund 85,27  44,13  5,00  36,14 

(BCT/U/11‐12)

77 Udhna‐Jalgaon Section:‐ Interlocking of LC No. 28. S.Fund 85,27  44,83  5,00  35,44 

(BCT/U/11‐12)

78 Udhna‐Jalgaon Section:‐ Interlocking of LC No. 40. S.Fund 85,27  53,55  5,00  26,72 

(BCT/U/11‐12)

79 Udhna‐Jalgaon Section:‐ Interlocking of LC No. 54. S.Fund 83,63  52,72  5,00  25,91 

(BCT/U/11‐12)

80 Udhna‐Jalgaon Section:‐ Interlocking of LC No. 56. S.Fund 85,27  58,97  5,00  21,30 

(BCT/U/11‐12)

81 Udhna‐Jalgaon Section:‐ Interlocking of LC No. 86. S.Fund 85,27  58,96  5,00  21,31 

(BCT/U/11‐12)

82 Virar‐Dahanu Road Section:‐ Provision of battery S.Fund 90,49  80,19  5,00  5,30 

back up for relays through IPS at 8 Relay

Huts.(S&T/U/11‐12)

83 Churchgate‐Virar Section:‐ Replacement of gate S.Fund 55,61  14,59  5,00  36,02 

machines and rewiring of indoor signaling circuits

at LC‐ 19, LC‐24 & LC‐41.(S&T/U/11‐12)

84 UDN‐JL Sec. Upgradation & Reclassification of at S.Fund 1,01,41  82,20  15,00  4,21 

LC No.8, 16, 25, 27, 28, 36, 37, 40

85 Virar‐Surat section: Upgradation and S.Fund 1,15,44  .. 17,50  97,94 

reclassification of 8 Nos LCs (52, 65, 70, 82, 88,

103, 105)

86 UDN‐JL Sec. Upgradation and reclassification of S.Fund 70,77  3,18  10,00  57,59 

LC's nos. 136,137,142,153.

87 BCT‐ Providing fibre reinforced precast RCC block S.Fund 1,04,26  26,69  10,00  67,57 

at LC's CCG‐VR : 24, 25, 26, 41 VR‐ST : 90, 92,

94, 96, 97, 99, 100, 101, 102, 103, 104, 105

UDN‐JL : 27, 35, 36, 37.

88 Provision of Auto Changeover panels at 50 Auto S.Fund 62,70  .. 5,00  57,70 

Relay Huts at LC gates in VR‐ST section

89 Virar‐Surat section: Provision of IPS at 4 Relay S.Fund 77,10  .. 10,00  67,10 

Huts in Valsad‐Bilimora section of Mumbai

Division.

Vadodara

90 Vadodara Division:‐Vadodara‐Godhra S.Fund 2,29,85  10,00  20,00  1,99,85 

Section:‐Elimination of Level X‐ing No. 30 at Km.

444/0‐2, 43 at Km. 459/41‐42 & LC No. 45 at Km.

460/25‐27 by providing diversion road.

ROAD SAFETY ‐ LEVEL CROSSINGS

15.03.29.10.3.

52.013

15.03.29.11.3.

52.004

15.03.29.11.3.

52.002

15.03.29.11.3.

52.003

15.03.29.11.3.

52.005

15.03.29.11.3.

52.006

15.03.29.11.3.

52.007

15.03.29.11.3.

52.008

15.03.29.11.3.

52.001

15.03.29.12.3.

52.003

15.03.29.12.3.

52.006

15.03.29.12.3.

52.004

15.03.29.12.3.

52.005

15.03.29.12.3.

52.001

15.03.29.14.3.

52.001

15.06.29.13.2.

55.001

Page 13: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   7     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

91 Vadodara‐Utran Section (NG):‐ Electrification of S.Fund 59,92  45,06  14,86  ..

LC gates   (52 Nos.) . (ELE/S/09‐10)

92 Surat ‐ Vadodara Section ‐ Replacement of S.Fund 1,32,00  55,38  10,00  66,62 

mechanical lifting barriers / wing gates into

electrically operated lifting barrier gates.

93 Vadodara Division:‐ Interlocking of LC gates S.Fund 99,75  77,70  6,24  15,81 

having ATVU more than 25000 at  LC No.8, 32, 83,

86, 28 (5 LCs). (S&T/S/10‐11)

94 Vadodara‐Anand Section:‐ Replacement of mechanical S.Fund 1,10,02  68,36  5,00  36,66 

lifting barrier/ wing gates into electrically

operated lifting barrier (7 gates). (S&T/S/10‐11)

95 Nadiad‐Anand Section:‐ Replacement of mechanical S.Fund 1,10,02  35,12  10,00  64,90 

lifting barrier/ wing gates into electrically

operated lifting barrier (7 gates). (S&T/S/10‐11)

96 Vadodara‐Godhra Section:‐ Replacement of S.Fund 1,10,02  32,46  10,00  67,56 

mechanical lifting barrier/ wing gates into

electrically operated lifting barrier (7 gates).

(S&T/S/10‐11)

97 Vadodara‐Surat Section:‐ Augmentation of power S.Fund 1,12,38  1,01,32  5,00  6,06 

supply arrangment and provision of LED signals to

enhance safety. (8 gates). (S&T/S/10‐11)

98 ADEN‐Nadiad Jurisdiction:‐  Providing road sign S.Fund 95,40  45,51  1,89  48,00 

boards speed breakers and rail fencing on various

LC.(BRC/U/11‐12)

99 Vadodara‐Anand‐Godhra Section:‐ Provision of S.Fund 99,87  87,98  5,00  6,89 

battery back up for relays through IPS at

interlocked LC gates.(S&T/U/11‐12)

100 Anand‐Utarsanda Section:‐ Provision of battery S.Fund 99,87  22,41  10,00  67,46 

back up for relays through IPS at 9LC gate relay

huts.(S&T/U/11‐12)

101 Kanjari Boriyavi Jn.‐Mahemdabad Section:‐ S.Fund 99,87  87,47  5,00  7,40 

Provision of battery back up for relays through

IPS at 9 LC gate relay huts.(S&T/U/11‐12)

102 Gothan‐Geratpur Section:‐ Provision of battery S.Fund 99,87  91,74  8,13  ..

back up for relays through IPS at 9 LC gate relay

huts. (BRC/U/11‐12)

103 Vadodara Division:‐ Provision of RTUs/Dataloggers S.Fund 91,15  4,07  10,00  77,08 

at LC gates in PRTN‐CTD & ANND‐GDA Sections.

(BRC/U/11‐12)

104 Provision of Emergency key Chain Interlocking S.Fund 94,40  84,40  10,00  ..

using Sliding boom in ANND‐GER Automatic

Signalling section of Vadodara Division.(40 LC

Gates)

ROAD SAFETY ‐ LEVEL CROSSINGS

15.06.29.09.3.

55.004

15.06.29.10.2.

55.001

15.06.29.10.3.

55.003

15.06.29.10.3.

55.005

15.06.29.10.3.

55.001

15.06.29.10.3.

55.006

15.06.29.10.3.

55.007

15.06.29.11.3.

55.011

15.06.29.11.3.

55.009

15.06.29.11.3.

55.003

15.06.29.11.3.

55.005

15.06.29.11.3.

55.004

15.06.29.11.3.

55.008

15.06.29.12.3.

55.007

Page 14: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   8     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

105 Vadodara Division: Replacement of Mechanical S.Fund 88,31  19,96  10,00  58,35 

lifting barrier into Electrical lifting barrier(6

Nos)

106 Provision of approach warning at interlocked LC S.Fund 93,76  .. 15,00  78,76 

gates on Vadodara‐Godhra and Anand‐Godhra Sections

of Vadodara Division.

107 Provision of selective calling facility at LC S.Fund 88,00  .. 15,00  73,00 

gates in BRC ‐ GDA section

108 Vadodara Division:‐Upgradation and S.Fund 91,53  5,35  15,00  71,18 

reclassification of 8 Nos. of Level X‐ings on

ST‐BRC Section LC No. 182, 189, 232 & 233 and

BRC‐GER Section LC No. 239, 246, 255 & 260) (Total

8 Nos. of level X‐ings)

109 Vadodara Division:‐Providing fibre reinforced S.Fund 94,33  15,12  10,00  69,21 

precast RCC blocks at level X‐ings. L. C. No. 151,

158, 161, 165, 178, 185, 187, 191, 197, 198 & 228

on ST‐BRC Section, L. C. No. 32, 37, 38, 41, 7 & 5

on BRc‐GDA Section and LC No. 240, 244, 290 & 299

110 Vadodara Division:‐Upgradation and S.Fund 94,52  .. 15,00  79,52 

reclassification of 8 Nos. of Level X‐ings. Level

X‐ing No. 264, 265, 269, 278, 285, 286, 295 & 300

on BRC‐GER Section.

111 Provision of Sliding boom at 33 LC gates in S.Fund 78,28  33,91  5,00  39,37 

Vadodara‐Godhra‐Anand section of Vadodara

Division.

Ratlam

112 Ratlam Division ‐ UJN‐BPL Section‐‐ Interlocking S.Fund 49,09  23,97  5,00  20,12 

of LC 110 Km. 217/ 22‐24 in PUD‐BQE section

113 Ratlam division: Provision of LED signal units for S.Fund 1,69,36  92,99  1,00  75,37 

better visibility at interlocked LC gates

114 RTM‐CNA & IDU section‐Provision of solar panel for S.Fund 1,78,77  1,21,68  1,00  56,09 

reliable power supply for signalling installaion

at interlocked LC gates. (Total 10 Nos)

115 Ratlam‐ Khandwa Section ‐ Removal of deficiences S.Fund 2,32,70  84,12  1,00  1,47,58 

on mannual LC's (51 Nos.). (RTM/S/08‐09)

116 Ratlam  Division‐Providing lever locking device at S.Fund 58,87  32,31  10,00  16,56 

LCs. (RTM/S/08‐09)

117 Godhra‐Nagda Section‐Improvement  to various LCs  S.Fund 1,18,47  67,71  10,00  40,76 

by providing pavers block, approach road & rumble

strips. (RTM/S/09‐10)

118 Nagda‐Ujjain‐Maksi & IDU Section:‐ Improvement  to S.Fund 99,82  50,35  5,00  44,47 

various LCs  by providing pavers block, approach

road & rumble strips. (RTM/S/09‐10)

ROAD SAFETY ‐ LEVEL CROSSINGS

15.06.29.12.3.

55.017

15.06.29.12.3.

55.012

15.06.29.12.3.

55.003

15.06.29.12.3.

55.013

15.06.29.12.3.

55.014

15.06.29.12.3.

55.015

15.06.29.12.3.

55.016

15.05.29.12.6.

54.001

15.05.29.11.2.

54.001

15.05.29.12.2.

54.001

15.05.29.08.2.

54.002

15.05.29.08.3.

54.004

15.05.29.09.3.

54.002

15.05.29.09.3.

54.007

Page 15: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   9     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

119 Ujjain‐Bhopal Section:‐ Up gradation of  LCs. from S.Fund 1,19,21  95,67  10,00  13,54 

?A? to Aspl. LC.NO. 104,107& 108 . (RTM/S/09‐10)

120 Ratlam Division:‐ Interlocking of LC No. 34 Km S.Fund 98,18  91,34  1 6,83 

508/16‐18 in GDA‐RTM section & LC No. 3 Km 4/1‐2

in IND‐UJN section. (S&T/U/10‐11)

121 Nagda‐Ujjain‐Bhopal Section:‐ Modification and S.Fund 63,71  50,56  5,00  8,15 

upgradation in existing boom locking system

suitable for power operated lifting barrier at

interlocked LC gates. (S&T/U/10‐11)

122 Godhra‐Nagda‐Ujjain‐IDU Section:‐ Providing remote S.Fund 1,26,87  1,26,58  1 28

terminal units at LC gates (20 Nos.).

(S&T/U/10‐11)

123 Indore‐Dewas‐Ujjain Section:‐ Interlocking & up S.Fund 96,10  79,68  8,41  8,01 

gradation  of Lc no. 3 Km.4/01‐02. at.(C to Spl).

(S&T//U/10‐11)

124 Indore‐Dewas‐ Ujjain Section:‐ Up gradation  of LC S.Fund 99,57  99,56  1 ..

No.30  Km: 42/08‐09 A to spl), & LC 37  Km

53/08‐09(C to spl). (RTM/U/10‐11)

125 Indore‐Dewas‐ Ujjain  Section:‐ Up gradation  of S.Fund 94,33  49,72  10,00  34,61 

LC No. 27  Km 37/16‐18(C to spl) and LC 31 at Km

43/01‐02 (C to B2 ). (RTM/U/10‐11)

126 Ujjain‐Bhopal Section:‐ Up gradation  of  LC No. S.Fund 1,07,17  92,96  8,21  6,00 

26 Km: 53/06‐08  (B  to spl), LC no. 21 Km.

42/24.26 ( B to A). (RTM/U/10‐11)

127 Ujjain‐Bhopal  Section:‐ Up gradation  of, LC 29   S.Fund 99,21  99,20  1 ..

Km 57/38‐40 ( A  to spl),  LC No. 45 Km: 85/30‐32(

‘A’  to spl.). (RTM/U/10‐11)

128 Indore‐Dewas‐ Ujjain   Section:‐  Up gradation of  S.Fund 99,02  87,06  11,96  ..

Level crossing No. 45  Km 63/9‐10 (C to Spl.), Lc

no. 52 X Km. 70/2‐3.(C to SPL). (RTM/U/10‐11)

129 Ujjain‐Bhopal Section‐  up gradation of  LC No. 79 S.Fund 91,58  60,73  5,00  25,85 

 Km 157/21‐23 (A to Spl.), Lc no. 85 Km.

170/10‐12.(A to SPL). (RTM/U/10‐11)

130 Vadodara‐Nagda Section:‐ Providing gate lodges at S.Fund 75,60  11,83  10,00  53,77 

interlocked gates having elevated ground frames.

(RTM/U/10‐11)

131 Ujjain‐Bhopal  Section:‐  Up gradation of  Level S.Fund 97,28  57,00  5,00  35,28 

crossing No. 113  Km 223/11‐13 (C to A.), Lc no.

114 Km. 226/17‐19.(C to A). (RTM/U/10‐11)

132 Ratlam Division:‐ Interlocking of LC No. BCW in S.Fund 59,85  53,65  1,20  5,00 

CAN‐RTM section & LC No. 31 in IND‐UJN section.

ROAD SAFETY ‐ LEVEL CROSSINGS

15.05.29.09.3.

54.011

15.05.29.10.3.

54.012

15.05.29.10.3.

54.008

15.05.29.10.3.

54.003

15.05.29.10.3.

54.007

15.05.29.10.3.

54.006

15.05.29.10.3.

54.005

15.05.29.10.3.

54.019

15.05.29.10.3.

54.017

15.05.29.10.3.

54.004

15.05.29.10.3.

54.018

15.05.29.10.3.

54.020

15.05.29.10.3.

54.016

15.05.29.10.3.

54.013

Page 16: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   10     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

133 Ratlam‐Neemach Section:‐ Removing Signaling S.Fund 1,00,92  49,88  5,00  46,04 

deficiencies at 20 interlocked LC Gates.

(RTM/U/11‐12)

134 Ujjain‐Bhopal Section:‐ Removing Signaling S.Fund 1,05,85  88,89  5,00  11,96 

deficiencies at 21 interlocked LC Gates.

(RTM/U/11‐12)

135 Ratlam‐Nagda‐Bhopal & IDU section:‐ Providing Road S.Fund 80,59  36,55  5,00  39,04 

Signals at 25 interlocked LC gates. (RTM/U/11‐12)

136 Chanderiya‐Ratlam Section:‐ Provision of Remote S.Fund 68,84  33,83  5,00  30,01 

Terminal Units at OSL interlocked LC gates  in

Ratlam division.(RTM/U/11‐12)

137 INDORE‐DEWAS‐UJJAIN section‐Closure of unmanned S.Fund 1,19,96  1,17,20  2,76  ..

level crossing no. 33X between stations  DEWAS and

 BARLAI  by merging with manned Lc no.33.

138 GDA‐MGN Sec:‐ Providing retro reflecting sign S.Fund 56,00  38,74  5,00  12,26 

boards ( W/L, road sign boards, danger sign boards

etc) at various LC's.

139 Chanderiya ‐ Ratlam Sec :‐ Closure of unmanned LC S.Fund 1,01,50  50,79  5,00  45,71 

no 149 between stations PIP & MDS by merging with

manned LC No 148 at

140 RTM Div.‐‐ Provision of solar street lights at LC S.Fund 39,74  5,75  5,00  28,99 

Gates and                     Replacement of AT

Cable at some of Interlocked LC Gates

141 MHOW‐ Khandwa Section:‐ Providing RCC retaining S.Fund 68,46  .. 5,00  63,46 

wall (210 Rm) on approaches in accident prone LC

No. 266, 268 & 270.

142 IDU   section‐ Providing diversion road for S.Fund 98,16  88,36  1 9,79 

closing of manned LC no. 40 Km. 57/12‐13 between

BLX‐MGG by 41X.

143 GDA‐NAD Sec:‐ Upgradation of Lc Nos.34, 63 and 87. S.Fund 1,00,03  .. 10,00  90,03 

144 NAD ‐UJN ‐MKC Section‐   Up gradation of LC No. 9 S.Fund 77,51  37,64  5,00  34,87 

('B1' to 'A' Class),  38 ('C' to 'A' Class and  LC

No.52 ('A' to 'Spl' Class)

145 CNA‐NMH Section‐   Up gradation of LC No. BCW ('C' S.Fund 1,02,05  50,12  5,00  46,93 

to 'A' Class),  100 ('B1' to 'A' Class and  LC

No.120 ('A' to 'Spl' Class)

146 NMH‐RTM Section‐   Up gradation of LC No. 151 S.Fund 1,02,47  59,30  5,00  38,17 

(B2C' to 'A' Class),  152 ('A' to 'Spl' Class and 

LC No.157('C' to 'B2' Class)

147 NMH‐RTM Section‐   Up gradation of LC No. 162 ('C' S.Fund 1,00,70  48,34  5,00  47,36 

to 'B1' Class),  177 ('A' to 'SPL' Class and  LC

No.187('B1' to 'SPL' Class)

ROAD SAFETY ‐ LEVEL CROSSINGS

15.05.29.11.3.

54.003

15.05.29.11.3.

54.004

15.05.29.11.3.

54.002

15.05.29.11.3.

54.001

15.05.29.12.3.

54.009

15.05.29.12.3.

54.014

15.05.29.12.3.

54.013

15.05.29.12.3.

54.016

15.05.29.12.3.

54.015

15.05.29.12.3.

54.002

15.05.29.12.3.

54.024

15.05.29.12.3.

54.019

15.05.29.12.3.

54.020

15.05.29.12.3.

54.021

15.05.29.12.3.

54.022

Page 17: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   11     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

148 Chanderia‐Chittor‐Ratlam Section:‐Provision of RTU S.Fund 79,70  60,22  1 19,47 

and its networking at interlocking LC gates

149 Godhra‐Nagda‐Ujjain‐Indore &Ujjain‐Bhopal S.Fund 79,46  60,38  5,00  14,08 

section:‐ Provision of RTU's and its networking in

WSL gates on Rtalm Division.

150 Godhra‐ Ratlam Sec.: Provision of approach warning S.Fund 71,37  51,04  5,00  15,33 

system at mid section (OSL) interlocked LC Gate

No. 61(Spl class)  between  MGN‐THDR Station and

79 (Spl Class)  between  MRN‐RTM A Station.

151 Godhra‐Nagda‐Ujjainand Indore‐Ujjain S.Fund 66,93  20,33  5,00  41,60 

section‐‐Provision of Stand By Transmission system

for the slot from LC to panel for WSL Gates and LC

Gate Closed indication to Cabin / ASM at OSL LC on

RTM Division

152 RTM division :‐ Providing fibre reinforced pre S.Fund 84,95  .. 13,63  71,32 

cast RCC blocks at 20Lc GDA‐RTM,NAD‐UJN&

IDU,UJN‐FTD‐UJN,RTM‐KNW section.

153 Ratlam Division ‐ Interlocking of LC 162 Km. 313/ S.Fund 92,70  24,26  10,00  58,44 

01‐02 in DLD‐KCNR and LC 98 Km. 203/ 07‐08 SMP‐

GRF section.

154 Nagda‐Ujjain‐Bhopal Section‐Provision of power S.Fund 64,40  49,66  10,00  4,74 

operated Lifting barriers at interlocked LC gates

in out side station Limit.

155 Ratlam Division‐Provision of sliding booms at S.Fund 64,23  3,19  10,00  51,04 

interlocked LC Gate Prone to Damage by Road

Traffic.

156 Godhra‐Nagda, Ratlam‐Chanderia and Indore Dewas S.Fund 64,41  57,00  7,41  ..

Section‐Provision of power operated lifting

barriers atinterlocked LC gates in OSL.

Ahmedabad

157 Ahmedabad Division:‐ Manning of LC No.15 KM 17/ S.Fund 77,16  70,89  6,27  ..

2‐3 on KLL‐KTRD‐RUJ Section, LC No 16 at Km 16/4‐5

on MSH‐VG Section & LC No 21at Km 21/10‐22/1

MSH‐PTN Section. (ADI/S/09‐10)

158 Sr.DEN(W) Jurisdiction:‐ Providing speed breakers S.Fund 77,92  58,38  5,00  14,54 

at LCs (148 Nos). (ADI/S/09‐10)

159 Sr.DEN(NW) Jurisdiction:‐ Providing speed breakers S.Fund 47,45  2,00  13,45  32,00 

at LCs  (141 Nos). (ADIS/09‐10)

160 Ahmedabad Division:‐ Interlocking of 2 Nos. of S.Fund 98,44  84,86  5,00  8,58 

Engg. LC gates:‐ (1) LC No.169 at Km. 653/10‐11

between PNU‐UM  (2) LC No.88 KHXB ‐ WDHR .

(S&T/S/10‐11)

ROAD SAFETY ‐ LEVEL CROSSINGS

15.05.29.12.3.

54.017

15.05.29.12.3.

54.018

15.05.29.12.3.

54.004

15.05.29.12.3.

54.026

15.05.29.12.3.

54.023

15.05.29.12.6.

54.002

15.05.29.14.6.

54.001

15.05.29.14.6.

54.002

15.05.29.14.6.

54.003

15.01.29.09.3.

50.004

15.01.29.09.3.

50.008

15.01.29.09.3.

50.007

15.01.29.10.3.

50.003

Page 18: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   12     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

161 Ahmedabad Division:‐ Interlocking of 2 Nos. of S.Fund 97,85  82,45  5,00  10,40 

Engg. LC gates:‐ (1) LC Gate No.316A bet. ABD ‐

SAU &  (2) LC Gate No.205 bet.VONB‐BCOB. 

(S&T/S/10‐11)

162 Ahmedabad Division:‐ Interlocking of 2 Nos. of S.Fund 97,64  81,12  5,00  11,52 

Engg. LC gates:‐ (1) LC Gate No.215 bet. BCOB‐CHIB

&  (2) LC No.229 bet.BMSB‐GIMB. (S&T/S/10‐11)

163 Ahmedabad Division:‐ Interlocking of 3 Nos. of S.Fund 89,65  58,90  5,00  25,75 

Traffic LC gates:‐ (1) LC  No.10C at JN,  (2) LC

No.62 at SUK & (3) LC No.80 at DVY  section.

(S&T/S/10‐11)

164 Ahmedabad Division:‐ Interlocking of 3 Nos. of S.Fund 89,64  57,80  5,00  26,84 

Traffic LC gates:‐ (1) LC  No.98C at MALB,  (2) LC

No.213 at UMN & (3) LC No.111 at KATR.

(S&T/S/10‐11)

165 Ahmedabad‐Palanpur Section:‐ Augmentation of Power S.Fund 87,45  86,33  12 1,00 

Supply at 11 Mid section Interlocked gates.

(S&T/U/10‐11)

166 Ahmedabad‐Samakhiali‐Gandhidham‐Bhuj Section:‐ S.Fund 1,15,33  1,14,20  13 1,00 

Augmentation of Power Supply at 16 Mid section

interlocked gates. (S&T/S/10‐11)

167 Ahmedabad Division:‐ Provision of battery back up S.Fund 86,73  .. 5,00  81,73 

for relays through IPS at Mid section interlocked

gates. (ADI/U/11‐12)

168 Ahemdabad Division:‐ Replacement of old mechanical S.Fund 99,29  83,43  5,00  10,86 

lifting barriers at 10 LC Gates (7 Nos Traffic & 3

Nos Engg). (ADI/U/11‐12)

169 Ahemdabad Division:‐ Replacement of Mechanical S.Fund 65,54  54,63  5,00  5,91 

lifting barriers 4 LC Gates (2 Nos Traffic & 2 Nos

Engg). (ADI/U/11‐12)

170 Ahemdabad Division:‐ Provision of Road signals and S.Fund 96,00  41,98  5,00  49,02 

Hooter on interlocked LC gates in ADI‐MSH‐PNU,

ADI‐VG‐SIOB & SIOB‐PNU (21 LC gates).

(ADI/U/11‐12)

171 Ahmedabad division‐ Replacement of old mechanical S.Fund 51,39  35,24  5,00  11,15 

lifting barrier by electric operated lifting

barrier on age cum condition basis.

172 Ahmedabad Division: Provision of slide boom type S.Fund 99,38  45,35  6,54  47,49 

gates.

173 Ahmedabad Div: Provision of stand by transmission S.Fund 66,32  37,80  5,00  23,52 

system for the slot from LC gate to panel for WSL

gates.

ROAD SAFETY ‐ LEVEL CROSSINGS

15.01.29.10.3.

50.002

15.01.29.10.3.

50.001

15.01.29.10.3.

50.004

15.01.29.10.3.

50.005

15.01.29.11.3.

50.009

15.01.29.11.3.

50.010

15.01.29.11.3.

50.006

15.01.29.11.3.

50.004

15.01.29.11.3.

50.003

15.01.29.11.3.

50.002

15.01.29.12.3.

50.002

15.01.29.12.3.

50.003

15.01.29.12.3.

50.006

Page 19: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   13     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

174 Ahmedabad Division : Provision of fuse alarm S.Fund 29,46  .. 3,46  26,00 

system at 79 interlocked LC gates.

175 Ahmedabad division‐ Provision of emergency sliding S.Fund 76,91  65,82  6,00  5,09 

type boom barrier at 30 interlocked LC gates.

176 ADI:‐ Providing fibre reinforced pre cast RCC S.Fund 97,58  .. 6,00  91,58 

block at various 20 Nos. of LCs. (VG‐SIOB ‐ Lc No.

3,5,7,32,43,108,112,114,116 & 117) (KHD‐GNC‐12,

KLL‐GNC‐3 &5, KLL‐RUJ‐10 & 22 AJM‐UMN ‐ 14,66,67 &

70)

Rajkot

177 Rajkot Division: Up gradation of LC No.219 bet. S.Fund 40,92  31,46  8,46  1,00 

Kanalus ‐Modpur, LC No. 289 bet. Gorinja ‐ Dwarka

& LC No.303 bet. Bhimrana ‐Okha.  (RJT/S/08‐09)

178 Rajkot Division:‐ Interlocking of Manned  OSL S.Fund 71,84  36,58  6,00  29,26 

LC.gate No.236 at Km 884/1 ‐2 between Khambhaliya

‐ Bhatel section.(S&T/U/11‐12)

179 Rajkot Division:‐ Upgradation of LC gate No.305 at S.Fund 73,67  52,95  9,72  11,00 

Km 985/0‐1 between BMRN ‐ OKHA from 'B' class to

Spl' class.(S&T/U/11‐12)

180 Rajkot Division:‐ Provision of battery back up for S.Fund 39,30  5,92  5,00  28,38 

relays through IPS at LC gates in Wankaner (Ex) ‐

Navalakhi ‐ Dahisara ‐ Vavaniya section and in

VG‐SUNR section. (RJT/U/11‐12)

181 RJT DIV ‐ Closing of LCs by interconnectivity in S.Fund 95,77  76,44  5,51  13,82 

the jurisdiction of DEN(E)‐RJT.

182 RJT Division ‐ Closing of LCs by S.Fund 96,42  89,03  7,39  ..

inter‐connectivity in the jurisdiction of

DEN(W)RJT

183 Rajkot Division : Provision of CLS at 3 S.Fund 93,85  32,77  5,00  56,08 

Interlocked OSL LC gates in RJT‐HAPA section in

connection of PI works already sanction. Ie LC

128,136 & 147.

184 Rajkot Division : Provision of Approach Warning S.Fund 75,26  34,17  5,00  36,09 

System for Interlocked LC gate.ie Viramgam‐OKHA 

section including branch

185 RJT Divn: Providing fibre reinforced pre‐cast RCC S.Fund 65,35  11,78  10,00  43,57 

blocks at 20 LC gates under DEN(W)‐RJT.

186 Rajkot Division : Up gradtion and Interlocking of S.Fund 38,51  34,93  2,99  59

Manned OSL LC gate No. 113 at Km 727/4‐5 to 'A'

class between Khorana ‐ Kankot section .

187 Rajkot Division:Up gradation and interlocking of S.Fund 39,00  38,99  1 ..

LC No. 135'C' class Engg. at Km 755/0‐1 between

Khandheri‐ Padadhari section to 'A' class,

ROAD SAFETY ‐ LEVEL CROSSINGS

15.01.29.12.3.

50.001

15.01.29.12.3.

50.007

15.01.29.12.3.

50.008

15.04.29.08.3.

53.005

15.04.29.11.3.

53.003

15.04.29.11.3.

53.005

15.04.29.11.3.

53.004

15.04.29.12.3.

53.010

15.04.29.12.3.

53.008

15.04.29.12.3.

13.011

15.04.29.12.3.

53.001

15.04.29.12.3.

53.007

15.04.29.12.3.

53.002

15.04.29.12.3.

53.003

Page 20: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   14     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Bhavnagar

188 KJV‐VSW Section (MG):‐ Providing CC Block on level S.Fund 36,23  8,27  12,00  15,96 

crossings gates (30 nos.). (BVP/S/08‐09)

189 Bhavnagar Division ‐ Removal of defeciencies and S.Fund 2,17,41  39,40  5,00  1,73,01 

providing Paver Blocks with speed breakers /

Rumble Strips on 219 LCs.

190 ADEN‐Botad Sub‐division:‐ Manning of unmanned S.Fund 48,79  23,83  15,00  9,96 

level crossings 24,Km 26/7‐8 between GG ‐ SEJ and

159/X at km 172/8‐9 between SAPR ‐ BTD.

(BVP/S/09‐10)

191 Sabarmati‐Botad (MG) Section:‐ Manning of LC No S.Fund 24,69  1,15  5,00  18,54 

81, km 84/2‐3 between KTGD and LHBK station.

(BVP/S/09‐10)

192 ADEN‐Junagadh Sub Division:‐ Manning of unmanned S.Fund 33,70  20,50  4,50  8,70 

level crossings 105/C, km 146/7‐8 between KSD ‐

MLHA and 126/C, km 179/3‐4 between ADE  VRL .

(BVP/S/09‐10)

193 PRCL Section:‐ Manning of unmanned level crossings S.Fund 19,11  5,35  5,00  8,76 

41/C, km 34/1‐2 between DAS ‐ RLA. (BVP/S/09‐10)

194 PRCL Section:‐ Manning of unmanned level crossings S.Fund 18,07  5,48  5,00  7,59 

 LC 22 at km 16/1‐2 between DME and LMO stations.

(BVP/S/09‐10)

195 Ribda‐Bhaktinagar Section:‐ Upgradation & S.Fund 37,75  17,18  5,00  15,57 

interlocking of LC no 13. (S&T/U/09‐10)

196 Bhavnagar sub division:‐ Providing approach road S.Fund 63,47  15,98  5,00  42,49 

between two unmanned level crossings situated

within 01 Km for diversion of traffic and closing

one ( LC 192 & 193, LC 21 & 22 , LC 212 & 213, LC

29 & 30 ). (BVP/S/10‐11)

197 Bhavnagar Division:‐ Providing approach road S.Fund 37,38  4,91  5,00  27,47 

between two unmanned level crossings situated

within 01 Km for diversion of traffic and closing

one (LC 3 &4, 5 & 6, 7 & 8, 9 & 10, 12 & 13, 16 &

15, 36 & 37 ,43 & 44 Khijadiya ‐ Veraval and LC 26

198 DAS‐RLA Section:‐ Improvement of poor visibility S.Fund 17,38  74 2,00  14,64 

by cutting of earthwork at LCs (LC No. 41, 68, 72

& 80). (BVP/U/10‐11)

199 Bhavnagar Division:‐ Interlocking of LC gates No S.Fund 53,42  26,82  1,27  25,33 

24 between Gandhigram‐ Sarkhej on Botad‐Sabarmati

(MG) Section.(S&T/U/11‐12)

200 Bhavnagar Division:‐ Interlocking of LC gate No 11 S.Fund 57,88  15,19  5,00  37,69 

C' Class (Engg) between Dhasa‐Damnagar on

Dhasa‐Rajula Jn. Section.(S&T/U/11‐12)

ROAD SAFETY ‐ LEVEL CROSSINGS

15.02.29.08.3.

51.008

15.02.29.09.2.

51.001

15.02.29.09.3.

51.001

15.02.29.09.3.

51.010

15.02.29.09.3.

51.003

15.02.29.09.3.

51.007

15.02.29.09.3.

51.005

15.02.29.09.3.

51.008

15.02.29.10.3.

51.005

15.02.29.10.3.

51.001

15.02.29.10.3.

51.002

15.02.29.11.3.

51.003

15.02.29.11.3.

51.001

Page 21: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   15     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

201 Rajula Jn.‐Mahuva Sec:‐Interlocking and S.Fund 47,60  14,89  5,00  27,71 

upgradation of LC gate No 129 'C' Class (Engg).

202 Prachiroad‐Delvada MG section:‐Interlocking and S.Fund 45,49  14,78  5,00  25,71 

upgradation of LC gate No 49 (Engg)

203 BVP Divn.: Upgradation & Reclassification of 3  S.Fund 61,48  .. 5,00  56,48 

Nos LC's ( KNLS ‐ PBR ‐ 63, 68,  JLR ‐ WSJ ‐ 67)

204 BVP Division  ‐ Providing fiber reinforced S.Fund 63,26  .. 5,00  58,26 

pre‐cast RCC blocks at 20LC's

RWO‐WSJ,63,57,56,JLR‐VRL,

81,82X,77,82,JND‐VSW,11,SUNR‐WC 108/C,109,110,

RUR‐KDI 160,BTJ YD 213X BVP‐BVC 219BVC YD 220

Mumbai

205 Works costing below DRM's Power S.Fund 8,00  .. 8,00  ..

Ratlam

206 Works costing below DRM's Power S.Fund 8,00  .. 8,00  ..

Ahmedabad

207 Works costing below DRM's Power S.Fund 8,00  .. 8,00  ..

Rajkot

208 Works costing below DRM's Power S.Fund 8,00  .. 8,00  ..

Bhavnagar

209 Works costing below DRM's Power S.Fund 8,00  .. 8,00  ..

TOTAL‐WORKS IN PROGRESS S.Fund .. .. 9,22,08  ..

B ‐ New Works

Mumbai

210 Udhna‐Jalgaon section: Providing 2nd whistle S.Fund 18,00  .. 1,00  17,00 

boards under ADEN/VYA and ADEN/NDB.

Vadodara

211 Vadodara Division:‐Provision of 2nd whistle Boards S.Fund 85,00  .. 1,00  84,00 

on various unmanned Level X‐ings on Vadodara

Division (Total 430 Level X‐ings

Ratlam

212 Ratlam‐Chanderiya Section ‐ Interlocking of level S.Fund 1,29,68  .. 1,00  1,28,68 

crossing gates (2 Nos.)Provision of Electrical

lifting barriers.2. Supply and installation of

RTU.3. Supply and installation of CLS Signal units

for gate signal.4.  Supply and installation of CT

213 Ratlam‐Chanderiya Section ‐ Interlocking of level S.Fund 71,99  .. 1,00  70,99 

crossing gates  LC 87 Provision of Electrical

lifting barriers.2. Supply and installation of

RTU.3. Supply and installation of CLS Signal units

for gate signal.4.  Supply and installation of CT

ROAD SAFETY ‐ LEVEL CROSSINGS

15.02.29.12.3.

51.001

15.02.29.12.3.

51.003

15.02.29.12.3.

51.002

15.02.29.12.3.

51.004

15.03.29.15.3.

00.999

15.05.29.15.3.

00.999

15.01.29.15.3.

00.999

15.04.29.15.3.

00.999

15.02.29.15.3.

00.999

15.03.29.15.3.

52.001

15.06.29.15.3.

55.001

15.05.29.15.2.

54.001

15.05.29.15.3.

54.001

Page 22: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   16     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

214 Ratlam‐Chanderiya Section ‐ Interlocking of level S.Fund 71,99  .. 1,00  70,99 

crossing gates  LC 85 at KM  176/05‐06.Provision

of Electrical lifting barriers.2. Supply and

installation of RTU.3. Supply and installation of

CLS Signal units for gate signal.4.  Supply and

215 Ratlam Division‐Providing Lever Locking S.Fund 42,77  .. 1,00  41,77 

device,safety chains and Shed over Winch on

variuos LC's.Nagda‐Bhoplal, Indore‐Dewas‐Ujjain

and Dewas‐Maksi  Section.

Ahmedabad

216 Ahmedabad Division:‐ Providing 2nd whistle board S.Fund 67,79  .. 1,00  66,79 

at unmanned LCs.

217 Gandhidham ‐ New bhuj Section:‐ Upgradation of LC S.Fund 43,39  .. 1,00  42,39 

classification from C to B2 at LC No. 9.

Rajkot

218 Rajkot Division: Interlocking of L.C. No. 247 in S.Fund 34,37  .. 1,00  33,37 

Bhatel Yard.

219 Rajkot Division ‐ Providing WSL boards on unmanned S.Fund 38,03  .. 1,00  37,03 

LCs.

Bhavnagar

220 Bhavnagar Division: Providing 2nd Whistle Board at S.Fund 74,66  .. 1,00  73,66 

unmanned level crossings (Non PRCL Section)

Mumbai

221 Works costing below DRM's Power S.Fund 2,00  .. 2,00  ..

Vadodara

222 Works costing below DRM's Power S.Fund 2,00  .. 2,00  ..

Ratlam

223 Works costing below DRM's Power S.Fund 2,00  .. 2,00  ..

Ahmedabad

224 Works costing below DRM's Power S.Fund 2,00  .. 2,00  ..

Rajkot

225 Works costing below DRM's Power S.Fund 2,00  .. 2,00  ..

Bhavnagar

226 Works costing below DRM's Power S.Fund 2,00  .. 2,00  ..

TOTAL‐NEW WORKS S.Fund .. .. 23,00  ..

ROAD SAFETY ‐ LEVEL CROSSINGS

15.05.29.15.3.

54.003

15.05.29.15.3.

54.002

15.01.29.15.3.

50.001

15.01.29.15.3.

50.002

15.04.29.15.3.

53.002

15.04.29.15.3.

53.001

15.02.29.15.3.

51.001

15.03.29.15.3.

00.999

15.06.29.15.3.

00.999

15.05.29.15.3.

00.999

15.01.29.15.3.

00.999

15.04.29.15.3.

00.999

15.02.29.15.3.

00.999

Page 23: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   17     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

TOTAL‐Road Safety ‐ Level S.Fund .. .. 9,45,08  ..

Crossings

A ‐ Works in Progress

Mumbai

227 Udvada‐Pardi:‐ Road over bridge in lieu of LC No. S.Fund 7,10,28  .. 1 7,10,27 

87. (BCT/U/09‐10) EBR(Dep) 11,40,43  .. .. 11,40,43 

228 Virar‐Surat:‐ Road over bridge in lieu of LC No. S.Fund 2,12,70  50,00  1 1,62,69 

101 (near Doongri). (BCT/U/09‐10) EBR(Dep) 2,75,36  .. .. 2,75,36 

229 UDN‐JL Sec. Providing limied height sub‐way in liu S.Fund 1,31,05  1,01,91  29,00  14

of LC no.85 at km143/6‐7

230 UDN‐JL(Sec):Providing normal limited height subway S.Fund 1,64,32  11,81  40,00  1,12,51 

in lieu of LC No 154

Vadodara

231 Bharuch Town (Hospital Road):‐ Construction of RUB S.Fund 1,27,00  50,00  1 76,99 

in lieu of LC No. 3 near. (BRC/U/10‐11) EBR(Dep) .. .. .. ..

232 Bharuch Town (Shaktinath Road):‐ Construction of S.Fund 2,44,00  50,00  1 1,93,99 

RUB in lieu of LC No. 4 near. (BRC/U/10‐11) EBR(Dep) .. .. .. ..

233 Vadodara‐Godhra Section:‐Elimination of existing S.Fund 2,44,27  .. 1,00,00  1,44,27 

Level X‐ing No. 10 at Km. 409/22‐24 by provision

of Road under Bridge (RUB)

Ratlam

234 Godhra‐Nagda Section:‐ Providing limited use S.Fund 1,35,61  72,58  45,00  18,03 

subway to eliminate LC No. 54 at Km. 560/22‐24

between Anas and NRH. (RTM/S/10‐11)

235 Ujain‐Bhopal Section:‐ Providing limited height S.Fund 1,38,40  1,36,40  2,00  ..

subway to eliiminate LC No. 99 at km. 196/00‐02

between BKTL‐SHE at unmanned LC. (RTM/U/11‐12)

236 Nagda‐Ujjain Section:‐ Providing limited height S.Fund 1,60,70  1,37,78  5,00  17,92 

subway to eliiminate LC No. 16 at km. 33/30‐42/2

between PSO‐ASL at unmanned LC. (RTM/U/11‐12)

237 Nagda‐Ujjain Section:‐ Providing limited height S.Fund 1,57,40  1,37,60  5,00  14,80 

subway to eliiminate LC No. 17X at km. 36/26‐28 at

unmanned LC. (RTM/U/11‐12)

238 Ujjain‐Bhopal Section:‐ Providing limited height S.Fund 1,38,90  1,36,59  2,00  31

subway to eliiminate LC No. 97 at km. 192/24‐26 at

unmanned LC. (RTM/U/11‐12)

239 Godhra‐Nagda Section:‐ Providing limited height S.Fund 1,43,00  1,29,39  13,00  61

subway to eliiminate LC No. 47 at km. 584/24‐26

between DHD and BIO stations. (RTM/U/11‐12)

240 Godhra‐Nagda Section:‐ Providing limited height S.Fund 1,45,00  1,13,44  30,00  1,56 

subway to eliiminate LC No. 52 at km. 555/14‐16

between BIO and ANAS stations. (RTM/U/11‐12)

ROAD SAFETY ‐ ROB/RUB

15.03.30.09.3.

30.001

15.03.30.09.3.

30.002

15.03.30.12.3.

52.002

15.03.30.12.3.

52.001

15.06.30.10.3.

55.001

15.06.30.10.3.

55.002

15.06.30.14.6.

55.001

15.05.30.10.3.

54.005

15.05.30.11.3.

54.007

15.05.30.11.3.

54.005

15.05.30.11.3.

54.006

15.05.30.11.3.

54.008

15.05.30.11.3.

54.001

15.05.30.11.3.

54.002

Page 24: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   18     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

241 Godhra‐Nagda Section:‐ Providing limited height S.Fund 1,45,00  29,12  60,00  55,88 

subway to eliiminate LC No. 56 at km. 563/10‐12

between ANAS and NRH stations. (RTM/U/11‐12)

242 Godhra‐Nagda Section:‐ Providing limited height S.Fund 1,43,00  98,32  15,00  29,68 

subway to eliiminate LC No. 58 at km. 570/10‐12

between ANAS and MGN stations. (RTM/U/11‐12)

243 GDA‐NAD Section‐Provision of Limited use sub way S.Fund 1,17,38  59,42  50,00  7,96 

to eliminate L. C. No. 50  at Km 552/16‐18 between

Bordi & ANAS stations.

244 GDA‐NAD Section‐Provision of Limited use sub way S.Fund 1,34,89  1,34,80  1 8

to eliminate L. C. No. 73  at Km 613/22‐24 between

AGR & BMI stations.

245 IDU section‐ povidinglimited height subway to S.Fund 1,92,75  1,87,64  5,00  11

eliminateManned Lc no.48 at Km.65/16‐66/01

betweenMGG&LMNR stations.

246 INDORE‐ DEWAS‐UJJAIN section:‐ Providing Limited S.Fund 1,95,00  36,93  80,00  78,07 

height Subway  to eliminiate unmanned LC no. 15

at. Km. 19/9‐10 between KADCHA‐NARANGIPUR

stations.

247 INDORE‐DEWAS‐UJJAIN section :‐ Providing Limited S.Fund 1,10,06  1,09,02  1,00  4

height Subway to eliminiate LC no. 9 at. Km.

10/14‐15 between UJJAIN‐KADCHA stations.

248 INDORE‐DEWAs‐UJJAIN sectio n:‐ Providing Limited S.Fund 92,29  92,28  1 ..

height Subway to eliminiate  LC no. 18 between

KDHA‐NRGR at Km. 23/5‐6.

249 INDORE‐DEWAS‐UJJAIN  section:‐ Providing Limited S.Fund 1,53,38  1,27,18  10,00  16,20 

height Subway to eliminiate unmanned LC no. 12 at.

Km. 14/17‐15/1 between UJJAIN‐KADCHAstation.

250 CNA ‐ RTM ‐ KNW section :‐ Providing Limited S.Fund 1,99,40  1,57,84  20,00  21,56 

height Subway in lieu of Unmanned LC no. 155 & 239

at Km. 299/8 ‐ 9 & 480/9 ‐ 10 at‐

251 Ratlam Division‐Providing Limited Hieght Subway of S.Fund 1,47,67  .. 40,00  1,07,67 

4.00 M (Width) x 3.00 M (Height) (Internal

dimension) precast R.C.C. M‐35 box  in liue of

Unmanned LC No.  194 & 195 at Km 382/8‐9 & 384/6‐7

between RTM‐NGW section.

252 Ratlam Division‐ Providing Limited Hieght Subway S.Fund 2,27,10  .. 1,50,00  77,10 

of 4.00 M (Width) x 3.00 M (Height) (Internal

dimension) precast R.C.C. M‐35 box  in liue of

Unmanned LC No.  200 & 201 at (Km 399/8‐9) & (Km

401/9‐10) between NGW‐RNJ section.

253 Providing Limited Hieght Subway of 4.00 M (Width) S.Fund 2,16,76  .. 1,00,00  1,16,76 

x 3.00 M (Height) (Internal dimension) precast

R.C.C. M‐35 box  in liue of Unmanned LC No.  205 &

211 at    Km 408/1‐2 & Km 424/11‐12 &between

RNJ‐BNG and BNG‐GPX section.

ROAD SAFETY ‐ ROB/RUB

15.05.30.11.3.

54.003

15.05.30.11.3.

54.004

15.05.30.12.3.

54.003

15.05.30.12.3.

54.007

15.05.30.12.3.

54.001

15.05.30.12.3.

54.002

15.05.30.12.3.

54.004

15.05.30.12.3.

54.005

15.05.30.12.3.

54.008

15.05.30.12.3.

54.006

15.05.30.12.3.

54.011

15.05.30.12.3.

54.010

15.05.30.12.3.

54.012

Page 25: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   19     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

254 Ratlam Division:‐ Providing Limited Height S.Fund 1,65,12  .. 55,00  1,10,12 

Sub‐ways(3.66 x 4.00 m)  in lieu of  Unmanned

Level crossing No.213/C , Km 428/9‐10 between

Barnagar ‐Gautampura Station.

255 Ratlam Division:‐ Providing Limited Height S.Fund 1,65,12  .. 55,00  1,10,12 

Sub‐ways(3.66 x 4.00 m)  in lieu of  Unmanned

Level crossing No. 220/C , Km 442/3‐4 between

Gautampura‐ Fatehabad Station.

256 Ratlam Division:‐ Providing Limited Height S.Fund 1,65,12  .. 40,00  1,25,12 

Sub‐ways(3.66 x 4.00 m)  in lieu of  Unmanned

Level crossing No. 221/C , Km 444/3‐4 between

Gautampura‐ Fatehabad Station.

257 Ratlam Division:‐ Providing Limited Height S.Fund 1,65,12  .. 40,00  1,25,12 

Sub‐ways(3.66 x 4.00 m)  in lieu of  Unmanned

Level crossing No. 224/C , Km 450/2‐3 between

Gautampura‐ Fatehabad Station.

258 Chittaurgarh‐Kota  section ;Providing Sub‐way  S.Fund 1,18,54  .. 20,00  98,54 

(RUB)  to eliminate  LC No. 121  Km: 155/11‐12

Bet: CNA‐BSSL in Ratlam Division of Western

railway  at.

Ahmedabad

259 Construction of Limited Hieght Subway in lieu of S.Fund 2,41,24  1,00  1 2,40,23 

LC No. 244C (manned) at Km 778/7‐8 between SBI‐CDK

station

260 Elimination of LC No. 16A at Km. 517/08‐09on S.Fund 2,22,86  1,00  1 2,21,85 

ADI‐VG Section by providing RUB for Dedicated EBR(Dep) .. .. .. ..

freight corrdor.

261 Elimination of LC No. 16 at Km. 517/01‐02on ADI‐VG S.Fund 1,55,99  1,00  26,98  1,28,01 

Section by providing RUB for Dedicated freight

corrdor.

262 Elimination of LC No. 18 at Km. 520/0‐1 on ADI‐VG S.Fund 1,55,99  1,00  1 1,54,98 

Section by providing RUB for Dedicated freight EBR(Dep) .. .. .. ..

corrdor.

263 Elimination of LC No. 19 at Km. 521/0‐1 on ADI‐VG S.Fund 1,55,99  1,00  26,00  1,28,99 

Section by providing RUB for Dedicated freight EBR(Dep) .. .. .. ..

corrdor.

264 Elimination of LC No. 20 at Km. 521/5‐6 on ADI‐VG S.Fund 1,55,99  1,00  50,00  1,04,99 

Section by providing RUB for Dedicated freight EBR(Dep) .. .. .. ..

corrdor.

265 Elimination of LC No. 21 at Km. 523/01‐02 on S.Fund 1,55,99  1,00  1,00  1,53,99 

ADI‐VG Section by providing RUB for Dedicated EBR(Dep) .. .. .. ..

freight corrdor.

266 Elimination of LC No. 10 at Km. 8/8‐9 on PNU‐SIOB S.Fund 1,64,84  1,00  40,00  1,23,84 

Section by providing RUB for Dedicated freight

corrdor.

ROAD SAFETY ‐ ROB/RUB

15.05.30.12.3.

54.013

15.05.30.12.3.

54.014

15.05.30.12.3.

54.015

15.05.30.12.3.

54.009

15.05.30.13.3.

54.002

15.01.30.13.3.

50.001

15.01.30.13.3.

50.005

15.01.30.13.3.

50.007

15.01.30.13.3.

50.008

15.01.30.13.3.

50.009

15.01.30.13.3.

50.010

15.01.30.13.3.

50.003

15.01.30.13.3.

50.004

Page 26: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   20     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

267 Elimination of LC No. 11 at Km. 9/8‐9 on PNU‐SIOB S.Fund 1,39,94  1,00  50,00  88,94 

Section by providing RUB for Dedicated freight

corrdor.

268 Elimination of LC No. 8 C at Km. 8/4‐5 on MSH‐PTN S.Fund 1,21,09  28,00  70,00  23,09 

Section by providing RUB.

Rajkot

269 Than‐Lakhamachi:‐ Road over bridge in lieu of LC S.Fund 1,42,80  50,00  1 92,79 

No. 73. (RJT/U/09‐10) EBR(Dep) 1,42,80  .. .. 1,42,80 

270 Rajkot Division:.‐ Road over bridge  in lieu of LC S.Fund 89,43  50,00  1 39,42 

No.274 at Km. 936/13‐14 between Kuranga‐Okhamadhi. EBR(Dep) 89,43  .. .. 89,43 

(S&C/U/09‐10)

Bhavnagar

271 Construction of Limited Height Sub Way to S.Fund 2,22,44  .. 10,00  2,12,44 

elimination of Level crossing (LC No. 32 & 36 on

Kanalus ‐Porbandar section)

272 Construction of Limited Height Sub Way to S.Fund 2,34,86  .. 1,00  2,33,86 

elimination of Level crossing (LC No. 17 & 22 on

Kanalus ‐Porbandar section)

273 Construction of Limited Height Sub Way to S.Fund 2,19,39  20,05  1,00,00  99,34 

elimination of Level crossing (LC No. 37 & 42 on

Kanalus ‐Porbandar section)

274 Construction of Limited Height Sub Way to S.Fund 2,29,65  .. 10,00  2,19,65 

elimination of Level crossing (LC No. 43 & 45 on

Kanalus ‐Porbandar section)

275 Construction of Limited Height Sub Way to S.Fund 2,37,08  .. 1,00  2,36,08 

elimination of Level crossing (LC No. 59 & 71 on

Kanalus ‐Porbandar section)

276 Construction of Limited Height Sub Way to S.Fund 1,83,97  .. 1,00  1,82,97 

elimination of Level crossing (LC No. 81 & 79 on

Jetalsar ‐ Wansjaliya section)

277 Construction of Sub Way to elimination of Level S.Fund 2,59,81  .. 1,00,00  1,59,81 

crossing (LC No. 91 & 85 on Jetalsar ‐ Wansjaliya

section)

278 Construction of Limited Height Sub Way to S.Fund 2,25,49  .. 1,00  2,24,49 

elimination of Level crossing (LC No. 97 & 109 on

Jetalsar ‐ Wansjaliya section)

279 Construction of Sub Way to elimination of Level S.Fund 2,34,50  .. 1,00  2,33,50 

crossing (LC No. 112 & 114 on Jetalsar ‐

Wansjaliya section)

280 Construction of Limited Height Sub Way to S.Fund 1,83,91  .. 1,00  1,82,91 

elimination of Level crossing (LC No. 51 on

Kanalus‐ Porbandar & 116 on Jetalsar ‐ Wansjaliya

section)

ROAD SAFETY ‐ ROB/RUB

15.01.30.13.3.

50.006

15.01.30.13.3.

50.002

15.04.30.09.3.

30.002

15.04.30.09.3.

30.001

15.02.30.13.3.

51.009

15.02.30.13.3.

51.010

15.02.30.13.3.

51.011

15.02.30.13.3.

51.012

15.02.30.13.3.

51.002

15.02.30.13.3.

51.003

15.02.30.13.3.

51.004

15.02.30.13.3.

51.005

15.02.30.13.3.

51.006

15.02.30.13.3.

51.007

Page 27: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   21     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

281 Construction of Limited Height Sub Way to S.Fund 2,36,66  .. 50,00  1,86,66 

elimination of Level crossing (LC No. 94 & 96 on

Jetalsar ‐ Wansjaliya section)

282 Construction of Limited Height Sub Way to S.Fund 2,19,04  .. 1,00  2,18,04 

elimination of Level crossing ( LC No. 18 & 105 on

RAJKOT ‐ SOMNATH section )

TOTAL‐WORKS IN PROGRESS S.Fund .. .. 15,53,09  ..

B ‐ New Works

Mumbai

283 Udhna ‐ Jalgaon section: Providing Subway in lieu S.Fund 2,50,00  .. 10,00  2,40,00 

of LC 66

284 Udhna ‐ Jalgaon section: Providing Subway in lieu S.Fund 2,50,00  .. 10,00  2,40,00 

of LC 100

285 Udhna ‐ Jalgaon section: Providing Subway in lieu S.Fund 2,50,00  .. 10,00  2,40,00 

of LC 101 (manned)

286 Churchgate ‐ Virar ‐ section Providing  protection S.Fund 1,80,83  .. 10,00  1,70,83 

screen plates on various FOB's& ROB's

Ratlam

287 Chanderiya‐Ratlam Section‐Providing Subways to S.Fund 1,41,03  .. 15,00  1,26,03 

Eliminate Unmanned LC No.142.

288 Chanderiya‐Ratlam Section‐Providing Subways to S.Fund 1,41,03  .. 15,00  1,26,03 

eliminate unmanned LC No.160.

289 Ratlam ‐ Khandwa Section‐Providing Subways to S.Fund 1,41,03  .. 15,00  1,26,03 

Eliminate unmanned LC.No. 235.

290 Ratlam‐Khandwa  Section‐Providing subways to S.Fund 1,56,53  .. 15,00  1,41,53 

Eliminate unmanned LC No. 229.

291 Ratlam‐Khandwa  section‐Providing Subways to S.Fund 1,58,10  .. 10,00  1,48,10 

Eliminate Unmanned LC. No.228.

292 Chanderiya ‐ Ratlam  section‐Providing Subways to S.Fund 1,41,21  .. 15,00  1,26,21 

Eliminate Unmanned LC. No. 107

293 Chanderiya ‐ Ratlam Sec:‐ Providing height gauge S.Fund 28,63  .. 10,00  18,63 

at bridge approaches to protect bridge from road

users.

294 Chanderiya ‐ Ratlam section ‐ Construction of 2 S.Fund 1,27,00  .. 10,00  1,17,00 

lane RUB in lieu of LC no. 177 km: 341/6 ‐ 7 near EBR(Dep) 1,27,00  .. .. 1,27,00 

Jaora yard

295 Chanderiya ‐ Ratlam Section ‐Providing Sub‐way to S.Fund 1,95,12  .. 15,00  1,80,12 

eliminate LC No. ‐ 127 (U/M) Between NMH ‐ HKL

station  in Ratlam Division of western railway at.

ROAD SAFETY ‐ ROB/RUB

15.02.30.13.3.

51.008

15.02.30.13.3.

51.001

15.03.30.15.3.

52.004

15.03.30.15.3.

52.002

15.03.30.15.3.

52.001

15.03.30.15.3.

52.003

15.05.30.15.3.

54.001

15.05.30.15.3.

54.006

15.05.30.15.3.

54.003

15.05.30.15.3.

54.002

15.05.30.15.3.

54.007

15.05.30.15.3.

54.008

15.05.30.15.3.

54.004

15.05.30.15.2.

54.001

15.05.30.15.3.

54.005

Page 28: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   22     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Ahmedabad

296 VG‐SIOB section:‐Proposal for extra work of RUB S.Fund 82,60  .. 10,00  72,60 

for doubling new track in addition to existing RUB

work at LC No. 11C for single existing track on

VG‐SIOB section.

297 VG‐SIOB section:‐Proposal for extra work of RUB S.Fund 49,56  .. 20,00  29,56 

for doubling new track in addition to existing RUB

work at LC No.27 for  existing track on VG‐SIOB

section.

298 VG‐SIOB section:‐Proposal for extra work of RUB S.Fund 82,60  .. 20,00  62,60 

for doubling new track in addition to existing RUB

work at LC No.42 for  existing track on VG‐SIOB

section

299 VG‐SIOB section :‐ Proposal for extra work of RUB S.Fund 66,08  .. 20,00  46,08 

for doubling new track  in addition to existing

RUB work at LC No. 116 on VG‐SIOB section for

existing track.

300 Proposal for extra work of RUB for doubling new S.Fund 66,08  .. 20,00  46,08 

track in addition to existing RUB work at LC No.

89 for existing track on VG‐SIOB section

301 Proposal for extra work of RUB for doubling new S.Fund 66,08  .. 20,00  46,08 

track in addition to existing RUB work at LC No.

114 for  existing track on VG‐SIOB section.

Rajkot

302 Rajkot Division – Providing Limited Height Subway S.Fund 1,14,81  .. 10,00  1,04,81 

on LC No. 116 to eliminate unmanned Level

Crossing.

303 Rajkot Division – Providing Limited Height Subway S.Fund 1,14,81  .. 10,00  1,04,81 

on LC No. 79 to eliminate unmanned Level Crossing.

304 Surendranagar ‐ Rajkot Section :Elimination of S.Fund 1,14,81  .. 10,00  1,04,81 

unmanned LC by providing Limited Height Subway on

LC No. 111.

TOTAL‐NEW WORKS S.Fund .. .. 3,00,00  ..

TOTAL‐Road Safety ‐ ROB/RUB S.Fund .. .. 18,53,09  ..

A ‐ Works in Progress

Mumbai

305 Udhna‐Jalgaon section:‐ TWR = 5.00 Kms. ( Uakai DRF 50,29  50,00  29 ..

Songadh ‐Lakkadkhot section) & ( Lakkadkhot ‐

Navapur section). (BCT/U/10‐11)

306 Sindkheda‐Nardana section:‐ TWR=5.00 Kms. DRF 41,77  17,33  5,00  19,44 

(BCT/U/10‐11)

ROAD SAFETY ‐ ROB/RUB

15.01.30.15.3.

50.005

15.01.30.15.3.

50.003

15.01.30.15.3.

50.002

15.01.30.15.3.

50.001

15.01.30.15.3.

50.006

15.01.30.15.3.

50.004

15.04.30.15.3.

53.001

15.04.30.15.3.

53.002

15.04.30.15.3.

53.003

TRACK RENEWALS

15.03.31.10.3.

52.034

15.03.31.10.3.

52.013

Page 29: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   23     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

307 Chawlkhede‐Jalgaon section:‐ TWR =5.00 Kms. DRF 41,77  24,61  5,00  12,16 

(BCT/U/10‐11)

308 Udhna‐Jalgaon section:‐ TRR =1.00 kms. DRF 79,70  66,12  2,00  11,58 

(BCT/U/10‐11)

309 Udhna‐Jalgaon section:‐ TSR = 0.703 kms.on major DRF 37,81  37,17  50 14

Bridge no‐ 374. (BCT/U/10‐11)

310 Udhna‐Jalgaon section:‐ Providing complete set of DRF 90,00  16,50  15,00  58,50 

SEJs. (BCT/U/10‐11)

311 Udhna‐Jalgaon Section:‐ Replacment of curved DRF 99,00  35,34  15,00  48,66 

switches = 126 Nos.under ADEN/E/Nandurbar.

(BCT/U/10‐11)

312 Udhna‐Jalgaon Section. Replacment of curved DRF 99,00  36,54  12,00  50,46 

switches = 126 Nos.under ADEN/W/Nandurbar.

(BCT/U/10‐11)

313 Udhna‐Jalgaon Section:‐ Renewal of SEJ = 88 Nos. DRF 99,00  60,14  10,00  28,86 

under ADEN/W/Nandurbar. (BCT/U/10‐11)

314 Virar‐Surat section:Replacement of  CMSC = 30 Nos DRF 52,77  34,90  3,00  14,87 

in the jurisdiction of ADEN/Dahanu Road and

ADEN/Surat section. (BCT/U/10‐11)

315 Virar‐Surat Section:‐ Replacement of CS = 40Nos. DRF 71,85  26,00  8,00  37,85 

in the jurisdiction of ADEN/Dahanu Road and

ADEN/Suarat section. (BCT/U/10‐11)

316 Virar‐Surat Section:‐ Replacement of  GRSP  in the DRF 50,00  16,00  6,00  28,00 

jurisdiction of ADEN/Dahanu Road and ADEN/Suarat

section. (BCT/U/10‐11)

317 Virar‐Surat section:‐ TWR = 2135 Jts. (60 kg/52 kg DRF 97,20  11,01  15,00  71,19 

) by mobile FBW plant in situ or on cess under

ADEN/Surat section. (BCT/U/10‐11)

318 Virar‐Surat section :CTR(S )  Sorting line Balsad DRF 78,11  64,18  8,00  5,93 

DN yard. (BCT/U/10‐11)

319 Virar‐Surat section :Renewal of switch,crossing & DRF 94,05  30,50  10,00  53,55 

GRSP for turnout in the section of ADEN/Surat &

ADEN/Dahanu Road. (BCT/U/10‐11)

320 Churchgate‐Virar Section :‐ CMSCR =8 Nos.under DRF 99,17  38,35  10,00  50,82 

SSE(Pway)Bhayandar. (BCT/U/10‐11)

321 Udhana‐Jalgaon TRR in connection with TWR under DRF 96,57  28,85  13,00  54,72 

SE/BIY.

322 Udhana‐Jalgaon TRR in connection with TWR under DRF 96,57  28,86  13,00  54,71 

SE/NWU.

TRACK RENEWALS

15.03.31.10.3.

52.001

15.03.31.10.3.

52.028

15.03.31.10.3.

52.032

15.03.31.10.3.

52.019

15.03.31.10.3.

52.023

15.03.31.10.3.

52.014

15.03.31.10.3.

52.021

15.03.31.10.3.

52.053

15.03.31.10.3.

52.044

15.03.31.10.3.

52.043

15.03.31.10.3.

52.052

15.03.31.10.3.

52.039

15.03.31.10.3.

52.040

15.03.31.10.3.

52.006

15.03.31.11.3.

52.014

15.03.31.11.3.

52.018

Page 30: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   24     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

323 Udhana‐JalgaonTRR in connection with TWR under DRF 96,57  28,87  13,00  54,70 

SE/KBH.

324 Udhana‐Jalgaon TRR in connection with TWR under DRF 96,57  28,87  13,00  54,70 

SE/NDB.

325 Udhana‐Jalgaon TRR in connection with TWR under DRF 96,57  28,87  13,00  54,70 

SE/DDE.

326 Udhana‐Jalgaon TRR in connection with TWR under DRF 96,57  28,87  13,00  54,70 

SE/DXG.

327 Virar‐Surat Section :‐ TRR on urgent condition DRF 98,57  38,79  14,00  45,78 

basis due to severe  liner bite UP Km.82.594 to

83.650 =1.056 & DN km 254.15 to 254.313 = 0.16 

Total  1.2 Kms .

328 Virar‐Surat Section :‐  TRR on urgent condition DRF 96,15  25,78  13,00  57,37 

basis due to severe  liner bite UP Km.114.810 to

115.925 = 1.150 Kms .

329 Virar‐Surat Section :‐ TRR on urgent condition DRF 96,15  25,78  14,00  56,37 

basis due to severe  liner bite UP Km.116.940 to

117.955 = 1.150 km.

330 Virar‐Surat Section :‐ UP line‐ TRR on urgent DRF 88,33  25,78  12,00  50,55 

condition basis due to severe  liner bite Km.

118.970  to Km.119.031 =0.061 Kms, Km.264.719 to

Km.265.031=0.313 Kms, Km. 267.344 to Km.267.906

=0.563 Kms, Km 268.031 to Km. 268.156= 0.125 Kms.

331 Virar‐Surat Section DN line :‐ TRR on urgent DRF 98,61  26,28  14,00  58,33 

condition basis due to severe  liner bite Km.

268.063 to 269.00= 0.938 kms, Km 263.458 to

Km.263.706 = 0.248 Kms Total 1.186 Km.

332 Virar‐Surat Section DN line :‐ TRR on urgent DRF 79,09  22,28  10,00  46,81 

condition basis due to severe  liner bite Km.

255.00  to 255.563 = 0.563, km 264.750 to

265.125=0.375  Total ‐ 0.938 km.

333 Virar‐Surat Section:‐ Casual renewal of channel DRF 1,85,72  71,29  30,00  84,43 

sleeper fittings.

334 Churchgate‐Virar section: ‐ Replacement of DRF 84,27  38,25  10,00  36,02 

existing sleepers on curves by slack gauge

sleepers between CYR‐GTR under SSE(Pway)DDR

Qty:4000 Nos.

335 Churchgate‐Virar & UDN‐JL sections ;‐ Casual DRF 89,99  32,88  11,00  46,11 

Renewal of Channel Sleepers fittings.

336 VR‐ST & UDN‐JL sections :‐ Casual renewal of PSC DRF 89,59  32,50  10,00  47,09 

sleepers on points & crossings.

TRACK RENEWALS

15.03.31.11.3.

52.022

15.03.31.11.3.

52.017

15.03.31.11.3.

52.015

15.03.31.11.3.

52.016

15.03.31.11.3.

52.026

15.03.31.11.3.

52.024

15.03.31.11.3.

52.025

15.03.31.11.3.

52.027

15.03.31.11.3.

52.028

15.03.31.11.3.

52.029

15.03.31.11.3.

52.030

15.03.31.11.3.

52.008

15.03.31.11.3.

52.001

15.03.31.11.3.

52.032

Page 31: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   25     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

337 Mumbai division :‐ Casual renewal of fittings of DRF 93,93  33,00  12,00  48,93 

P&Cs.

338 Mumbai division :‐ Casual renewal of glued joints. DRF 86,59  31,50  10,00  45,09 

339 Mumbai division:‐ Casual renewal of rails of DRF 95,65  53,50  8,00  34,15 

points & crossings.

340 Virar‐Surat & Udhna‐Jalgaon sections:‐ Casual DRF 99,82  43,98  3,00  52,84 

renewal of SEJs.

341 Mumbai division ‐ Renewal of special layouts on DRF 98,96  74,75  4,00  20,21 

wooden sleepers by PRC sleepers.

342 VR ‐ ST section :‐ TRR on urgent condition basis DRF 99,19  75,57  4,00  19,62 

due to sever liner bite Km.77.00 to 78.15 UP line

Total km 1.15 km .

343 VR ‐ ST section :‐ TRR on urgent condition basis DRF 86,70  75,39  2,00  9,31 

due to sever liner bite Km.78.15 to 79.15 UP line

Total 1.0 km

344 VR‐ST‐ section:Replacement of GRSP ordinary, GRSP DRF 98,81  49,00  15,00  34,81 

for turn out , turn out fittings & SEJ etc. in the

jurisdiction of ADEN/DRD, ADEN/BL, ADEN/ST

section.

Complete Track Renewal

345 Churchgate‐ Virar Section. (A) CTR(S&P)=2.20 DRF 3,24,51  1,24,97  35,00  1,64,54 

kms.(B)TRR(P)=0.70 kms. (A) of existing 60kg(SH)

on PRC with 60kg (SH) on new PRC @ M+7 in BCT main

PF 1 to 5 =2.20( B) P) of exitg 60kg 90UTS on PRC

by 60kg 90UTS LWR on new PRC/6  fr. km 5.00 ‐ 5.4

Complete Track Renewal

346 VR‐ST section : Complete track Renewal(S ) km for DRF 98,24  8,15  10,81  79,28 

providing ballast siding at UVD quarry.

Complete Track Renewal

347 VR ST section: CTR(P) by 60 kg 90 UTS rail and PRC DRF 43,82  .. 8,00  35,82 

sleepers @ 1660 Nos/Km in yards(manual) between km R. 2,93 

67.935 to 68.221 = 0.286 km DN Line.

Complete Track Renewal

348 VR ST section: CTR(P) by 60 kg 90 UTS rail and PRC DRF 68,24  .. 12,00  56,24 

sleepers @ 1660 Nos/Km in yards between km 76.480 R. 46

to 76.90=0.420 km DN Line.

Through Rail Renewal

349 Churchgate‐Virar: ‐ Replacement of defective/ DRF 88,23  56 17,00  70,67 

scabbed rails under section of ADEN(T/S)PL

section.

Through Rail Renewal

350 Udhna‐Jalgaon section.:‐ Casual renewal of rails DRF 82,88  .. 15,00  67,88 

under SSE(Pway) Vyara

TRACK RENEWALS

15.03.31.11.3.

52.011

15.03.31.11.3.

52.012

15.03.31.11.3.

52.013

15.03.31.11.3.

52.023

15.03.31.11.3.

52.010

15.03.31.12.3.

52.009

15.03.31.12.3.

52.011

15.03.31.12.3.

52.018

15.03.31.09.2.

52.002

15.03.31.12.3.

52.019

15.03.31.13.6.

52.001

15.03.31.13.6.

52.002

15.03.31.13.3.

52.018

15.03.31.14.3.

52.004

Page 32: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   26     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Through Rail Renewal

351 Udhna‐Jalgaon . Casual renewal of rails  under DRF 98,56  .. 16,00  82,56 

SSE(P.Way)Nandurbar. Total  1.20 kms.

Through Rail Renewal

352 Virar‐Surat section‐ Casual renewal of rails due DRF 95,23  .. 15,00  80,23 

to eutectic welds under the jurisdiction of SSE(p.

way) Vapi section.

Through Rail Renewal

353 Udhna‐Jalgaon. Casual renewal of rails under DRF 95,97  .. 16,00  79,97 

SSE/P.way/Amalner. Total 1.20 kms.

Through Rail Renewal

354 Virar‐Surat section:‐  section :‐ Casual Renewal DRF 80,02  .. 16,00  64,02 

of rails on  due to sever liner bite between Km

188/01 to 192//01 Km UP line Total 0.986 kms.

Through Rail Renewal

355 Udhna Jalgaon .:‐Casual renewal of rails under DRF 99,93  .. 18,00  81,93 

ADEN‐Vyara. Total 1.280 kms.

Through Rail Renewal

356 Virar‐Surat UP line:‐ Casual renewal of rails  DRF 43,01  .. 7,00  36,01 

from 143.00 to 143.530 = 0.53 Km

Through Rail Renewal

357 Virar‐Surat UP line :‐ Casual renewal of rails  DRF 68,09  .. 13,00  55,09 

from Km.202/01 to Km.202/29 =0.839 kms.

Through Rail Renewal

358 Churchgate ‐ Virar Section: TRR (P) DNLL38.85 to DRF 99,15  .. 16,00  83,15 

39.85 = 1.00 Km Br.No.72

Through Rail Renewal

359 Udhna‐Jalgaon:‐. Casual renewal of rail under DRF 88,90  .. 17,00  71,90 

SSE(P.way), Vyara

Through Rail Renewal

360 Udhna‐Jalgaon:‐. Casual renewal of rails under DRF 88,90  .. 17,00  71,90 

SS(P.WAY),Navapur

Through Rail Renewal

361 Udhna‐Jalgaon Section:‐. Casual renewal of rails DRF 88,90  .. 17,00  71,90 

at various location with 52kg rail under

SSE(P.WAY),Nandurbar

Through Rail Renewal

362 Udhana‐Jalgaon section:‐ . Casual renewal of rails DRF 88,90  .. 17,00  71,90 

at various loctions with 52kg rails under

SSE(P.WAY)Amalner

Through Rail Renewal

363 CCG‐VR Section:‐Replacement of Existing SEJ under DRF 89,69  23,51  13,00  53,18 

ADEN(T/S)PL  section.

TRACK RENEWALS

15.03.31.14.3.

52.005

15.03.31.13.3.

52.013

15.03.31.14.3.

52.003

15.03.31.13.3.

52.012

15.03.31.14.3.

52.002

15.03.31.13.3.

52.009

15.03.31.13.3.

52.017

15.03.31.14.3.

52.006

15.03.31.13.3.

52.019

15.03.31.13.3.

52.020

15.03.31.13.3.

52.021

15.03.31.13.3.

52.010

15.03.31.12.3.

52.021

Page 33: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   27     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Through Rail Renewal

364 VR ‐ ST section :‐TRR on urgent condition basis DRF 86,79  75,33  2,00  9,46 

due to sever liner bite bet.various location from

196/11 to 197/21 Km UP line Total 1.001 kms

Through Rail Renewal

365 VR ‐ ST section :‐ TRR (p)on urgent condition DRF 78,67  75,19  1,00  2,48 

basis due to sever liner bite bet.various location

from 184/25 to 187/21 Km UP line Total 0.905 kms

Through Rail Renewal

366 VR ‐ ST section :‐ TRR (p)on urgent condition DRF 78,98  75,19  1,00  2,79 

basis due to sever liner bite bet.various location

from 192/07 to 195/15 Km UP line Total 0.907 kms

Through Rail Renewal

367 VR ‐ ST section :‐ TRR (p)on urgent condition DRF 89,30  40,72  10,00  38,58 

basis due to sever liner bite bet.various location

from 197/29 to 199/05 Km UP line Total 1.032 kms

Through Rail Renewal

368 VR ‐ ST section :‐ TRR(P) on urgent condition DRF 97,76  75,48  4,00  18,28 

basis due to sever liner bite bet.various location

from 199/15 to 201/13 Km UP line Total 1.132 kms.

Through Rail Renewal

369 VR ‐ ST section :‐ TRR (P)bet.various location DRF 97,76  75,11  5,00  17,65 

from 201/13 to 201/29 =.452 Km & 136/19 to137

=.387 kms. UP line Total0.839 kms.

Through Sleeper Renewal

370 Virar‐Surat Sec. TSR(P) 220.563 to 221.250 = 0.69 DRF 88,18  .. 1,00  87,18 

km & 221.313 to 222.180 = 0.87 Total TSR(P) = R. 11,67 

1.56km on UP Line.

Through Sleeper Renewal

371 Bilimora ‐ Waghai ( NG section ) ‐ Through  DRF 1,40,23  1,37,94  2,00  29

Sleeper  Renewal(s)  of the existing on wooden  R. 25,69 

sleepers  with ST / CST‐9 sleepers ( SH ) at  1310

Nos/ Kms. Dencity  including deep screening &

recoupment of ballast to 150 mm ‐ a) From km

Through Sleeper Renewal

372 VR‐ST section: TSR(P) of existing  52kg PRC DRF 76,18  .. 15,00  61,18 

sleepers at 1540 Nos/km  with 60kg PRC sleepers at R. 13,33 

1660 Nos/km including deep screening and

recoupment of ballast to 300mm (i) Km 70.87‐ Km

71.705=0.835 km DN line.(ii) Km 74.89‐ Km

Through Sleeper Renewal

373 VR‐ST section: TSR(P) of existing  52kg PRC DRF 54,06  .. 15,00  39,06 

sleepers at 1540 Nos/km  with 60kg PRC sleepers at R. 8,75 

1660 Nos/km including deep screening and

recoupment of ballast to 300mm (i) Km 75.480‐ Km

76.48: Total 1.00 km DN line

TRACK RENEWALS

15.03.31.12.3.

52.010

15.03.31.12.3.

52.005

15.03.31.12.3.

52.006

15.03.31.12.3.

52.007

15.03.31.12.3.

52.008

15.03.31.12.3.

52.012

15.03.31.14.3.

52.001

15.03.31.11.2.

52.001

15.03.31.13.6.

52.003

15.03.31.13.6.

52.005

Page 34: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   28     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Ballast

374 VR‐ST section :  construction of Ballast wall in DRF 98,84  18,00  15,00  65,84 

various location in the jurisdiction of

SSE/P‐way/ST  section TV main line from TV/1‐0 to

TV 2/12 and UDN by pass line from km UB 1/1 to UB

4/1  and  km 264/7 to 264/15 between ST‐UDN UP &

Points & Crossings

375 Virar‐Surat:‐TTR of  one Diamonds crossing at NVS DRF 64,91  .. 1,00  63,91 

R. ..

Points & Crossings

376 Virar‐Surat:‐ TTR of  one diamonds at Vapi (Point DRF 65,27  .. 12,00  53,27 

no 108) R. ..

Points & Crossings

377 Udhna‐Jalgaon:‐. TTR of 6 P&Cs on wooden sleeper DRF 87,60  .. 17,00  70,60 

layout by PRC sleeper layout in NDB yard R. 6,81 

Points & Crossings

378 Virar‐Surat. :‐Replacement of Trap points laid on DRF 63,23  .. 12,00  51,23 

wooden sleepers layouts with new trap points on R. ..

PRC sleepers layout at Valsad & Dungri stations

under ADEN‐BL . Total 10 Sets

Points & Crossings

379 Virar‐Surat. :‐Replacement of Trap points laid on DRF 93,99  .. 18,00  75,99 

wooden sleepers layouts with trap points on PRC R. ..

sleepers layout under ADEN‐DRD . (Total 15 Sets)

Points & Crossings

380 Virar‐Surat. :‐Replacement of Trap points laid on DRF 93,99  .. 18,00  75,99 

wooden sleepers layouts with new trap points on R. ..

PRC sleepers layout under ADEN‐ST . (Total 15

Sets)

Points & Crossings

381 Mumbai Division  Virar ‐Surat section :‐TTR=22 Nos DRF 73,13  73,00  10 3

 1 in 8.5 = 22 Nos.existing 90R/52kg railso n R. 3,62 

wooden/ST  52/60 KG derailing switches on PRC

ayout  ballast cushion from 25 to 30 cms.

Points & Crossings

382 CCG – VR section: ‐ Replacement of existing Obtus DRF 49,06  5,00  8,00  36,06 

CMS Crossings by new 52 Kg 1 in 8.5 Obtus CMS

Crossings under CCG‐VR section.

Others

383 Virar ‐ Surat section :Through Fittings Renewal of DRF 1,05,62  83,76  10,00  11,86 

fittings of turnouts: 1 in 12 =120 Nos.

Others

384 Churchgate‐Virar section: ‐ Replacement of DRF 93,85  56 15,00  78,29 

existing 52/60 Kg Built up acute and Obtuse Built

up  crossings

TRACK RENEWALS

15.03.31.09.3.

52.031

15.03.31.13.3.

52.025

15.03.31.13.3.

52.027

15.03.31.13.3.

52.026

15.03.31.13.3.

52.022

15.03.31.13.3.

52.023

15.03.31.13.3.

52.024

15.03.31.08.3.

52.015

15.03.31.12.3.

52.003

15.03.31.11.2.

52.003

15.03.31.13.3.

52.011

Page 35: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   29     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Others

385 Virar‐Surat Section:‐  Scattered renewal of SEJ DRF 49,98  42,10  1,00  6,88 

and special sleepers. (BCT/U/08‐09)

Others

386 Scattered renewal of fish bolts & black bolts. DRF 49,68  22,03  4,00  23,65 

(BCT/U/08‐09)

Others

387 Virar ‐ Surat section:‐TFR = 25.154 kms.DN/UP DRF 1,14,47  80,69  10,00  23,78 

Through fitting renewal of existing fittting by

new ERC clips,Rubber pad and liners etc.fr.

km.112.10‐124.00 = 11.90, 133.75‐1135.56 =1.81 &

137.00‐143.60 = 6.60 on UP &  fr.km 124.36‐129.20

Others

388 VR‐ST section :TFR at km 212/0 to 229/24 DN line= DRF 89,56  27,15  10,00  52,41 

17.35 km. (BCT/U/09‐10)

Others

389 Udhana ‐ Jalgoan section TFR = 26.72 kms. bet. DRF 1,80,43  45,52  25,00  1,09,91 

225.08 ‐ 251.80.

Others

390 Churchgate ‐ Virar Section :‐ Replacement of DRF 96,85  60,00  7,00  29,85 

Existing Bridge timbers with Galvanised steel

channel sleepers on Bridge no 20,61, 62 & 66 on

BCT suburban section

Others

391 ccg‐virar Section Replacement of Existing Bridge DRF 94,94  60,00  6,00  28,94 

timbers with Galvanised steel channel sleepers on

Bridge no 5,7,27,31,43,46,56&78.Total =555 Nos.

Others

392 CCG‐VR Section:‐Replacement of glued joint under DRF 86,48  25,87  12,00  48,61 

ADEN(T/S)PL & (T/N)BVI section.

Others

393 CCG‐VR Section:‐Replacement of Existing SEJ under DRF 89,68  11,69  15,00  62,99 

ADEN(T/N)BVI  section.

Others

394 UDN‐JL Sec. Casual renewal of 52kg rail due to DRF 1,03,94  19,00  16,00  68,94 

lateral wear at km239/11‐14, 239/14 to 240/0,

240/0‐13, 241/0‐2, 241/7‐12  (Total = 1430m).

Others

395 Mumbai Central :‐ Modification of Line No. 1 & 2 DRF 95,17  .. 18,00  77,17 

at EMU car shed BCT North end at MX. R. 4,58 

Vadodara

396 Vadodara Division:‐Miyagam‐Malsar (NG) DRF 2,08,80  2,03,63  5,00  17

Section:‐Through Sleeper Renewal of existing  R. 32,57 

wooden sleepers laid at density 1310 Nos/Km. with

60R/75R CST‐9/ST (S/H) sleepers at 1310 Nos.Km

including providing clean ballast cushion of 150mm

TRACK RENEWALS

15.03.31.08.3.

52.027

15.03.31.08.3.

52.020

15.03.31.09.2.

52.003

15.03.31.09.3.

52.034

15.03.31.10.2.

52.001

15.03.31.11.3.

52.034

15.03.31.11.3.

52.035

15.03.31.12.3.

52.014

15.03.31.12.3.

52.015

15.03.31.12.3.

52.016

15.03.31.13.6.

52.004

15.06.31.13.2.

55.002

Page 36: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   30     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

397 Godhra Yard: TBR & casual renewal of sleepers of DRF 89,49  57,74  5,00  26,75 

line No. 1,  and up & Dn line  total 6.50 Kms.

(BRC/U/10‐11)

398 Vadodara division ‐ Casual Renewal of Channel DRF 90,33  80 15,00  74,53 

Sleepers fittings.

Complete Track Renewal

399 PRTN BG Yard:‐Through Turn out renewal of  DRF 1,70,60  79,59  40,00  51,01 

existing 90R 1 in 8.5 turnouts with new 52 kg 1 in R. 7,11 

8.5 turnouts on PRC sleepers including deep

screening and recoupment of ballast to 250mm

Total11 Nos including complete Track Renewal of

Complete Track Renewal

400 Godhra‐Nagda:‐CTR of 52Kg rails laid on wooden DRF 87,36  21,33  11,00  55,03 

sleepers/blocks on CC apron by new 60Kg (90 UTS) R. 6,70 

rails on PRC sleepers 1660 Nos./Km.with 300mm

clean ballast cushion on Line No. 4 at Godhra

Yard. Total length 0.65 Kms.

Through Rail Renewal

401 Surat‐Miyagam Section:‐TRR(P) Up Km. 302.150 to DRF 88,62  .. 13,00  75,62 

Km. 303.150=1.00 Kms with 60kg rails

Through Rail Renewal

402 Surat‐Vadodara‐Godhra DN line:‐TRR(P) of 60Kg DRF 56,67  46,67  10,00  ..

rails laid on steel channel sleepers with  60 Kg 

rails from Km. 380.750 to Km. 381.350=0.600 Kms.

on Major Bridge No. 566, 567 &  100m of its

approaches.

Through Rail Renewal

403 Surat‐Godhra Section UP line:‐TRR(P) of 60Kg  DRF 56,67  41,38  10,00  5,29 

rails on steel channel sleepers with  60 Kg  rails

from Km. 380.750 to Km. 381.350=0.600 Kms. on

Major Bridge No. 566, 567 & its approaches

Through Rail Renewal

404 Surat‐Godhra Section DN line :‐TRR of 60Kg rails DRF 70,48  61,33  1,00  8,15 

laid on PRC sleepers with 60 Kg  rails from Km.

393.26 to Km. 396.050=0.814 Kms. on DN line

Through Rail Renewal

405 Surat‐Godhra Section UP & DN :‐TRR(P) of 60Kg DRF 80,20  59,56  4,00  16,64 

rails laid on PRC sleepers with  60 Kg rails from

Km. 371.690 to Km. 372.120=0.430 Kms. on Major

Bridge No. 550, 551 & its approaches

Through Rail Renewal

406 Surat‐Godhra UP line:‐TRR(P) of 60Kg rails laid on DRF 60,27  99 10,00  49,28 

PRC sleepers with  60 Kg ) rails from Km. 395.305

to Km. 395.997=0.692 Kms.

Through Rail Renewal

407 Vadodara‐Godhra UP line:‐TRR(P) of 60 Kg rails DRF 68,72  61,50  1,00  6,22 

laid on PRC sleepers with 60 Kg 90 UTS rails from

Km. 400.21 to Km. 401.00=0.79 Kms.

TRACK RENEWALS

15.06.31.10.3.

55.003

15.06.31.11.3.

55.011

15.06.31.13.2.

55.001

15.06.31.13.3.

55.028

15.06.31.14.3.

55.002

15.06.31.13.3.

55.024

15.06.31.13.3.

55.008

15.06.31.13.3.

55.020

15.06.31.13.3.

55.022

15.06.31.13.3.

55.021

15.06.31.13.3.

55.017

Page 37: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   31     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Through Rail Renewal

408 Vadodara‐Gerathpur Dn Line:‐TRR(P)Km. 477.50 to DRF 61,38  61,08  30 ..

Km. 478.20 = 0.70Kms. .

Through Rail Renewal

409 Vadodara‐Gerathpur Dn Line:‐ TRR(P) Km. 474.60 to DRF 85,36  72,76  2,00  10,60 

Km. 475.00 & Km. 475.40 to 476.00 Total 1.00 Kms.

Through Rail Renewal

410 Vadodara ‐ Gerathpur (Dn Line):‐TRR(P) from Km. DRF 92,01  59,27  6,00  26,74 

429.25 to Km. 429.40 & Km. 429.40 to 490.30 Total

1.05 Kms.

Through Rail Renewal

411 Vadodara‐ Gerathpur Up Line:‐TRR(P) from Km. DRF 93,15  61,47  6,00  25,68 

449.80 to Km. 450.30 & Km. 450.50 to Km. 451.10

Total 1.10 Kms.

Through Rail Renewal

412 Vadodara Division:‐TRR(P) of  52 Kg (90 UTS) rails DRF 79,52  60,17  2,00  17,35 

laid on PRC sleepers with  52Kg (90 UTS) rails

from Km. 0.00 to 1.080 of Bajuwa Bypass line.

Ballast

413 Vadodara Division:‐Surat‐Godhra Section (Dn DRF 72,80  28,81  10,00  33,99 

line):‐Deep Screening and recoupment of ballast to

the existing standard of 300mm from Km. 273.15 to

Km. 274.80, Km. 279.73 to Km. 281.08 & Km. 288.61

to Km. 291.60. Total TBR 5.99 Kms.

Ballast

414 Vadodara Division:‐Surat‐Godhra Section (Dn DRF 71,13  28,66  12,00  30,47 

line):‐Deep Screening and recoupment of ballast to

the existing standard of 300mm from Km. 291.60 to

Km. 296.75 & Km. 297.34 to Km. 298.19 Total TBR

6.00 Kms.

Ballast

415 Vadodara Division:‐Surat‐Godhra Section (Dn DRF 46,98  10,66  10,00  26,32 

line):‐Deep Screening and recoupment of ballast to

the existing standard of 300mm from Km. 298.19 to

Km. 300.00, Km. 315.28 to Km. 316.32, Km. 344.00

to Km. 344.26 & Km. 394.94 to Km. 395.04 Total TBR

Ballast

416 Vadodara Division:‐Surat‐Godhra Section (Dn DRF 61,85  .. 20,00  41,85 

line):‐Deep Screening and recoupment of ballast to

the existing standard of 300mm from Km. 333.55 to

Km. 339.00 Total TBR 5.45 Kms.

Ballast

417 Vadodara Division:‐Surat‐Godhra Section (Up DRF 77,62  19,07  20,00  38,55 

line):‐Deep Screening and recoupment of ballast to

the existing standard of 300mm from Km. 268.89 to

Km. 270.98, Km. 273.26 to Km. 274.11, Km. 276.32

to Km. 278.00 & Km. 297.89 to Km. 299.29 Total TBR

TRACK RENEWALS

15.06.31.13.3.

55.019

15.06.31.13.3.

55.015

15.06.31.13.3.

55.014

15.06.31.13.3.

55.023

15.06.31.13.3.

55.016

15.06.31.12.3.

55.015

15.06.31.12.3.

55.016

15.06.31.12.3.

55.019

15.06.31.12.3.

55.020

15.06.31.12.3.

55.023

Page 38: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   32     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Ballast

418 Vadodara Division:‐Surat‐Godhra Section (Up DRF 61,40  .. 10,00  51,40 

line):‐Deep Screening and recoupment of ballast to

the existing standard of 300mm from Km. 27930 to

Km. 281.08, Km. 289.30 to 290.76, Km. 293.82 to

Km. 293.93, Km. 315.25 to Km. 315.74 & Km. 395.00

Ballast

419 Vadodara Division:‐Surat‐Godhra Section (Up DRF 49,25  17,88  20,00  11,37 

line):‐Deep Screening and recoupment of ballast to

the existing standard of 300mm from Km. 327.15 to

Km. 331.49 otal TBR 4.34 Kms.

Ballast

420 Vadodara Division:‐Surat‐Godhra Section (Up DRF 68,09  .. 30,00  38,09 

line):‐Deep Screening and recoupment of ballast to

the existing standard of 300mm from Km. 384.00 to

Km. 390.00 Total TBR 6.00 Kms.

Ballast

421 Vadodara Division:‐Surat‐Godhra Section (Up DRF 56,74  .. 20,00  36,74 

line):‐Deep Screening and recoupment of ballast to

the existing standard of 300mm from Km. 390.00 to

Km. 395.00 Total TBR 5.00 Kms.

Points & Crossings

422 Surat‐Godhra section:‐ TTR of 4 P&Cs (2 at Bharuch DRF 95,83  .. 13,00  82,83 

& 2 at Palej) on wooden/ST sleepers by PRC and R. 2,96 

casual renewal of sleepers for one Km

Points & Crossings

423 Vadodara Division:‐Replacement of double slip DRF 92,16  .. 18,00  74,16 

scissor X‐ing in Anand yard by new double slip R. 3,80 

scissor X‐ing on PRC sleeper layout.

Points & Crossings

424 Vadodara Division:‐Replacement of 15 Nos. of Trap DRF 84,69  44 12,00  72,25 

points laid on wooden sleepers layouts with new R. 6,76 

trap points on PRC sleepers layout in various

station yards under jurisdiction of Sr. DEN(N)‐BRC

Points & Crossings

425 Vadodara Division:‐Replacement of 12 Nos. of Trap DRF 67,08  3 10,00  57,05 

points laid on wooden sleepers layouts with new R. 5,41 

trap points on PRC sleepers layout in various

station yards under AEN‐ANND section.

Others

426 Surat Godhra section:‐ Development of Track DRF 96,68  .. 13,00  83,68 

Machine siding at Bharuch and Palej Stations

Others

427 Surat‐Godhra UP line:‐Replacement of existing DRF 91,15  88,63  1,00  1,52 

broken/cracked steel channel sleeers on Bridge No.

452 (Tapti River) Total 475 Nos.

TRACK RENEWALS

15.06.31.12.3.

55.034

15.06.31.12.3.

55.025

15.06.31.12.3.

55.026

15.06.31.12.3.

55.027

15.06.31.14.3.

55.001

15.06.31.13.3.

55.025

15.06.31.13.3.

55.027

15.06.31.13.3.

55.030

15.06.31.14.3.

55.003

15.06.31.13.3.

55.029

Page 39: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   33     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Others

428 Surat‐Godhra section:‐TBTR of existing DRF 91,31  88,19  1,00  2,12 

broken/cracked steel channel sleepers on DN line

of  Bridge No. 452 i.e. Tapti River  Total 476

Nos.

Others

429 Vadodara Division:‐Deep Screening of 25 Nos. 1 in DRF 68,71  10,02  11,00  47,69 

12 Turnouts on main line, its approaches and

renewal of grooved rubber sole plate for 60 Kg 1

in 12 turnouts under jurisdiction of ADEN‐Anand

under jurisdiction of Sr. DEN(N)‐BRC

Others

430 Vadodara Division:‐Deep Screening of 25 Nos. 1 in DRF 68,71  5,60  8,00  55,11 

12 Turnouts on main line, its approaches and

renewal of grooved rubber sole plate for 60 Kg 1

in 12 turnouts under jurisdiction of ADEN‐Nadiad

under jurisdiction of Sr. DEN(N)‐BRC

Others

431 Surat‐Vadodara‐Godhra Section:‐Replacement of DRF 69,86  24,02  6,00  39,84 

Rubber Pads and GFN lines on Up & Dn Main lines at

isolated location under jurisdiction of Sr.

DEN(S)‐BRC

Others

432 Vadodara Division:‐Removal of special layouts of DRF 95,97  .. 10,00  85,97 

turnouts at Anand Yard.

Others

433 Vadodara Division:‐ Rectification of badlayout in DRF 99,52  35,87  11,00  52,65 

Godhra yard to prevent accidents

Ratlam

434 Ngda‐Ujjain‐Indore Section‐Spot renewal of 1:12 DRF 63,00  52,78  2,00  8,22 

(60/52 Kg.) switches.TTR=118 Nos. (RTM/U/10‐11)

435 Ujjain‐Maksi & IDU Section:‐ Deep screening of DRF 70,00  12,46  10,00  47,54 

turn outs in different location of various yards‐(

1 in 12 ‐ 43, 1 in 8 1/2 ‐22 & derailing

switches‐2).

436 Ujjain‐Maksi Section:‐TBR of DN line at km DRF 1,02,65  24,06  14,00  64,59 

87/0‐95/0= 8.0 Km bet TAN –MKC section and line

no.5 MKC yard=700 TRM.

437 NAD‐BPL section‐ Casual  Rail Renewal with 60 DRF 1,24,93  90,83  14,00  20,10 

kg/90 UTS new rails in AEN (E) UJN

438 CNA – RTM Section :‐ Casual renewal of worn out & DRF 1,27,71  41,41  9,00  77,30 

defective curved switches 52kg 1 In 12, 52kg 1 in

8.5

439 GDA‐NAD SEC:‐ Through weld renewal by renewal of DRF 1,20,81  57,73  20,00  43,08 

SKV welds with FB welds

TRACK RENEWALS

15.06.31.13.3.

55.026

15.06.31.12.3.

55.029

15.06.31.12.3.

55.030

15.06.31.12.3.

55.018

15.06.31.12.3.

55.014

15.06.31.12.6.

55.001

15.05.31.10.3.

54.004

15.05.31.11.3.

54.017

15.05.31.11.3.

54.018

15.05.31.12.3.

54.012

15.05.31.12.3.

54.005

15.05.31.12.3.

54.020

Page 40: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   34     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Complete Track Renewal

440 IDU section ‐CTR of loops and siding UJN yard DRF 1,14,06  95,51  3,00  15,55 

L/9=339.50,yard L/10=617.20 & IOW Sdg.=200 & CTR

of loops and siding UJN  IOW Sdg.=100, UJN loco

line no.1=268.00, loco line no. 2 =444.93.

(RTM/U/09‐10)

Through Rail Renewal

441 GDA‐NAD Section ‐ Removal of speed restriction of DRF 1,04,20  40,54  14,00  49,66 

75 KMPH to normal speed at MAM & USRA stations.

Through Rail Renewal

442 Chanderiya ‐ Nimach section :‐  TRR (P) on Major DRF 1,29,13  .. 25,00  1,04,13 

bridge No. 491, 229, 232, 256, 271 & 272 Total

1.728 Km

Through Rail Renewal

443 Nagda‐Bhopal:‐ Casual  Renewal of rails on DRF 96,93  68,71  6,00  22,22 

Makshi‐Sujalpur section under  ADEN(E) Ujjain

Through Rail Renewal

444 Nagda‐Bhopal:‐ Casual Rail Renewal of rails  on DRF 96,93  86,25  8,00  2,68 

Sujalpur‐Bhopal section under ADEN(E) Ujjain

Through Rail Renewal

445 NAD‐BPL Section:‐  Casual renewal of 1:12 ( 60kg) DRF 1,04,03  9,02  20,00  75,01 

& 1:8.5( 60kg) switches.

Through Rail Renewal

446 NAD‐BPL  Section:‐ Casual renewal of 1:12( 60kg)& DRF 1,06,45  .. 20,00  86,45 

1:8.5( 60kg) CMS x‐ing.

Through Rail Renewal

447 NAD‐BPL section‐Casual renewal of SEJ's. DRF 1,22,24  27,14  21,00  74,10 

Through Rail Renewal

448 NAD‐BPL  section‐Casual renewal of Glued joints. DRF 1,27,14  13,25  20,00  93,89 

Through Rail Renewal

449 GDA‐NAD Sec:‐ Through Rail renewal with 60(kg) 90 DRF 99,50  96,00  1,00  2,50 

UTS rails between Km 597.82 to 599.20 ( DN Line)

Through Rail Renewal

450 IDU Section ‐ ‐ Through rail renewal by 52Kg( DRF 1,27,78  1,00,29  10,00  17,49 

90UTS) of line no. 1 & 5 of INDORE station.

Through Sleeper Renewal

451 Chanderia ‐ Ratlam : ‐ TSR (S) with Deep Screening DRF 2,02,67  1,32,85  7,00  62,82 

of  Main/loop line (8.02 Km.) at‐.����� R. 8,18 

Through Sleeper Renewal

452 GDA‐NAD Sec.:‐ Through sleeper renewal at sharp DRF 1,28,06  99,56  2,00  26,50 

curves 3 to 5 degree with slack gauge PRC R. 4,22 

sleepers.

TRACK RENEWALS

15.05.31.09.3.

54.008

15.05.31.12.3.

54.024

15.05.31.14.2.

54.001

15.05.31.13.3.

54.012

15.05.31.13.3.

54.013

15.05.31.12.3.

54.025

15.05.31.12.3.

54.026

15.05.31.12.3.

54.014

15.05.31.12.3.

54.015

15.05.31.12.3.

54.008

15.05.31.12.3.

54.006

15.05.31.12.2.

54.001

15.05.31.12.3.

54.019

Page 41: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   35     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Ballast

453 GDA‐NAD (BG)  Section :‐Through ballast recoupment DRF 1,85,16  62,16  16,00  1,07,00 

of existing ballast laid under 60Kg rails and PRC

sleepers by deep screening and recoupment of

ballast to the existing standard of 30 Cms.  on

GDA‐NAD (UP & DN Line) Sec..= 23.83 Km

Points & Crossings

454 GDA‐NAD Section:‐ Casual renewal of 1:12 & 1:8.5 DRF 1,06,04  29,91  13,00  63,13 

(60 KG) switches.

Points & Crossings

455 Chanderiya – Ratlam Section :‐ Casual Renewal of DRF 1,26,45  49,97  17,00  59,48 

52 kg CMS X‐ings 1 in 12/1 in 8.5 (Total 58 Nos.)

Others

456 Godhra‐Nagda section‐Casual Renewal of  Switches, DRF 90,52  .. 17,00  73,52 

crossings  and SEJs

Others

457 Godhra‐Nagda section:‐ Renewal of fittings of DRF 91,06  .. 17,00  74,06 

channel sleepers, Riubber pads of points and

crossings and other fittings.

Others

458 Nagda‐Bhopal :‐ Casual  Renewal of rails on DRF 95,42  46,63  7,00  41,79 

Nagda‐Makshi section under ADEN(W) Ujjain.

Others

459 NAD‐UJN‐BPL, IDU , DWX‐MKC (BG)  Section DRF 2,48,60  1,65,82  15,00  67,78 

:‐Replacemnt of damaged/ Decayed slpeers with new

galvanised steel channel sleepers with all

fixtureson NAD‐UJN‐BPL & IDU, DWX‐MKC

section.Bridge Nos. Nad‐UJN‐8Up/Dn, 12Up/dn, 32A,

Others

460 Indore‐Dewas‐Ujjain :‐ TWR  Km.0 to 43.65 Km DRF 1,73,90  .. 30,00  1,43,90 

Others

461 Nagda‐Bhopal  Section. :‐ Supplying and fixing of DRF 99,63  65 18,00  80,98 

new Insulated  fittings for steel Channel sleepers

on  different bridges

Others

462 Ratlam Division Godhra‐Nagda Section (UP /Dn Line) DRF 1,63,95  1,48,30  .. 15,65 

:‐TWR = 56.85

Others

463 Indore‐Dewas ‐Ujjain Section : ‐ WFT=14.00kms. DRF 2,46,61  94,64  60,00  91,97 

Formation Treatment using blaxial Geo ‐ Grid from

km 27/0 ‐ 32/0, 35/0‐36/0,44/0 ‐ 48/1 and59/0 ‐

63/0 =14.00 kms.

Others

464 MGN ‐RTM Sec:‐Easing of slopes and Widening of DRF 98,27  10,88  18,00  69,39 

Deep Cutting in section of SE (P. WAY) BOG under

AEN (E) RTM. (RTM/U/09‐10)

TRACK RENEWALS

15.05.31.12.2.

54.002

15.05.31.12.3.

54.027

15.05.31.12.3.

54.007

15.05.31.14.3.

54.002

15.05.31.14.3.

54.001

15.05.31.13.3.

54.019

15.05.31.12.2.

54.003

15.05.31.13.2.

54.001

15.05.31.13.3.

54.020

15.05.31.08.2.

54.004

15.05.31.09.2.

54.002

15.05.31.09.3.

54.011

Page 42: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   36     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Others

465 TAN‐Providing stabling siding for track DRF 84,33  42,80  7,00  34,53 

machine.(173 RM). (RTM/U/09‐10)

Others

466 Godhra‐Nagda.:‐ Development of ballast siding for DRF 44,50  21,43  6,00  17,07 

full length to accommodate 30 hoppers including

top wiring at Morwani station.

Others

467 Nagda‐Bhopal:‐ .‐Development of ballast siding at DRF 58,43  27,61  10,00  20,82 

Ujjain including top wiring.

Others

468 GDA‐NAD Sec.:‐ Casual renewal of SEJs. DRF 1,04,29  68,64  10,00  25,65 

Others

469 GDA‐NAD Sec.:‐ Casual renewal of Glued Joints. DRF 1,25,19  46,61  10,00  68,58 

Others

470 GDA‐NAD Sec.:‐ Casual renewal of Channel Sleeper & DRF 1,20,74  67,01  10,00  43,73 

Fittings in ADEN(S)‐DHD Section.

Others

471 GDA‐NAD Sec.:‐ Casual renewal of Channel sleepers DRF 1,22,49  70,02  10,00  42,47 

and fittings in ADEN(E)‐RTM Section.

Others

472 RATLAM ‐ CHANDERIYA section‐ Through Weld Renewal DRF 1,25,59  61,77  20,00  43,82 

of defective joints

Ahmedabad

473 Jhund‐Kharagoda: TTR ‐5 sets DRF 94,00  .. 5,00  89,00 

R. 3,17 

474 Ahmedabad‐Viramgam:‐ TRR(P) of 52Kg. rails laid on DRF 98,81  .. 20,00  78,81 

M+7 density with new 52Kg rails on Major bridge No

733 from Km 499.00 to 500.30. Total 1.3Km

475 Gerathpur‐Ahmedabad section:‐ Through turn out DRF 92,28  40,00  10,00  42,28 

renewal(P) 4 Nos 1 in 8.5 on PRC layout after R. 59

removal of 2 Nos double slip in KKFY yard

476 Ahmedabad‐Viramgam‐Samakhiali section:‐ TTR of 5 DRF 91,50  60,00  6,00  25,50 

sets of  1 in 8.5 and 1 set 1 in 12 P&Cs on R. 1,71 

wooden/ST layout by PRC lay out.

477 Ahmedabad division:‐ TTR(P) of 6 Nos 1 in 8.5 P&Cs DRF 80,02  57,69  5,00  17,33 

on 90R/52 Kg  rails laid on wooden/ST layout by R. 7,00 

52/60 Kg rail on PRC lay out   in the jurisdiction

of CPWI DHG and CPWI VG.

478 Ahmedabad division:‐ TTR (P) of 11 Nos trap point DRF 60,96  49,70  5,00  6,26 

in the jurisdiction of ADEN(N/W)ADI R. 11,53 

479 Viramgam‐Samikhiali:‐ Casual renewal of channel DRF 80,06  40,00  10,00  30,06 

sleeper fittings between HVD‐SIOB section under

jurisdiction of CPWI MALB

TRACK RENEWALS

15.05.31.09.3.

54.018

15.05.31.11.3.

54.020

15.05.31.11.3.

54.021

15.05.31.12.3.

54.028

15.05.31.12.3.

54.001

15.05.31.12.3.

54.002

15.05.31.12.3.

54.003

15.05.31.12.3.

54.010

15.01.31.14.3.

50.006

15.01.31.13.3.

50.014

15.01.31.13.3.

50.018

15.01.31.13.3.

50.019

15.01.31.13.3.

50.021

15.01.31.13.3.

50.020

15.01.31.13.3.

50.022

Page 43: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   37     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

480 Viramgam‐Okha:‐ Casual renewal of channel sleeper DRF 30,06  .. 2,00  28,06 

fittings between JN‐HVD section under jurisdiction

of CPWI DHG

481 Ahmedabad‐TRR(S) of 52Kg. rails laid on PRC DRF 58,18  30,00  6,00  22,18 

sleepers at M+7 density with 52Kg rails (SH) in

ADI yard PF line No 2 & 7. Total TRR=1.1 Km

482 Viramgaon ‐ Samakhyali Section:‐  SEJR=82 Nos. DRF 39,34  5,68  5,00  28,66 

(ADI/U/10‐11)

483 Ahmedabad‐Viramgaon Section:‐ TSEJR = 32 Nos. DRF 39,34  5,68  5,00  28,66 

(ADI/U/10‐11)

484 Ahmedabad ‐ Viramgaon (DN )Section:‐ TWR =1550 DRF 90,41  69 10,00  79,72 

Nos. (ADI/U/10‐11)

485 Ahmedabad yard:‐TRR (S) =1.54 Kms. on goods line DRF 37,00  5,68  5,00  26,32 

No. 7 & 9. (ADI/U/10‐11)

486 Ahmedabad Yard:‐ TRR (S)=1.66 Kms. on goods line DRF 40,00  5,68  5,00  29,32 

No.6 & 8. (ADI/U/10‐11)

487 Replacement of corroded fittings of turnout under DRF 78,00  26,34  10,00  41,66 

SSE (Pway) ADI.

488 Renewals of wornout rails of various turnouts in DRF 89,88  34,60  5,00  50,28 

the jurisdiction of SSE (P.Way) ADI.

489 Through Switch Renewal (P) of chipped/wornout 1:12 DRF 84,53  36,05  10,00  38,48 

switches with new 52 kg/60kg sawitches on

ADI‐VG‐SIOB section.

490 Through Weld Renewal in Chandlodiya‐Khodiyar DRF 90,23  24,70  10,00  55,53 

Section.

491 Through Weld Renewal in Ahmedabad‐Geratpur DRF 77,33  22,26  10,00  45,07 

Section.

492 Renewals of wornout rails of various turnouts in DRF 81,50  32,31  10,00  39,19 

the jurisdiction of SSE (P.Way) SBI .

493 Ahmedabad division ‐ Casual Renewal of Channel DRF 90,00  29,66  12,00  48,34 

Sleepers fittings.

494 Ahmedabad division‐ Casual renewal of sleepers on DRF 92,00  57,85  7,00  27,15 

P&C.

495 Ahmedabad division‐ Casual renewal of fittings of DRF 86,00  35,53  10,00  40,47 

P&C.

496 Ahmedabad division‐ Casual renewal of glued DRF 88,00  34,08  10,00  43,92 

joints.

497 Ahmedabad division ‐ Casual renewal of rails on DRF 94,00  35,72  10,00  48,28 

points & crossings.

TRACK RENEWALS

15.01.31.13.3.

53.023

15.01.31.13.3.

50.024

15.01.31.10.3.

50.025

15.01.31.10.3.

50.014

15.01.31.10.3.

50.007

15.01.31.10.3.

50.013

15.01.31.10.3.

50.012

15.01.31.11.3.

50.017

15.01.31.11.3.

50.015

15.01.31.11.3.

50.024

15.01.31.11.3.

50.026

15.01.31.11.3.

50.025

15.01.31.11.3.

50.016

15.01.31.11.3.

50.001

15.01.31.11.3.

50.005

15.01.31.11.3.

50.003

15.01.31.11.3.

50.004

15.01.31.11.3.

50.002

Page 44: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   38     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

498 Ahmedabad division‐Casual renewal of SEJs. DRF 96,00  36,87  12,00  47,13 

499 Khodiyar yard : Through Rail Renewal (S) of DRF 84,86  38,01  10,00  36,85 

existing 90 R rails with 52 Kg (SH) rails on line

No. 1 & 2 of Khodiyar yard =TRR 1.49 (S) Kms.

500 Khodiyar yard : Through Rail Renewal (S) of DRF 83,22  43,40  8,00  31,82 

existing 90 R rails with 52 Kg (SH) rails on line

No. 4 & 5 of Khodiyar yard =TRR 1.48 (S) Kms.

501 Ahmedabad‐SHB section‐TTR(P) with 60 kg 1:12 PRC DRF 86,33  39,93  10,00  36,40 

fan shaped layout including deep screening  (5

sets).

502 CTR of line No. 1 & TSR of line No. 2 along with DRF 96,56  5,00  10,00  81,56 

deep screening at Asarava yard. R. 2,03 

503 Through fitting renewal between KHD‐PNU section. DRF 84,11  5,00  15,00  64,11 

504 Through Bridge Timber Renewal‐ Replacement of DRF 70,17  58,08  3,00  9,09 

existing wooden sleeper with new galvanized steel

channel sleepers with all fittings and fixtures on

HMT‐KDBM(MG section) of DEN(N)’s jurisdiction

(total Nos 372).

505 Replacement of Curved switches & CMS Xing for PSC DRF 90,82  15,46  15,00  60,36 

fan shaped layout on age cum condition basis in R. ..

the section of Sr. DEN (NW)‐ADI

506 Replacement of Curved switches & CMS Xing for PSC DRF 90,82  10,00  15,00  65,82 

fan shaped layout on age cum condition basis in R. ..

the section of Sr. DEN (W)‐ADI

507 Replacement of Curved switches & CMS Xing for PSC DRF 90,82  10,00  5,00  75,82 

fan shaped layout on age cum condition basis in R. ..

the section of DEN (N)‐ADI

508 Replacement of Glued joint & SEJs with web DRF 89,96  10,00  5,00  74,96 

stiffener on age cum condition basis in the

section of Sr. DEN (W)‐ADI

509 TBTR with steel channel sleepers on Br. No 731‐A DRF 93,61  .. 20,00  73,61 

and casual renewal of steel channel sleepers on

Br. No.733 ADI‐VG section

510 Scattered renewal of switches & crossings on 1:12 DRF 97,80  31,91  15,00  50,89 

(52 Kg) points under ADEN(NW)ADI R. ..

511 Through deep screening between section GER‐ADI DRF 84,28  28,41  10,00  45,87 

R. 12,84 

512 Replacement of Glued joint & SEJs with web DRF 76,18  10,00  10,00  56,18 

stiffener on age cum condition basis in the

section of Sr. DEN (NW)‐ADI

513 Replacement of Glued joint & SEJs with web DRF 76,18  10,00  15,00  51,18 

stiffener on age cum condition basis in the

section of DEN (N)‐ADI

TRACK RENEWALS

15.01.31.11.3.

50.006

15.01.31.11.3.

50.012

15.01.31.11.3.

50.013

15.01.31.11.3.

50.007

15.01.31.12.3.

50.011

15.01.31.12.3.

50.012

15.01.31.12.3.

50.018

15.01.31.12.3.

50.013

15.01.31.12.3.

50.014

15.01.31.12.3.

50.015

15.01.31.12.3.

50.016

15.01.31.12.3.

50.005

15.01.31.12.3.

50.006

15.01.31.12.3.

50.007

15.01.31.12.3.

50.009

15.01.31.12.3.

50.010

Page 45: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   39     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

514 Renewal of three single slip Diamond crossing in DRF 98,32  13,10  10,00  75,22 

GER‐ADI Section R. 20

515 Renewal of Scissors Crossover in ADI Yard DRF 88,10  40,00  10,00  38,10 

516 Renewal of 2 Nos diamond crossing (BG/MG) in DRF 65,13  12,05  10,00  43,08 

Jurisduction of SSE(PWay)ADI

Through Rail Renewal

517 Gerathpur–Ahmedabad‐Viramgam & DRF 2,26,81  .. 40,00  1,86,81 

Chandlodiya‐Khodiyar:‐ TRR(P)2.762Km

Through Rail Renewal

518 Viramgam‐Samakhiali:‐ TRR (P) on curve No52 from DRF 89,34  .. 15,00  74,34 

Km 700.80 to 701.90 = 1.10 Km

Through Rail Renewal

519 Viramgam‐Samakhiali:‐TRR(P) on curve No53 from Km DRF 89,34  .. 15,00  74,34 

702.10 to 703.20 = 1.10 Km

Through Rail Renewal

520 Samakhiali‐Gandhidham Section:‐TRR(P) of 52kg rail DRF 96,31  13,00  15,00  68,31 

laid on PRC sleepers with new 52kg (90UTS) rails

from km 781.20 to 782.50=1.30 kms

Through Rail Renewal

521 Samakhiali‐Gandhidham Section:‐TRR(P) of 52kg rail DRF 88,90  .. 20,00  68,90 

laid on PRC sleepers with new 52kg (90UTS) rails

from km 764.30 to 765.50=1.20 kms

Through Rail Renewal

522 Samakhiali‐Gndhidham :‐TRR (P) of  52kg rail laid DRF 74,08  .. 15,00  59,08 

on PRC sleepers with new 52kg (90UTS) rails from

km 757.00 to 758.00=1.00 kms

Through Sleeper Renewal

523 Gandhidham yard:‐ TSR(P)5.157 Km of existing CST‐9 DRF 1,99,16  1,21,32  20,00  57,84 

sleepers with PSC sleepers @1660 nos/Km

Points & Crossings

524 Ahmedabad yard:‐Renewal of two Nos scissors DRF 2,25,79  7,55  40,00  1,78,24 

crossing and one  diamond withhout slip. R. 16,35 

Points & Crossings

525 Ahmedabad division:‐ TTR of one P&C at Kharaghoda DRF 54,87  .. 10,00  44,87 

and five trap points at Jhund, Kkodiyar & R. 4,88 

Ahmedabad yards on wooden/ST sleeper by PRC layout

Points & Crossings

526 Ahmedabad‐Palanpur Section:‐ TTR(P) of existing DRF 1,32,21  25,98  20,00  86,23 

points and X‐ings 50R/60R/75R/90R rails on wooden R. 11,34 

sleeper layout with new 52Kg (90 UTS) points and

X‐ings on PRC sleeper layout including deep

screening and recoupment of ballast  on BG station

TRACK RENEWALS

15.01.31.12.3.

50.003

15.01.31.12.3.

50.017

15.01.31.12.6.

50.001

15.01.31.14.2.

50.001

15.01.31.14.3.

50.002

15.01.31.14.3.

50.004

15.01.31.13.3.

50.016

15.01.31.13.3.

50.011

15.01.31.13.3.

50.015

15.01.31.10.2.

50.005

15.01.31.13.1.

50.003

15.01.31.14.3.

50.005

15.01.31.13.2.

50.001

Page 46: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   40     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Points & Crossings

527 Ahmedabad Division:‐TTR(P) of existing points and DRF 1,48,25  6,19  30,00  1,12,06 

X‐ings 50R/60R/75R/90R rails on wooden sleeper R. 11,85 

layout with new 52Kg (90 UTS) points and X‐ings on

PRC sleeper layout including deep screening and

recoupment of ballast  on MG station yards 1 in

Points & Crossings

528 Sabarmati ‐ Renewal of 3 Nos Gauntelated Diamond DRF 95,61  60,00  7,00  28,61 

crossing (BG/MG)

Points & Crossings

529 ADI‐PNU & GER‐VG Section: ‐ Through Switch Renewal DRF 47,69  10,36  10,00  27,33 

(P) of chipped/ worn out 1: 12 switches with new

52kg/60kg switches. (ADI/U/08‐09)

Points & Crossings

530 GER ‐ SIOB section : Through switch Renewal (P) of DRF 86,54  18,00  15,00  53,54 

existing worn out crossings  with new 52 kg/60kg.

crossing. (ADI/U/09‐10)

Points & Crossings

531 Renewal of scrissors crossover in GER‐ADI section. DRF 88,10  20,00  15,00  53,10 

Others

532 Through Fitting Renewal on Jhund ‐Samakhiali DRF 2,24,18  5,00  40,00  1,79,18 

section Total  = TFR 31.40 Kms.

Others

533 Through Fitting Renewal from km 769.900 to 795.910 DRF 1,64,99  15,00  30,00  1,19,99 

 on Samakhiali ‐ Gandhidham section Total  = TFR

26.01 Kms.

Others

534 Palanpur‐Gandhidham section:‐ Providing facilities DRF 64,45  .. 10,00  54,45 

for track machine siding at Gandhidham & Bhildi

Others

535 Mehasana‐ Viramgam‐Samakhiali:‐ Providing DRF 96,67  .. 20,00  76,67 

facilties for track machine sidings at Mehasana,

Dharangadhara & Halvad

Others

536 Through Weld Renewal  and related track works on  DRF 85,60  27,07  5,00  53,53 

JN ‐ VG ‐ ADI (UP) section Total TWR = 1450 Nos.

(ADI/U/09‐10)

Others

537 Through Fitting Renewal  from km 721.24 ‐ 732.0  DRF 58,36  22,47  7,00  28,89 

on JN ‐ SIOB section Total  = TFR 10.76 Km.

(ADI/U/09‐10)

Others

538 ADI‐VG section :‐ Conversion of free rails into DRF 84,44  27,79  10,00  46,65 

LWR on loop lines of  Total=14 loop lines.

(ADI/U/09‐10)

TRACK RENEWALS

15.01.31.13.2.

50.002

15.01.31.13.3.

50.017

15.01.31.08.3.

50.001

15.01.31.09.3.

50.019

15.01.31.12.3.

50.002

15.01.31.12.2.

50.001

15.01.31.12.2.

50.002

15.01.31.14.3.

50.003

15.01.31.14.3.

50.001

15.01.31.09.3.

50.032

15.01.31.09.3.

50.031

15.01.31.09.3.

50.016

Page 47: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   41     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Others

539 Through Fitting Renewal  from km 508.93 to 522.60 DRF 74,19  13,38  12,00  48,81 

(UP) on ADI ‐ VG section Total  = TFR 13.67 Km.

(ADI/U/09‐10)

Others

540 ADI ‐ VG ‐ JN Section : Providing gapless joints DRF 88,29  27,18  10,00  51,11 

at CMS crossings in the yards. (ADI/U/09‐10)

Others

541 Replacement of U/S sleepers in track circuited DRF 99,72  96,38  1,00  2,34 

portion with PRC sleepers(MG) and 60R rails with

90‐R SH rails in ADI yard. (ADI/U/09‐10)

Others

542 GER ‐ SIOB section : Through crossing Renewal (P) DRF 90,50  21,38  12,00  57,12 

of existing worn out crossings  with new 52

kg/60kg. crossing. (ADI/U/09‐10)

Others

543 Through Weld Renewal  and related track works on DRF 88,69  67,70  5,00  15,99 

SIOB‐GIM‐BVJ section Total  = TWR 1550 Nos.

(ADI/U/09‐10)

Others

544 Viramgam‐Samakhiali Through SEJ renewal of DRF 65,02  20,00  9,00  36,02 

existing SEJs to be replaced with new 52Kg SEJ on

PRC sleepers (50 Nos)

Rajkot

545 Rajkot Yard ‐ CTR =1.30 Kms. on R&D and IOC DRF 99,99  17,10  15,00  67,89 

siding. (RJT/U/10‐11)

546 Jaliyadewani Yard ‐ TRR(S)  = 1.60 Kms.in line DRF 72,13  17,10  10,00  45,03 

No.1&3. (RJT/U/10‐11)

547 Sikka Yard ‐ TRR  = 2.40 Kms. in line No.1,2&3. DRF 99,93  38,25  10,00  51,68 

(RJT/U/10‐11)

548 Rajkot division ‐ Casual Renewal of Channel EBR(IRFC) 59,91  2,53  .. 57,38 

Sleepers fittings.

Complete Track Renewal

549 Lavanpur Yard ‐ Complete Track Renewal  of DRF 67,55  11,65  1,00  54,90 

existing 52Kg rails on PRC with 52 Kg.SH rails R. 2,00 

(SWR) on new PRC sleepers at M+4 density (1340

Nos./Km.) including deep screening on salt loading

line .Total 0.80 Kms.

Through Rail Renewal

550 Viramgam ‐ Surendranagar ; TRR (P) on major DRF 89,31  .. 19,41  69,90 

bridges & its approaches .

Others

551 Creating of necessary facilities for Machine DRF 98,79  7,92  20,00  70,87 

Maintenance of track in Rajkot Division costing

Rs. 98.79 Lakhs.  (RJT/U/09‐10)

TRACK RENEWALS

15.01.31.09.3.

50.030

15.01.31.09.3.

50.011

15.01.31.09.3.

50.026

15.01.31.09.3.

50.018

15.01.31.09.3.

50.033

15.01.31.11.3.

50.030

15.04.31.10.3.

53.006

15.04.31.10.3.

53.002

15.04.31.10.3.

53.007

15.04.31.11.3.

53.004

15.04.31.12.3.

53.005

15.04.31.13.3.

53.004

15.04.31.09.3.

53.001

Page 48: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   42     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Others

552 Rajkot Division ; Through Weld Renewal of DRF 95,59  95,00  59 ..

defective flash butt welds and AT welds (fracture

prone location) on various locations between

Chamaraj and Lakhamanchi stations.Total 13.50 Kms.

Bhavnagar

553 Kanalus‐Porbandar Section : Through bridge timber DRF 98,36  73,17  25,00  19

replacement = 880 Nos. of girder bridges with span

above 6.1m. (BVP/S/10‐11/OT)

Complete Track Renewal

554 CTR 0.91Km Yard Line (MG) in JUNAGADH. DRF 52,57  8,47  25,00  19,10 

R. 9,92 

Through Rail Renewal

555 Rajkot‐Veeraval section:‐ TRR(S) 0.70 Km on pit DRF 44,62  .. 25,00  19,62 

line

Others

556 BVP Division ‐ Casual renewal of P. Way fittings DRF 96,53  .. 25,00  71,53 

Mumbai

557 Works costing below DRM's Power DRF 14,92  .. 14,92  ..

Ratlam

558 Works costing below DRM's Power DRF 14,59  .. 14,59  ..

Ahmedabad

559 Works costing below DRM's Power DRF 29,00  .. 29,00  ..

Bhavnagar

560 Works costing below DRM's Power DRF 1,41,49  .. 1,41,49  ..

TOTAL‐WORKS IN PROGRESS DRF .. .. 31,90,00  ..

B ‐ New Works

Mumbai

561 Virar‐Surat Sec. Casual renewal of eutectic weld DRF 89,26  .. 40,00  49,26 

rails in various location in SSE(P.way) PLG

Section (Approx. 1.0km).

Through Rail Renewal

562 Virar‐Surat: Casual renewal of Eutectic weld rails DRF 89,26  .. 40,00  49,26 

in SSE(P‐way) Vapi section.

Through Rail Renewal

563 Churchgate‐Virar:‐ Casual Renewal of 60 Kg rails DRF 89,26  .. 40,00  49,26 

under SSE(P.Way) DDR Section.

Through Rail Renewal

564 Churchgate‐Virar:‐ Casual Renewal of 60 Kg rails DRF 89,26  .. 40,00  49,26 

under SSE(P.Way) ADH Section.

Through Rail Renewal

565 Churchgate‐Virar:‐ Casual Renewal of 60 Kg rails DRF 89,26  .. 40,00  49,26 

under SSE(P.Way) BVI Section.

TRACK RENEWALS

15.04.31.12.3.

53.007

15.02.31.10.3.

51.004

15.02.31.12.3.

51.002

15.02.31.13.3.

51.001

15.02.31.12.3.

51.001

15.03.31.15.3.

00.999

15.05.31.15.3.

00.999

15.01.31.15.3.

00.999

15.02.31.15.3.

00.999

15.03.31.15.3.

52.069

15.03.31.15.3.

52.066

15.03.31.15.3.

52.077

15.03.31.15.3.

52.078

15.03.31.15.3.

52.079

Page 49: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   43     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Through Rail Renewal

566 Churchgate‐Virar:‐  Casual Renewal of 60 Kg rails DRF 89,26  .. 40,00  49,26 

under SSE(P.Way) BYR Section.

Through Rail Renewal

567 Udhna ‐ Jalgaon section:‐ Casual Renewal of  52kg DRF 78,26  .. 40,00  38,26 

rails under AEN‐ Vyara

Through Rail Renewal

568 Udhna‐Jalgaon Section. Casual renewal of 52kg DRF 78,26  .. 40,00  38,26 

90UTS rail under AEN(E)Nandurbar

Others

569 Churchgate‐Virar Section: Casual renewal of PSC DRF 89,70  .. 36,00  53,70 

sleepers

Others

570 Virar Surat  section: Replacement of steel channel DRF 88,03  .. 36,00  52,03 

sleeper fittings

Others

571 Udhna‐Jalgaon: Through Channel sleeper fitting DRF 97,84  .. 36,00  61,84 

Renewals

Others

572 Churchgate‐Virar ‐ Replacement of existing 60 Kg DRF 85,81  .. 36,00  49,81 

switches by new switches

Others

573 Churchgate‐Virar:‐Replacement of Existing SEJs DRF 90,63  .. 36,00  54,63 

Others

574 Virar‐Surat:Replacement of SEJ (52kg/60kg) by DRF 97,88  .. 36,00  61,88 

improved SEJ in AEN/BL section.

Others

575 Virar‐Surat: Replacement of  Glued joints   DRF 80,26  .. 36,00  44,26 

(52kg/60kg) by in‐situ glued joints in SE(P‐way)BL

section.

Others

576 Udhna‐Jalgaon section: Replacement of Glued joints DRF 88,21  .. 36,00  52,21 

(52kg/60kg) by in‐situ glued joints in ADEN‐VYA

and AEN‐NDB section

Others

577 Virar‐Surat section: Renewal of defective welds DRF 58,30  .. 36,00  22,30 

Others

578 Virar‐Surat Sec. Rehabilitation of existing track DRF 89,87  .. 36,00  53,87 

machine stabling lines and its allied facilities

Vadodara

579 Vadodara Division:‐Casual Renewal of defective DRF 89,26  .. 40,00  49,26 

rails and rails on turnouts with 60 Kg (90 UTS)

rails on Up & Dn Main lines between Surat‐Bharuch.

TRACK RENEWALS

15.03.31.15.3.

52.080

15.03.31.15.3.

52.072

15.03.31.15.3.

52.073

15.03.31.15.3.

52.074

15.03.31.15.3.

52.075

15.03.31.15.3.

52.076

15.03.31.15.3.

52.067

15.03.31.15.3.

52.068

15.03.31.15.3.

52.064

15.03.31.15.3.

52.071

15.03.31.15.3.

52.070

15.03.31.15.3.

52.065

15.03.31.15.3.

52.081

15.06.31.15.3.

55.061

Page 50: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   44     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

580 Vadodara Division:‐Casual Renewal of defective DRF 89,26  .. 40,00  49,26 

rails and rails on turnouts with 60 Kg (90 UTS)

rails on Up & Dn Main lines between

Bharuch‐Miyagam.

581 Vadodara Division:Casual renewal of existing DRF 89,70  .. 36,00  53,70 

broken and unserviceable 60kg PRC sleepers at

isolated location between Bharuch‐Miyagam on Up &

Dn line under ADEN(N)Bharuch 3000 Nos.

582 Dakor & Sevaliya:‐Rehabilitation of existing track DRF 63,18  .. 36,00  27,18 

machine stabling line and its allied facilities.

583 Itola:‐Rehabilitation of existing track machine DRF 66,28  .. 30,00  36,28 

stabling line and its allied facilities R. 2,90 

Through Rail Renewal

584 Vadodara Division:‐Through Rail Renewal with 60 Kg DRF 72,19  .. 40,00  32,19 

(90 UTS) rails from Km. 398.830 to Km. 399.680

Total TRR 0.85 Kms. On Dn Line between

Vadodara‐Godhra.

Through Rail Renewal

585 Vadodara Division:‐Through Rail Renewal with 60 Kg DRF 82,12  .. 40,00  42,12 

(90 UTS) rails from Km. 398.600 to Km. 399.520

Total TRR 0.92 Kms. on Up Line between

Vadodara‐Godhra Section.

Through Rail Renewal

586 Vadodara‐Geratpur Section‐TRR with 60 Kg (90 UTS) DRF 71,40  .. 40,00  31,40 

rails from Km. 430.14 to Km. 430.28(Up), Km.

431.94 to Km. 432.50(Up) & Km. 438.00 to Km.

438.10(Dn) Total TRR 0.80 Kms.

Through Rail Renewal

587 Vadodara‐Geratpur Section:‐TRR with 60 Kg (90 UTS) DRF 89,26  .. 40,00  49,26 

rails from Km. 415.85 to 416.85 Total TRR 1.00

Kms. on Up line

Through Rail Renewal

588 Vadodara‐Geratpur Section:‐TRR with 60 Kg (90 UTS) DRF 89,26  .. 40,00  49,26 

rails from Km. 471.637 to 472.637 Total TRR 1.00

Kms. on Dn line

Points & Crossings

589 Vadodara Division:‐ Casual renewal of broken and DRF 89,98  .. 36,00  53,98 

cracked sleeper of Points and Xing under the

jurisdiction of DEN(S)BRC

Others

590 Vadodara Division:Casual renewal of existing DRF 89,70  .. 36,00  53,70 

broken and unserviceable 60kg PRC sleepers at

isolated location between Surat‐Bharuch on Up & Dn

line under ADEN(S)Bharuch 3000 Nos.

TRACK RENEWALS

15.06.31.15.3.

55.062

15.06.31.15.3.

55.052

15.06.31.15.3.

55.063

15.06.31.15.3.

55.059

15.06.31.15.3.

55.054

15.06.31.15.3.

55.053

15.06.31.15.3.

55.058

15.06.31.15.3.

55.056

15.06.31.15.3.

55.057

15.06.31.15.3.

55.050

15.06.31.15.3.

55.051

Page 51: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   45     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Others

591 Vadodara Division:‐Casual Renewal of Sleeper No. DRF 89,98  .. 30,00  59,98 

64 to 76 of Points and X‐ings under the

jurisdiction of Sr. DEN(N)‐BRC on

Vadodara‐Geratpur Section.

Others

592 Vadodara Division:‐Replacement of existing channel DRF 98,98  .. 36,00  62,98 

sleepers with new channel sleepers on Bridge No.

32‐B/DN, 40‐B/UP, 49‐A/Up & DN, 53‐A/ Up & Dn.

Total 472 Nos. of channel sleepers on

Vadodara‐Godhra Section.

Ratlam

593 Godhra‐ Nagda Sec:‐ Elimination of bad lay out by DRF 78,45  .. 36,00  42,45 

easement of curve at point No. 194 ( Loco yard R. 15,57 

Ratlam) , by shifting of point No. 206 and 208 at

MGN Yard, by Shifting of X‐over 206 & 207 at MGN

yard and by providing 1:8.5 t/ out at PCN Yard

Through Rail Renewal

594 Godhra‐Nagda Sec:‐ Casual Rail renewal with 60(kg) DRF 75,87  .. 36,00  39,87 

90 UTS rails

Through Rail Renewal

595 Nagda‐Bhopal Section:‐ Casual Rail renewal with 60 DRF 99,97  .. 40,00  59,97 

(kg) 90 UTS rails

Through Rail Renewal

596 Indore‐Dewas‐Ujjain Section:‐ Casual Rail renewal DRF 99,97  .. 40,00  59,97 

with 60 (kg) 90 UTS rails in ADEN ‐West section.

Through Rail Renewal

597 Tajpur station:‐  :‐ Rehabilitation of existing DRF 67,21  .. 36,00  31,21 

track machine stabling line and its allied R. 9,34 

facilities

Through Sleeper Renewal

598 Nagda‐Ujjain section ‐ Through sleeper renewal (P) DRF 67,99  .. 36,00  31,99 

with 60Kg PRC sleepers Up line  from54.00 km to R. 6,46 

54.98 km.

Points & Crossings

599 Chanderia ‐ Ratlam Section ‐ Deep screening of  DRF 60,99  .. 36,00  24,99 

Points & X‐ings of main line and yard's   at‐ R. 36,07 

Points & Crossings

600 Godhra‐Nagda Sec:‐ Casual renewal of old PRC DRF 43,44  .. 36,00  7,44 

layout sleepers of points and X‐ings.

Points & Crossings

601 Chanderia‐Ratlam section ‐ Casual Renewal of CMS DRF 48,30  .. 36,00  12,30 

crossings (1:12)

Points & Crossings

602 Nagda‐Bhopal & Indore‐Dewas‐Ujjain sections:‐ DRF 73,26  .. 36,00  37,26 

Elimination of Bad layout at  Akodia ( 101‐102  R. 18,57 

X‐over),Baktal(119‐120 X‐over)Phanda ,(115‐116 X‐

over)& Bakanian Bhaunri (BQE( 139‐140 X‐over)MKC

&DWX .

TRACK RENEWALS

15.06.31.15.3.

55.060

15.06.31.15.3.

55.055

15.05.31.15.3.

54.075

15.05.31.15.3.

54.064

15.05.31.15.3.

54.071

15.05.31.15.3.

54.069

15.05.31.15.3.

54.080

15.05.31.15.3.

54.063

15.05.31.15.3.

54.081

15.05.31.15.3.

54.065

15.05.31.15.3.

54.074

15.05.31.15.3.

54.076

Page 52: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   46     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Others

603 Nagda‐Bhopal TFR of rubber pads 98.12 Km. DRF 1,64,85  .. 1,00  1,63,85 

Others

604 Godhra‐Nagda Sec:‐ Renewal of fittings of steel DRF 53,40  .. 36,00  17,40 

channel sleepers of various bridges.

Others

605 Mhow ‐ Sanawad (MG) Sec. :‐ Supplying and fixing DRF 47,98  .. 36,00  11,98 

of new Galvanized Steel channel sleeper with all

fitting and fixture under SSE (P. Way)  Mhow and

KNW section (366 Nos.)

Others

606 Nagda‐Bhopal, Indore‐Dewas‐Ujjain & Dewas‐Maksi DRF 94,55  .. 36,00  58,55 

section ‐Casual Renewal of 52KG Switches ( 1:12&

1in 8 1/2)Under jurisdiction of DEN(S) RTM.

Others

607 Chanderia‐Ratlam section ‐ Casual Renewal of DRF 99,04  .. 36,00  63,04 

Switches ( 1:12 & 1in 8 1/2)

Others

608 Nagda‐Bhopal, Indore‐Dewas‐Ujjain & Dewas‐Maksi DRF 98,88  .. 36,00  62,88 

section‐Casual Renewal of 52KG  Crossings  ( 1:12&

1in 8 1/2)Under jurisdiction of Den(S) RTM.

Others

609 Godhra‐ Nagda Section :‐ Casual renewal of glued DRF 83,38  .. 36,00  47,38 

joints, SEJ's and provision of SEJ's in curves in

ADEN (E) RTM section.

Others

610 Godhra‐ Nagda Section :‐ Casual renewal of glued DRF 83,38  .. 36,00  47,38 

joints, SEJ's and provision of SEJ's in curves in

ADEN (S) DHD section.

Others

611 Chanderiya ‐ Ratlam section: Casual renewal of  DRF 86,54  .. 40,00  46,54 

Glued joints (52kg)  in ADEN‐NMH section.

Others

612 Indore Yard :‐ Elimination of bad lay out by DRF 33,39  .. 30,00  3,39 

easement of curve and shifting of turnout R. 6,69 

Others

613 Godhra‐Nagda section‐Casual Renewal of Switches ( DRF 95,52  .. 36,00  59,52 

1:12& 1in 8 1/2)

Ahmedabad

614 Samakhiyali ‐ Gandhidham SECTION‐DN.Line‐TRR of DRF 70,71  .. 40,00  30,71 

747/1‐748/0 with new 52 KG rails

615 Samakhiyali ‐ Gandhidham section DN line ‐ TRR of DRF 86,43  .. 40,00  46,43 

Bhimasar entry from GIM side with new 52Kg rails.

TRACK RENEWALS

15.05.31.15.2.

54.001

15.05.31.15.3.

54.068

15.05.31.15.3.

54.079

15.05.31.15.3.

54.066

15.05.31.15.3.

54.073

15.05.31.15.3.

54.067

15.05.31.15.3.

54.070

15.05.31.15.3.

54.072

15.05.31.15.3.

54.078

15.05.31.15.3.

54.077

15.05.31.15.3.

54.082

15.01.31.15.3.

50.046

15.01.31.15.3.

50.051

Page 53: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   47     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

616 Palanpur‐Mahesana section:‐ TWR 38.50 km DRF 1,76,63  .. 1,00  1,75,63 

617 Sabarmati‐ Mehsana (MG) Sewction: Renewal of one DRF 77,19  .. 36,00  41,19 

No scissors cross over 1 in 12 (MG) in the

jurisdiction of ADEN(NW) ADI...

618 Ratnal:‐ Rehabilitation of existing track machine DRF 89,59  .. 36,00  53,59 

stabling line and its allied facilities R. 6,52 

Complete Track Renewal

619 Jhund‐ Samakhiyali Section : Removal of PSR at  Km DRF 29,42  .. 28,00  1,42 

628/108 to 628/944 . R. 1,67 

Through Rail Renewal

620 Viramgam‐Samakhiyali section : TRR(P) 52 kg 90 UTS DRF 47,14  .. 40,00  7,14 

of existing 52 Kg 90 UTS rail of curve No 54 total

0.6 Km..

Through Rail Renewal

621 Jhund‐ Samakhiyali : TRR (P) of existing 52 Kg 90 DRF 98,18  .. 40,00  58,18 

UTS rail laid on PRC sleeper  at 1660 density with

new 60 Kg 90UTS rail at Km 639.260 to 640.360  bet

GSY‐CUL on JN‐SIOB section Total TRR 1.1 Km

Through Rail Renewal

622 Viramgam‐Samakhiyali Section : TSR (P) 60 Kg of Km DRF 58,28  .. 36,00  22,28 

606.2 to 607.100 total 0.9 Km with renewal of R. 5,93 

channel sleeper fitting of Br No 53 .

Through Rail Renewal

623 Jhund‐Samakhiyali sect.:Removal of PSR at Km  DRF 90,36  .. 36,00  54,36 

707/03 to 708/0

Points & Crossings

624 Ahmedabad‐Palanpur & Kalol to Ranuj :‐ TTR of DRF 1,16,32  .. 40,00  76,32 

diamond crossings at Mahesana & Katosan Yards = 2 R. 10,87 

Nos.

Points & Crossings

625 Ahmedabad ‐ Palanpur section : ‐ TTR = 10 Nos. (CS DRF 1,58,11  .. 1,00  1,57,11 

‐ 10 Nos. + CMS ‐ 10 Nos.)TBR 5.00 kms. & TFR  R. 32,96 

5.00 kms.

Points & Crossings

626 Samakhiali ‐ Gandhidham ‐ Kandlaport :‐ DRF 1,58,76  .. 1,00  1,57,76 

TTR(CS+CMS) 27 Nos (60kg 1 in 12 = 26 & 1 in 8½ =

1 Nos.)

Points & Crossings

627 Through Switch renewal 52 Kg (P) 1 in 8.5 and 1 in DRF 92,26  .. 36,00  56,26 

12 in the jurisdiction of DEN(N)ADI

Points & Crossings

628 Ahmedabad Division :Through crossing renewal 52 kg DRF 50,32  .. 36,00  14,32 

(P) in the jurisduction of SrDEN(W) ADI.

TRACK RENEWALS

15.01.31.15.2.

50.004

15.01.31.15.3.

50.048

15.01.31.15.3.

50.054

15.01.31.15.3.

50.045

15.01.31.15.3.

50.044

15.01.31.15.3.

50.050

15.01.31.15.3.

50.052

15.01.31.15.3.

50.047

15.01.31.15.2.

50.001

15.01.31.15.2.

50.005

15.01.31.15.2.

50.006

15.01.31.15.3.

50.043

15.01.31.15.3.

50.049

Page 54: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   48     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Others

629 Ahmedabad‐Viramgam‐Samakhiali & Ahmedabad‐ DRF 1,09,31  .. 53,00  56,31 

Mehasana sections:‐ TBTR of wooden sleepers by

H‐beam sleepers 579 Nos..

Others

630 Ahmedabad‐ Palanpur Section :‐ TFR of only Rubber DRF 1,60,45  .. 1,00  1,59,45 

Pads ‐ 95.50 Km

Others

631 Viramgam ‐ Samakhiali section : ‐ TFR  21.57 Km DRF 1,87,24  .. 1,00  1,86,24 

Others

632 Palanpur‐Mahesana Section:‐ TFR of only Rubber DRF 92,41  .. 36,00  56,41 

Pads ‐ 55.00 Km

Rajkot

633 Wankaner ‐ Rajkot Section; TRR(P) on major bridges DRF 94,29  .. 40,00  54,29 

& its approaches.

634 Rajkot Division ; Casual Renewal of rails on DRF 98,21  .. 40,00  58,21 

various locations under DEN (East & West) Rajkot's

jurisdiction.

635 Rajkot Division ; Casual Renewal of Switches under DRF 97,15  .. 36,00  61,15 

DEN (East) RJT's jurisdiction Total 25 Nos.

636 Rajkot Division ; Casual Renewal of switches under DRF 97,15  .. 36,00  61,15 

DEN (West)  RJT's jurisdiction Total 25 Nos.

637 Rajkot Division ; Casual Renewal of crossings DRF 46,22  .. 36,00  10,22 

under DEN (East) RJT's jurisdiction Total 23 Nos.

638 Rajkot Division ; Casual Renewal of crossings DRF 92,51  .. 36,00  56,51 

under DEN (West) RJT's jurisdiction Total 46 Nos.

639 Rajkot Division ; Casual Renewal of SEJs under DEN DRF 96,89  .. 36,00  60,89 

(East) RJT's jurisdiction Total 38Nos.

640 Rajkot Division‐ Casual renewal of glued joints DRF 80,48  .. 36,00  44,48 

under DEN (East) RJT's jurisdiction Total 186 Nos.

641 Rajkot Division; Casual Renewal of glued joints DRF 77,02  .. 36,00  41,02 

under DEN (West) RJT's jurisdiction Total 178 Nos.

642 Rajkot Division‐ Rehabilitation of existing track DRF 94,77  .. 36,00  58,77 

machine stabling line and its allied facilities at

Dwakara, Khambaliya & Hadmatiya

Others

643 Rajkot Division ; Casual Renewal of SEJs under DEN DRF 84,14  .. 36,00  48,14 

(W) RJT's jurisdiction Total 33 Nos.

Bhavnagar

644 Bhavnagar Division: Casual renewal of SEJ (Non DRF 91,79  .. 36,00  55,79 

PRCL BG section).

TRACK RENEWALS

15.01.31.15.2.

50.002

15.01.31.15.2.

50.007

15.01.31.15.2.

50.003

15.01.31.15.3.

50.053

15.04.31.15.3.

53.041

15.04.31.15.3.

53.042

15.04.31.15.3.

53.040

15.04.31.15.3.

53.044

15.04.31.15.3.

53.043

15.04.31.15.3.

53.045

15.04.31.15.3.

53.037

15.04.31.15.3.

53.039

15.04.31.15.3.

53.046

15.04.31.15.3.

53.047

15.04.31.15.3.

53.038

15.02.31.15.3.

51.025

Page 55: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   49     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

645 Bhavnagar Division : Through Fitting renewal on  DRF 78,70  .. 36,00  42,70 

RLA‐MHV  section

646 Bhavnagar Division ‐ Casual renewal of defective DRF 82,58  .. 38,00  44,58 

weld at verious locations (Non‐PRCL Sections)

Through Rail Renewal

647 Bhavnagar Terminus : Through Rail Renewal ‐1.6 TKm DRF 90,06  .. 38,00  52,06 

of Pit line at

Ballast

648 Talala‐Veraval (MG section) :‐ TBR 10 Kms DRF 1,11,44  .. 1,00  1,10,44 

R. 65,91 

Points & Crossings

649 Bhavnagar Division: Casual renewal of CMS DRF 99,23  .. 36,00  63,23 

crossings (Non PRCL BG section)

Others

650 Bhavnagar Division :‐  Casual Renueval of Track BG DRF 95,68  .. 36,00  59,68 

section.

Others

651 Wansjaliya :‐ Rehabilitation of existing track DRF 93,40  .. 36,00  57,40 

machine stabling line and its allied facilities R. 6,56 

Others

652 Bhavnagar Division :‐ Casual Renueval of Track MG DRF 95,68  .. 36,00  59,68 

Section.

TOTAL‐NEW WORKS DRF .. .. 31,62,00  ..

TOTAL‐Track Renewals DRF .. .. 63,52,00  ..

A ‐ Works in Progress

Headquarter

653 Providing man refuges on different open web DF(4) 86,29  .. 1,00  85,29 

through type steel girder bridges as per RDSO

DRG.No.CBS‐0028 in Western Railway

Mumbai

654 Replacement of Elastomeric Bearing on PSC‐Box DRF 38,78  .. 1,00  37,78 

Girder Bridge NO. 75UP/DN(11X48.50MTS0 Local Line

between BYR‐NIG Stations on CCG‐VR Section in

Mumbai Division W.Rly

655 Virar‐Surat Section:‐ Replacement & strengthening DRF 2,31,18  2,19,72  11,46  ..

of cracked stringer angles  in Br.No. 275 and 313

and replacement of corroded bracing gussets and

metallising of flooring system of Br. No.313.

(BCT/S/06‐07)

656 Nallasopara ‐ Vasai Road ‐ Construction / DRF 3,87,37  .. 1,00  3,86,37 

strengthening of cast iron screw piles (bridge No

78) at Km. 53/6‐7. (BCT/S/06‐07) XEN/BR/DDR

TRACK RENEWALS

15.02.31.15.3.

51.023

15.02.31.15.3.

51.021

15.02.31.15.3.

51.027

15.02.31.15.2.

51.001

15.02.31.15.3.

51.024

15.02.31.15.3.

51.022

15.02.31.15.3.

51.026

15.02.31.15.3.

51.028

BRIDGE WORKS

15.00.32.14.6.

11.001

15.03.32.13.3.

11.002

15.03.32.06.2.

11.003

15.03.32.06.2.

52.002

Page 56: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   50     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

657 Churchgate‐Virar Section:‐ Replacement of small DRF 1,58,92  86,71  10,00  62,21 

span girders by PSC slabs upto 6.10m span bridges

(Br.No. 15,24,25,32, 38,40,53, 54 & 58 = 9

bridges.). (BCT/U/06‐07)

658 Virar ‐ Surat Section ‐ Replacement of cracked top DRF 1,16,37  54,85  31,00  30,52 

flange, bracing and gussets etc. of Br.No. 417 UP

& DN (13 x 18.30m) at km 249/11‐29.

659 Replacement of Elastomeric Bearings on PSC BOX DRF 93,70  .. 1,00  92,70 

Girder of bridge No.73 UP/DN Local Line between

BYR‐NIG stns on CCG‐VR section on Mumbai Division.

Vadodara

660 Vadodara Division ‐ Replacement of existing aged DRF 1,05,58  52,70  50,00  2,88 

steel girders by providing 9.15 m spans PSC slabs

on Br. No.537, 539, 568, 549 on Surat‐Godhra

Sectoin and Br. No.51A on Anand‐Godhra Section 

(Total 9 spans). (BRC/S/08‐09)

661 Ankleshwar ‐ Bharuch Section:‐ Replacement of DRF 49,75  43,65  3,00  3,10 

chequered plate & top hand railing of foot path &

trolley refuge on  Bridge No. 502.(BRC/S/08‐09)

(Dy.CE(BR)‐BL)

662 Vadodara Division:‐ Replacement of bearing and DRF 1,54,48  .. 1,00  1,53,48 

rehabilitation of PSC/RCC girders.  (BRC/S/09‐10)

663 Sr.DEN(N)BRC's Jurisdiction:‐ Replacement of aged DRF 84,81  69,92  13,00  1,89 

steel girders by providing PSC/RCC slabS up to

6.10 m span (25 bridges). (BRC/U/11‐12)

664 Regirdering of Br.No.102 including channel DRF 96,95  55,02  20,00  21,93 

sleepers. (BRC/U/11‐12)

665 Vadodara Division:‐Rebuilding of Bridge No. 531 at DRF 42,17  21,21  20,96  ..

Km on Surat‐Vadodara Section with 5.10m RCC Box.

Ratlam

666 Godhra‐Meghnagar Section:‐ Re‐building of Bridge DRF 89,50  66,40  14,00  9,10 

No. R‐01 (UP & DN) at Km. 514/15‐17 & R‐21 (DN) at

Km. 521/14‐16 and R‐22 (DN) at Km. 622/22‐24 .

667 UJN ‐BPL Sec.:‐  Replacement of  Earley steel DRF 99,48  32,86  30,00  36,62 

girders by providing PSC/PRC slabs of 9.15m span

on NAD‐UJN‐ BPL,IDU, DWX‐MKC section at ORN‐2 

Bridge Nos. 134 Dn( 1X9.15m),135 ( 1X9.15m) ,137

Dn( 2X9.15m), 175 Dn( 3X9.15m),176 Dn (

668 Indore ‐ Dewas ‐Ujjain section‐Rebuilding of S.Fund 96,52  95,66  .. 86

bridge no.32. ( 2x091 M hume pipe),46(2X0.91),49(

2X0.91) by RCC box.

669 MKC‐BPL section‐Rebuilding of bridge no.105 Dn DRF 93,18  32,86  40,00  20,32 

(1x1.22 M),166Dn(2X.91m),167Dn(2X0.91m) ( ORN‐2)

by RCC box.

BRIDGE WORKS

15.03.32.06.2.

52.001

15.03.32.10.2.

11.001

15.03.32.13.3.

11.001

15.06.32.08.2.

55.001

15.06.32.08.3.

11.002

15.06.32.09.3.

11.002

15.06.32.11.3.

55.002

15.06.32.11.3.

55.001

15.06.32.12.3.

55.001

15.05.32.09.3.

54.001

15.05.32.12.3.

54.003

15.05.32.12.3.

54.001

15.05.32.12.3.

54.002

Page 57: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   51     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Ahmedabad

670 Planpur ‐ Ahmedabad Section ‐ Rebuilding of Br.No. DRF 1,47,02  1,04  77,28  68,70 

1016 at Km. 744/9‐10 between DNW‐JUL.

671 Mehasana ‐ Palanpur Section ‐  Regirdering  Br. DRF 1,92,72  72,09  20,00  1,00,63 

No.945 (3x24). (ADI/S/08‐09)

672 Ahmedabad‐Viramgam Section:‐ Rebuilding of Br. No. DRF 96,23  .. 1,00  95,23 

5,7 in Viramgam‐ Jhund Section & Br. No. 24,29,

29Dn, 33Dn of Ahmedabad‐Viramgam & Br. No. 38 of

Jhund‐Kharaghoda Section. (ADI/U/09‐10)

673 Samakhiali‐Gandhidham‐Kandla Port Section:‐ DRF 98,20  11 1,00  97,09 

Replacement of small span girder by providing PSC

slab at Br. No. 313 (6 x 3.05m) & Br. No. 277 (5 x

8.23m) & 279 ( 3 x 8.23m). (ADI/U/10‐11)

674 Ahmedabad ‐Viramgam ‐Jhund Section‐:‐ Replacement DRF 36,89  1 1,00  35,88 

of small span girders by providing PSC slab.(

Br.No.26DN,89 Up,89L1,715). (ADI/U/11‐12)

675 Chandlodiya‐Khodiyar‐Gandhinagar section:‐ DRF 83,50  29,05  30,00  24,45 

Replacement of small span girders by providing PSC

slab.( Br.No.28,20,70,2up,4up). (ADI/U/11‐12)

676 Jhund‐Kharaghoda section:‐ Replacement of small DRF 69,62  1 1,00  68,61 

span girders by providing PSC slab.

(Br.No.13,14,17,19A). (ADI/U/11‐12

677 Ambli Road‐Sanand:‐ Rebuilding of Br.No.12 at km DRF 88,29  43,00  30,00  15,29 

515/5‐6(Up&Dn line). (ADI/U/11‐12)

678 Samakhiali‐Gandhidham Section:‐ Replacement of DRF 94,22  1 1,00  93,21 

steel girders by PSC slab of BrNo. 314(1x3.05

m)and Br.No.316(6x12.19m)(Total span 9 nos.).

(ADI/U/11‐12)

679 Sabarmati (Engg.W/S):‐ Replacement of broken AC C.Fund 93,95  1 .. 93,94 

sheets with aluminium sheets  and polycorbonate 

sheets and down take pipes in STR shop.

(ADI/U/11‐12)

680 Sabarmati:‐ Improvement to flooring in STR shop DRF 93,07  2,98  50,00  40,09 

and other allied Engineering works. (ADI/U/11‐12)

Rajkot

681 Viramgam‐Surendranagar Section:‐ New Bridge No. DRF 48,11  1 1,00  47,10 

20X (RCC Box 2x 3.05m) at Km. 587.15. 

(RJT/S/10‐11)

682 Rajkot Division:‐ New Bridge No.380/A‐ Proposed DRF 59,71  1 1,00  58,70 

R.C.C. Box ( 2x6.10m RCC Box) at Km 838/0‐1.

(RJT/S/10‐11)

683 Viramgam‐Okha Section:‐ Replacement of old girder DRF 32,50  1 32,00  49

Bridge  No.39(1x6.10m) by RCC Box (1x4.72 m+1x3.90

m) at km 616/9‐617/1 between BLRD‐SUNR section.

(RJT/U/11‐12)

BRIDGE WORKS

15.01.32.10.1.

30.001

15.01.32.08.3.

11.001

15.01.32.09.3.

50.001

15.01.32.10.3.

50.001

15.01.32.11.3.

50.001

15.01.32.11.3.

50.003

15.01.32.11.3.

50.004

15.01.32.11.3.

50.002

15.01.32.11.3.

50.008

15.01.32.11.3.

50.006

15.01.32.11.3.

50.007

15.04.32.10.3.

53.002

15.04.32.10.3.

53.001

15.04.32.11.3.

53.002

Page 58: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   52     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Bhavnagar

684 Kanalus Porbandar Section ‐ Replacement  of steel DRF 2,71,70  1,52,83  75,98  42,89 

girders up to 6.10 m span by RCC/PSC (41 spans)

685 Replacement of damaged RCC slab of Br. No. 46 (3 X DRF 68,53  50,30  13,00  5,23 

2.42) & Br. No. 59 (3 X 3.02)  on SBI‐BTD Section.

Mumbai

686 Works costing below DRM's Power DRF 1,22  .. 1,22  ..

Ratlam

687 Works costing below DRM's Power DRF 5,00  .. 5,00  ..

Ahmedabad

688 Works costing below DRM's Power DF(4) 9,00  .. 9,00  ..

Bhavnagar

689 Works costing below DRM's Power DF(3) 10,00  .. 10,00  ..

TOTAL‐WORKS IN PROGRESS DRF .. .. 5,88,90  ..

DF(3) .. .. 10,00  ..

DF(4) .. .. 10,00  ..

B ‐ New Works

Mumbai

690 Churchgate‐Virar Section: Regirdering of Bridge DRF 1,07,98  .. 50 1,07,48 

No. 40 on UP THROUGH / Down THROUGH Line under

ADEN (T/S) Lower Parel Section.

691 Churchgate ‐ Virar Section:‐ Regirdering of Bridge DRF 1,87,00  .. 50 1,86,50 

No. 20 on UP Through Line under Jurisdiction of

ADEN(T/S) Lower Parel Section.

Vadodara

692 Surat‐Miyagam Section:‐Replacement of Steel Girder DRF 37,43  .. 50 36,93 

of Bridge No. 464 at km. 274/22‐24 on Up & Dn line

by provding PSC slab.

Ratlam

693 Maksi‐Bhopal  Section.‐Rebuilding of of stone Slab DRF 65,60  .. 50 65,10 

by RCC BOX. (Bridges No.106 span Dn 

2X0.91m,Br.No.107span DN 2X0.91m) ( ORN‐2).( Total

Bridges =02Nos.)

TOTAL‐NEW WORKS DRF .. .. 2,00  ..

BRIDGE WORKS

15.02.32.09.2.

51.001

15.02.32.12.3.

51.001

15.03.32.15.3.

00.999

15.05.32.15.3.

00.999

15.01.32.15.3.

00.999

15.02.32.15.3.

00.999

15.03.32.15.2.

52.001

15.03.32.15.2.

52.002

15.06.32.15.3.

55.001

15.05.32.15.3.

54.001

Page 59: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   53     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

TOTAL‐Bridge Works DRF .. .. 5,90,90  ..

DF(3) .. .. 10,00  ..

DF(4) .. .. 10,00  ..

A ‐ Works in Progress

Mumbai

694 Churchgate‐ Virar :‐ Replacement of SDH / STM‐1 DRF 98,62  .. 50,00  48,62 

equipment.

695 Marine Lines ‐ Replacement of signalling PI DRF 1,39,33  1,22,30  .. 17,03 

equipments with centralised operation of points &

signals in Churchgate‐Virar section on 'C' route.

(BCT/S/08‐09)

696 Mumbai Suburban Section:‐ Replacement of Opto DRF 94,55  64,77  25,00  4,78 

Coupler Boxes with FRP boxes & Opto coupler cards,

AWS clamps, Protection pipe from Track Magnet to

Optocoupler box with wiring. (BCT/S/09‐10)

697 Mumbai Division:‐ Providing Fuse Alarm System with DF(4) 97,46  66,04  31,42  ..

Automatic change over system in Relay Huts of 

VR‐ST section and point health monitoring system

in Mumbai Division. (BCT/S/09‐10)

698 Valsad:‐ Replacement of over aged outdoor DRF 98,12  48,23  30,00  19,89 

Signalling gears. (BCT/U/10‐11)

699 Churchgate‐Virar Section:‐ Replacement of DRF 96,26  50,84  30,00  15,42 

corroded, rusty and worn‐out location boxes.

(BCT/U/10‐11)

700 Churchgate‐Virar Section: Replacement of worn out DRF 96,26  64,41  25,00  6,85 

and corroded AWS Track‐Device Accessories /

Equipments. (BCT/S/10‐11)

701 Virar ‐Kelve Road Section:‐  Provision of battery DF(4) 1,19,26  .. 10,00  1,09,26 

back up for relays through IPS at 9 Relay

Huts.(BCT/U/11‐12)

702 Kelve Road‐Boribali Section:‐ Provision of battery DF(4) 1,01,30  93,58  1,00  6,72 

back up for relays through IPS at 9 Relay

Huts.(BCT/U/11‐12)

703 CSTE office Churchgate‐Provision of V‐LAN facility DF(3) 22,14  .. 22,14  ..

for CAD Centre in Drawing  section.

704 CCG‐VR :‐ Replacement of Rusty Rail Track Circuits DRF 85,25  7,20  50,00  28,05 

with Digital Axle Counterson CCG‐VR suburban

section

705 CCG‐VR :‐ Provision of additional locations and DF(3) 95,25  34,18  61,07  ..

laying of standby cables acrossthe bridges for

enhancing the availability of spare cables

duringemergency in CCG‐VR suburban section

706 CCG‐VR Section:‐ Casual renewal of defective and DRF 95,92  15,44  50,00  30,48 

overaged signalling cables in MEL‐MRU & KHAR‐VLP

section of Mumbai suburban section

S & T WORKS

15.03.33.14.6.

52.001

15.03.33.08.2.

52.001

15.03.33.09.3.

52.004

15.03.33.09.3.

52.003

15.03.33.10.3.

52.017

15.03.33.10.3.

52.010

15.03.33.10.3.

52.009

15.03.33.11.3.

52.006

15.03.33.11.3.

52.004

15.03.33.12.3.

52.017

15.03.33.12.3.

52.008

15.03.33.12.3.

52.009

15.03.33.12.3.

52.016

Page 60: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   54     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

707 CCG‐VR Section ‐ Strengthening of Datalogger DF(4) 73,67  1 63,00  10,66 

network extending connectivity to HQ& field

offices, generation of various reports, alarms,

SMS andproviding centrallised monitoring in Mumbai

Suburban Section.

708 CCG‐BVI :‐ Provision of additional AWS track DF(4) 89,96  77,91  12,05  ..

devices at stop marks ahead ofstarter signals of

vulnerable stations in Churchgate‐Borivali section

709 BVI‐VR :‐ Provision of additional AWS track DF(4) 91,89  77,51  14,38  ..

devices at stop marks ahead ofstarter signals of

vulnerable stations in Borivali – Virar section.

710 Provision of Power Management System at  DF(4) 59,16  28,60  25,00  5,56 

signalling installations in CCG‐VR suburban

section

711 Palghar : Provision of High reliability digital DRF 1,09,76  4,88  50,00  54,88 

axle counters (HRDAC ) for frequently failing

track circuits in flood prone area along with

replacement of associated signalling equipment.

712 Dhanu Road : Provision of High reliability digital DRF 1,04,28  5,24  50,00  49,04 

axle counters (HRDAC ) for frequently failing

track circuits in flood prone area along with

replacement of associated signalling equipment

713 Replacement of track circuits by DAC in rusty rail DRF 1,07,12  .. 50,00  57,12 

sections in VR ‐ DRD section

714 Strengthening of Datalogger network extending DF(4) 93,92  .. 58,00  35,92 

connectivity to HQ & field offices, generation of

various reports, alarms, SMS and providing

centrallised monitoring in non suburban section of

Mumbai Div

715 Replacement of automatic change over panel at DRF 79,54  .. 50,00  29,54 

stations between  VR‐ST section

Vadodara

716 Replacement of Auto Telephone Exchange and  DRF 30,00  27,99  2,01  ..

defective U/G cable at BRCP. (BRC/S/08‐09)

717 Replacement of Auto Telephone Exchange and  DRF 30,00  2,05  25,00  2,95 

defective U/G cable at GDA (BRC/S/08‐09)

718 Vadodara Division:‐ Replacement of over aged DRF 49,40  2,98  25,00  21,42 

battery at 32 stations. (BRC/U/09‐10)

719 Surat‐Vadodara Section:‐ Provision of LED Signals DF(4) 99,82  88,49  11,33  ..

in auto signalling. (BRC/S/10‐11)

720 Vadodara‐Anand‐Vatva Section:‐ Provision of DF(4) 97,98  85,23  12,75  ..

Integrated power supply at relay huts for auto

signalling in Auto Section. (BRC/S/10‐11)

S & T WORKS

15.03.33.12.3.

52.010

15.03.33.12.3.

52.012

15.03.33.12.3.

52.013

15.03.33.12.3.

52.014

15.03.33.12.3.

52.004

15.03.33.12.3.

52.001

15.03.33.12.3.

52.005

15.03.33.12.3.

52.002

15.03.33.13.3.

52.001

15.06.33.08.3.

55.004

15.06.33.08.3.

55.005

15.06.33.09.3.

55.003

15.06.33.10.3.

55.004

15.06.33.10.3.

55.008

Page 61: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   55     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

721 Vadodara Division:‐ Replacement of Overaged DRF 29,16  7,98  1,00  20,18 

Universal Emergency Communication eqpts by VHF

Sets for communication of Guard and Driver with

Station Masters(BRC/U/11‐12)

722 Vadodara Division:‐ Replacement of defective DRF 99,89  82,07  17,82  ..

Signaling cable.(BRC/U/11‐12)

723 Surat‐Vadodara‐Godhra Section:‐ Provision of DF(3) 94,03  8,41  85,62  ..

Automatic fuse alarm system with automatic change

over at stations & Auto Huts.(BRC/U/11‐12)

724 Vadodara Division:‐ Replacement of overaged DRF 59,20  32,81  26,39  ..

Section Control, Emergency Control and Traction

Power Control HQ Control equipments & Control

Telephone system in ST ‐ BRC ‐ GER, BRC ‐ GDA ‐

ANND sections.(BRC/U/11‐12)

725 Casual renewal of defective signalling cables & DRF 95,47  5,02  90,00  45

signalling gears over Vadodara division

726 Vadodara Division:Replacement of CLS Shunt Signal DRF 98,62  69,45  20,00  9,17 

lamp and 'A'/'AG', SPI lamp by LED type

727 Vadodara Division ‐ Shifting of Starter Signal to DF(4) 60,98  22,98  30,00  8,00 

the boundary of Track circuit ahead in Itola

‐Ranoli & Vadodara ‐ Godhra Section

728 Vadodara Division ‐ Shifting of Starter Signal to DF(4) 61,13  20,66  30,00  10,47 

the boundary of Track circuit ahead in Vasad ‐

Geratpur & Anand ‐ Godhra Section

729 Vadodara Division: Shifting of Starter Signal to DF(4) 70,04  22,29  30,00  17,75 

the boundary of Track circuit ahead in Surat ‐

Kashipura & Pratapnagar ‐ Chhota Udepur Section

730 Kosamba: Provision of Multisection Digital Axle DF(4) 94,63  .. 25,00  69,63 

Counters on vulnerable track circuits for

improving reliability of signalling systems at

731 Provision of Multisection Digital Axle Counters DF(4) 92,31  .. 25,00  67,31 

for improving reliability of signaling system at

Ankleshwar‐Bharuch section in ST‐BRC section.

(Phase I)

732 Provision of Multisection Digital Axle Counters DF(4) 99,61  4,52  25,00  70,09 

for improving reliability of signaling system at

Nabipur‐ Varediya section in ST‐BRC section (Phase

I)

Ratlam

733 Ratlam Division.‐‐Shifting of S&T equipments from DRF 81,02  .. 75,00  6,02 

existing dilapidated S&T Rooms to new location

with PI System 1.Shifting of S&T equipments new

S&T rooms:‐Provision of new PI System for thr

entire Indoor replacement work Shifting of

S & T WORKS

15.06.33.11.3.

55.004

15.06.33.11.3.

55.002

15.06.33.11.3.

55.001

15.06.33.11.3.

55.003

15.06.33.12.3.

55.002

15.06.33.12.3.

55.004

15.06.33.13.3.

55.001

15.06.33.13.3.

55.002

15.06.33.13.3.

55.003

15.06.33.14.3.

55.002

15.06.33.14.3.

55.003

15.06.33.14.3.

55.001

15.05.33.14.3.

54.002

Page 62: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   56     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

734 Godhra‐Kansudhi, Kansudhi‐Chanchelav and DRF 92,34  49,01  20,00  23,33 

Chanchelav‐Sant Road. Section‐Replacement of

analog axle counters for BPAC/IBS by High

reliability digital axle counters (HRDAC ) of

Ratlam division.

735 Piplod‐Limkheda, Limkheda‐ Mangal Mahudhi,  Mangal DRF 92,34  49,01  30,00  13,33 

Mahudhi‐USRA,  Section‐Replacement of analog axle

counters for BPAC/IBS by High reliability digital

axle counters (HRDAC ) of Ratlam division.

736 Punchpiplia‐Amargarh, Bhairongarh‐Raoti, DRF 96,24  .. 50,00  46,24 

Bildi‐Morwani IBS, Replacement of analog axle

counters for BPAC by High reliability digital axle

counters (HRDAC) of Ratlam division.

737 Nagda‐Ujjain‐Bhopal Section ‐Provision of High DRF 93,29  46,85  25,00  21,44 

reliability digital axle counters (HRDAC ) for

frequently failing track circuits in flood prone

area along with replacement of associated

signalling equipment at  stations

738 Godhra‐Dahod Section and IBH:‐ Replacement of age DRF 94,89  43,39  28,59  22,91 

old Data logger (9 Nos) for improving efficiency &

usefulness of Signaling System on RTM Division

739 Ratlam‐Nagda Section:‐  Replacement of age old DRF 1,03,01  86,80  9,26  6,95 

Analog Axle counters and MUX of BPAC by DAC &

UFSBI in 2 block sections i.e

RNH‐KUH‐BRNA.(RTM/U/111‐12)

740 Jekot‐Usra, Rentiya‐Jekot and DRF 88,26  47,64  30,00  10,62 

Bajranggarh‐Panchpipliya sections: Replacement of

analog axle counters for BPAC/IBS by High

reliability digital axle counters (HRDAC )

741 Nagda‐Berwaniya, Asloada‐ Pulsoramakrawan and DRF 88,27  31,60  55,41  1,26 

Ujjain C‐Pingleshwar sections: Replacement of

analog axle counters for BPAC by HRDAC.

742 Ratlam‐Runkheda section: Replacement of analog DRF 90,13  44,57  30,00  15,56 

axle counters for BPAC by High Reliability Digital

Axle cCounters (HRDAC) of Ratlam division.

743 Nagda‐Piploda Bagla and Nishadpura‐ Bairaghar: DF(4) 62,35  15,33  30,00  17,02 

Provision of High reliability digital axle

counters (HRDAC ) for BPAC of Ratlam Division

744 Ratlam Division: Strengthening of Datalogger DF(4) 91,66  33,23  40,00  18,43 

Network extending connectivity to HQ & Field

offices, generation of various reports, alarms,

sms and providing centrallised monitoring

745 Indore, Ujjain and Ratlam stations: Provision of DRF 79,95  46,83  20,00  13,12 

High reliability digital axle counters (HRDAC )

for frequently failing track circuits in flood

prone area along withreplacement of associated

signalling equipment.

S & T WORKS

15.05.33.14.3.

54.005

15.05.33.14.3.

54.004

15.05.33.14.3.

54.001

15.05.33.12.3.

54.015

15.05.33.12.3.

54.013

15.05.33.11.3.

54.005

15.05.33.12.3.

54.007

15.05.33.12.3.

54.008

15.05.33.12.3.

54.009

15.05.33.12.3.

54.010

15.05.33.12.3.

54.005

15.05.33.12.3.

54.006

Page 63: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   57     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

746 Chitoor‐Chanderia Section: Replacement of DC LED DRF 92,37  36,00  30,00  26,37 

Signals & Nagda‐Ujjain old version LED Signals on

with revised RDSO Spec LED Signals on RATLAM

Division.

747 Ratlam Division: Provision of Parallel VDU with DF(3) 42,71  25,12  17,59  ..

version 3 at four electronic interlocking

installation.

748 Godhra‐Nagda Section: Casual renewal of signaling DRF 1,12,50  1,09,32  3,18  ..

gears & improving reliability on RATLAM Division.

749 Nagda‐ Bhopal, Indore ‐Dewas Ujjain & Chanderia DRF 1,30,17  65,90  40,00  24,27 

‐Chittaur: Casual renewal of signaling gears &

improving reliability on RATLAM Division.

750 Godhra‐Nagda section ‐Provision of High DRF 88,29  46,48  25,00  16,81 

reliability digital axle counters (HRDAC) for

frequently failing track circuits in flood prone

area along with replacement of associated

signaling equipment at  stations

751 Dhameda‐Bordi, Bordi‐Anas, Anas‐Megnagar DRF 92,34  44,42  30,00  17,92 

Section‐Replacement of analog axle counters for

BPAC/IBS by High reliability digital axle counters

(HRDAC ) of Ratlam division.

Ahmedabad

752 Khodiyar‐Dangarva Section:‐ Replacement of Low DRF 98,64  90,65  7,99  ..

insulation / defective cables. (ADI/S/10‐11)

753 Ahmedabad Division:‐ Replacement of worn out DRF 89,23  71,56  17,67  ..

location boxes of  Vatva‐Geratpur  automatic

section.(ADI/U/11‐12)

754 Ahmedabad Yard:‐ Replacement of shelf type relay DRF 92,24  69,06  23,18  ..

Track Circuit by MSDAC.(ADI/U/11‐12)

755 i)Supply and installation of HRDAC in MSH‐PNU and Cap. 1,35,51  1,23,12  12,39  ..

shifting of SSDAC from MSH‐PNU to ADI‐MSH section

for dual detection. & ii)Supply and installation

of HRDAC in CLDY‐ABD and shifting of SSDAC from

CLDY‐ABD to SBI‐CLDY section for dual detection.

756 Ahmedabad‐ Viramgam section‐ Provision of high DRF 98,63  49,97  40,00  8,66 

reliability digital axle counter(HRDAC) for

frequently failing track circuit in flood prone

area along with replacement of associated

signalling equipment.

757 Ahmedabad yard‐ Provision of high reliability DRF 88,97  58,82  30,15  ..

digital axle counter (HRDAC) for frequently

failing track circuit in flood prone area along

with replacement of associated signalling

equipment.

S & T WORKS

15.05.33.12.3.

54.001

15.05.33.12.3.

54.004

15.05.33.12.3.

54.011

15.05.33.12.3.

54.012

15.05.33.12.3.

54.014

15.05.33.14.3.

54.003

15.01.33.10.3.

50.003

15.01.33.11.3.

50.002

15.01.33.11.3.

50.003

15.01.33.12.3.

50.002

15.01.33.12.3.

50.003

15.01.33.12.3.

50.004

Page 64: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   58     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

758 Ahmedabad division‐Casual renewal of defective DRF 95,00  59,44  25,00  10,56 

signalling cable .

759 Viramgam‐Mahesana‐Patan, Gandhinagar ‐ Kalol DRF 42,19  .. 30,00  12,19 

section. ‐Replacement of old current regulators of

LED signals.

760 Ahmedabad division Strengthning of datalogger DF(4) 85,94  55,71  30,23  ..

network extending connectivity to HQ & field

official, generation of various report, alarm, SMS

and providing centralised monitoring..

761 Ahmedabad division‐Casual renewal of signalling DRF 76,50  51,28  25,00  22

gears at 25 station

762 Ahmedabad division‐ Replacement of defective DRF 63,25  22,80  30,00  10,45 

telecom cables and Remote Location Unit (RLU).

763 To provide  Electronic Interlocking System at S&T DF(4) 97,24  3,10  94,14  ..

Traning centre Sabarmat for setting up a training

facility on EI.

764 Ahmedabad Division‐ Shifting of Starter Signal to DF(4) 35,28  8,00  27,28  ..

the boundary of the Track Circuit ahead to

mitigate the risk in GER(Ex) –CLDY section.

765 Ahmedabad Division‐ Shifting of Starter Signal to DF(4) 36,80  7,35  29,45  ..

the boundary of the Track Circuit ahead to

mitigate the risk in SBI‐KLL‐GNC section.

766 Replacement  of  over aged Ahmedabad exchange  of DRF 64,48  31,97  32,51  ..

Ahmedabad Division

Rajkot

767 Wankaner(Ex) ‐Navalakhi, Dahisara‐ Vavaniya DF(4) 59,92  52,00  7,92  ..

section Provision of IPS in Rajkot Division .

768 Rajkot Div.: Replacement of  defective signaling DRF 71,72  59,16  12,56  ..

cables, provision of cable at various locations.

769 Rajkot Division : Provision of  High reliability Cap. 62,70  47,08  7,50  8,12 

digital axle counters ( HRDAC) for BPAC in VG‐VNRD

(2), SR‐BMM,BMM‐LPR ie 4 Block Section .

770 Surendranagar , Rajkot,Bhaktinagar and Modpur DRF 29,43  6,21  23,22  ..

stations  :Replacement of old current regulatorof

LED Signals.

771 Rajkot Division : Provision of  High reliability Cap. 62,70  47,08  7,50  8,12 

digital axle counters (HRDAC) for BPAC in Lilapur

Rd.‐Kessariya Rd., Kesariya Rd.‐Lakhtar,

Lakhtar‐Bajrangpura & Bajrangpura‐Bala Road ie 4

Block Sections.

772 Rajkot Division : Replacement of CLS lamps with DRF 73,95  31,95  42,00  ..

LED signal aspects in Wankaner –Navlakhi,

Dahisara‐ Maliya section.

S & T WORKS

15.01.33.12.3.

50.005

15.01.33.12.3.

50.006

15.01.33.12.3.

50.007

15.01.33.12.3.

50.008

15.01.33.12.3.

50.001

15.01.33.12.6.

50.001

15.01.33.13.3.

50.002

15.01.33.13.3.

50.001

15.01.33.13.3.

50.003

15.04.33.12.3.

53.003

15.04.33.12.3.

53.004

15.04.33.12.3.

53.005

15.04.33.12.3.

53.006

15.04.33.12.3.

53.007

15.04.33.12.3.

53.001

Page 65: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   59     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

773 Rajkot Division : Strengthening of Datalogger DF(4) 62,12  43,09  11,00  8,03 

network extending connectivity to HQ & field

offices,generation of  various reports, alarms,

SMS and providing centrallised monitoring.

774 Rajkot Division : Shifting of Starter Signal to DF(4) 53,81  7,29  40,00  6,52 

the boundary of the Track Circuit ahead to

mitigate the risk in  WKR‐WWA sec,SUNR, RJT BKNG &

MDPR .

Bhavnagar

775 Bhavnagar Division:‐ Upgradation of data logger DF(3) 43,45  29,77  5,00  8,68 

and its connectivity at Signal Fault Control and

at SSE/Signal ‐ Dhola, Botad and Junagadh.

(BVP/S/09‐10)

776 Surendranagar‐Pipavav, Rajkot‐Somnath & DF(4) 98,59  .. 30,03  68,56 

Jetalsar‐Wansjaliya sections:‐ Provision of fuse

indication and monitoring system at 35 Panel

interlocked stations .

777 Dhasa‐Pipavav and Rajula‐Mahuva section ‐Provision DF(3) 98,51  73,28  25,23  ..

of short haul OFC equipments.

Mumbai

778 Works costing below DRM's Power DF(4) 10,85  .. 10,85  ..

Vadodara

779 Works costing below DRM's Power DRF 15,50  .. 15,50  ..

DF(3) 17,00  .. 17,00  ..

DF(4) 1,00  .. 1,00  ..

Ahmedabad

780 Works costing below DRM's Power DRF 8,00  .. 8,00  ..

DF(4) 56,00  .. 56,00  ..

Rajkot

781 Works costing below DRM's Power DRF 19,00  .. 19,00  ..

DF(4) 17,50  .. 17,50  ..

Bhavnagar

782 Works costing below DRM's Power DRF 13,00  .. 13,00  ..

DF(3) 8,00  .. 8,00  ..

DF(4) 4,00  .. 4,00  ..

TOTAL‐WORKS IN PROGRESS Cap. .. .. 27,39  ..

DRF .. .. 15,63,44  ..

DF(3) .. .. 2,41,65  ..

DF(4) .. .. 8,33,33  ..

B ‐ New Works

Mumbai

783 Miraroad :‐ Provision of MSDAC on  vulnerable DF(4) 94,56  .. 4,00  90,56 

Track Circuits.

784 Naigaon :‐ Provision of MSDAC on Bridges / DF(4) 94,56  .. 4,00  90,56 

vulnerable Track Circuits.

785 Vaitarna ‐ Valsad section :‐ Reliability DF(4) 78,15  .. 4,00  74,15 

improvement by way of redundancies for track

occupancy detection on Bridge portion

S & T WORKS

15.04.33.12.3.

53.002

15.04.33.13.3.

53.001

15.02.33.09.3.

51.001

15.02.33.12.3.

51.005

15.02.33.12.3.

51.004

15.03.33.15.3.

00.999

15.06.33.15.3.

00.999

15.01.33.15.3.

00.999

15.04.33.15.3.

00.999

15.02.33.15.3.

00.999

15.03.33.15.3.

52.008

15.03.33.15.3.

52.001

15.03.33.15.3.

52.004

Page 66: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   60     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

786 Virar‐Surat Section:‐ Provision of Fuse alarm DF(4) 44,43  .. 4,00  40,43 

system for balance fuses at stations & relay huts.

787 Virar‐Surat Section:‐ Provision of Earth Leakage DF(4) 95,73  .. 4,00  91,73 

Detector at 15 stations & 34 Relay huts.

788 Chuchgate ‐ Virar :‐ Replcement of relays which DRF 91,20  .. 7,00  84,20 

have outlived their designed life

789 Valsad: Replacement of Telephone Exchange based on DRF 30,78  .. 7,00  23,78 

IP Based technology.

790 Mumbai Division :‐ Provision of Video Conferencing DF(4) 21,37  .. 4,00  17,37 

system for Board room of DRM office Mumbai

central.

791 Valsad‐Surat section :‐ Reliability improvement by DF(4) 78,15  .. 4,00  74,15 

way of redundancies for track occupancy detection

on Bridge portion

Vadodara

792 Surat‐ Vadodara Section: Reliability Improvement DF(4) 82,93  .. 4,00  78,93 

by way of redundancy for track occupancy at bridge

No. 474,478,480 and 514

793 Panoli‐Ankleswar Section :Reliability Improvement DF(4) 86,30  .. 4,00  82,30 

by way of redundancy for track occupancy

794 Varedia‐Palej Section :Reliability Improvement by DF(4) 86,30  .. 4,00  82,30 

way of redundancy for track occupancy

795 Vadodara Division:‐Provision of VOIP based control DF(4) 50,78  .. 4,00  46,78 

communication system in Vadodara‐Geratpur,

Vadodara‐Godhra & Anand‐Godhra sections.

Ratlam

796 Ratlam‐Chittorgarh and Ujjain‐Bhopal section‐ DRF 51,20  .. 7,00  44,20 

Provision of Route and shunt LED signal units.

797 Godhra‐Meghnagar Section: Replacement of Old aged DRF 95,61  .. 7,00  88,61 

BPAC Mux & Analog Axle Counter by Digital Axle

counter with UFSBI

798 Godhra‐Ratlam Section:‐ Replacement of Defective DRF 98,69  .. 7,50  91,19 

Signalling Cables to enhance safety and

reliability of S&T Gears .

799 Ratlam division‐  Provision of automatic media DF(4) 58,19  .. 4,00  54,19 

change over system suitable for UFSBI.

800 Ratlam Division‐Replacement of Electronic exchange DRF 98,76  .. 7,00  91,76 

128 lines at Hospital, Diesel Shed, RRI Tower & 

over aged cable of local area for strengthening of

exchange network at.

S & T WORKS

15.03.33.15.3.

52.005

15.03.33.15.3.

52.006

15.03.33.15.3.

52.007

15.03.33.15.3.

52.002

15.03.33.15.3.

52.003

15.03.33.15.3.

52.009

15.06.33.15.3.

55.001

15.06.33.15.3.

55.002

15.06.33.15.3.

55.003

15.06.33.15.3.

55.004

15.05.33.15.3.

54.002

15.05.33.15.3.

54.003

15.05.33.15.3.

54.005

15.05.33.15.3.

54.006

15.05.33.15.3.

54.008

Page 67: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   61     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

801 Ratlam division:‐ Provision of Track Feed Charger DF(4) 49,07  .. 5,00  44,07 

Failure alarm system at leftover 38 stations.

802 Ratlam‐E ‐Bangrod‐Runkheda  IBS: Shifting of DRF 74,41  .. 7,00  67,41 

indoor signalling equipment from existing

dilapidate Porta cabin relay room to new location

and construction of new S&T rooms.

803 Ratlam division: Replacement of Defective VRLA DRF 79,04  .. 7,00  72,04 

batteries  for IPS.

Ahmedabad

804 Ahmedabad Division: Provision of Solar Power Cap. 1,52,93  .. 1 1,52,92 

System for standby power supply arrangement at 19

stations of Samakhiali‐New Bhuj,

Mahesana‐Viramgaom & Mahesana‐Patan section.

805 Proposal covers complete division: Replacement of DRF 82,95  .. 7,00  75,95 

101 km of cable, VG‐2, DHG‐ 34, SBI‐7, GIM‐3,

MSH‐25, ADI‐30. The estimate includes trenching

and laying along with laying materials. Supply of

cable not taken in the estimate, cable received

806 Supply, installation and wiring of ELD at 27 DF(4) 96,07  .. 4,00  92,07 

stations. Two no of 12 channel ELD for PI and 4 no

for RRI.  Stations of VG‐SIOB and KLL‐PNU section

not taken in the estimate as covered in doubling

and DFCIL work respectively. Remaning stations

807 Supply and installation of fire alarm system. DF(4) 48,62  .. 4,00  44,62 

Proposal covers 15 station. SHB, CLDY A, CLDY B,

ADI RRI, MSH, PNU, VG, GIM, BLDI, KLL, KHD, DHG, 

SBIRRI,MALB & SIOB.

808 The estimate covers replacement of neutral relay, DRF 98,48  .. 7,00  91,48 

point group, SH group, QNN1, QNA1, QS3, QTA2 & QL1

of ADI RRI, GIM, MSH‐VG, PNU‐SIOB block ckt, KHD.

These station relays has completed its codal life.

809 Replacement of old version LED light unit of DRF 86,03  .. 7,00  79,03 

SIOB‐GIM‐NBVJ & MSH‐VG section. The estimate

includes supply of main signal LED, SH LED, Route

LED and Calling signal LED. This also includes LED

ECR.

Rajkot

810 Supply, Installation Testing & Commissioning of  DF(4) 28,01  .. 4,00  24,01 

OFC base way station equipments  with rack/Wall

mounting  arrangement in RJT‐VG Section of RJT

Division.

811 Rajkot Division : Provision of Earth Leakage DF(4) 56,33  .. 4,00  52,33 

Detector at 41 stations.

812 Rajkot Division: Provision of fuse alarm system at DF(4) 42,43  .. 4,00  38,43 

Kanalus, Rajkot and Surendranagar.

S & T WORKS

15.05.33.15.3.

54.001

15.05.33.15.3.

54.007

15.05.33.15.3.

54.004

15.01.33.15.2.

50.001

15.01.33.15.3.

50.004

15.01.33.15.3.

50.005

15.01.33.15.3.

50.002

15.01.33.15.3.

50.001

15.01.33.15.3.

50.003

15.04.33.15.3.

53.003

15.04.33.15.3.

53.001

15.04.33.15.3.

53.002

Page 68: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   62     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Bhavnagar

813 Bhavnagar Division: Provision of fuse indication DF(4) 48,97  .. 4,00  44,97 

and monitoring system at 12 Panel interlocked

stations (RJT‐SMNH 05 stations, BVC‐DLJ ‐ 07

stations) and 19 LC interlocked gates.

814 Bhavnagar Division: Replacement of Earth Leakage DRF 82,27  .. 7,50  74,77 

Detector at 41 location in RJT‐SMNH (14 stations &

11 LC gates), JLR‐WSJ (6 stations) BVC‐SOA (7

stations & 01 LC gate) and PIT & MHV stations.

815 Bhavnagar Division: Provision of Solar Power DF(4) 89,66  .. 4,00  85,66 

System for standby power supply arrangement at

BVC‐DLJ (07 Stations) section and PIT station.

816 Bhavnagar Division: Provision of  failure alarm DF(4) 91,61  .. 4,00  87,61 

for track feed battery charger on BVC‐DLJ &

RJT‐SMNH  sections.

817 Bhavnagar Division: Improving and strenghtening of DF(4) 32,97  .. 4,00  28,97 

OFC hut at various locations.

Mumbai

818 Works costing below DRM's Power DRF 4,00  .. 4,00  ..

DF(4) 4,00  .. 4,00  ..

Vadodara

819 Works costing below DRM's Power Cap. 1,00  .. 1,00  ..

DRF 2,00  .. 2,00  ..

DF(4) 1,00  .. 1,00  ..

Ratlam

820 Works costing below DRM's Power Cap. 1,00  .. 1,00  ..

DRF 3,00  .. 3,00  ..

DF(4) 3,00  .. 3,00  ..

Ahmedabad

821 Works costing below DRM's Power DRF 2,00  .. 2,00  ..

DF(4) 1,00  .. 1,00  ..

Rajkot

822 Works costing below DRM's Power DRF 2,00  .. 2,00  ..

DF(4) 1,00  .. 1,00  ..

Bhavnagar

823 Works costing below DRM's Power Cap. 1,00  .. 1,00  ..

DRF 2,00  .. 2,00  ..

DF(4) 1,00  .. 1,00  ..

TOTAL‐NEW WORKS Cap. .. .. 3,01  ..

DRF .. .. 1,00,00  ..

DF(4) .. .. 1,00,00  ..

S & T WORKS

15.02.33.15.3.

51.001

15.02.33.15.3.

51.002

15.02.33.15.3.

51.005

15.02.33.15.3.

51.004

15.02.33.15.3.

51.003

15.03.33.15.3.

00.999

15.06.33.15.3.

00.999

15.05.33.15.3.

00.999

15.01.33.15.3.

00.999

15.04.33.15.3.

00.999

15.02.33.15.3.

00.999

Page 69: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   63     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

TOTAL‐S & T Works Cap. .. .. 30,40  ..

DRF .. .. 16,63,44  ..

DF(3) .. .. 2,41,65  ..

DF(4) .. .. 9,33,33  ..

A ‐ Works in Progress

Vadodara

824 Vadodara Division ‐ Replacement of averaged, DRF 1,10,64  .. 1,10,64  ..

undersized AT cables at various places.

Ratlam

825 Western Railway:‐ Use of renewable energy sources DF(3) 2,26,09  27,75  1,50,00  48,34 

for inproving energy efficiency and energy

conservation (Part of PB 2010‐11 item No.264 of

CR). (WRLY/U/10‐11)

826 RTM (P) Division:‐ Replacement of over aged LT DRF 55,13  44,42  3,19  7,52 

distribution panels  & Replacement of existing

worn out earthing at Rly. Power house, PRS &

Electrical sub station & replacement of worn out

earths in staff quarters. (RTM/U/11‐12)

Mumbai

827 Works costing below DRM's Power DRF 8,99  .. 8,99  ..

Vadodara

828 Works costing below DRM's Power DRF 60 .. 60 ..

Ratlam

829 Works costing below DRM's Power DRF 1 .. 1 ..

DF(3) 14,48  .. 14,48  ..

Rajkot

830 Works costing below DRM's Power DRF 5,00  .. 5,00  ..

Bhavnagar

831 Works costing below DRM's Power DRF 7,15  .. 7,15  ..

DF(3) 10,00  .. 10,00  ..

TOTAL‐WORKS IN PROGRESS DRF .. .. 1,35,58  ..

DF(3) .. .. 1,74,48  ..

B ‐ New Works

Mumbai

832 Churchgate‐GLO‐Replacement of overaged wiring & DRF 89,92  .. 40,00  49,92 

switch boards in GLO office building.

833 Mumbai Division‐Improvement of earthings by DRF 79,93  .. 31,80  48,13 

provision of maintenance free earthings

834 Churchgate‐Replacement of overaged wiring & switch DRF 79,93  .. 40,00  39,93 

boards in CCG station office building

Vadodara

835 Pratapnagar:‐Replacement of over aged water DRF 22,22  .. 20,00  2,22 

chilled AC package units  6 Nos of  10 TR capacity

for TPC/ EDPM / Controll  office at DRM office.

Ratlam

836 Ratlam Division‐Replacement of worn out earths in DRF 23,04  .. 20,00  3,04 

staff quarters & service buildings.

OTHER ELECTRICAL WORKS

15.06.36.14.2.

55.001

15.05.36.10.2.

54.001

15.05.36.11.3.

54.001

15.03.36.15.3.

00.999

15.06.36.15.3.

00.999

15.05.36.15.3.

00.999

15.04.36.15.3.

00.999

15.02.36.15.3.

00.999

15.03.36.15.3.

52.003

15.03.36.15.3.

52.002

15.03.36.15.3.

52.001

15.06.36.15.3.

55.001

15.05.36.15.3.

54.001

Page 70: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   64     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Ahmedabad

837 Ahmedabad Area:‐ Replacement of overaged Power DRF 1,50,00  .. 10 1,49,90 

transformers of 500 KVA, 250KVA, and VCB

838 Gandhidham:‐ Electrical work in connection with DF(3) 69,67  .. 10,00  59,67 

Strengthening and improvement of HT power

distribution system of station cubical at.

Rajkot

839 Hapa:‐Replacement of Transformarof 2X300 Kva DRF 1,64,83  .. 10 1,64,73 

capacity along with the associated HT control

gears at Hapa sub station.

840 Okha : Provision of Dyna Drive facility at. DF(3) 50,11  .. 7,50  42,61 

Bhavnagar

841 Bhavnagar Term. depot: Providing of Dyna Drive for DF(3) 50,11  .. 7,50  42,61 

25 KW alternators testing at

Mumbai

842 Works costing below DRM's Power DRF 16,00  .. 16,00  ..

DF(3) 5,00  .. 5,00  ..

Vadodara

843 Works costing below DRM's Power DRF 14,00  .. 14,00  ..

Ratlam

844 Works costing below DRM's Power DRF 13,00  .. 13,00  ..

Ahmedabad

845 Works costing below DRM's Power DRF 10,00  .. 10,00  ..

Rajkot

846 Works costing below DRM's Power DRF 8,00  .. 8,00  ..

Bhavnagar

847 Works costing below DRM's Power DRF 6,00  .. 6,00  ..

TOTAL‐NEW WORKS DRF .. .. 2,19,00  ..

DF(3) .. .. 30,00  ..

TOTAL‐Other Electrical Works DRF .. .. 3,54,58  ..

DF(3) .. .. 2,04,48  ..

A ‐ Works in Progress

Mumbai

848 Churchgate‐Marine Lines Seciton ‐  Replacement of DRF 1,99,60  .. 54,00  1,45,60 

non standard OHE structures.

849 Churchgate‐Virar Section ‐ Provision of insulation DRF 69,82  .. 38,00  31,82 

scheme for catenary wire under FOB/ROB.

850 Providing DC voltage (Battery) monitoring relay at DF(3) 66,59  30,59  35,02  98

traction sub stations in VR‐JL section of Mumbai

division

851 Churchgate‐ Virar section ‐ Replacement of non DRF 91,51  5,28  50,00  36,23 

standard suspension adaptor fittings of OHE.

OTHER ELECTRICAL WORKS

15.01.36.15.2.

50.001

15.01.36.15.3.

50.001

15.04.36.15.2.

53.001

15.04.36.15.3.

53.001

15.02.36.15.3.

51.001

15.03.36.15.3.

00.999

15.06.36.15.3.

00.999

15.05.36.15.3.

00.999

15.01.36.15.3.

00.999

15.04.36.15.3.

00.999

15.02.36.15.3.

00.999

TRACTION DISTRIBUTION WORKS

15.03.37.14.2.

52.001

15.03.37.14.3.

52.001

15.03.37.14.3.

52.003

15.03.37.14.3.

52.002

Page 71: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   65     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

852 Mahalaxi and Elphinstone Road:‐ Replacement of DRF 95,54  69,74  23,75  2,05 

anchoring arrangement on two bridges by

independent structures. (BCT/U/11‐12)

Vadodara

853 Vadodara Division :‐ Strenghtening of OHE by DRF 49,79  .. 40,00  9,79 

providing proper cross feeder, G jumper, C jumper

etc.

854 BRC Division‐Replacement of overaged 25 kV SP DRF 50,02  1 45,00  5,01 

Isolator

855 BRC Division ‐ Re‐location of critical DRF 97,59  46,97  45,00  5,62 

implantation locations‐

856 BRC Division‐ Augmentation of capacitor bank at DF(3) 35,97  19,59  16,38  ..

Godhra TSS.

Ratlam

857 Godhra‐Nadga  Section ‐ Replacement of Oil type DRF 1,82,73  66,15  82,72  33,86 

interrupter by Vacuum type Interrupter.

858 RTM Division:Replacement of relay and control DRF 60,00  .. 15,00  45,00 

panel at DHD, BMI & NAD traction substation of RTM

division.

859 Replacement of existing isolator of OHE with DRF 50,01  39,53  6,48  4,00 

higher rating isolator and replacement of cross

feeder at FP/SP/SSP of RTM division

860 RTM Division:Augmentation of capacitor bank at RTM DF(3) 40,64  .. 19,00  21,64 

& NAD/TSS of Ratlam division, Western Railway.

Mumbai

861 Works costing below DRM's Power DRF 66,20  .. 66,20  ..

DF(3) 29,60  .. 29,60  ..

Vadodara

862 Works costing below DRM's Power DRF 52,00  .. 52,00  ..

Ratlam

863 Works costing below DRM's Power DRF 32,55  .. 32,55  ..

Ahmedabad

864 Works costing below DRM's Power DRF 36,00  .. 36,00  ..

TOTAL‐WORKS IN PROGRESS DRF .. .. 5,86,70  ..

DF(3) .. .. 1,00,00  ..

B ‐ New Works

Mumbai

865 Virar‐Surat Section‐Replacement of existing DRF 1,98,09  .. 1,00  1,97,09 

underrated 25 kV single pole and double pole

isolators

866 Virar‐Surat Section ‐Maintain of OHE profile by DRF 2,49,90  .. 1,00  2,48,90 

replacement of existing worn out inspan droppers

in connection with  inputs required for running of

trains at 160 KMPH

TRACTION DISTRIBUTION WORKS

15.03.36.11.3.

52.001

15.06.37.14.3.

55.001

15.06.36.12.3.

55.002

15.06.36.12.3.

55.003

15.06.36.12.3.

55.001

15.05.36.12.2.

54.001

15.05.37.14.3.

54.001

15.05.36.12.3.

54.002

15.05.37.14.3.

54.002

15.03.37.15.3.

00.999

15.06.37.15.3.

00.999

15.05.37.15.3.

00.999

15.01.37.15.3.

00.999

15.03.37.15.2.

52.002

15.03.37.15.2.

52.001

Page 72: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   66     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Vadodara

867 Vadodara Division ‐ Replacement of faded porcelain DRF 36,96  .. 75 36,21 

insulators by long creepage path 1050 mm OHE 

insulators at major yards of polluted area.

868 Vadodara division ‐ Augmentation of existing DRF 1,99,94  .. 1,00  1,98,94 

transformer capacity by providing ONAF arrangement

at BH and MPR traction sub‐stations, in connection

with raising of speed potential of OHE from 140 to

160 KMPH.(Two trains in each direction)

Mumbai

869 Works costing below DRM's Power DRF 14,70  .. 14,70  ..

DF(3) 20,03  .. 20,03  ..

Vadodara

870 Works costing below DRM's Power DRF 4,71  .. 4,71  ..

DF(3) 6,29  .. 6,29  ..

Ratlam

871 Works costing below DRM's Power DRF 5,14  .. 5,14  ..

DF(3) 6,86  .. 6,86  ..

Ahmedabad

872 Works costing below DRM's Power DRF 1,70  .. 1,70  ..

DF(3) 2,27  .. 2,27  ..

TOTAL‐NEW WORKS DRF .. .. 30,00  ..

DF(3) .. .. 35,45  ..

TOTAL‐Traction Distribution DRF .. .. 6,16,70  ..

Works DF(3) .. .. 1,35,45  ..

A ‐ Works in Progress

Mumbai

873 PAREL WORKSHOP Improvement to storm water drainag DF(3) 2,42,41  .. 40,00  2,02,41 

system and water pipe line to prevent water

logging and contamination of drinking water.

874 Valsad:‐ Providing one pit line & associated sick DF(3) 1,00,13  40,08  1 60,04 

line facilities. (BCT/S/06‐07)

875 Mumbai Central (CFO Yard):‐ Extension of covered DF(3) 92,99  70,14  1 22,84 

shed on extended pit lines. (BCT/U/10‐11)

876 Parel (CR Shop):‐ Improvement to flooring by DF(3) 43,20  .. 40,00  3,20 

hardonite of Wheel shop ,  North side of ACC shop.

(BCT/U/10‐11)

877 Parel (CR Shop):‐ Providing  CC apron at New Trail Cap. 84,15  71,10  1,00  12,05 

Line (NTL) and Old Trial Line (OTL). (BCT/U/10‐11)

878 Bandra Terminus:‐ Provision of heavy duty DF(3) 1,06,00  35,23  1 70,76 

industrial paver block pathway at STR Miatenance

Lines. (BCT/U/11‐12)

879 Lower Parel:‐ Replacement and laying of LT cables DRF 47,90  .. 1 47,89 

of different sizes as per schedule of rate and

scope of work. (BCT/U/11‐12)

TRACTION DISTRIBUTION WORKS

15.06.37.15.3.

55.001

15.06.37.15.2.

55.001

15.03.37.15.3.

00.999

15.06.37.15.3.

00.999

15.05.37.15.3.

00.999

15.01.37.15.3.

00.999

WORKSHOPS INCLUDING PUS

15.03.42.11.1.

52.001

15.03.42.06.2.

52.001

15.03.42.10.3.

52.002

15.03.42.10.3.

52.003

15.03.42.10.3.

52.005

15.03.42.11.3.

52.001

15.03.42.11.3.

52.002

Page 73: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   67     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

880 BCT (CFO Yard)‐Provision of CC Apron on washing DF(3) 99,59  .. 1 99,58 

lines

Vadodara

881 Pratapnagar (Workshop):‐ Providing Hardonite DF(3) 83,11  46,49  21,09  15,53 

Flooring in various shops & IOH facilities for ICF

Bogies. (BRC/S/10‐11)

882 BRCY ‐ Improvement to storm water drainage system DF(3) 87,95  33,57  1 54,37 

and roof of electric loco shed.

Ratlam

883 Ratlam (D/Shed):‐ Rebuilding of heavily cracked DRF 99,40  50,66  10,00  38,74 

and leaky administrative building. (RTM/S/09‐10)

884 Dahod (workshop):‐ Replacement of Old corroded DRF 98,51  37,83  1 60,67 

steel member of structure and painting of all

steel structure to prevent rusting. (RTM/U/10‐11)

885 Dahod (workshop):‐ Renovation work of Battery DF(3) 34,66  21,69  1,00  11,97 

Section. (RTM/U/10‐11)

Ahmedabad

886 ADI (BG):‐ Repair to cat walks of washing cum DRF 97,36  .. 1 97,35 

inspection pit lines with portal lightings.

887 Ahmedabad ‐ Augmentation to BG pit line at ADI DF(3) 96,76  1 45,00  51,75 

area

Lower Parel Workshop

888 Lower Parel Workshop ‐ MPCB compliance : Provision DF(3) 16,32  .. 16,32  ..

of ETP

Mumbai

889 Works costing below DRM's Power DF(3) 17,78  .. 17,78  ..

Ratlam

890 Works costing below DRM's Power Cap. 12,30  .. 12,30  ..

DF(3) 10,00  .. 10,00  ..

Lower Parel Workshop

891 Works costing below DRM's Power Cap. 10,55  .. 10,55  ..

DRF 2,39  .. 2,39  ..

TOTAL‐WORKS IN PROGRESS Cap. .. .. 23,85  ..

DRF .. .. 12,42  ..

DF(3) .. .. 1,91,24  ..

B ‐ New Works

Ratlam

892 Ratlam Diesel Shed ‐ Dust free Axle box Cap. 27,28  .. 5,00  22,28 

overhauling and under frame component overhauling

room

Ahmedabad

893 Vatva Diesel shed:‐ Improvement to flooring of DF(3) 28,86  .. 5,00  23,86 

store building and approach road upto SMM/DL/VTA.

WORKSHOPS INCLUDING PUS

15.03.42.12.3.

52.003

15.06.42.10.3.

55.001

15.06.42.12.3.

55.001

15.05.42.09.3.

54.003

15.05.42.10.3.

54.004

15.05.42.10.3.

54.003

15.01.42.12.3.

50.002

15.01.42.12.3.

50.001

15.10.42.14.3.

74.001

15.03.42.15.3.

00.999

15.05.42.15.3.

00.999

15.10.42.15.3.

00.999

15.05.42.15.3.

54.001

15.01.42.15.3.

50.001

Page 74: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   68     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

TOTAL‐NEW WORKS Cap. .. .. 5,00  ..

DF(3) .. .. 5,00  ..

TOTAL‐Workshops including PUs Cap. .. .. 28,85  ..

DRF .. .. 12,42  ..

DF(3) .. .. 1,96,24  ..

A ‐ Works in Progress

Mumbai

894 Udhna ‐ Jalgaon Section (Corporate Welfare Plan) ‐ DRF 1,26,49  78,89  30,00  17,60 

Rebuilding of 17 units type‐II quarters.

895 Virar‐Surat section:‐ Providing 12 units type II DRF 99,87  47,53  24,00  28,34 

quarters in lieu of earlier demolished unsafe

quarter No 25/L at Udhna.

Vadodara

896 Ankleshwar :‐ Providing 15 units type‐II  for DRF 1,18,92  21,21  20,00  77,71 

gangmen in lieu of Gang chawl No. E/34.

(BRC/U/09‐10)

897 Vadodara Division:‐ Providing 7 units type‐III and Cap. 1,24,40  66,73  26,00  31,67 

3 units type‐IV quarters for supervisors.

(BRC/U/09‐10)

898 Vadodara Division : Providing Type‐V bungalows for DRF 2,34,66  2,21,71  12,95  ..

officers (Total 10 units) on replacement account.

899 Vadodara Division: Providing 12 Units Type ‐ II DRF 1,13,76  1,06,70  1 7,05 

quarters for gangman at Gothaj in lieu of

Gangchwal under the SSE (P.Way) MHD Jurisdiction.

(BRC/U/11‐12)

900 Vadodara Division:‐Providing new 8 Units Type II DRF 86,27  .. 7,00  79,27 

quarters in lieu of abandoned staff quarters block

No. E/90 at Bharuch Railway station.

Ratlam

901 Mhow and Jaora:‐ Providing 5 units type‐IV Cap. 70,84  19,76  5,00  46,08 

quarters for station superitendent & SE(P.Way) at

Mhow & JAO and Providing 2 units type‐III quarters

for Dy.SS & JE(P.Way) at Jaora. (RTM/U/09‐10)

902 CNA‐NMH Section:‐ Shifting of abandoned mid Cap. 94,00  73,96  1 20,03 

section gang chawl No. 28 at Chanderia Station.

(RTM/U/11‐12)

903 GDA‐NAD Sec:‐ Providing 8 unit type III quarters Cap. 72,75  .. 65,00  7,75 

for PWS at THDR, BJG, CCL, SAT, LMK, MAM, JKT &

KUH stations.

904 Indore ‐ Providing 10 units Type ‐II quarters DRF 99,37  .. 7,00  92,37 

(multistoried) in lieu of  abandoned  quarters.

Ahmedabad

905 Ahmedabad ‐ Construction of 4 type V and 4 type IV Cap. 2,00,62  1,54,15  1 46,46 

quarters for officers.

STAFF QUARTERS

15.03.51.10.2.

52.001

15.03.51.12.3.

52.001

15.06.51.09.3.

55.001

15.06.51.09.3.

55.002

15.06.51.09.2.

55.001

15.06.51.11.3.

55.001

15.06.51.14.3.

55.001

15.05.51.09.3.

54.001

15.05.51.11.3.

54.001

15.05.51.13.3.

54.001

15.05.51.14.3.

54.001

15.01.51.10.2.

30.001

Page 75: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   69     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

906 GIM‐Providing 10 units type II Qrts on replacement DRF 1,00,49  10,00  1,00  89,49 

account in lieu of SARVA colony.

Rajkot

907 RJT Divn:Replacement of 10 units type‐I DRF 83,84  74,85  6,73  2,26 

substandard qtrs of Gang No 49 at KNLS by standard

type‐II quarters.

908 DWK: Providing 4 unit type‐II qtrs for RPF staff. Cap. 33,21  10,68  20,00  2,53 

909 Than ‐ Replacement of non‐standard type I quarters DRF 89,87  .. 1,00  88,87 

by type II standard quarters.(10 units)

910 RJT : Providing 2 units transit accomodation for Cap. 34,01  .. 25,00  9,01 

Officers.

Bhavnagar

911 ADEN Botad Sub Division:‐ Providing 3 units Cap. 43,00  29,80  6,00  7,20 

Type‐III Qtrs. for Dy. SS & ASM SEJ & Dy. SS 

operating Deptt.at Dhandhuka. (BVP/U/08‐09)

912 Veraval:‐ Providing 3‐units type IV qtrs. For Cap. 39,95  36,31  1,00  2,64 

CPWI,PWI,and IOW. (BVP/U/08‐09)

913 Jamjodhpur: Providing 6 units type II quarters and DRF 45,00  25,24  16,76  3,00 

one Units type III quarter on replacement

accounts.

TOTAL‐WORKS IN PROGRESS Cap. .. .. 1,48,02  ..

DRF .. .. 1,26,45  ..

B ‐ New Works

Mumbai

914 Jogeshwari (East):‐ Providing 8 units type‐II Cap. 82,47  .. 15,00  67,47 

quarters.

Vadodara

915 Bharuch:‐ Providing 8 unit Type II quartes in lieu DRF 75,27  .. 5,00  70,27 

of existing abandoned staff quarters of Block No.

E/106 on replacement account.

Ratlam

916 Ratlam ‐ Providing 4 UNIT  Type‐IV quarters. Cap. 93,57  .. 30,00  63,57 

917 SEHORE‐Providing Type IV quarters 1 Unit,Type Cap. 86,05  .. 35,00  51,05 

III‐2 Units and Type II‐2 Units for Engineering

Staff.

Ahmedabad

918 Detroj:‐ Providing 8 unit type‐II quarters in lieu DRF 93,41  .. 5,00  88,41 

of sub standard quarters.

STAFF QUARTERS

15.01.51.12.3.

30.001

15.04.51.12.3.

53.001

15.04.51.12.3.

53.002

15.04.51.14.3.

53.001

15.04.51.14.3.

53.002

15.02.51.08.3.

51.001

15.02.51.08.3.

51.002

15.02.51.12.3.

51.001

15.03.51.15.3.

52.001

15.06.51.15.3.

55.001

15.05.51.15.3.

54.002

15.05.51.15.3.

54.001

15.01.51.15.3.

50.001

Page 76: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   70     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

TOTAL‐NEW WORKS Cap. .. .. 80,00  ..

DRF .. .. 10,00  ..

TOTAL‐Staff Quarters Cap. .. .. 2,28,02  ..

DRF .. .. 1,36,45  ..

A ‐ Works in Progress

Headquarter

919 Vadodara and Ratlam  Division ‐ Rewiring of staff DF(2) 1,50,00  43,94  17,00  89,06 

quarters

Mumbai

920 Virar‐Surat Section ‐ Corporate Welfare plan ‐ DRF 1,44,89  1,39,84  4,99  6

Improvements to quarters, latrines, bathrooms,

kitchen, court‐yard, verandas, re‐roofing, decade

wood work raising of floors, Augmentation of water

supply.

921 Dahanu road:‐ Improvement to sub‐standard quarter DF(2) 54,40  27,35  15,00  12,05 

type I. (BCT/S/08‐09)

922 Malad:‐ Segregation of domestic water suply to DF(2) 28,73  6,00  10,00  12,73 

colony and distribution system improvement.

(BCT/S/08‐09)

923 Udhna‐Jalgaon Section:‐ Providing bathroom DF(2) 44,72  4,41  25,00  15,31 

facilities in 60 type I qtrs at AEN/E/NDB.

(BCT/U/09‐10)

924 Santacruz (East) – Improvement to water supply by DRF 81,15  17,62  40,00  23,53 

construction of 80,000 lit. Capacity underground

tank with pump room in lieu of underground tank.

(BCT/U/11‐12)

925 Bandra (West):‐ Improvement to water supply by DF(2) 1,02,15  22,57  40,00  39,58 

providing overhead tanks to enhancement of BMC

water supply

Vadodara

926 Vadodara Division ‐ Improvement to drainage DRF 1,88,59  1,58,27  1 30,31 

arrangements in Railway colony of various

stations.

927 Derol,Timba Road,Godhara:‐Improvement to watering Cap. 95,27  80,61  1 14,65 

arrangement by providing 100000 liters capacity

RCC OH tank with 20mm dia. Bore and paipe line

arrangement

Ratlam

928 Dahod ‐ Standardization of Sub standard qtrs 200 DRF 1,23,32  35,85  80,00  7,47 

Nos. in type‐II at Dhobighat, fiulter site area,

Sudaimata, Godhra road , char rasta & Bakri road 

in connection with CWP

929 Ratlam ‐Khandawa Section:‐ Providing Individual Cap. 42,92  18,61  14,00  10,31 

latrines in staff quarters. (RTM/S/08‐09)

AMENITIES FOR STAFF

15.00.52.11.2.

55.001

15.03.52.08.2.

52.001

15.03.52.08.3.

52.006

15.03.52.08.3.

52.008

15.03.52.09.3.

52.003

15.03.52.11.3.

52.001

15.03.52.12.3.

52.001

15.06.52.11.2.

55.001

15.06.52.10.2.

55.001

15.05.52.11.2.

54.001

15.05.52.08.3.

54.004

Page 77: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   71     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

930 Ratlam ‐ Rebuilding of old Dilapidated DRF 2,38,77  49,56  1,20,00  69,21 

senior/junior institute

931 Ratlam‐Chanderia Section:‐ Improvement to sub Cap. 91,27  88,09  1 3,17 

standard quarters by providing basic facility like

lat, bath, kitchen & court yard & Raising of

plinth of staff quarters of Mandsaur(Gang chawl

No.47)& Jaora. (RTM/U/09‐10)

932 RTM‐Replacement of over aged filter plant at. DRF 99,99  51,27  48,72  ..

Ahmedabad

933 Sabarmati:‐ Replacement of 2 Nos. existing DRF 95,25  33,65  60,00  1,60 

dilapidated tanks at township and near pump No. 4

with one bore and inter connectivity of various

bores. (ADI/U/09‐10)

934 MALB: Providing 1 lakh litres over head tank DF(2) 27,23  5,00  22,00  23

935 Kalol :‐Providing 1 lakh litres RCC OH tank on DRF 26,15  .. 25,00  1,15 

replacement basis

936 Gandhidham (Colony) ‐ Providing 1 lac. Ltr DF(2) 41,32  .. 30,00  11,32 

capacity RCC OH Tank at double storey quarters.

Rajkot

937 New Jamnagar:‐ Providing RCC O/H tank 100 kl Cap. 41,83  13,89  11,82  16,12 

Capacity & RCC sump 100kl capacity, one No.

borewell of 250mm dia. (RJT/U/10‐11)

Mumbai

938 Works costing below DRM's Power DF(2) 12,36  .. 12,36  ..

Vadodara

939 Works costing below DRM's Power DF(2) 5,47  .. 5,47  ..

Ratlam

940 Works costing below DRM's Power DF(2) 2,00  .. 2,00  ..

Ahmedabad

941 Works costing below DRM's Power DF(2) 3,00  .. 3,00  ..

Rajkot

942 Works costing below DRM's Power DF(2) 2,03  .. 2,03  ..

Bhavnagar

943 Works costing below DRM's Power DRF 1,00  .. 1,00  ..

DF(2) 8,11  .. 8,11  ..

AMENITIES FOR STAFF

15.05.52.09.2.

54.001

15.05.52.09.3.

54.005

15.05.52.13.6.

54.001

15.01.52.09.3.

50.003

15.01.52.12.3.

50.002

15.01.52.13.3.

50.001

15.01.52.14.3.

50.001

15.04.52.10.3.

53.002

15.03.52.15.3.

00.999

15.06.52.15.3.

00.999

15.05.52.15.3.

00.999

15.01.52.15.3.

00.999

15.04.52.15.3.

00.999

15.02.52.15.3.

00.999

Page 78: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   72     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

TOTAL‐WORKS IN PROGRESS Cap. .. .. 25,84  ..

DRF .. .. 3,79,72  ..

DF(2) .. .. 1,91,97  ..

B ‐ New Works

Mumbai

944 Jagjivan Ram Hospital ( BCT)‐procurement of semi DRF 37,42  .. 13,40  24,02 

electric bed with mattress.

945 Bandra(East & West) Colony ‐ Structural repairs to DF(2) 1,43,61  .. 1,00  1,42,61 

staff quarters by replastering,ceiling

repair,column and beam repair and drainage line.

946 Valsad (ZMC):‐ Provision of basic staff amenities DF(2) 97,68  .. 20,00  77,68 

by providing Tiffin Room, Flooring, Roofing and

replacement of dilapidated health affecting AC

sheet by PPGI sheets including replacement of

windows.

947 Matunga :‐ Providing 2.25 lakhs OH tank to DF(2) 73,02  .. 1,00  72,02 

rationalise water supply

948 Nandurbar : Providing RCC overhead /Under ground DF(2) 98,57  .. 50 98,07 

water storage tank in lieu of old dilapidated

steel tank

Vadodara

949 Pratapnagar:‐Rewiring of staff quarters( TypeI & DRF 30,53  .. 1,00  29,53 

Type II) in Railway colony.

950 Pratapnagar:‐Providing facilities for stem cell DF(2) 20,78  .. 10,00  10,78 

threrapy in Railway Hospital in connection with

enhanced madical facilities as per guidelines.

Ratlam

951 Dahod:‐ Provision of toilets inside the compound DF(2) 78,22  .. 1,00  77,22 

wall in quarters with old & dilapidated community

toilets

952 Chanderiya ‐ Ratlam section ‐ Providing New bore Cap. 1,13,85  .. 50 1,13,35 

well with  pipe line  (at NMH, HKL, MLG, PIP, MDS, DRF 75,89  .. 20 75,69 

JAO, DLD & BRLA stations) along with Over head RCC

water tank at NMH= 2.25 Lac lit., MDS= 1.0 Lac

lit. & JAO =1.0 Lac lit, NBH 1.0 Lac litres

953 Godhra‐Nagda Section ‐ Improvement to water supply Cap. 52,49  .. 50 51,99 

network at various stations of staff colony. DRF 1,10,77  .. 20 1,10,57 

954 Dahod:‐ Rewiring of 219 units Types I  and 412 DRF 89,06  .. 1,00  88,06 

units Type II  (Total= 631 units) staff Quarter 

at FLG Colony.

Ahmedabad

955 Ahmedabad Division:‐ Providing latrine & bathroom DF(2) 91,70  .. 1,00  90,70 

in sub‐standard type‐I quarters under AEN/MG/SBI

Rajkot

956 Rajkot:‐ Rehabilitation of old staff quarters in DRF 88,61  .. 1,00  87,61 

Loco & Construction colony.

15.03.52.15.3.

52.004

15.03.52.15.2.

52.001

15.03.52.15.3.

52.002

15.03.52.15.3.

52.003

15.03.52.15.3.

52.001

15.06.52.15.3.

55.001

15.06.52.15.3.

55.002

15.05.52.15.3.

54.002

15.05.52.15.2.

54.001

15.05.52.15.2.

54.002

15.05.52.15.3.

54.001

15.01.52.15.3.

50.001

15.04.52.15.3.

53.001

Page 79: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   73     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

957 Rajkot:‐ Replacement of RCC Over Head Tank 2.50 KL DRF 92,65  .. 50 92,15 

capacity in KC Colony.

Bhavnagar

958 Botad ‐ Improvement to staff quarters of outside DF(2) 88,52  .. 1,00  87,52 

plaster, balcony, chajja, sunshade etc.

Mumbai

959 Works costing below DRM's Power Cap. 6,50  .. 6,50  ..

DRF 70 .. 70 ..

DF(2) 1,50  .. 1,50  ..

Vadodara

960 Works costing below DRM's Power Cap. 6,50  .. 6,50  ..

DRF 70 .. 70 ..

DF(2) 1,50  .. 1,50  ..

Ratlam

961 Works costing below DRM's Power Cap. 6,50  .. 6,50  ..

DRF 70 .. 70 ..

DF(2) 1,50  .. 1,50  ..

Ahmedabad

962 Works costing below DRM's Power Cap. 6,50  .. 6,50  ..

DRF 70 .. 70 ..

DF(2) 1,50  .. 1,50  ..

Rajkot

963 Works costing below DRM's Power Cap. 6,50  .. 6,50  ..

DRF 70 .. 70 ..

DF(2) 1,50  .. 1,50  ..

Bhavnagar

964 Works costing below DRM's Power Cap. 6,50  .. 6,50  ..

DRF 70 .. 70 ..

DF(2) 1,50  .. 1,50  ..

TOTAL‐NEW WORKS Cap. .. .. 40,00  ..

DRF .. .. 21,50  ..

DF(2) .. .. 44,50  ..

TOTAL‐Amenities For Staff Cap. .. .. 65,84  ..

DRF .. .. 4,01,22  ..

DF(2) .. .. 2,36,47  ..

A ‐ Works in Progress

Mumbai

965 Mumbai Central(L) to Bandra:Raising of suburban DF(1) 1,36,58  13,63  1,21,64  1,31 

section platforms   at BCT (L)  plat no.1&2, MX

plat no 2&3, EPR plat no.1&2, BA  plat no. 2&3 

from 840mm to 920 mm (08 platforms)

966 Churchgate & Grant Road  ‐Raising of suburban DF(1) 1,22,31  .. 1,20,00  2,31 

section platforms at CCG plat .no 1&2,2&3,3&4 and

GTR plat no 2&3  from 840mm to 920 mm( 08

platforms)

967 Mumbai Central ‐ Design, Development, Supply, DF(1) 1,99,71  1,36,10  50,00  13,61 

Installation, Testing & Commissioning of Machines

/ Equipments for setting up a Mechanized Laundry

of 3 Ton capacity on Turn Key Basis.

AMENITIES FOR STAFF

15.04.52.15.3.

53.002

15.02.52.15.3.

51.001

15.03.52.15.3.

00.999

15.06.52.15.3.

00.999

15.05.52.15.3.

00.999

15.01.52.15.3.

00.999

15.04.52.15.3.

00.999

15.02.52.15.3.

00.999

PASSENGER  AMENITIES

15.03.53.14.3.

52.001

15.03.53.14.3.

52.002

15.03.53.13.3.

52.002

Page 80: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   74     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

968 Surat ‐ Providing  RCC overhead  tank & water pipe DF(1) 1,75,69  1,25,69  50,00  ..

lines for segregation of coach watering

969 Dadar ‐ Renewal of deterioted COP covering and DRF 1,63,64  .. 75,00  88,64 

structure.

Vadodara

970 Vadodara Division :‐ Dismantaling of corroded DRF 2,06,82  .. 75,00  1,31,82 

existing covershed and providing new covershed at

Bharuch Railway station on platfom No. 1, 2, 3, 4

& 5.

971 Vadodara Division:‐Provision of of minimum DF(1) 2,19,69  .. 1,50,00  69,69 

essantial amenities on various Railway station on

Vadodara Division to eliminate shortfall.

Ratlam

972 Chittorgarh : Providing CC apron on PF no. 02 DF(1) 1,59,97  .. 10,00  1,49,97 

973 Augmentation of Laundry at IND & ETPat Junagad. DF(1) 1,23,36  .. 98,36  25,00 

974 UJN ‐ Providing additional FOB with connectivity DF(1) 1,98,65  1,30,65  50,00  18,00 

to all passenger platforms at IND end

975 UJN ‐Extension to existing FOB at NAD ends towards DF(1) 1,94,85  1,47,90  45,76  1,19 

Passenger platform no 8

976 Ujjain ‐ Developing sitting space with covering DF(1) 1,90,32  1,62,69  27,63  ..

shed on PF No 1 ( Nagda end) at old goods PF area

and Extension of PF shelter of galvenium at PF No

2/3 in connection to Sinhastha 2016 at.

977 RTM Div‐ Provision of Multiline train display DF(1) 1,69,71  .. 1,50,00  19,71 

boards at important stations in connection with

Simhastha Mela 2016.

978 Ratlam Division‐ Provision of 100 Toilets at DF(1) 1,72,04  .. 1,00,00  72,04 

various stations.

Ahmedabad

979 Ahmedabad :‐ Providing two passenger lift at DF(1) 1,40,71  1,33,83  6,88  ..

platform No.1 and one passenger lift on platform

No.2‐3, 4‐5, and 6‐7.

980 ADI Division:‐ Removal of deficiencies in Minimum DF(1) 1,91,06  .. 1,25,00  66,06 

Essential Amenities at stations over Ahmedabad

Division.

Mumbai

981 Works costing below DRM's Power DRF 2,15,01  .. 2,15,01  ..

DF(1) 6,00,00  .. 6,00,00  ..

Vadodara

982 Works costing below DRM's Power DRF 50,00  .. 50,00  ..

DF(1) 2,00,00  .. 2,00,00  ..

Ratlam

983 Works costing below DRM's Power DRF 1,37,00  .. 1,37,00  ..

DF(1) 6,00,00  .. 6,00,00  ..

PASSENGER  AMENITIES

15.03.53.09.3.

52.002

15.03.53.14.3.

52.003

15.06.53.14.3.

55.001

15.06.53.14.3.

55.002

15.05.53.13.3.

54.003

15.05.53.14.3.

54.002

15.05.53.13.3.

54.001

15.05.53.13.3.

54.002

15.05.53.11.3.

54.001

15.05.53.14.3.

54.001

15.05.53.14.6.

54.001

15.01.53.08.3.

50.001

15.01.53.14.3.

50.001

15.03.53.15.3.

00.999

15.06.53.15.3.

00.999

15.05.53.15.3.

00.999

Page 81: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   75     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Ahmedabad

984 Works costing below DRM's Power DRF 34,00  .. 34,00  ..

DF(1) 2,50,00  .. 2,50,00  ..

Rajkot

985 Works costing below DRM's Power DRF 78,00  .. 78,00  ..

DF(1) 2,00,00  .. 2,00,00  ..

Bhavnagar

986 Works costing below DRM's Power DRF 60,00  .. 60,00  ..

DF(1) 2,82,38  .. 2,82,38  ..

TOTAL‐WORKS IN PROGRESS DRF .. .. 7,24,01  ..

DF(1) .. .. 32,37,65  ..

B ‐ New Works

Mumbai

987 Dahanu Road ‐ Rasing of PF No.1, 2 ,3 and DF(1) 1,23,80  .. 30,00  93,80 

improvement to roof covering of cover shed under

ADEN‐Dahanu Road Section.

988 Dahanu Road: Improvement to circulating area, DF(1) 1,90,08  .. 30,00  1,60,08 

façade cover shed etc.

989 Navsari: Extension and raising of platforms to DF(1) 1,98,82  .. 1,50  1,97,32 

accimodate 24 coaches trains At PF No. 1

990 Vapi: Extension of platforms to accommodate 24 DF(1) 1,92,57  .. 1,50  1,91,07 

coaches trains‐Vapi PF No. 3

991 Santacruz‐Virar section: Replacement of AC sheet DRF 1,72,43  .. 40,00  1,32,43 

COP by galvalume.

992 Virar: Extension of PF 03 at Virar to accommodate DF(1) 2,00,00  .. 2,00  1,98,00 

18 coaches train.

Vadodara

993 Vadodara:‐Shifting of parcel office and booking DF(1) 1,90,25  .. 20,00  1,70,25 

office at Vadodara (P)

994 Vadodara Yard:‐Improvement of facilities like DF(1) 1,24,86  .. 40,00  84,86 

pucca handling area, all weather approach road,

adequate lighting, proper Cover shed etc at

Vadodara Goods shed

995 Derol:‐Extension of platforms of Dn & Up line DF(1) 1,79,69  .. 10,00  1,69,69 

platforms to accomodate 22/24 coaches trains.

Ratlam

996 Maksi‐Provision of Minimum Essential Amenities DF(1) 1,59,76  .. 30,00  1,29,76 

(MEA) at Raising of Level of PF No.1.

997 Bercha‐Provision of Minimum Essential DF(1) 1,60,48  .. 30,00  1,30,48 

Amenities(MEA) at (PF No.2) by Raising the level

of Paltform from RL to ML.

998 Ratlam Division‐Extension of platform length of DF(1) 1,67,87  .. 30,00  1,37,87 

Chittorgarh(PF No.4/5) & Nimbahera (PF No.1)

station for accommodating 24 coaches train over.

PASSENGER  AMENITIES

15.01.53.15.3.

00.999

15.04.53.15.3.

00.999

15.02.53.15.3.

00.999

15.03.53.15.3.

52.001

15.03.53.15.3.

52.003

15.03.53.15.3.

00.004

15.03.53.15.3.

00.005

15.03.53.15.3.

52.002

15.03.53.15.3.

00.006

15.06.53.15.3.

55.002

15.06.53.15.3.

55.001

15.06.53.15.3.

55.003

15.05.53.15.3.

54.001

15.05.53.15.3.

54.003

15.05.53.15.3.

54.002

Page 82: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   76     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

999 Ratlam Division‐Provision of passenger DF(1) 1,06,86  .. 50,00  56,86 

announcement system, LCD display boards, VHF sets,

Fare repeaters in connection with Simhastha Mela

2016

1000 Ratlam Division‐Provision of Coach Guidance Boards DF(1) 1,58,01  .. 40,00  1,18,01 

at Chittourgarh (PF No.3),Dewas(PF

No.1&2),Nimach(PF No.1),Mandsaur(PF No.1).

1001 Ratlam Division‐Replacement of coach guidance DRF 1,53,12  .. 60,00  93,12 

display system at Ratlam, Ujjain &  Chittourgarh

Statioin.

Ahmedabad

1002 Ahmedabad Division:‐ Final phase of removal of DF(1) 1,78,93  .. 50,00  1,28,93 

deficiencies in Minimum Essential Amenities.

1003 Ambli Road : Provision of Medium level PF No. 1 & DF(1) 1,98,29  .. 50,00  1,48,29 

2/3 and inter connecting pathway in connection

with Adarsh Station at.

Rajkot

1004 Rajkot:‐ Replacement of AC sheet, valley gutter DRF 1,39,08  .. 10,00  1,29,08 

and storm water down take pipe at Platform no.1 to

5 at.

Mumbai

1005 Works costing below DRM's Power DRF 50,00  .. 50,00  ..

DF(1) 1,00,00  .. 1,00,00  ..

Vadodara

1006 Works costing below DRM's Power DRF 30,00  .. 30,00  ..

DF(1) 1,00,00  .. 1,00,00  ..

Ratlam

1007 Works costing below DRM's Power DRF 40,00  .. 40,00  ..

DF(1) 1,25,00  .. 1,25,00  ..

Ahmedabad

1008 Works costing below DRM's Power DRF 30,00  .. 30,00  ..

DF(1) 80,00  .. 80,00  ..

Rajkot

1009 Works costing below DRM's Power DRF 25,00  .. 25,00  ..

DF(1) 50,00  .. 50,00  ..

Bhavnagar

1010 Works costing below DRM's Power DRF 25,00  .. 25,00  ..

DF(1) 50,25  .. 50,25  ..

TOTAL‐NEW WORKS DRF .. .. 3,10,00  ..

DF(1) .. .. 9,20,25  ..

PASSENGER  AMENITIES

15.05.53.15.3.

54.006

15.05.53.15.3.

54.004

15.05.53.15.3.

54.005

15.01.53.15.3.

50.002

15.01.53.15.3.

50.001

15.04.53.15.3.

53.001

15.03.53.15.3.

00.999

15.06.53.15.3.

00.999

15.05.53.15.3.

00.999

15.01.53.15.3.

00.999

15.04.53.15.3.

00.999

15.02.53.15.3.

00.999

Page 83: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   77     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

TOTAL‐Passenger  Amenities DRF .. .. 10,34,01  ..

DF(1) .. .. 41,57,90  ..

A ‐ Works in Progress

Mumbai

1011 Mumbai Division ‐ Providing RPF barracks at BL ( DF(2) 2,08,02  71,85  15,00  1,21,17 

20 beds) and Vapi (10beds) dog kennels and

Malkhanas at BCT , BDTS and USD lock ups at BDTS,

UDN & BDTS , rest rooms at BSR, VR, and NDB for

RPF staff & cementing of parade ground at BL.

1012 Mahalaxmi (General Stores):‐ Replacement of DF(3) 63,61  11,76  39,00  12,85 

dilapidated Non ‐ Ferrous Godown. (BCT/U/10‐11)

1013 Mumbai Central ‐ Installation of Effluent DF(3) 57,30  .. 9,99  47,31 

treatment facility for JRH.

1014 JR Hospital, Mumbai Central ‐ Provision of smoke DF(3) 62,97  .. 20,00  42,97 

detection & fire alarm system at JR hospital at

Mumbai Central

1015 Churchgate ‐ Modernization of office space at 3rd DRF 47,97  .. 25,00  22,97 

floor of GLO building and 2nd floor of station DF(2) 47,98  .. 25,00  22,98 

building..

Vadodara

1016 Pratapnagar (Railway Staff College) ‐ Upgradation DF(2) 2,22,48  .. 17,00  2,05,48 

of sports facilities. (Vadodara division)

(S&C/U/07‐08)

1017 Bharuch  (Yard) ‐ Provision of storm water drain DF(3) 2,30,00  2,23,58  1 6,41 

in yard for disposal of water and flooding of

track.

1018 Vadodara Division:‐Consultancy for restoration of DF(3) 71,58  .. 20,00  51,58 

Pratap Vilas Palace building in National Academey

(Railway Staff College) at Pratapnagar, Vadodara.

Ratlam

1019 Ratlam ‐ Replacement of 200 mm dia CI pipe line DRF 1,59,71  1,34,63  1 25,07 

from Well No 572 to Well No 470 and 150 mm dia new

CI pipe line at from well No 470 to loco well at

1020 RTM ‐ Improvement to sports facilities at. DF(2) 51,54  32,43  1 19,10 

1021 Indore‐Provision of open drain for LMNR Colony at. DRF 39,65  .. 30,00  9,65 

1022 RTM‐Providing Effulent treatment plant in DF(3) 81,12  .. 25,00  56,12 

Divisional Railway Hospital.

Ahmedabad

1023 Mahesana:‐ Replacement of existing two nos Bore DRF 52,33  23,96  12,00  16,37 

Well 250mm dia. and 300m deep at Kalyaneshwar Bore

and Bala Hanuman ji Bore.

1024 Maninagar:‐ Providing RPF building including DF(3) 35,35  .. 15,00  20,35 

IPF,SIPF,Clerical, Armed & CCTV room at PF No.1.

OTHER SPECIFIED WORKS

15.03.64.07.2.

52.001

15.03.64.10.3.

52.001

15.03.64.14.3.

52.001

15.03.64.14.3.

52.002

15.03.64.14.6.

52.001

15.06.64.07.2.

30.002

15.06.64.10.2.

55.001

15.06.64.14.3.

55.001

15.05.64.09.2.

54.001

15.05.64.12.3.

54.001

15.05.64.14.3.

54.002

15.05.64.14.3.

54.001

15.01.64.13.3.

50.001

15.01.64.14.3.

50.001

Page 84: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   78     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

Rajkot

1025 Dwarka:‐ Providing two additional rooms in DF(2) 19,97  9,26  10,00  71

Officer's Rest House. (RJT/U/11‐12)

1026 RJT: Improvement to Divisional Hospital, OT, ICU, DF(2) 20,74  17,30  3,44  ..

Kitchen & Toilet etc.

1027 HAPA ‐ Supply, Installation, Testing and DF(3) 35,68  .. 20,00  15,68 

Commissioning of Effluent Treatment Plant at C&W

Depot of Capacity 10cubic metre per day.

Bhavnagar

1028 Providing catch water drain, side drain at DF(3) 68,54  23,87  1 44,66 

breaches locatons between Km: 18/11 ‐ 19/3 and Km:

23/5 to 23/11  on TAV ‐ DVA Section.

Mumbai

1029 Works costing below DRM's Power Cap. 12,19  .. 12,19  ..

DRF 6,06  .. 6,06  ..

DF(3) 46,07  .. 46,07  ..

Vadodara

1030 Works costing below DRM's Power DF(2) 5,76  .. 5,76  ..

DF(3) 6,18  .. 6,18  ..

Ratlam

1031 Works costing below DRM's Power DF(3) 9,75  .. 9,75  ..

Ahmedabad

1032 Works costing below DRM's Power DF(3) 17,27  .. 17,27  ..

Rajkot

1033 Works costing below DRM's Power DF(3) 13,10  .. 13,10  ..

Bhavnagar

1034 Works costing below DRM's Power Cap. 4,49  .. 4,49  ..

DRF 20,00  .. 20,00  ..

DF(3) 12,63  .. 12,63  ..

TOTAL‐WORKS IN PROGRESS Cap. .. .. 16,68  ..

DRF .. .. 93,07  ..

DF(2) .. .. 76,21  ..

DF(3) .. .. 2,54,01  ..

B ‐ New Works

Ratlam

1035 Indore‐Dewas‐Ujjain section‐Providing Boundary DF(3) 92,51  .. 3,50  89,01 

wall to Protect Rly land from Encroachment. at

DWX(Stn Colony),NRGR(Behind Rly colony)&VRG stn.

Rajkot

1036 Rajkot:‐ Replacement of old temperary office shed DRF 95,33  .. 1,50  93,83 

used as office for SSE(Pway) east

Rajkot,SSE(W)RJT, SSE(Tele) and SSE(Elect) office.

TOTAL‐NEW WORKS DRF .. .. 1,50  ..

DF(3) .. .. 3,50  ..

TOTAL‐Other Specified Works Cap. .. .. 16,68  ..

DRF .. .. 94,57  ..

DF(2) .. .. 76,21  ..

DF(3) .. .. 2,57,51  ..

OTHER SPECIFIED WORKS

15.04.64.11.3.

53.001

15.04.64.12.3.

53.002

15.04.64.15.3.

00.999

15.02.64.15.3.

00.999

15.05.64.15.3.

54.001

15.04.64.15.3.

53.001

15.04.64.14.3.

53.001

15.02.64.12.3.

51.001

15.03.64.15.3.

00.999

15.06.64.15.3.

00.999

15.05.64.15.3.

00.999

15.01.64.15.3.

00.999

Page 85: LAW BOOK 2015 16 - Western Railway...7 PH 31 - Track Renewals 22 49 8 PH 32 - Bridge Works 49 53 9 PH 33 - Signalling & Telecommunication Works 53 63 10 PH 36 - Other Electrical Works

List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each

WESTERN  RAILWAY

Assets‐Acquisition, Construction and Replacement for 2015‐16

Page No.  :   79     .

(Figures in thousands of rupees)     .

Item 

No.

Project ID Particulars of Works Allocation Anticipated 

Cost

Outlay 

expected 

to end of 

2014‐15

Outlay 

2015‐16

Balance to 

complete 

work

TOTAL‐WORKS IN PROGRESS Cap. .. .. 3,08,42  ..

DRF .. .. 77,70,29  ..

DF(1) .. .. 32,37,66  ..

DF(2) .. .. 2,68,18  ..

DF(3) .. .. 14,11,93  ..

DF(4) .. .. 8,44,33  ..

S.Fund .. .. 24,75,17  ..

TOTAL ‐ NEW WORKS Cap. .. .. 2,13,01  ..

DRF .. .. 40,30,91  ..

DF(1) .. .. 9,20,25  ..

DF(2) .. .. 44,50  ..

DF(3) .. .. 1,42,95  ..

DF(4) .. .. 1,00,00  ..

S.Fund .. .. 3,23,00  ..

GRAND TOTAL Cap. .. .. 5,21,43  ..

DRF .. .. 118,01,20  ..

DF(1) .. .. 41,57,91  ..

DF(2) .. .. 3,12,68  ..

DF(3) .. .. 15,54,88  ..

DF(4) .. .. 9,44,33  ..

S.Fund .. .. 27,98,17  ..