WESTERN RAILWAY
LAW BOOK 2015‐16
( May 2015 )
Page No.
From To
1 Summary of Alloted Funds I -
2 Distribution of outlays for the Works under Board, GM & DRM's Power II IV
3 PH 16 - Traffic Facilities - Yard Remodelling & Others 1 3
4 PH 17 - Computerisation 3 5
5 PH 29 - Road Safety Works- Level Crossings 5 17
6 PH 30 - Road Safety Works- Road Over/Under Bridges 17 22
7 PH 31 - Track Renewals 22 49
8 PH 32 - Bridge Works 49 53
9 PH 33 - Signalling & Telecommunication Works 53 63
10 PH 36 - Other Electrical Works 63 64
11 PH 37 - Traction Distribution Works 64 66
12 PH 42 - Workshop - Including Production Units 66 68
13 PH 51 - Staff Quarters 68 70
14 PH 52 - Amenities for Staff 70 73
15 PH 53 - Passenger and Other Railway Users' Ameniites 73 76
16 PH 64 - Other Specified Works 76 78
17 Summary 79 -
I N D E X
Sr. Particulars
Page No. : I
( Figures in thousands of Rs. )
Sr.No. Plan Heads Cap. DRF DF(1) DF(2) DF(3) DF(4) S.Fund OLWR Total
1 16- Traffic Facilities 32000 10000 61118 100 103218
2 17- Computerisation 60000 2500 62500
3 29- Road Safety Works - Level Crossings 110000 110000
4 30- Road Safety Works - ROB/RUB 200000 200000
5 31- Track Renewals 655200 655200
6 32- Bridge Works 70000 1000 1000 72000
7 33- Signalling & Telecommunication Works 29900 170000 30000 110000 339900
8 36- Other Electrical Works 45900 21000 66900
9 37- Traction Distribution Works 61670 14000 75670
10 42- Workshop - Including Production Units 6498 2500 20500 29498
11 51- Staff Quarters 40287 21000 61287
12 52- Amenities for Staff 45000 52200 26500 123700
13 53- Passenger Amenity 113401 465363 578764
14 64- Other Specified Works 2500 12100 8200 29800 100 52700
Total 156185 1273971 467863 34700 177418 111200 310000 2531337
WESTERN RAILWAY
Assets ‐ Acquisition, Construction and Replacement for 2015‐16
PLAN HEAD WISE SUMMARY OF ALLOTTED FUNDS WITH ALLOCATIONS
( Works costing below Rs. 2.5 crores )
(Figures in thousands of Rs.)
Itemised Works Reserve
1 16- Traffic Facilities Cap. 8000 6664 1336 DRF 7000 2000 500 4500 DF(1)DF(3) 54218 14208 21847 10163 1000 1000 2500 2000 1500 DF(4) 100 100 OLWRTotal 69318 14208 28511 11499 1000 3100 3000 2000 4500 1500
2 17- Computerisation Cap.DRF 30000 5751 24249 DF(1) 2500 1 2499 DF(3)OLWRTotal 32500 5752 24249 2499
3 29- RSW-LC Gates S.Fund 100000 3800 84408 7792 800 800 800 800 800
4 30- RSW-ROB/RUB S.Fund 170000 155309 14691
5 31- Track Renewal DRF 339000 50000 249000 20000 1492 1459 2900 14149
6 32- Bridge Works DRF * * 69800 25672 32596 10910 122 500 DF(3) 1000 1000 DF(4) 1000 100 900 Total 71800 25672 32696 10910 122 500 900 1000
7 33- Signal & Telecom Works Cap. 20000 2739 17261 DRF 160000 150794 3656 1550 800 1900 1300 DF(3) 30000 21665 5835 1700 800 DF(4) 100000 74398 16667 1085 100 5600 1750 400 OLWRTotal 310000 249596 43419 1085 3350 6400 3650 2500
8 36- Other Electrical Works Cap.DRF 21000 11064 319 7442 899 60 1 500 715 DF(3) 18000 15000 552 1448 1000 OLWRTotal 39000 26064 319 7994 899 60 1449 500 1715
9 37- Traction Distribution Works Cap.DRF 58670 13672 26323 6620 5200 3255 3600 DF(3) 10000 7040 2960 OLWRTotal 68670 13672 33363 9580 5200 3255 3600
10 42- Workshop Cap. 5998 100 3613 1230 1055 DRF 2000 1003 758 239 DF(3) 20000 4001 12345 876 1778 1000 OLWRTotal 27998 4001 13448 5247 1778 2230 1294
11 51- Staff Quarters Cap. 20287 1 14801 5485 DRF 20000 4295 8350 7355 Total 40287 4296 23151 12840
12 52- Amenities for Staff Cap. 25000 2584 22416 DRF 50000 20500 17372 12028 100 DF(2) 22000 1700 14200 2803 1236 547 200 300 203 811 DF(3)Total 97000 22200 34156 37247 1236 547 200 300 203 911
13 53- Passenger Amenity DRF 77401 15000 5000 21501 5000 13700 3400 7800 6000 DF(1) 373238 110527 49473 60000 20000 60000 25000 20000 28238 DF(3)Total 450639 125527 54473 81501 25000 73700 28400 27800 34238
14 64- Other Specified Works Cap. 2100 432 1219 449 DRF 11900 1 6700 2593 606 2000 DF(1)DF(2) 8200 3200 3845 579 576 DF(3) 29400 1 14900 3999 4607 618 975 1727 1310 1263 DF(4) 100 100 OLWRTotal 51700 3202 25445 7703 6432 1194 975 1727 1310 3712
Grand Total 1867912 172867 1079178 236314 105925 38451 87568 47027 38763 60525 1294
LB 2015-16 : WORKS IN PROGRESSDistribution of outlays for the Works under Board's Power, GM's Power and DRM's Power
Sr No. Planhead Alocation Total Provision Under Board's Power
Under GM's Power Under DRM BCT
Under DRM BRC
Under DRM RTM
Under DRM ADI
Under DRM RJT
Under DRM BVP
Under CWM/PLW
Page N
o. II
(Figures in thousands of Rs.)
Itemised Works Reserve
1 16- Traffic Facilities Cap. 24000 8500 15500 DRF 3000 500 500 500 500 500 500 DF(1)DF(3) 6900 3900 500 500 500 500 500 500 DF(4)OLWRTotal 33900 12400 15500 1000 1000 1000 1000 1000 1000
2 17- Computerisation Cap.DRF 30000 14491 15509 DF(1)DF(3)OLWRTotal 30000 14491 15509
3 29- RSW-LC Gates S.Fund 10000 100 1000 7700 200 200 200 200 200 200
4 30- RSW-ROB/RUB S.Fund 30000 1000 29000
5 31- Track Renewal DRF 316200 10000 306200
6 32- Bridge Works DRF * * 200 100 100 DF(3)DF(4)Total 200 100 100
7 33- Signal & Telecom Works Cap. 9900 1 9599 100 100 100 DRF 10000 8500 400 200 300 200 200 200 DF(3)DF(4) 10000 8900 400 100 300 100 100 100 OLWRTotal 29900 1 17400 9599 800 400 700 300 300 400
8 36- Other Electrical Works Cap.DRF 24900 20 15180 3000 1600 1400 1300 1000 800 600 DF(3) 3000 2500 500 OLWRTotal 27900 20 17680 3000 2100 1400 1300 1000 800 600
9 37- Traction Distribution Works Cap.DRF 3000 300 75 1470 471 514 170 DF(3) 4000 455 2003 629 686 227 OLWRTotal 7000 300 75 455 3473 1100 1200 397
10 42- Workshop Cap. 500 500 DRF 500 500 DF(3) 500 500 OLWRTotal 1500 1000 500
11 51- Staff Quarters Cap. 20000 8000 12000 DRF 1000 1000 Total 21000 9000 12000
12 52- Amenities for Staff Cap. 20000 100 16000 650 650 650 650 650 650 DRF 2200 40 1690 50 70 70 70 70 70 70 DF(2) 4500 100 3450 50 150 150 150 150 150 150 DF(3)Total 26700 240 5140 16100 870 870 870 870 870 870
13 53- Passenger Amenity DRF 36000 11000 5000 5000 3000 4000 3000 2500 2500 DF(1) 92125 41500 100 10000 10000 12500 8000 5000 5025 DF(3)Total 128125 52500 5100 15000 13000 16500 11000 7500 7525
14 64- Other Specified Works Cap. 400 400 DRF 200 150 50 DF(1)DF(2)DF(3) 400 350 50 DF(4)OLWRTotal 1000 500 500
Grand Total 663425 11761 466486 85963 23443 17970 21770 14767 10670 10595
Under CWM/PLW
LB 2015-16 : NEW WORKSDistribution of outlays for the Works under Board's Power, GM's Power and DRM's Power
Sr No. Planhead Alocation Total Provision Under Board's Power
Under GM's Power Under DRM BCT
Under DRM BRC
Under DRM RTM
Under DRM ADI
Under DRM RJT
Under DRM BVP
Page N
o. III
Itemised Works Reserve
1 16 - Traffic Facility 103218 14208 40911 26999 2000 4100 4000 3000 5500 2500
2 17 - computerisation 62500 5752 38740 18008
3 29 - RSW - LC Gates 110000 3900 85408 15492 1000 200 1000 1000 1000 1000
4 30 - RSW - ROB/RUB 200000 1000 184309 14691
5 31 - Track Renewals 655200 60000 555200 20000 1492 1459 2900 14149
6 32 - Bridge Works 72000 25772 32796 10910 122 500 900 1000
7 33 - Signalling & Telecom. Works 339900 1 266996 53018 1885 3750 700 6700 3950 2900
8 36 - Other Electrical Works 66900 26084 17999 10994 2999 1460 2749 1000 1300 2315
9 37 - Other Traction Works 75670 13972 33438 455 13053 6300 4455 3997
10 42 - Workshops 29498 4001 14448 5747 1778 2230 1294
11 51 - Staff Quarters 61287 4296 32151 24840
12 52 - Amenities For Staff 123700 22440 39296 53347 2106 1417 1070 1170 1073 1781
13 53 - Passenger Amenity 578764 178027 59573 96501 38000 90200 39400 35300 41763
14 64 - Other Specified Works 52700 3202 25945 8203 6432 1194 975 1727 1310 3712
Grand Total 2531337 184628 1545664 322277 129368 56421 109338 61794 49433 71120 1294
LB 2015-16 : GRAND SUMMARY
Page N
o. IV
Distribution of outlays for the Works under Board's Power, GM's Power and DRM's Power (Works in Progress and New Works)
Sr No.Planhead Total Provision Under Board's Power
Under GM's Power Under DRM BCT
Under DRM BRC
Under DRM RTM
Under DRM ADI
Under DRM RJT
Under DRM BVP
Under CWM/PLW
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 1 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
A ‐ Works in Progress
Mumbai
1 Bandra Terminus ‐ Provision of shunting neck at DF(3) 99,15 .. 30,00 69,15
south of coaching yard.
2 Churchgate ‐ Construction of Guards & Motorman DF(3) 1,26,66 31,56 30,00 65,10
lobby. (BCT/S/09‐10)
3 Bhestan:‐ Providing new foot over bridge. DF(3) 83,91 22,72 20,00 41,19
4 Provision of approach road to Goods Shed at Surat DF(3) 82,02 80,75 1,27 ..
Vadodara
5 Godhara Phase‐II work: Making line No.2 as main Up DF(3) 95,45 8,50 15,45 71,50
line and line No.4 as Dn main line for raising of
speed from 15 to 50 Kmph on main line throght yard
remodelling.
Ratlam
6 Nagda ‐ Piploda Bagla ‐ Providing intermediate DF(3) 2,21,24 1,37,05 30,00 54,19
block section.
7 Dalauda:‐ Provision of direct reception & Cap. 96,11 59,67 2,63 33,81
dispatch facility at DLD goods/ Ballast siding.
(RTM/S/10‐11)
8 Shambhupura :‐ Improvement to goods platform DF(3) 67,18 42,16 20,00 5,02
surface. (RTM/U/11‐12)
Ahmedabad
9 Kankariya Goods shed :‐ Provision of CC approach DF(3) 89,87 .. 30,00 59,87
road between out ward PF no.3 and cover goods shed
PF.
10 Provision of Intermediate Block stop signal DF(3) 2,38,79 1,69,83 57,82 11,14
between Ambli road – Sanand – Ambli road section
(Both up and down lines).IBS to be planned in such
location on both the lines which will bifurcate
the block section almost halve.No such gradients
11 Maliya Miyana ‐ Extension of shunting neck to full DF(3) 1,85,26 1,00,36 54,26 30,64
length loading spur.
12 VTA‐ Providing direct connectiviy from Down yard DF(3) 95,89 53,83 21,74 20,32
to Common loop. Existing point no. 111/112 to be
reversed. A new point (1:12) to be provided to
give connectivity from UP main line to Diesel
shed. A Trap point to ensure isolation of Down
Rajkot
13 OKHA:‐ conversion of non running line 04 into DF(3) 83,86 .. 30,00 53,86
running line by provision of cross over from main
line to shunting neck
TRAFFIC FACILITIES
15.03.16.14.3.
52.001
15.03.16.09.3.
52.001
15.03.16.10.3.
52.002
15.03.16.12.3.
52.001
15.06.16.12.3.
55.002
15.05.16.10.2.
54.001
15.05.16.10.3.
54.001
15.05.16.11.3.
54.001
15.01.16.14.3.
50.001
15.01.16.12.2.
13.001
15.01.16.10.2.
50.001
15.01.16.12.6.
50.001
15.04.16.14.3.
53.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 2 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
14 Digsar ‐ Providing simultaneous reception DF(3) 76,55 48,29 1 28,25
facility. (RJT/U/09‐10)
15 Okha :‐ Stabling line along side of pit line. Cap. 99,01 33,07 64,01 1,93
(RJT/U/1‐12)
16 Rajkot : ‐ Improvement in existing Goods Yard to DF(3) 91,11 46,85 20,00 24,26
make fit for reception and dispatch of
Passenger trains.(Main Line of Goods Yard)
Mumbai
17 Works costing below DRM's Power DF(3) 10,00 .. 10,00 ..
Vadodara
18 Works costing below DRM's Power DRF 20,00 .. 20,00 ..
DF(3) 10,00 .. 10,00 ..
DF(4) 1,00 .. 1,00 ..
Ratlam
19 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
DF(3) 25,00 .. 25,00 ..
Ahmedabad
20 Works costing below DRM's Power DF(3) 20,00 .. 20,00 ..
Rajkot
21 Works costing below DRM's Power DRF 45,00 .. 45,00 ..
Bhavnagar
22 Works costing below DRM's Power DF(3) 15,00 .. 15,00 ..
TOTAL‐WORKS IN PROGRESS Cap. .. .. 66,64 ..
DRF .. .. 70,00 ..
DF(3) .. .. 4,40,55 ..
DF(4) .. .. 1,00 ..
B ‐ New Works
Mumbai
23 Boisar ‐ Provision of OHE wiring for 400 m towards Cap. 99,43 .. 20,00 79,43
Tarapur siding to avoid main line blocking
24 Lower parel‐Removal of trap point and provision of DF(3) 94,49 .. 10,00 84,49
dead end.
Vadodara
25 Anand:‐Direct Placement and Removal at goods Shed Cap. 88,08 .. 20,00 68,08
Ahmedabad
26 Shirva‐ Provision of one interlocked cross over Cap. 97,96 .. 20,00 77,96
between goods line No. 1 & 2 and Down main line.
27 Ahmedabad BG‐ Repair of PIT line no 4 catwalk and DF(3) 88,80 .. 15,00 73,80
pillars and hydrant main water pipe line +
charging and precooling points needs replacement
as corroded badly at ADI BG pit lines.
Rajkot
28 Navlakhi :‐ Provision of Hepper key transmitters Cap. 32,56 .. 25,00 7,56
at Navlakhi.
TRAFFIC FACILITIES
15.04.16.09.3.
53.002
15.04.16.11.3.
53.001
15.04.16.12.3.
53.001
15.03.16.15.3.
00.999
15.06.16.15.3.
00.999
15.05.16.15.3.
00.999
15.01.16.15.3.
00.999
15.04.16.15.3.
00.999
15.02.16.15.3.
00.999
15.03.16.15.3.
52.002
15.03.16.15.3.
52.001
15.06.16.15.3.
55.001
15.01.16.15.3.
50.002
15.01.16.15.3.
50.001
15.04.16.15.3.
53.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 3 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
29 Hapa :‐ Improvement in C&W yard facility at Hapa. DF(3) 32,08 .. 14,00 18,08
Mumbai
30 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
DF(3) 5,00 .. 5,00 ..
Vadodara
31 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
DF(3) 5,00 .. 5,00 ..
Ratlam
32 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
DF(3) 5,00 .. 5,00 ..
Ahmedabad
33 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
DF(3) 5,00 .. 5,00 ..
Rajkot
34 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
DF(3) 5,00 .. 5,00 ..
Bhavnagar
35 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
DF(3) 5,00 .. 5,00 ..
TOTAL‐NEW WORKS Cap. .. .. 85,00 ..
DRF .. .. 30,00 ..
DF(3) .. .. 69,00 ..
TOTAL‐Traffic Facilities Cap. .. .. 1,51,64 ..
DRF .. .. 1,00,00 ..
DF(3) .. .. 5,09,55 ..
DF(4) .. .. 1,00 ..
A ‐ Works in Progress
Headquarter
36 Replacement of 14nos. High Speed Dot Matrix DRF 9,03 7,06 .. 1,97
Printers at various PRS locations.
37 Replacement of 464 UTS ticket printers DRF 41,50 39,64 1 1,85
38 Replacement of 32 SMC at 28 suburban stations DRF 28,18 .. 28,18 ..
39 Replacement of heavy duty chart printers, desktop DRF 17,72 17,57 .. 15
computers, and laser printers
40 Provision of 31 nos of additional heavy duty chart DF(1) 54,73 49,93 .. 4,80
printers (line) at various charting PRS locations
41 Western Railway ‐ Replacement of 263 nos. Ticket DRF 20,10 .. 4,02 16,08
Printers at various PRS locations
42 Abstract Estimate of Replacement of 335 nos LCD DRF 95,34 .. 57,51 37,83
Dumb Terminals with keyboards against existing
Terminal/keyboards at various PRS loacations
43 Replacement of CMS equipments of WR DRF 16,58 .. 16,58 ..
44 Replacement of Datacom Equipment of FOIS DRF 39,92 .. 39,92 ..
45 Replacement of Datacom equipment for FOIS at 10 DRF 22,71 .. 21,05 1,66
locations
TRAFFIC FACILITIES
15.04.16.15.3.
53.002
15.03.16.15.3.
00.999
15.06.16.15.3.
00.999
15.05.16.15.3.
00.999
15.01.16.15.3.
00.999
15.04.16.15.3.
00.999
15.02.16.15.3.
00.999
COMPUTERISATION
15.00.17.12.3.
12.003
15.00.17.12.3.
12.004
15.00.17.12.3.
12.005
15.00.17.12.6.
12.001
15.00.17.13.2.
12.001
15.00.17.13.6.
12.003
15.00.17.14.2.
12.001
15.00.17.13.6.
12.001
15.00.17.13.6.
12.002
15.00.17.14.3.
12.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 4 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Mumbai
46 Replacement of 220 high speed ticket printers for DRF 45,22 36,17 10 8,95
Mumbai suburban on emergent basis
47 2 Nos. Xeon Servers for MMIS on reolacement DRF 9,00 .. 9,00 ..
account
48 One RISC base data base server for MMIS on DRF 5,00 .. 5,00 ..
replacement basis.
49 20 Nos. Desktop Computers for smooth working of DRF 7,98 .. 7,98 ..
MMIS on replacement account.
50 Provision of 86 terminal servers DF(1) 35,00 22,91 .. 12,09
51 Provision of 93 switches. DF(1) 29,00 21,20 .. 7,80
52 Provision of 65 LAN extenders. DF(1) 10,00 7,31 .. 2,69
53 Provision of 5, 2 MBPS routers. DF(1) 6,00 4,40 .. 1,60
54 Provision of PC based charting. DF(1) 10,93 .. 1 10,92
55 Replacement of 1 No. fast report printers. DRF 79 .. 1 78
56 Mumbai Division:‐ Replacement of existing out DRF 50,00 25,02 24,98 ..
dated computers & printers along with furniture of
Engineering department.
57 Replacement of equipments for FOIS Terminals – DRF 10,50 9,39 1 1,10
Procurement of Computers, printers and
peripherals.
Vadodara
58 Chhota Udaipur:‐ Providing UTS. DF(1) 9,26 5,75 .. 3,51
59 Vadodara Division:‐Replacement of FOIS and TMS DRF 13,32 .. 13,32 ..
computer system on BRC Division.
Ratlam
60 Ratlam Division‐Replacement of FOIS(TMS) equipment DRF 23,48 .. 23,48 ..
at various TMS Locations in Ratlam Divsion.
Ahmedabad
61 Ahemdabad Division ‐ Replacement of equipments for DRF 14,91 11,84 10 2,97
FOIS Terminals – Procurement of Computers,
printers and peripherals.
62 Ahemdabad Division ‐ Replacement of equipments for DRF 27,51 .. 27,51 ..
FOIS Terminals – Procurement of Computers,
printers and peripherals.
Rajkot
63 Rajkot Division ‐ Procurement of 41 Nos. of PCs & DRF 19,20 .. 12,00 7,20
38 Nos. Printers on replacement account for
Operating Department.
COMPUTERISATION
15.03.17.13.6.
12.001
15.03.17.14.6.
12.003
15.03.17.14.6.
12.001
15.03.17.14.6.
12.002
15.03.17.07.2.
12.003
15.03.17.07.2.
12.004
15.03.17.07.2.
12.002
15.03.17.07.2.
12.001
15.03.17.08.2.
12.003
15.03.17.08.3.
12.002
15.03.17.10.3.
52.001
15.03.17.10.3.
12.003
15.06.17.05.2.
12.001
15.06.17.13.6.
12.001
15.05.17.14.3.
12.001
15.01.17.10.3.
12.001
15.01.17.14.3.
12.001
15.04.17.13.6.
12.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 5 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
64 Rajkot Division ‐ Procurement of 04 computers with DRF 2,38 .. 2,38 ..
UPS and printers on replacement account for
COIS/ICMS system.
65 Rajkot : Providing Compurasied system in wards of DRF 3,79 .. 3,79 ..
Divisional Hospital at.
Bhavnagar
66 Bhavnagar Division ‐Proposal for personal computer DRF 3,07 .. 3,07 ..
sets and UPS for FOIS work on replacement account.
TOTAL‐WORKS IN PROGRESS DRF .. .. 3,00,00 ..
DF(1) .. .. 1 ..
B ‐ New Works
Headquarter
67 Western Railway:‐ Replacement of PRS ticket DRF 21,15 .. 21,15 ..
printer at various locations.
68 Western Railway:‐ Replacement of 155 nos. LCD dumb DRF 44,71 .. 44,71 ..
terminals with keyboard at various PRS locations
(phase 1).
69 Ahmedabad and Ratlam Divisions:‐ Converting 9.6 DRF 31,79 .. 31,79 ..
Kbps and MUX based PRS locations with 2Mbps IP
based connectivity.
70 Replacement of over aged Datacom Equipment near of DRF 47,26 .. 47,26 ..
more than 8 year old installed at FOIS location
over Western Railway
TOTAL‐NEW WORKS DRF .. .. 1,44,91 ..
TOTAL‐Computerisation DRF .. .. 4,44,91 ..
DF(1) .. .. 1 ..
A ‐ Works in Progress
Mumbai
71 Virar‐Surat Section:‐ Improvement of LC gates by S.Fund 50,27 .. 10,00 40,27
replacement of new PRC sleepers on various L.C.
and paver block etc. under ADEN/DRD section.
(BCT/S/09‐10)
72 Mumbai Non‐Suburban Section:‐ Replacement of 13 S.Fund 98,60 88,60 10,00 ..
Nos. of (Swing / flap) gates into Electrically /
Mechanically operated lifting barrier.
(S&T/U/09‐10)
73 Virar‐Surat Section:‐ Rebuilding of gate lodge, S.Fund 96,30 8,53 10,00 77,77
providing gang tool room &providing toilet with
sock pit etc. under various L.C Under ADEN DRD.
(BCT/U/10‐11)
74 Virar‐Surat Section:‐ Rebuilding of gate lodge, S.Fund 97,55 6,89 10,00 80,66
providing gang tool room & providing toilet with
sock pit etc. under various L.C Under ADEN ST .
(BCT/U/10‐11)
COMPUTERISATION
15.04.17.14.3.
12.001
15.04.17.14.3.
12.002
15.02.17.13.6.
12.001
15.00.17.15.3.
12.002
15.00.17.15.3.
12.004
15.00.17.15.3.
12.003
15.00.17.15.3.
12.001
ROAD SAFETY ‐ LEVEL CROSSINGS
15.03.29.09.3.
52.005
15.03.29.09.3.
52.001
15.03.29.10.3.
52.015
15.03.29.10.3.
52.014
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 6 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
75 Virar‐Surat Section:‐ Providing MS fencing to S.Fund 1,00,00 72,54 10,00 17,46
protect cattle run over (2200 RM). (BCT/U/10‐11)
76 Udhna‐Jalgaon Section:‐ Interlocking of LC No. 5. S.Fund 85,27 44,13 5,00 36,14
(BCT/U/11‐12)
77 Udhna‐Jalgaon Section:‐ Interlocking of LC No. 28. S.Fund 85,27 44,83 5,00 35,44
(BCT/U/11‐12)
78 Udhna‐Jalgaon Section:‐ Interlocking of LC No. 40. S.Fund 85,27 53,55 5,00 26,72
(BCT/U/11‐12)
79 Udhna‐Jalgaon Section:‐ Interlocking of LC No. 54. S.Fund 83,63 52,72 5,00 25,91
(BCT/U/11‐12)
80 Udhna‐Jalgaon Section:‐ Interlocking of LC No. 56. S.Fund 85,27 58,97 5,00 21,30
(BCT/U/11‐12)
81 Udhna‐Jalgaon Section:‐ Interlocking of LC No. 86. S.Fund 85,27 58,96 5,00 21,31
(BCT/U/11‐12)
82 Virar‐Dahanu Road Section:‐ Provision of battery S.Fund 90,49 80,19 5,00 5,30
back up for relays through IPS at 8 Relay
Huts.(S&T/U/11‐12)
83 Churchgate‐Virar Section:‐ Replacement of gate S.Fund 55,61 14,59 5,00 36,02
machines and rewiring of indoor signaling circuits
at LC‐ 19, LC‐24 & LC‐41.(S&T/U/11‐12)
84 UDN‐JL Sec. Upgradation & Reclassification of at S.Fund 1,01,41 82,20 15,00 4,21
LC No.8, 16, 25, 27, 28, 36, 37, 40
85 Virar‐Surat section: Upgradation and S.Fund 1,15,44 .. 17,50 97,94
reclassification of 8 Nos LCs (52, 65, 70, 82, 88,
103, 105)
86 UDN‐JL Sec. Upgradation and reclassification of S.Fund 70,77 3,18 10,00 57,59
LC's nos. 136,137,142,153.
87 BCT‐ Providing fibre reinforced precast RCC block S.Fund 1,04,26 26,69 10,00 67,57
at LC's CCG‐VR : 24, 25, 26, 41 VR‐ST : 90, 92,
94, 96, 97, 99, 100, 101, 102, 103, 104, 105
UDN‐JL : 27, 35, 36, 37.
88 Provision of Auto Changeover panels at 50 Auto S.Fund 62,70 .. 5,00 57,70
Relay Huts at LC gates in VR‐ST section
89 Virar‐Surat section: Provision of IPS at 4 Relay S.Fund 77,10 .. 10,00 67,10
Huts in Valsad‐Bilimora section of Mumbai
Division.
Vadodara
90 Vadodara Division:‐Vadodara‐Godhra S.Fund 2,29,85 10,00 20,00 1,99,85
Section:‐Elimination of Level X‐ing No. 30 at Km.
444/0‐2, 43 at Km. 459/41‐42 & LC No. 45 at Km.
460/25‐27 by providing diversion road.
ROAD SAFETY ‐ LEVEL CROSSINGS
15.03.29.10.3.
52.013
15.03.29.11.3.
52.004
15.03.29.11.3.
52.002
15.03.29.11.3.
52.003
15.03.29.11.3.
52.005
15.03.29.11.3.
52.006
15.03.29.11.3.
52.007
15.03.29.11.3.
52.008
15.03.29.11.3.
52.001
15.03.29.12.3.
52.003
15.03.29.12.3.
52.006
15.03.29.12.3.
52.004
15.03.29.12.3.
52.005
15.03.29.12.3.
52.001
15.03.29.14.3.
52.001
15.06.29.13.2.
55.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 7 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
91 Vadodara‐Utran Section (NG):‐ Electrification of S.Fund 59,92 45,06 14,86 ..
LC gates (52 Nos.) . (ELE/S/09‐10)
92 Surat ‐ Vadodara Section ‐ Replacement of S.Fund 1,32,00 55,38 10,00 66,62
mechanical lifting barriers / wing gates into
electrically operated lifting barrier gates.
93 Vadodara Division:‐ Interlocking of LC gates S.Fund 99,75 77,70 6,24 15,81
having ATVU more than 25000 at LC No.8, 32, 83,
86, 28 (5 LCs). (S&T/S/10‐11)
94 Vadodara‐Anand Section:‐ Replacement of mechanical S.Fund 1,10,02 68,36 5,00 36,66
lifting barrier/ wing gates into electrically
operated lifting barrier (7 gates). (S&T/S/10‐11)
95 Nadiad‐Anand Section:‐ Replacement of mechanical S.Fund 1,10,02 35,12 10,00 64,90
lifting barrier/ wing gates into electrically
operated lifting barrier (7 gates). (S&T/S/10‐11)
96 Vadodara‐Godhra Section:‐ Replacement of S.Fund 1,10,02 32,46 10,00 67,56
mechanical lifting barrier/ wing gates into
electrically operated lifting barrier (7 gates).
(S&T/S/10‐11)
97 Vadodara‐Surat Section:‐ Augmentation of power S.Fund 1,12,38 1,01,32 5,00 6,06
supply arrangment and provision of LED signals to
enhance safety. (8 gates). (S&T/S/10‐11)
98 ADEN‐Nadiad Jurisdiction:‐ Providing road sign S.Fund 95,40 45,51 1,89 48,00
boards speed breakers and rail fencing on various
LC.(BRC/U/11‐12)
99 Vadodara‐Anand‐Godhra Section:‐ Provision of S.Fund 99,87 87,98 5,00 6,89
battery back up for relays through IPS at
interlocked LC gates.(S&T/U/11‐12)
100 Anand‐Utarsanda Section:‐ Provision of battery S.Fund 99,87 22,41 10,00 67,46
back up for relays through IPS at 9LC gate relay
huts.(S&T/U/11‐12)
101 Kanjari Boriyavi Jn.‐Mahemdabad Section:‐ S.Fund 99,87 87,47 5,00 7,40
Provision of battery back up for relays through
IPS at 9 LC gate relay huts.(S&T/U/11‐12)
102 Gothan‐Geratpur Section:‐ Provision of battery S.Fund 99,87 91,74 8,13 ..
back up for relays through IPS at 9 LC gate relay
huts. (BRC/U/11‐12)
103 Vadodara Division:‐ Provision of RTUs/Dataloggers S.Fund 91,15 4,07 10,00 77,08
at LC gates in PRTN‐CTD & ANND‐GDA Sections.
(BRC/U/11‐12)
104 Provision of Emergency key Chain Interlocking S.Fund 94,40 84,40 10,00 ..
using Sliding boom in ANND‐GER Automatic
Signalling section of Vadodara Division.(40 LC
Gates)
ROAD SAFETY ‐ LEVEL CROSSINGS
15.06.29.09.3.
55.004
15.06.29.10.2.
55.001
15.06.29.10.3.
55.003
15.06.29.10.3.
55.005
15.06.29.10.3.
55.001
15.06.29.10.3.
55.006
15.06.29.10.3.
55.007
15.06.29.11.3.
55.011
15.06.29.11.3.
55.009
15.06.29.11.3.
55.003
15.06.29.11.3.
55.005
15.06.29.11.3.
55.004
15.06.29.11.3.
55.008
15.06.29.12.3.
55.007
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 8 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
105 Vadodara Division: Replacement of Mechanical S.Fund 88,31 19,96 10,00 58,35
lifting barrier into Electrical lifting barrier(6
Nos)
106 Provision of approach warning at interlocked LC S.Fund 93,76 .. 15,00 78,76
gates on Vadodara‐Godhra and Anand‐Godhra Sections
of Vadodara Division.
107 Provision of selective calling facility at LC S.Fund 88,00 .. 15,00 73,00
gates in BRC ‐ GDA section
108 Vadodara Division:‐Upgradation and S.Fund 91,53 5,35 15,00 71,18
reclassification of 8 Nos. of Level X‐ings on
ST‐BRC Section LC No. 182, 189, 232 & 233 and
BRC‐GER Section LC No. 239, 246, 255 & 260) (Total
8 Nos. of level X‐ings)
109 Vadodara Division:‐Providing fibre reinforced S.Fund 94,33 15,12 10,00 69,21
precast RCC blocks at level X‐ings. L. C. No. 151,
158, 161, 165, 178, 185, 187, 191, 197, 198 & 228
on ST‐BRC Section, L. C. No. 32, 37, 38, 41, 7 & 5
on BRc‐GDA Section and LC No. 240, 244, 290 & 299
110 Vadodara Division:‐Upgradation and S.Fund 94,52 .. 15,00 79,52
reclassification of 8 Nos. of Level X‐ings. Level
X‐ing No. 264, 265, 269, 278, 285, 286, 295 & 300
on BRC‐GER Section.
111 Provision of Sliding boom at 33 LC gates in S.Fund 78,28 33,91 5,00 39,37
Vadodara‐Godhra‐Anand section of Vadodara
Division.
Ratlam
112 Ratlam Division ‐ UJN‐BPL Section‐‐ Interlocking S.Fund 49,09 23,97 5,00 20,12
of LC 110 Km. 217/ 22‐24 in PUD‐BQE section
113 Ratlam division: Provision of LED signal units for S.Fund 1,69,36 92,99 1,00 75,37
better visibility at interlocked LC gates
114 RTM‐CNA & IDU section‐Provision of solar panel for S.Fund 1,78,77 1,21,68 1,00 56,09
reliable power supply for signalling installaion
at interlocked LC gates. (Total 10 Nos)
115 Ratlam‐ Khandwa Section ‐ Removal of deficiences S.Fund 2,32,70 84,12 1,00 1,47,58
on mannual LC's (51 Nos.). (RTM/S/08‐09)
116 Ratlam Division‐Providing lever locking device at S.Fund 58,87 32,31 10,00 16,56
LCs. (RTM/S/08‐09)
117 Godhra‐Nagda Section‐Improvement to various LCs S.Fund 1,18,47 67,71 10,00 40,76
by providing pavers block, approach road & rumble
strips. (RTM/S/09‐10)
118 Nagda‐Ujjain‐Maksi & IDU Section:‐ Improvement to S.Fund 99,82 50,35 5,00 44,47
various LCs by providing pavers block, approach
road & rumble strips. (RTM/S/09‐10)
ROAD SAFETY ‐ LEVEL CROSSINGS
15.06.29.12.3.
55.017
15.06.29.12.3.
55.012
15.06.29.12.3.
55.003
15.06.29.12.3.
55.013
15.06.29.12.3.
55.014
15.06.29.12.3.
55.015
15.06.29.12.3.
55.016
15.05.29.12.6.
54.001
15.05.29.11.2.
54.001
15.05.29.12.2.
54.001
15.05.29.08.2.
54.002
15.05.29.08.3.
54.004
15.05.29.09.3.
54.002
15.05.29.09.3.
54.007
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 9 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
119 Ujjain‐Bhopal Section:‐ Up gradation of LCs. from S.Fund 1,19,21 95,67 10,00 13,54
?A? to Aspl. LC.NO. 104,107& 108 . (RTM/S/09‐10)
120 Ratlam Division:‐ Interlocking of LC No. 34 Km S.Fund 98,18 91,34 1 6,83
508/16‐18 in GDA‐RTM section & LC No. 3 Km 4/1‐2
in IND‐UJN section. (S&T/U/10‐11)
121 Nagda‐Ujjain‐Bhopal Section:‐ Modification and S.Fund 63,71 50,56 5,00 8,15
upgradation in existing boom locking system
suitable for power operated lifting barrier at
interlocked LC gates. (S&T/U/10‐11)
122 Godhra‐Nagda‐Ujjain‐IDU Section:‐ Providing remote S.Fund 1,26,87 1,26,58 1 28
terminal units at LC gates (20 Nos.).
(S&T/U/10‐11)
123 Indore‐Dewas‐Ujjain Section:‐ Interlocking & up S.Fund 96,10 79,68 8,41 8,01
gradation of Lc no. 3 Km.4/01‐02. at.(C to Spl).
(S&T//U/10‐11)
124 Indore‐Dewas‐ Ujjain Section:‐ Up gradation of LC S.Fund 99,57 99,56 1 ..
No.30 Km: 42/08‐09 A to spl), & LC 37 Km
53/08‐09(C to spl). (RTM/U/10‐11)
125 Indore‐Dewas‐ Ujjain Section:‐ Up gradation of S.Fund 94,33 49,72 10,00 34,61
LC No. 27 Km 37/16‐18(C to spl) and LC 31 at Km
43/01‐02 (C to B2 ). (RTM/U/10‐11)
126 Ujjain‐Bhopal Section:‐ Up gradation of LC No. S.Fund 1,07,17 92,96 8,21 6,00
26 Km: 53/06‐08 (B to spl), LC no. 21 Km.
42/24.26 ( B to A). (RTM/U/10‐11)
127 Ujjain‐Bhopal Section:‐ Up gradation of, LC 29 S.Fund 99,21 99,20 1 ..
Km 57/38‐40 ( A to spl), LC No. 45 Km: 85/30‐32(
‘A’ to spl.). (RTM/U/10‐11)
128 Indore‐Dewas‐ Ujjain Section:‐ Up gradation of S.Fund 99,02 87,06 11,96 ..
Level crossing No. 45 Km 63/9‐10 (C to Spl.), Lc
no. 52 X Km. 70/2‐3.(C to SPL). (RTM/U/10‐11)
129 Ujjain‐Bhopal Section‐ up gradation of LC No. 79 S.Fund 91,58 60,73 5,00 25,85
Km 157/21‐23 (A to Spl.), Lc no. 85 Km.
170/10‐12.(A to SPL). (RTM/U/10‐11)
130 Vadodara‐Nagda Section:‐ Providing gate lodges at S.Fund 75,60 11,83 10,00 53,77
interlocked gates having elevated ground frames.
(RTM/U/10‐11)
131 Ujjain‐Bhopal Section:‐ Up gradation of Level S.Fund 97,28 57,00 5,00 35,28
crossing No. 113 Km 223/11‐13 (C to A.), Lc no.
114 Km. 226/17‐19.(C to A). (RTM/U/10‐11)
132 Ratlam Division:‐ Interlocking of LC No. BCW in S.Fund 59,85 53,65 1,20 5,00
CAN‐RTM section & LC No. 31 in IND‐UJN section.
ROAD SAFETY ‐ LEVEL CROSSINGS
15.05.29.09.3.
54.011
15.05.29.10.3.
54.012
15.05.29.10.3.
54.008
15.05.29.10.3.
54.003
15.05.29.10.3.
54.007
15.05.29.10.3.
54.006
15.05.29.10.3.
54.005
15.05.29.10.3.
54.019
15.05.29.10.3.
54.017
15.05.29.10.3.
54.004
15.05.29.10.3.
54.018
15.05.29.10.3.
54.020
15.05.29.10.3.
54.016
15.05.29.10.3.
54.013
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 10 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
133 Ratlam‐Neemach Section:‐ Removing Signaling S.Fund 1,00,92 49,88 5,00 46,04
deficiencies at 20 interlocked LC Gates.
(RTM/U/11‐12)
134 Ujjain‐Bhopal Section:‐ Removing Signaling S.Fund 1,05,85 88,89 5,00 11,96
deficiencies at 21 interlocked LC Gates.
(RTM/U/11‐12)
135 Ratlam‐Nagda‐Bhopal & IDU section:‐ Providing Road S.Fund 80,59 36,55 5,00 39,04
Signals at 25 interlocked LC gates. (RTM/U/11‐12)
136 Chanderiya‐Ratlam Section:‐ Provision of Remote S.Fund 68,84 33,83 5,00 30,01
Terminal Units at OSL interlocked LC gates in
Ratlam division.(RTM/U/11‐12)
137 INDORE‐DEWAS‐UJJAIN section‐Closure of unmanned S.Fund 1,19,96 1,17,20 2,76 ..
level crossing no. 33X between stations DEWAS and
BARLAI by merging with manned Lc no.33.
138 GDA‐MGN Sec:‐ Providing retro reflecting sign S.Fund 56,00 38,74 5,00 12,26
boards ( W/L, road sign boards, danger sign boards
etc) at various LC's.
139 Chanderiya ‐ Ratlam Sec :‐ Closure of unmanned LC S.Fund 1,01,50 50,79 5,00 45,71
no 149 between stations PIP & MDS by merging with
manned LC No 148 at
140 RTM Div.‐‐ Provision of solar street lights at LC S.Fund 39,74 5,75 5,00 28,99
Gates and Replacement of AT
Cable at some of Interlocked LC Gates
141 MHOW‐ Khandwa Section:‐ Providing RCC retaining S.Fund 68,46 .. 5,00 63,46
wall (210 Rm) on approaches in accident prone LC
No. 266, 268 & 270.
142 IDU section‐ Providing diversion road for S.Fund 98,16 88,36 1 9,79
closing of manned LC no. 40 Km. 57/12‐13 between
BLX‐MGG by 41X.
143 GDA‐NAD Sec:‐ Upgradation of Lc Nos.34, 63 and 87. S.Fund 1,00,03 .. 10,00 90,03
144 NAD ‐UJN ‐MKC Section‐ Up gradation of LC No. 9 S.Fund 77,51 37,64 5,00 34,87
('B1' to 'A' Class), 38 ('C' to 'A' Class and LC
No.52 ('A' to 'Spl' Class)
145 CNA‐NMH Section‐ Up gradation of LC No. BCW ('C' S.Fund 1,02,05 50,12 5,00 46,93
to 'A' Class), 100 ('B1' to 'A' Class and LC
No.120 ('A' to 'Spl' Class)
146 NMH‐RTM Section‐ Up gradation of LC No. 151 S.Fund 1,02,47 59,30 5,00 38,17
(B2C' to 'A' Class), 152 ('A' to 'Spl' Class and
LC No.157('C' to 'B2' Class)
147 NMH‐RTM Section‐ Up gradation of LC No. 162 ('C' S.Fund 1,00,70 48,34 5,00 47,36
to 'B1' Class), 177 ('A' to 'SPL' Class and LC
No.187('B1' to 'SPL' Class)
ROAD SAFETY ‐ LEVEL CROSSINGS
15.05.29.11.3.
54.003
15.05.29.11.3.
54.004
15.05.29.11.3.
54.002
15.05.29.11.3.
54.001
15.05.29.12.3.
54.009
15.05.29.12.3.
54.014
15.05.29.12.3.
54.013
15.05.29.12.3.
54.016
15.05.29.12.3.
54.015
15.05.29.12.3.
54.002
15.05.29.12.3.
54.024
15.05.29.12.3.
54.019
15.05.29.12.3.
54.020
15.05.29.12.3.
54.021
15.05.29.12.3.
54.022
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 11 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
148 Chanderia‐Chittor‐Ratlam Section:‐Provision of RTU S.Fund 79,70 60,22 1 19,47
and its networking at interlocking LC gates
149 Godhra‐Nagda‐Ujjain‐Indore &Ujjain‐Bhopal S.Fund 79,46 60,38 5,00 14,08
section:‐ Provision of RTU's and its networking in
WSL gates on Rtalm Division.
150 Godhra‐ Ratlam Sec.: Provision of approach warning S.Fund 71,37 51,04 5,00 15,33
system at mid section (OSL) interlocked LC Gate
No. 61(Spl class) between MGN‐THDR Station and
79 (Spl Class) between MRN‐RTM A Station.
151 Godhra‐Nagda‐Ujjainand Indore‐Ujjain S.Fund 66,93 20,33 5,00 41,60
section‐‐Provision of Stand By Transmission system
for the slot from LC to panel for WSL Gates and LC
Gate Closed indication to Cabin / ASM at OSL LC on
RTM Division
152 RTM division :‐ Providing fibre reinforced pre S.Fund 84,95 .. 13,63 71,32
cast RCC blocks at 20Lc GDA‐RTM,NAD‐UJN&
IDU,UJN‐FTD‐UJN,RTM‐KNW section.
153 Ratlam Division ‐ Interlocking of LC 162 Km. 313/ S.Fund 92,70 24,26 10,00 58,44
01‐02 in DLD‐KCNR and LC 98 Km. 203/ 07‐08 SMP‐
GRF section.
154 Nagda‐Ujjain‐Bhopal Section‐Provision of power S.Fund 64,40 49,66 10,00 4,74
operated Lifting barriers at interlocked LC gates
in out side station Limit.
155 Ratlam Division‐Provision of sliding booms at S.Fund 64,23 3,19 10,00 51,04
interlocked LC Gate Prone to Damage by Road
Traffic.
156 Godhra‐Nagda, Ratlam‐Chanderia and Indore Dewas S.Fund 64,41 57,00 7,41 ..
Section‐Provision of power operated lifting
barriers atinterlocked LC gates in OSL.
Ahmedabad
157 Ahmedabad Division:‐ Manning of LC No.15 KM 17/ S.Fund 77,16 70,89 6,27 ..
2‐3 on KLL‐KTRD‐RUJ Section, LC No 16 at Km 16/4‐5
on MSH‐VG Section & LC No 21at Km 21/10‐22/1
MSH‐PTN Section. (ADI/S/09‐10)
158 Sr.DEN(W) Jurisdiction:‐ Providing speed breakers S.Fund 77,92 58,38 5,00 14,54
at LCs (148 Nos). (ADI/S/09‐10)
159 Sr.DEN(NW) Jurisdiction:‐ Providing speed breakers S.Fund 47,45 2,00 13,45 32,00
at LCs (141 Nos). (ADIS/09‐10)
160 Ahmedabad Division:‐ Interlocking of 2 Nos. of S.Fund 98,44 84,86 5,00 8,58
Engg. LC gates:‐ (1) LC No.169 at Km. 653/10‐11
between PNU‐UM (2) LC No.88 KHXB ‐ WDHR .
(S&T/S/10‐11)
ROAD SAFETY ‐ LEVEL CROSSINGS
15.05.29.12.3.
54.017
15.05.29.12.3.
54.018
15.05.29.12.3.
54.004
15.05.29.12.3.
54.026
15.05.29.12.3.
54.023
15.05.29.12.6.
54.002
15.05.29.14.6.
54.001
15.05.29.14.6.
54.002
15.05.29.14.6.
54.003
15.01.29.09.3.
50.004
15.01.29.09.3.
50.008
15.01.29.09.3.
50.007
15.01.29.10.3.
50.003
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 12 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
161 Ahmedabad Division:‐ Interlocking of 2 Nos. of S.Fund 97,85 82,45 5,00 10,40
Engg. LC gates:‐ (1) LC Gate No.316A bet. ABD ‐
SAU & (2) LC Gate No.205 bet.VONB‐BCOB.
(S&T/S/10‐11)
162 Ahmedabad Division:‐ Interlocking of 2 Nos. of S.Fund 97,64 81,12 5,00 11,52
Engg. LC gates:‐ (1) LC Gate No.215 bet. BCOB‐CHIB
& (2) LC No.229 bet.BMSB‐GIMB. (S&T/S/10‐11)
163 Ahmedabad Division:‐ Interlocking of 3 Nos. of S.Fund 89,65 58,90 5,00 25,75
Traffic LC gates:‐ (1) LC No.10C at JN, (2) LC
No.62 at SUK & (3) LC No.80 at DVY section.
(S&T/S/10‐11)
164 Ahmedabad Division:‐ Interlocking of 3 Nos. of S.Fund 89,64 57,80 5,00 26,84
Traffic LC gates:‐ (1) LC No.98C at MALB, (2) LC
No.213 at UMN & (3) LC No.111 at KATR.
(S&T/S/10‐11)
165 Ahmedabad‐Palanpur Section:‐ Augmentation of Power S.Fund 87,45 86,33 12 1,00
Supply at 11 Mid section Interlocked gates.
(S&T/U/10‐11)
166 Ahmedabad‐Samakhiali‐Gandhidham‐Bhuj Section:‐ S.Fund 1,15,33 1,14,20 13 1,00
Augmentation of Power Supply at 16 Mid section
interlocked gates. (S&T/S/10‐11)
167 Ahmedabad Division:‐ Provision of battery back up S.Fund 86,73 .. 5,00 81,73
for relays through IPS at Mid section interlocked
gates. (ADI/U/11‐12)
168 Ahemdabad Division:‐ Replacement of old mechanical S.Fund 99,29 83,43 5,00 10,86
lifting barriers at 10 LC Gates (7 Nos Traffic & 3
Nos Engg). (ADI/U/11‐12)
169 Ahemdabad Division:‐ Replacement of Mechanical S.Fund 65,54 54,63 5,00 5,91
lifting barriers 4 LC Gates (2 Nos Traffic & 2 Nos
Engg). (ADI/U/11‐12)
170 Ahemdabad Division:‐ Provision of Road signals and S.Fund 96,00 41,98 5,00 49,02
Hooter on interlocked LC gates in ADI‐MSH‐PNU,
ADI‐VG‐SIOB & SIOB‐PNU (21 LC gates).
(ADI/U/11‐12)
171 Ahmedabad division‐ Replacement of old mechanical S.Fund 51,39 35,24 5,00 11,15
lifting barrier by electric operated lifting
barrier on age cum condition basis.
172 Ahmedabad Division: Provision of slide boom type S.Fund 99,38 45,35 6,54 47,49
gates.
173 Ahmedabad Div: Provision of stand by transmission S.Fund 66,32 37,80 5,00 23,52
system for the slot from LC gate to panel for WSL
gates.
ROAD SAFETY ‐ LEVEL CROSSINGS
15.01.29.10.3.
50.002
15.01.29.10.3.
50.001
15.01.29.10.3.
50.004
15.01.29.10.3.
50.005
15.01.29.11.3.
50.009
15.01.29.11.3.
50.010
15.01.29.11.3.
50.006
15.01.29.11.3.
50.004
15.01.29.11.3.
50.003
15.01.29.11.3.
50.002
15.01.29.12.3.
50.002
15.01.29.12.3.
50.003
15.01.29.12.3.
50.006
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 13 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
174 Ahmedabad Division : Provision of fuse alarm S.Fund 29,46 .. 3,46 26,00
system at 79 interlocked LC gates.
175 Ahmedabad division‐ Provision of emergency sliding S.Fund 76,91 65,82 6,00 5,09
type boom barrier at 30 interlocked LC gates.
176 ADI:‐ Providing fibre reinforced pre cast RCC S.Fund 97,58 .. 6,00 91,58
block at various 20 Nos. of LCs. (VG‐SIOB ‐ Lc No.
3,5,7,32,43,108,112,114,116 & 117) (KHD‐GNC‐12,
KLL‐GNC‐3 &5, KLL‐RUJ‐10 & 22 AJM‐UMN ‐ 14,66,67 &
70)
Rajkot
177 Rajkot Division: Up gradation of LC No.219 bet. S.Fund 40,92 31,46 8,46 1,00
Kanalus ‐Modpur, LC No. 289 bet. Gorinja ‐ Dwarka
& LC No.303 bet. Bhimrana ‐Okha. (RJT/S/08‐09)
178 Rajkot Division:‐ Interlocking of Manned OSL S.Fund 71,84 36,58 6,00 29,26
LC.gate No.236 at Km 884/1 ‐2 between Khambhaliya
‐ Bhatel section.(S&T/U/11‐12)
179 Rajkot Division:‐ Upgradation of LC gate No.305 at S.Fund 73,67 52,95 9,72 11,00
Km 985/0‐1 between BMRN ‐ OKHA from 'B' class to
Spl' class.(S&T/U/11‐12)
180 Rajkot Division:‐ Provision of battery back up for S.Fund 39,30 5,92 5,00 28,38
relays through IPS at LC gates in Wankaner (Ex) ‐
Navalakhi ‐ Dahisara ‐ Vavaniya section and in
VG‐SUNR section. (RJT/U/11‐12)
181 RJT DIV ‐ Closing of LCs by interconnectivity in S.Fund 95,77 76,44 5,51 13,82
the jurisdiction of DEN(E)‐RJT.
182 RJT Division ‐ Closing of LCs by S.Fund 96,42 89,03 7,39 ..
inter‐connectivity in the jurisdiction of
DEN(W)RJT
183 Rajkot Division : Provision of CLS at 3 S.Fund 93,85 32,77 5,00 56,08
Interlocked OSL LC gates in RJT‐HAPA section in
connection of PI works already sanction. Ie LC
128,136 & 147.
184 Rajkot Division : Provision of Approach Warning S.Fund 75,26 34,17 5,00 36,09
System for Interlocked LC gate.ie Viramgam‐OKHA
section including branch
185 RJT Divn: Providing fibre reinforced pre‐cast RCC S.Fund 65,35 11,78 10,00 43,57
blocks at 20 LC gates under DEN(W)‐RJT.
186 Rajkot Division : Up gradtion and Interlocking of S.Fund 38,51 34,93 2,99 59
Manned OSL LC gate No. 113 at Km 727/4‐5 to 'A'
class between Khorana ‐ Kankot section .
187 Rajkot Division:Up gradation and interlocking of S.Fund 39,00 38,99 1 ..
LC No. 135'C' class Engg. at Km 755/0‐1 between
Khandheri‐ Padadhari section to 'A' class,
ROAD SAFETY ‐ LEVEL CROSSINGS
15.01.29.12.3.
50.001
15.01.29.12.3.
50.007
15.01.29.12.3.
50.008
15.04.29.08.3.
53.005
15.04.29.11.3.
53.003
15.04.29.11.3.
53.005
15.04.29.11.3.
53.004
15.04.29.12.3.
53.010
15.04.29.12.3.
53.008
15.04.29.12.3.
13.011
15.04.29.12.3.
53.001
15.04.29.12.3.
53.007
15.04.29.12.3.
53.002
15.04.29.12.3.
53.003
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 14 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Bhavnagar
188 KJV‐VSW Section (MG):‐ Providing CC Block on level S.Fund 36,23 8,27 12,00 15,96
crossings gates (30 nos.). (BVP/S/08‐09)
189 Bhavnagar Division ‐ Removal of defeciencies and S.Fund 2,17,41 39,40 5,00 1,73,01
providing Paver Blocks with speed breakers /
Rumble Strips on 219 LCs.
190 ADEN‐Botad Sub‐division:‐ Manning of unmanned S.Fund 48,79 23,83 15,00 9,96
level crossings 24,Km 26/7‐8 between GG ‐ SEJ and
159/X at km 172/8‐9 between SAPR ‐ BTD.
(BVP/S/09‐10)
191 Sabarmati‐Botad (MG) Section:‐ Manning of LC No S.Fund 24,69 1,15 5,00 18,54
81, km 84/2‐3 between KTGD and LHBK station.
(BVP/S/09‐10)
192 ADEN‐Junagadh Sub Division:‐ Manning of unmanned S.Fund 33,70 20,50 4,50 8,70
level crossings 105/C, km 146/7‐8 between KSD ‐
MLHA and 126/C, km 179/3‐4 between ADE VRL .
(BVP/S/09‐10)
193 PRCL Section:‐ Manning of unmanned level crossings S.Fund 19,11 5,35 5,00 8,76
41/C, km 34/1‐2 between DAS ‐ RLA. (BVP/S/09‐10)
194 PRCL Section:‐ Manning of unmanned level crossings S.Fund 18,07 5,48 5,00 7,59
LC 22 at km 16/1‐2 between DME and LMO stations.
(BVP/S/09‐10)
195 Ribda‐Bhaktinagar Section:‐ Upgradation & S.Fund 37,75 17,18 5,00 15,57
interlocking of LC no 13. (S&T/U/09‐10)
196 Bhavnagar sub division:‐ Providing approach road S.Fund 63,47 15,98 5,00 42,49
between two unmanned level crossings situated
within 01 Km for diversion of traffic and closing
one ( LC 192 & 193, LC 21 & 22 , LC 212 & 213, LC
29 & 30 ). (BVP/S/10‐11)
197 Bhavnagar Division:‐ Providing approach road S.Fund 37,38 4,91 5,00 27,47
between two unmanned level crossings situated
within 01 Km for diversion of traffic and closing
one (LC 3 &4, 5 & 6, 7 & 8, 9 & 10, 12 & 13, 16 &
15, 36 & 37 ,43 & 44 Khijadiya ‐ Veraval and LC 26
198 DAS‐RLA Section:‐ Improvement of poor visibility S.Fund 17,38 74 2,00 14,64
by cutting of earthwork at LCs (LC No. 41, 68, 72
& 80). (BVP/U/10‐11)
199 Bhavnagar Division:‐ Interlocking of LC gates No S.Fund 53,42 26,82 1,27 25,33
24 between Gandhigram‐ Sarkhej on Botad‐Sabarmati
(MG) Section.(S&T/U/11‐12)
200 Bhavnagar Division:‐ Interlocking of LC gate No 11 S.Fund 57,88 15,19 5,00 37,69
C' Class (Engg) between Dhasa‐Damnagar on
Dhasa‐Rajula Jn. Section.(S&T/U/11‐12)
ROAD SAFETY ‐ LEVEL CROSSINGS
15.02.29.08.3.
51.008
15.02.29.09.2.
51.001
15.02.29.09.3.
51.001
15.02.29.09.3.
51.010
15.02.29.09.3.
51.003
15.02.29.09.3.
51.007
15.02.29.09.3.
51.005
15.02.29.09.3.
51.008
15.02.29.10.3.
51.005
15.02.29.10.3.
51.001
15.02.29.10.3.
51.002
15.02.29.11.3.
51.003
15.02.29.11.3.
51.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 15 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
201 Rajula Jn.‐Mahuva Sec:‐Interlocking and S.Fund 47,60 14,89 5,00 27,71
upgradation of LC gate No 129 'C' Class (Engg).
202 Prachiroad‐Delvada MG section:‐Interlocking and S.Fund 45,49 14,78 5,00 25,71
upgradation of LC gate No 49 (Engg)
203 BVP Divn.: Upgradation & Reclassification of 3 S.Fund 61,48 .. 5,00 56,48
Nos LC's ( KNLS ‐ PBR ‐ 63, 68, JLR ‐ WSJ ‐ 67)
204 BVP Division ‐ Providing fiber reinforced S.Fund 63,26 .. 5,00 58,26
pre‐cast RCC blocks at 20LC's
RWO‐WSJ,63,57,56,JLR‐VRL,
81,82X,77,82,JND‐VSW,11,SUNR‐WC 108/C,109,110,
RUR‐KDI 160,BTJ YD 213X BVP‐BVC 219BVC YD 220
Mumbai
205 Works costing below DRM's Power S.Fund 8,00 .. 8,00 ..
Ratlam
206 Works costing below DRM's Power S.Fund 8,00 .. 8,00 ..
Ahmedabad
207 Works costing below DRM's Power S.Fund 8,00 .. 8,00 ..
Rajkot
208 Works costing below DRM's Power S.Fund 8,00 .. 8,00 ..
Bhavnagar
209 Works costing below DRM's Power S.Fund 8,00 .. 8,00 ..
TOTAL‐WORKS IN PROGRESS S.Fund .. .. 9,22,08 ..
B ‐ New Works
Mumbai
210 Udhna‐Jalgaon section: Providing 2nd whistle S.Fund 18,00 .. 1,00 17,00
boards under ADEN/VYA and ADEN/NDB.
Vadodara
211 Vadodara Division:‐Provision of 2nd whistle Boards S.Fund 85,00 .. 1,00 84,00
on various unmanned Level X‐ings on Vadodara
Division (Total 430 Level X‐ings
Ratlam
212 Ratlam‐Chanderiya Section ‐ Interlocking of level S.Fund 1,29,68 .. 1,00 1,28,68
crossing gates (2 Nos.)Provision of Electrical
lifting barriers.2. Supply and installation of
RTU.3. Supply and installation of CLS Signal units
for gate signal.4. Supply and installation of CT
213 Ratlam‐Chanderiya Section ‐ Interlocking of level S.Fund 71,99 .. 1,00 70,99
crossing gates LC 87 Provision of Electrical
lifting barriers.2. Supply and installation of
RTU.3. Supply and installation of CLS Signal units
for gate signal.4. Supply and installation of CT
ROAD SAFETY ‐ LEVEL CROSSINGS
15.02.29.12.3.
51.001
15.02.29.12.3.
51.003
15.02.29.12.3.
51.002
15.02.29.12.3.
51.004
15.03.29.15.3.
00.999
15.05.29.15.3.
00.999
15.01.29.15.3.
00.999
15.04.29.15.3.
00.999
15.02.29.15.3.
00.999
15.03.29.15.3.
52.001
15.06.29.15.3.
55.001
15.05.29.15.2.
54.001
15.05.29.15.3.
54.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 16 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
214 Ratlam‐Chanderiya Section ‐ Interlocking of level S.Fund 71,99 .. 1,00 70,99
crossing gates LC 85 at KM 176/05‐06.Provision
of Electrical lifting barriers.2. Supply and
installation of RTU.3. Supply and installation of
CLS Signal units for gate signal.4. Supply and
215 Ratlam Division‐Providing Lever Locking S.Fund 42,77 .. 1,00 41,77
device,safety chains and Shed over Winch on
variuos LC's.Nagda‐Bhoplal, Indore‐Dewas‐Ujjain
and Dewas‐Maksi Section.
Ahmedabad
216 Ahmedabad Division:‐ Providing 2nd whistle board S.Fund 67,79 .. 1,00 66,79
at unmanned LCs.
217 Gandhidham ‐ New bhuj Section:‐ Upgradation of LC S.Fund 43,39 .. 1,00 42,39
classification from C to B2 at LC No. 9.
Rajkot
218 Rajkot Division: Interlocking of L.C. No. 247 in S.Fund 34,37 .. 1,00 33,37
Bhatel Yard.
219 Rajkot Division ‐ Providing WSL boards on unmanned S.Fund 38,03 .. 1,00 37,03
LCs.
Bhavnagar
220 Bhavnagar Division: Providing 2nd Whistle Board at S.Fund 74,66 .. 1,00 73,66
unmanned level crossings (Non PRCL Section)
Mumbai
221 Works costing below DRM's Power S.Fund 2,00 .. 2,00 ..
Vadodara
222 Works costing below DRM's Power S.Fund 2,00 .. 2,00 ..
Ratlam
223 Works costing below DRM's Power S.Fund 2,00 .. 2,00 ..
Ahmedabad
224 Works costing below DRM's Power S.Fund 2,00 .. 2,00 ..
Rajkot
225 Works costing below DRM's Power S.Fund 2,00 .. 2,00 ..
Bhavnagar
226 Works costing below DRM's Power S.Fund 2,00 .. 2,00 ..
TOTAL‐NEW WORKS S.Fund .. .. 23,00 ..
ROAD SAFETY ‐ LEVEL CROSSINGS
15.05.29.15.3.
54.003
15.05.29.15.3.
54.002
15.01.29.15.3.
50.001
15.01.29.15.3.
50.002
15.04.29.15.3.
53.002
15.04.29.15.3.
53.001
15.02.29.15.3.
51.001
15.03.29.15.3.
00.999
15.06.29.15.3.
00.999
15.05.29.15.3.
00.999
15.01.29.15.3.
00.999
15.04.29.15.3.
00.999
15.02.29.15.3.
00.999
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 17 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
TOTAL‐Road Safety ‐ Level S.Fund .. .. 9,45,08 ..
Crossings
A ‐ Works in Progress
Mumbai
227 Udvada‐Pardi:‐ Road over bridge in lieu of LC No. S.Fund 7,10,28 .. 1 7,10,27
87. (BCT/U/09‐10) EBR(Dep) 11,40,43 .. .. 11,40,43
228 Virar‐Surat:‐ Road over bridge in lieu of LC No. S.Fund 2,12,70 50,00 1 1,62,69
101 (near Doongri). (BCT/U/09‐10) EBR(Dep) 2,75,36 .. .. 2,75,36
229 UDN‐JL Sec. Providing limied height sub‐way in liu S.Fund 1,31,05 1,01,91 29,00 14
of LC no.85 at km143/6‐7
230 UDN‐JL(Sec):Providing normal limited height subway S.Fund 1,64,32 11,81 40,00 1,12,51
in lieu of LC No 154
Vadodara
231 Bharuch Town (Hospital Road):‐ Construction of RUB S.Fund 1,27,00 50,00 1 76,99
in lieu of LC No. 3 near. (BRC/U/10‐11) EBR(Dep) .. .. .. ..
232 Bharuch Town (Shaktinath Road):‐ Construction of S.Fund 2,44,00 50,00 1 1,93,99
RUB in lieu of LC No. 4 near. (BRC/U/10‐11) EBR(Dep) .. .. .. ..
233 Vadodara‐Godhra Section:‐Elimination of existing S.Fund 2,44,27 .. 1,00,00 1,44,27
Level X‐ing No. 10 at Km. 409/22‐24 by provision
of Road under Bridge (RUB)
Ratlam
234 Godhra‐Nagda Section:‐ Providing limited use S.Fund 1,35,61 72,58 45,00 18,03
subway to eliminate LC No. 54 at Km. 560/22‐24
between Anas and NRH. (RTM/S/10‐11)
235 Ujain‐Bhopal Section:‐ Providing limited height S.Fund 1,38,40 1,36,40 2,00 ..
subway to eliiminate LC No. 99 at km. 196/00‐02
between BKTL‐SHE at unmanned LC. (RTM/U/11‐12)
236 Nagda‐Ujjain Section:‐ Providing limited height S.Fund 1,60,70 1,37,78 5,00 17,92
subway to eliiminate LC No. 16 at km. 33/30‐42/2
between PSO‐ASL at unmanned LC. (RTM/U/11‐12)
237 Nagda‐Ujjain Section:‐ Providing limited height S.Fund 1,57,40 1,37,60 5,00 14,80
subway to eliiminate LC No. 17X at km. 36/26‐28 at
unmanned LC. (RTM/U/11‐12)
238 Ujjain‐Bhopal Section:‐ Providing limited height S.Fund 1,38,90 1,36,59 2,00 31
subway to eliiminate LC No. 97 at km. 192/24‐26 at
unmanned LC. (RTM/U/11‐12)
239 Godhra‐Nagda Section:‐ Providing limited height S.Fund 1,43,00 1,29,39 13,00 61
subway to eliiminate LC No. 47 at km. 584/24‐26
between DHD and BIO stations. (RTM/U/11‐12)
240 Godhra‐Nagda Section:‐ Providing limited height S.Fund 1,45,00 1,13,44 30,00 1,56
subway to eliiminate LC No. 52 at km. 555/14‐16
between BIO and ANAS stations. (RTM/U/11‐12)
ROAD SAFETY ‐ ROB/RUB
15.03.30.09.3.
30.001
15.03.30.09.3.
30.002
15.03.30.12.3.
52.002
15.03.30.12.3.
52.001
15.06.30.10.3.
55.001
15.06.30.10.3.
55.002
15.06.30.14.6.
55.001
15.05.30.10.3.
54.005
15.05.30.11.3.
54.007
15.05.30.11.3.
54.005
15.05.30.11.3.
54.006
15.05.30.11.3.
54.008
15.05.30.11.3.
54.001
15.05.30.11.3.
54.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 18 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
241 Godhra‐Nagda Section:‐ Providing limited height S.Fund 1,45,00 29,12 60,00 55,88
subway to eliiminate LC No. 56 at km. 563/10‐12
between ANAS and NRH stations. (RTM/U/11‐12)
242 Godhra‐Nagda Section:‐ Providing limited height S.Fund 1,43,00 98,32 15,00 29,68
subway to eliiminate LC No. 58 at km. 570/10‐12
between ANAS and MGN stations. (RTM/U/11‐12)
243 GDA‐NAD Section‐Provision of Limited use sub way S.Fund 1,17,38 59,42 50,00 7,96
to eliminate L. C. No. 50 at Km 552/16‐18 between
Bordi & ANAS stations.
244 GDA‐NAD Section‐Provision of Limited use sub way S.Fund 1,34,89 1,34,80 1 8
to eliminate L. C. No. 73 at Km 613/22‐24 between
AGR & BMI stations.
245 IDU section‐ povidinglimited height subway to S.Fund 1,92,75 1,87,64 5,00 11
eliminateManned Lc no.48 at Km.65/16‐66/01
betweenMGG&LMNR stations.
246 INDORE‐ DEWAS‐UJJAIN section:‐ Providing Limited S.Fund 1,95,00 36,93 80,00 78,07
height Subway to eliminiate unmanned LC no. 15
at. Km. 19/9‐10 between KADCHA‐NARANGIPUR
stations.
247 INDORE‐DEWAS‐UJJAIN section :‐ Providing Limited S.Fund 1,10,06 1,09,02 1,00 4
height Subway to eliminiate LC no. 9 at. Km.
10/14‐15 between UJJAIN‐KADCHA stations.
248 INDORE‐DEWAs‐UJJAIN sectio n:‐ Providing Limited S.Fund 92,29 92,28 1 ..
height Subway to eliminiate LC no. 18 between
KDHA‐NRGR at Km. 23/5‐6.
249 INDORE‐DEWAS‐UJJAIN section:‐ Providing Limited S.Fund 1,53,38 1,27,18 10,00 16,20
height Subway to eliminiate unmanned LC no. 12 at.
Km. 14/17‐15/1 between UJJAIN‐KADCHAstation.
250 CNA ‐ RTM ‐ KNW section :‐ Providing Limited S.Fund 1,99,40 1,57,84 20,00 21,56
height Subway in lieu of Unmanned LC no. 155 & 239
at Km. 299/8 ‐ 9 & 480/9 ‐ 10 at‐
251 Ratlam Division‐Providing Limited Hieght Subway of S.Fund 1,47,67 .. 40,00 1,07,67
4.00 M (Width) x 3.00 M (Height) (Internal
dimension) precast R.C.C. M‐35 box in liue of
Unmanned LC No. 194 & 195 at Km 382/8‐9 & 384/6‐7
between RTM‐NGW section.
252 Ratlam Division‐ Providing Limited Hieght Subway S.Fund 2,27,10 .. 1,50,00 77,10
of 4.00 M (Width) x 3.00 M (Height) (Internal
dimension) precast R.C.C. M‐35 box in liue of
Unmanned LC No. 200 & 201 at (Km 399/8‐9) & (Km
401/9‐10) between NGW‐RNJ section.
253 Providing Limited Hieght Subway of 4.00 M (Width) S.Fund 2,16,76 .. 1,00,00 1,16,76
x 3.00 M (Height) (Internal dimension) precast
R.C.C. M‐35 box in liue of Unmanned LC No. 205 &
211 at Km 408/1‐2 & Km 424/11‐12 &between
RNJ‐BNG and BNG‐GPX section.
ROAD SAFETY ‐ ROB/RUB
15.05.30.11.3.
54.003
15.05.30.11.3.
54.004
15.05.30.12.3.
54.003
15.05.30.12.3.
54.007
15.05.30.12.3.
54.001
15.05.30.12.3.
54.002
15.05.30.12.3.
54.004
15.05.30.12.3.
54.005
15.05.30.12.3.
54.008
15.05.30.12.3.
54.006
15.05.30.12.3.
54.011
15.05.30.12.3.
54.010
15.05.30.12.3.
54.012
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 19 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
254 Ratlam Division:‐ Providing Limited Height S.Fund 1,65,12 .. 55,00 1,10,12
Sub‐ways(3.66 x 4.00 m) in lieu of Unmanned
Level crossing No.213/C , Km 428/9‐10 between
Barnagar ‐Gautampura Station.
255 Ratlam Division:‐ Providing Limited Height S.Fund 1,65,12 .. 55,00 1,10,12
Sub‐ways(3.66 x 4.00 m) in lieu of Unmanned
Level crossing No. 220/C , Km 442/3‐4 between
Gautampura‐ Fatehabad Station.
256 Ratlam Division:‐ Providing Limited Height S.Fund 1,65,12 .. 40,00 1,25,12
Sub‐ways(3.66 x 4.00 m) in lieu of Unmanned
Level crossing No. 221/C , Km 444/3‐4 between
Gautampura‐ Fatehabad Station.
257 Ratlam Division:‐ Providing Limited Height S.Fund 1,65,12 .. 40,00 1,25,12
Sub‐ways(3.66 x 4.00 m) in lieu of Unmanned
Level crossing No. 224/C , Km 450/2‐3 between
Gautampura‐ Fatehabad Station.
258 Chittaurgarh‐Kota section ;Providing Sub‐way S.Fund 1,18,54 .. 20,00 98,54
(RUB) to eliminate LC No. 121 Km: 155/11‐12
Bet: CNA‐BSSL in Ratlam Division of Western
railway at.
Ahmedabad
259 Construction of Limited Hieght Subway in lieu of S.Fund 2,41,24 1,00 1 2,40,23
LC No. 244C (manned) at Km 778/7‐8 between SBI‐CDK
station
260 Elimination of LC No. 16A at Km. 517/08‐09on S.Fund 2,22,86 1,00 1 2,21,85
ADI‐VG Section by providing RUB for Dedicated EBR(Dep) .. .. .. ..
freight corrdor.
261 Elimination of LC No. 16 at Km. 517/01‐02on ADI‐VG S.Fund 1,55,99 1,00 26,98 1,28,01
Section by providing RUB for Dedicated freight
corrdor.
262 Elimination of LC No. 18 at Km. 520/0‐1 on ADI‐VG S.Fund 1,55,99 1,00 1 1,54,98
Section by providing RUB for Dedicated freight EBR(Dep) .. .. .. ..
corrdor.
263 Elimination of LC No. 19 at Km. 521/0‐1 on ADI‐VG S.Fund 1,55,99 1,00 26,00 1,28,99
Section by providing RUB for Dedicated freight EBR(Dep) .. .. .. ..
corrdor.
264 Elimination of LC No. 20 at Km. 521/5‐6 on ADI‐VG S.Fund 1,55,99 1,00 50,00 1,04,99
Section by providing RUB for Dedicated freight EBR(Dep) .. .. .. ..
corrdor.
265 Elimination of LC No. 21 at Km. 523/01‐02 on S.Fund 1,55,99 1,00 1,00 1,53,99
ADI‐VG Section by providing RUB for Dedicated EBR(Dep) .. .. .. ..
freight corrdor.
266 Elimination of LC No. 10 at Km. 8/8‐9 on PNU‐SIOB S.Fund 1,64,84 1,00 40,00 1,23,84
Section by providing RUB for Dedicated freight
corrdor.
ROAD SAFETY ‐ ROB/RUB
15.05.30.12.3.
54.013
15.05.30.12.3.
54.014
15.05.30.12.3.
54.015
15.05.30.12.3.
54.009
15.05.30.13.3.
54.002
15.01.30.13.3.
50.001
15.01.30.13.3.
50.005
15.01.30.13.3.
50.007
15.01.30.13.3.
50.008
15.01.30.13.3.
50.009
15.01.30.13.3.
50.010
15.01.30.13.3.
50.003
15.01.30.13.3.
50.004
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 20 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
267 Elimination of LC No. 11 at Km. 9/8‐9 on PNU‐SIOB S.Fund 1,39,94 1,00 50,00 88,94
Section by providing RUB for Dedicated freight
corrdor.
268 Elimination of LC No. 8 C at Km. 8/4‐5 on MSH‐PTN S.Fund 1,21,09 28,00 70,00 23,09
Section by providing RUB.
Rajkot
269 Than‐Lakhamachi:‐ Road over bridge in lieu of LC S.Fund 1,42,80 50,00 1 92,79
No. 73. (RJT/U/09‐10) EBR(Dep) 1,42,80 .. .. 1,42,80
270 Rajkot Division:.‐ Road over bridge in lieu of LC S.Fund 89,43 50,00 1 39,42
No.274 at Km. 936/13‐14 between Kuranga‐Okhamadhi. EBR(Dep) 89,43 .. .. 89,43
(S&C/U/09‐10)
Bhavnagar
271 Construction of Limited Height Sub Way to S.Fund 2,22,44 .. 10,00 2,12,44
elimination of Level crossing (LC No. 32 & 36 on
Kanalus ‐Porbandar section)
272 Construction of Limited Height Sub Way to S.Fund 2,34,86 .. 1,00 2,33,86
elimination of Level crossing (LC No. 17 & 22 on
Kanalus ‐Porbandar section)
273 Construction of Limited Height Sub Way to S.Fund 2,19,39 20,05 1,00,00 99,34
elimination of Level crossing (LC No. 37 & 42 on
Kanalus ‐Porbandar section)
274 Construction of Limited Height Sub Way to S.Fund 2,29,65 .. 10,00 2,19,65
elimination of Level crossing (LC No. 43 & 45 on
Kanalus ‐Porbandar section)
275 Construction of Limited Height Sub Way to S.Fund 2,37,08 .. 1,00 2,36,08
elimination of Level crossing (LC No. 59 & 71 on
Kanalus ‐Porbandar section)
276 Construction of Limited Height Sub Way to S.Fund 1,83,97 .. 1,00 1,82,97
elimination of Level crossing (LC No. 81 & 79 on
Jetalsar ‐ Wansjaliya section)
277 Construction of Sub Way to elimination of Level S.Fund 2,59,81 .. 1,00,00 1,59,81
crossing (LC No. 91 & 85 on Jetalsar ‐ Wansjaliya
section)
278 Construction of Limited Height Sub Way to S.Fund 2,25,49 .. 1,00 2,24,49
elimination of Level crossing (LC No. 97 & 109 on
Jetalsar ‐ Wansjaliya section)
279 Construction of Sub Way to elimination of Level S.Fund 2,34,50 .. 1,00 2,33,50
crossing (LC No. 112 & 114 on Jetalsar ‐
Wansjaliya section)
280 Construction of Limited Height Sub Way to S.Fund 1,83,91 .. 1,00 1,82,91
elimination of Level crossing (LC No. 51 on
Kanalus‐ Porbandar & 116 on Jetalsar ‐ Wansjaliya
section)
ROAD SAFETY ‐ ROB/RUB
15.01.30.13.3.
50.006
15.01.30.13.3.
50.002
15.04.30.09.3.
30.002
15.04.30.09.3.
30.001
15.02.30.13.3.
51.009
15.02.30.13.3.
51.010
15.02.30.13.3.
51.011
15.02.30.13.3.
51.012
15.02.30.13.3.
51.002
15.02.30.13.3.
51.003
15.02.30.13.3.
51.004
15.02.30.13.3.
51.005
15.02.30.13.3.
51.006
15.02.30.13.3.
51.007
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 21 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
281 Construction of Limited Height Sub Way to S.Fund 2,36,66 .. 50,00 1,86,66
elimination of Level crossing (LC No. 94 & 96 on
Jetalsar ‐ Wansjaliya section)
282 Construction of Limited Height Sub Way to S.Fund 2,19,04 .. 1,00 2,18,04
elimination of Level crossing ( LC No. 18 & 105 on
RAJKOT ‐ SOMNATH section )
TOTAL‐WORKS IN PROGRESS S.Fund .. .. 15,53,09 ..
B ‐ New Works
Mumbai
283 Udhna ‐ Jalgaon section: Providing Subway in lieu S.Fund 2,50,00 .. 10,00 2,40,00
of LC 66
284 Udhna ‐ Jalgaon section: Providing Subway in lieu S.Fund 2,50,00 .. 10,00 2,40,00
of LC 100
285 Udhna ‐ Jalgaon section: Providing Subway in lieu S.Fund 2,50,00 .. 10,00 2,40,00
of LC 101 (manned)
286 Churchgate ‐ Virar ‐ section Providing protection S.Fund 1,80,83 .. 10,00 1,70,83
screen plates on various FOB's& ROB's
Ratlam
287 Chanderiya‐Ratlam Section‐Providing Subways to S.Fund 1,41,03 .. 15,00 1,26,03
Eliminate Unmanned LC No.142.
288 Chanderiya‐Ratlam Section‐Providing Subways to S.Fund 1,41,03 .. 15,00 1,26,03
eliminate unmanned LC No.160.
289 Ratlam ‐ Khandwa Section‐Providing Subways to S.Fund 1,41,03 .. 15,00 1,26,03
Eliminate unmanned LC.No. 235.
290 Ratlam‐Khandwa Section‐Providing subways to S.Fund 1,56,53 .. 15,00 1,41,53
Eliminate unmanned LC No. 229.
291 Ratlam‐Khandwa section‐Providing Subways to S.Fund 1,58,10 .. 10,00 1,48,10
Eliminate Unmanned LC. No.228.
292 Chanderiya ‐ Ratlam section‐Providing Subways to S.Fund 1,41,21 .. 15,00 1,26,21
Eliminate Unmanned LC. No. 107
293 Chanderiya ‐ Ratlam Sec:‐ Providing height gauge S.Fund 28,63 .. 10,00 18,63
at bridge approaches to protect bridge from road
users.
294 Chanderiya ‐ Ratlam section ‐ Construction of 2 S.Fund 1,27,00 .. 10,00 1,17,00
lane RUB in lieu of LC no. 177 km: 341/6 ‐ 7 near EBR(Dep) 1,27,00 .. .. 1,27,00
Jaora yard
295 Chanderiya ‐ Ratlam Section ‐Providing Sub‐way to S.Fund 1,95,12 .. 15,00 1,80,12
eliminate LC No. ‐ 127 (U/M) Between NMH ‐ HKL
station in Ratlam Division of western railway at.
ROAD SAFETY ‐ ROB/RUB
15.02.30.13.3.
51.008
15.02.30.13.3.
51.001
15.03.30.15.3.
52.004
15.03.30.15.3.
52.002
15.03.30.15.3.
52.001
15.03.30.15.3.
52.003
15.05.30.15.3.
54.001
15.05.30.15.3.
54.006
15.05.30.15.3.
54.003
15.05.30.15.3.
54.002
15.05.30.15.3.
54.007
15.05.30.15.3.
54.008
15.05.30.15.3.
54.004
15.05.30.15.2.
54.001
15.05.30.15.3.
54.005
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 22 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Ahmedabad
296 VG‐SIOB section:‐Proposal for extra work of RUB S.Fund 82,60 .. 10,00 72,60
for doubling new track in addition to existing RUB
work at LC No. 11C for single existing track on
VG‐SIOB section.
297 VG‐SIOB section:‐Proposal for extra work of RUB S.Fund 49,56 .. 20,00 29,56
for doubling new track in addition to existing RUB
work at LC No.27 for existing track on VG‐SIOB
section.
298 VG‐SIOB section:‐Proposal for extra work of RUB S.Fund 82,60 .. 20,00 62,60
for doubling new track in addition to existing RUB
work at LC No.42 for existing track on VG‐SIOB
section
299 VG‐SIOB section :‐ Proposal for extra work of RUB S.Fund 66,08 .. 20,00 46,08
for doubling new track in addition to existing
RUB work at LC No. 116 on VG‐SIOB section for
existing track.
300 Proposal for extra work of RUB for doubling new S.Fund 66,08 .. 20,00 46,08
track in addition to existing RUB work at LC No.
89 for existing track on VG‐SIOB section
301 Proposal for extra work of RUB for doubling new S.Fund 66,08 .. 20,00 46,08
track in addition to existing RUB work at LC No.
114 for existing track on VG‐SIOB section.
Rajkot
302 Rajkot Division – Providing Limited Height Subway S.Fund 1,14,81 .. 10,00 1,04,81
on LC No. 116 to eliminate unmanned Level
Crossing.
303 Rajkot Division – Providing Limited Height Subway S.Fund 1,14,81 .. 10,00 1,04,81
on LC No. 79 to eliminate unmanned Level Crossing.
304 Surendranagar ‐ Rajkot Section :Elimination of S.Fund 1,14,81 .. 10,00 1,04,81
unmanned LC by providing Limited Height Subway on
LC No. 111.
TOTAL‐NEW WORKS S.Fund .. .. 3,00,00 ..
TOTAL‐Road Safety ‐ ROB/RUB S.Fund .. .. 18,53,09 ..
A ‐ Works in Progress
Mumbai
305 Udhna‐Jalgaon section:‐ TWR = 5.00 Kms. ( Uakai DRF 50,29 50,00 29 ..
Songadh ‐Lakkadkhot section) & ( Lakkadkhot ‐
Navapur section). (BCT/U/10‐11)
306 Sindkheda‐Nardana section:‐ TWR=5.00 Kms. DRF 41,77 17,33 5,00 19,44
(BCT/U/10‐11)
ROAD SAFETY ‐ ROB/RUB
15.01.30.15.3.
50.005
15.01.30.15.3.
50.003
15.01.30.15.3.
50.002
15.01.30.15.3.
50.001
15.01.30.15.3.
50.006
15.01.30.15.3.
50.004
15.04.30.15.3.
53.001
15.04.30.15.3.
53.002
15.04.30.15.3.
53.003
TRACK RENEWALS
15.03.31.10.3.
52.034
15.03.31.10.3.
52.013
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 23 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
307 Chawlkhede‐Jalgaon section:‐ TWR =5.00 Kms. DRF 41,77 24,61 5,00 12,16
(BCT/U/10‐11)
308 Udhna‐Jalgaon section:‐ TRR =1.00 kms. DRF 79,70 66,12 2,00 11,58
(BCT/U/10‐11)
309 Udhna‐Jalgaon section:‐ TSR = 0.703 kms.on major DRF 37,81 37,17 50 14
Bridge no‐ 374. (BCT/U/10‐11)
310 Udhna‐Jalgaon section:‐ Providing complete set of DRF 90,00 16,50 15,00 58,50
SEJs. (BCT/U/10‐11)
311 Udhna‐Jalgaon Section:‐ Replacment of curved DRF 99,00 35,34 15,00 48,66
switches = 126 Nos.under ADEN/E/Nandurbar.
(BCT/U/10‐11)
312 Udhna‐Jalgaon Section. Replacment of curved DRF 99,00 36,54 12,00 50,46
switches = 126 Nos.under ADEN/W/Nandurbar.
(BCT/U/10‐11)
313 Udhna‐Jalgaon Section:‐ Renewal of SEJ = 88 Nos. DRF 99,00 60,14 10,00 28,86
under ADEN/W/Nandurbar. (BCT/U/10‐11)
314 Virar‐Surat section:Replacement of CMSC = 30 Nos DRF 52,77 34,90 3,00 14,87
in the jurisdiction of ADEN/Dahanu Road and
ADEN/Surat section. (BCT/U/10‐11)
315 Virar‐Surat Section:‐ Replacement of CS = 40Nos. DRF 71,85 26,00 8,00 37,85
in the jurisdiction of ADEN/Dahanu Road and
ADEN/Suarat section. (BCT/U/10‐11)
316 Virar‐Surat Section:‐ Replacement of GRSP in the DRF 50,00 16,00 6,00 28,00
jurisdiction of ADEN/Dahanu Road and ADEN/Suarat
section. (BCT/U/10‐11)
317 Virar‐Surat section:‐ TWR = 2135 Jts. (60 kg/52 kg DRF 97,20 11,01 15,00 71,19
) by mobile FBW plant in situ or on cess under
ADEN/Surat section. (BCT/U/10‐11)
318 Virar‐Surat section :CTR(S ) Sorting line Balsad DRF 78,11 64,18 8,00 5,93
DN yard. (BCT/U/10‐11)
319 Virar‐Surat section :Renewal of switch,crossing & DRF 94,05 30,50 10,00 53,55
GRSP for turnout in the section of ADEN/Surat &
ADEN/Dahanu Road. (BCT/U/10‐11)
320 Churchgate‐Virar Section :‐ CMSCR =8 Nos.under DRF 99,17 38,35 10,00 50,82
SSE(Pway)Bhayandar. (BCT/U/10‐11)
321 Udhana‐Jalgaon TRR in connection with TWR under DRF 96,57 28,85 13,00 54,72
SE/BIY.
322 Udhana‐Jalgaon TRR in connection with TWR under DRF 96,57 28,86 13,00 54,71
SE/NWU.
TRACK RENEWALS
15.03.31.10.3.
52.001
15.03.31.10.3.
52.028
15.03.31.10.3.
52.032
15.03.31.10.3.
52.019
15.03.31.10.3.
52.023
15.03.31.10.3.
52.014
15.03.31.10.3.
52.021
15.03.31.10.3.
52.053
15.03.31.10.3.
52.044
15.03.31.10.3.
52.043
15.03.31.10.3.
52.052
15.03.31.10.3.
52.039
15.03.31.10.3.
52.040
15.03.31.10.3.
52.006
15.03.31.11.3.
52.014
15.03.31.11.3.
52.018
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 24 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
323 Udhana‐JalgaonTRR in connection with TWR under DRF 96,57 28,87 13,00 54,70
SE/KBH.
324 Udhana‐Jalgaon TRR in connection with TWR under DRF 96,57 28,87 13,00 54,70
SE/NDB.
325 Udhana‐Jalgaon TRR in connection with TWR under DRF 96,57 28,87 13,00 54,70
SE/DDE.
326 Udhana‐Jalgaon TRR in connection with TWR under DRF 96,57 28,87 13,00 54,70
SE/DXG.
327 Virar‐Surat Section :‐ TRR on urgent condition DRF 98,57 38,79 14,00 45,78
basis due to severe liner bite UP Km.82.594 to
83.650 =1.056 & DN km 254.15 to 254.313 = 0.16
Total 1.2 Kms .
328 Virar‐Surat Section :‐ TRR on urgent condition DRF 96,15 25,78 13,00 57,37
basis due to severe liner bite UP Km.114.810 to
115.925 = 1.150 Kms .
329 Virar‐Surat Section :‐ TRR on urgent condition DRF 96,15 25,78 14,00 56,37
basis due to severe liner bite UP Km.116.940 to
117.955 = 1.150 km.
330 Virar‐Surat Section :‐ UP line‐ TRR on urgent DRF 88,33 25,78 12,00 50,55
condition basis due to severe liner bite Km.
118.970 to Km.119.031 =0.061 Kms, Km.264.719 to
Km.265.031=0.313 Kms, Km. 267.344 to Km.267.906
=0.563 Kms, Km 268.031 to Km. 268.156= 0.125 Kms.
331 Virar‐Surat Section DN line :‐ TRR on urgent DRF 98,61 26,28 14,00 58,33
condition basis due to severe liner bite Km.
268.063 to 269.00= 0.938 kms, Km 263.458 to
Km.263.706 = 0.248 Kms Total 1.186 Km.
332 Virar‐Surat Section DN line :‐ TRR on urgent DRF 79,09 22,28 10,00 46,81
condition basis due to severe liner bite Km.
255.00 to 255.563 = 0.563, km 264.750 to
265.125=0.375 Total ‐ 0.938 km.
333 Virar‐Surat Section:‐ Casual renewal of channel DRF 1,85,72 71,29 30,00 84,43
sleeper fittings.
334 Churchgate‐Virar section: ‐ Replacement of DRF 84,27 38,25 10,00 36,02
existing sleepers on curves by slack gauge
sleepers between CYR‐GTR under SSE(Pway)DDR
Qty:4000 Nos.
335 Churchgate‐Virar & UDN‐JL sections ;‐ Casual DRF 89,99 32,88 11,00 46,11
Renewal of Channel Sleepers fittings.
336 VR‐ST & UDN‐JL sections :‐ Casual renewal of PSC DRF 89,59 32,50 10,00 47,09
sleepers on points & crossings.
TRACK RENEWALS
15.03.31.11.3.
52.022
15.03.31.11.3.
52.017
15.03.31.11.3.
52.015
15.03.31.11.3.
52.016
15.03.31.11.3.
52.026
15.03.31.11.3.
52.024
15.03.31.11.3.
52.025
15.03.31.11.3.
52.027
15.03.31.11.3.
52.028
15.03.31.11.3.
52.029
15.03.31.11.3.
52.030
15.03.31.11.3.
52.008
15.03.31.11.3.
52.001
15.03.31.11.3.
52.032
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 25 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
337 Mumbai division :‐ Casual renewal of fittings of DRF 93,93 33,00 12,00 48,93
P&Cs.
338 Mumbai division :‐ Casual renewal of glued joints. DRF 86,59 31,50 10,00 45,09
339 Mumbai division:‐ Casual renewal of rails of DRF 95,65 53,50 8,00 34,15
points & crossings.
340 Virar‐Surat & Udhna‐Jalgaon sections:‐ Casual DRF 99,82 43,98 3,00 52,84
renewal of SEJs.
341 Mumbai division ‐ Renewal of special layouts on DRF 98,96 74,75 4,00 20,21
wooden sleepers by PRC sleepers.
342 VR ‐ ST section :‐ TRR on urgent condition basis DRF 99,19 75,57 4,00 19,62
due to sever liner bite Km.77.00 to 78.15 UP line
Total km 1.15 km .
343 VR ‐ ST section :‐ TRR on urgent condition basis DRF 86,70 75,39 2,00 9,31
due to sever liner bite Km.78.15 to 79.15 UP line
Total 1.0 km
344 VR‐ST‐ section:Replacement of GRSP ordinary, GRSP DRF 98,81 49,00 15,00 34,81
for turn out , turn out fittings & SEJ etc. in the
jurisdiction of ADEN/DRD, ADEN/BL, ADEN/ST
section.
Complete Track Renewal
345 Churchgate‐ Virar Section. (A) CTR(S&P)=2.20 DRF 3,24,51 1,24,97 35,00 1,64,54
kms.(B)TRR(P)=0.70 kms. (A) of existing 60kg(SH)
on PRC with 60kg (SH) on new PRC @ M+7 in BCT main
PF 1 to 5 =2.20( B) P) of exitg 60kg 90UTS on PRC
by 60kg 90UTS LWR on new PRC/6 fr. km 5.00 ‐ 5.4
Complete Track Renewal
346 VR‐ST section : Complete track Renewal(S ) km for DRF 98,24 8,15 10,81 79,28
providing ballast siding at UVD quarry.
Complete Track Renewal
347 VR ST section: CTR(P) by 60 kg 90 UTS rail and PRC DRF 43,82 .. 8,00 35,82
sleepers @ 1660 Nos/Km in yards(manual) between km R. 2,93
67.935 to 68.221 = 0.286 km DN Line.
Complete Track Renewal
348 VR ST section: CTR(P) by 60 kg 90 UTS rail and PRC DRF 68,24 .. 12,00 56,24
sleepers @ 1660 Nos/Km in yards between km 76.480 R. 46
to 76.90=0.420 km DN Line.
Through Rail Renewal
349 Churchgate‐Virar: ‐ Replacement of defective/ DRF 88,23 56 17,00 70,67
scabbed rails under section of ADEN(T/S)PL
section.
Through Rail Renewal
350 Udhna‐Jalgaon section.:‐ Casual renewal of rails DRF 82,88 .. 15,00 67,88
under SSE(Pway) Vyara
TRACK RENEWALS
15.03.31.11.3.
52.011
15.03.31.11.3.
52.012
15.03.31.11.3.
52.013
15.03.31.11.3.
52.023
15.03.31.11.3.
52.010
15.03.31.12.3.
52.009
15.03.31.12.3.
52.011
15.03.31.12.3.
52.018
15.03.31.09.2.
52.002
15.03.31.12.3.
52.019
15.03.31.13.6.
52.001
15.03.31.13.6.
52.002
15.03.31.13.3.
52.018
15.03.31.14.3.
52.004
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 26 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Through Rail Renewal
351 Udhna‐Jalgaon . Casual renewal of rails under DRF 98,56 .. 16,00 82,56
SSE(P.Way)Nandurbar. Total 1.20 kms.
Through Rail Renewal
352 Virar‐Surat section‐ Casual renewal of rails due DRF 95,23 .. 15,00 80,23
to eutectic welds under the jurisdiction of SSE(p.
way) Vapi section.
Through Rail Renewal
353 Udhna‐Jalgaon. Casual renewal of rails under DRF 95,97 .. 16,00 79,97
SSE/P.way/Amalner. Total 1.20 kms.
Through Rail Renewal
354 Virar‐Surat section:‐ section :‐ Casual Renewal DRF 80,02 .. 16,00 64,02
of rails on due to sever liner bite between Km
188/01 to 192//01 Km UP line Total 0.986 kms.
Through Rail Renewal
355 Udhna Jalgaon .:‐Casual renewal of rails under DRF 99,93 .. 18,00 81,93
ADEN‐Vyara. Total 1.280 kms.
Through Rail Renewal
356 Virar‐Surat UP line:‐ Casual renewal of rails DRF 43,01 .. 7,00 36,01
from 143.00 to 143.530 = 0.53 Km
Through Rail Renewal
357 Virar‐Surat UP line :‐ Casual renewal of rails DRF 68,09 .. 13,00 55,09
from Km.202/01 to Km.202/29 =0.839 kms.
Through Rail Renewal
358 Churchgate ‐ Virar Section: TRR (P) DNLL38.85 to DRF 99,15 .. 16,00 83,15
39.85 = 1.00 Km Br.No.72
Through Rail Renewal
359 Udhna‐Jalgaon:‐. Casual renewal of rail under DRF 88,90 .. 17,00 71,90
SSE(P.way), Vyara
Through Rail Renewal
360 Udhna‐Jalgaon:‐. Casual renewal of rails under DRF 88,90 .. 17,00 71,90
SS(P.WAY),Navapur
Through Rail Renewal
361 Udhna‐Jalgaon Section:‐. Casual renewal of rails DRF 88,90 .. 17,00 71,90
at various location with 52kg rail under
SSE(P.WAY),Nandurbar
Through Rail Renewal
362 Udhana‐Jalgaon section:‐ . Casual renewal of rails DRF 88,90 .. 17,00 71,90
at various loctions with 52kg rails under
SSE(P.WAY)Amalner
Through Rail Renewal
363 CCG‐VR Section:‐Replacement of Existing SEJ under DRF 89,69 23,51 13,00 53,18
ADEN(T/S)PL section.
TRACK RENEWALS
15.03.31.14.3.
52.005
15.03.31.13.3.
52.013
15.03.31.14.3.
52.003
15.03.31.13.3.
52.012
15.03.31.14.3.
52.002
15.03.31.13.3.
52.009
15.03.31.13.3.
52.017
15.03.31.14.3.
52.006
15.03.31.13.3.
52.019
15.03.31.13.3.
52.020
15.03.31.13.3.
52.021
15.03.31.13.3.
52.010
15.03.31.12.3.
52.021
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 27 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Through Rail Renewal
364 VR ‐ ST section :‐TRR on urgent condition basis DRF 86,79 75,33 2,00 9,46
due to sever liner bite bet.various location from
196/11 to 197/21 Km UP line Total 1.001 kms
Through Rail Renewal
365 VR ‐ ST section :‐ TRR (p)on urgent condition DRF 78,67 75,19 1,00 2,48
basis due to sever liner bite bet.various location
from 184/25 to 187/21 Km UP line Total 0.905 kms
Through Rail Renewal
366 VR ‐ ST section :‐ TRR (p)on urgent condition DRF 78,98 75,19 1,00 2,79
basis due to sever liner bite bet.various location
from 192/07 to 195/15 Km UP line Total 0.907 kms
Through Rail Renewal
367 VR ‐ ST section :‐ TRR (p)on urgent condition DRF 89,30 40,72 10,00 38,58
basis due to sever liner bite bet.various location
from 197/29 to 199/05 Km UP line Total 1.032 kms
Through Rail Renewal
368 VR ‐ ST section :‐ TRR(P) on urgent condition DRF 97,76 75,48 4,00 18,28
basis due to sever liner bite bet.various location
from 199/15 to 201/13 Km UP line Total 1.132 kms.
Through Rail Renewal
369 VR ‐ ST section :‐ TRR (P)bet.various location DRF 97,76 75,11 5,00 17,65
from 201/13 to 201/29 =.452 Km & 136/19 to137
=.387 kms. UP line Total0.839 kms.
Through Sleeper Renewal
370 Virar‐Surat Sec. TSR(P) 220.563 to 221.250 = 0.69 DRF 88,18 .. 1,00 87,18
km & 221.313 to 222.180 = 0.87 Total TSR(P) = R. 11,67
1.56km on UP Line.
Through Sleeper Renewal
371 Bilimora ‐ Waghai ( NG section ) ‐ Through DRF 1,40,23 1,37,94 2,00 29
Sleeper Renewal(s) of the existing on wooden R. 25,69
sleepers with ST / CST‐9 sleepers ( SH ) at 1310
Nos/ Kms. Dencity including deep screening &
recoupment of ballast to 150 mm ‐ a) From km
Through Sleeper Renewal
372 VR‐ST section: TSR(P) of existing 52kg PRC DRF 76,18 .. 15,00 61,18
sleepers at 1540 Nos/km with 60kg PRC sleepers at R. 13,33
1660 Nos/km including deep screening and
recoupment of ballast to 300mm (i) Km 70.87‐ Km
71.705=0.835 km DN line.(ii) Km 74.89‐ Km
Through Sleeper Renewal
373 VR‐ST section: TSR(P) of existing 52kg PRC DRF 54,06 .. 15,00 39,06
sleepers at 1540 Nos/km with 60kg PRC sleepers at R. 8,75
1660 Nos/km including deep screening and
recoupment of ballast to 300mm (i) Km 75.480‐ Km
76.48: Total 1.00 km DN line
TRACK RENEWALS
15.03.31.12.3.
52.010
15.03.31.12.3.
52.005
15.03.31.12.3.
52.006
15.03.31.12.3.
52.007
15.03.31.12.3.
52.008
15.03.31.12.3.
52.012
15.03.31.14.3.
52.001
15.03.31.11.2.
52.001
15.03.31.13.6.
52.003
15.03.31.13.6.
52.005
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 28 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Ballast
374 VR‐ST section : construction of Ballast wall in DRF 98,84 18,00 15,00 65,84
various location in the jurisdiction of
SSE/P‐way/ST section TV main line from TV/1‐0 to
TV 2/12 and UDN by pass line from km UB 1/1 to UB
4/1 and km 264/7 to 264/15 between ST‐UDN UP &
Points & Crossings
375 Virar‐Surat:‐TTR of one Diamonds crossing at NVS DRF 64,91 .. 1,00 63,91
R. ..
Points & Crossings
376 Virar‐Surat:‐ TTR of one diamonds at Vapi (Point DRF 65,27 .. 12,00 53,27
no 108) R. ..
Points & Crossings
377 Udhna‐Jalgaon:‐. TTR of 6 P&Cs on wooden sleeper DRF 87,60 .. 17,00 70,60
layout by PRC sleeper layout in NDB yard R. 6,81
Points & Crossings
378 Virar‐Surat. :‐Replacement of Trap points laid on DRF 63,23 .. 12,00 51,23
wooden sleepers layouts with new trap points on R. ..
PRC sleepers layout at Valsad & Dungri stations
under ADEN‐BL . Total 10 Sets
Points & Crossings
379 Virar‐Surat. :‐Replacement of Trap points laid on DRF 93,99 .. 18,00 75,99
wooden sleepers layouts with trap points on PRC R. ..
sleepers layout under ADEN‐DRD . (Total 15 Sets)
Points & Crossings
380 Virar‐Surat. :‐Replacement of Trap points laid on DRF 93,99 .. 18,00 75,99
wooden sleepers layouts with new trap points on R. ..
PRC sleepers layout under ADEN‐ST . (Total 15
Sets)
Points & Crossings
381 Mumbai Division Virar ‐Surat section :‐TTR=22 Nos DRF 73,13 73,00 10 3
1 in 8.5 = 22 Nos.existing 90R/52kg railso n R. 3,62
wooden/ST 52/60 KG derailing switches on PRC
ayout ballast cushion from 25 to 30 cms.
Points & Crossings
382 CCG – VR section: ‐ Replacement of existing Obtus DRF 49,06 5,00 8,00 36,06
CMS Crossings by new 52 Kg 1 in 8.5 Obtus CMS
Crossings under CCG‐VR section.
Others
383 Virar ‐ Surat section :Through Fittings Renewal of DRF 1,05,62 83,76 10,00 11,86
fittings of turnouts: 1 in 12 =120 Nos.
Others
384 Churchgate‐Virar section: ‐ Replacement of DRF 93,85 56 15,00 78,29
existing 52/60 Kg Built up acute and Obtuse Built
up crossings
TRACK RENEWALS
15.03.31.09.3.
52.031
15.03.31.13.3.
52.025
15.03.31.13.3.
52.027
15.03.31.13.3.
52.026
15.03.31.13.3.
52.022
15.03.31.13.3.
52.023
15.03.31.13.3.
52.024
15.03.31.08.3.
52.015
15.03.31.12.3.
52.003
15.03.31.11.2.
52.003
15.03.31.13.3.
52.011
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 29 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Others
385 Virar‐Surat Section:‐ Scattered renewal of SEJ DRF 49,98 42,10 1,00 6,88
and special sleepers. (BCT/U/08‐09)
Others
386 Scattered renewal of fish bolts & black bolts. DRF 49,68 22,03 4,00 23,65
(BCT/U/08‐09)
Others
387 Virar ‐ Surat section:‐TFR = 25.154 kms.DN/UP DRF 1,14,47 80,69 10,00 23,78
Through fitting renewal of existing fittting by
new ERC clips,Rubber pad and liners etc.fr.
km.112.10‐124.00 = 11.90, 133.75‐1135.56 =1.81 &
137.00‐143.60 = 6.60 on UP & fr.km 124.36‐129.20
Others
388 VR‐ST section :TFR at km 212/0 to 229/24 DN line= DRF 89,56 27,15 10,00 52,41
17.35 km. (BCT/U/09‐10)
Others
389 Udhana ‐ Jalgoan section TFR = 26.72 kms. bet. DRF 1,80,43 45,52 25,00 1,09,91
225.08 ‐ 251.80.
Others
390 Churchgate ‐ Virar Section :‐ Replacement of DRF 96,85 60,00 7,00 29,85
Existing Bridge timbers with Galvanised steel
channel sleepers on Bridge no 20,61, 62 & 66 on
BCT suburban section
Others
391 ccg‐virar Section Replacement of Existing Bridge DRF 94,94 60,00 6,00 28,94
timbers with Galvanised steel channel sleepers on
Bridge no 5,7,27,31,43,46,56&78.Total =555 Nos.
Others
392 CCG‐VR Section:‐Replacement of glued joint under DRF 86,48 25,87 12,00 48,61
ADEN(T/S)PL & (T/N)BVI section.
Others
393 CCG‐VR Section:‐Replacement of Existing SEJ under DRF 89,68 11,69 15,00 62,99
ADEN(T/N)BVI section.
Others
394 UDN‐JL Sec. Casual renewal of 52kg rail due to DRF 1,03,94 19,00 16,00 68,94
lateral wear at km239/11‐14, 239/14 to 240/0,
240/0‐13, 241/0‐2, 241/7‐12 (Total = 1430m).
Others
395 Mumbai Central :‐ Modification of Line No. 1 & 2 DRF 95,17 .. 18,00 77,17
at EMU car shed BCT North end at MX. R. 4,58
Vadodara
396 Vadodara Division:‐Miyagam‐Malsar (NG) DRF 2,08,80 2,03,63 5,00 17
Section:‐Through Sleeper Renewal of existing R. 32,57
wooden sleepers laid at density 1310 Nos/Km. with
60R/75R CST‐9/ST (S/H) sleepers at 1310 Nos.Km
including providing clean ballast cushion of 150mm
TRACK RENEWALS
15.03.31.08.3.
52.027
15.03.31.08.3.
52.020
15.03.31.09.2.
52.003
15.03.31.09.3.
52.034
15.03.31.10.2.
52.001
15.03.31.11.3.
52.034
15.03.31.11.3.
52.035
15.03.31.12.3.
52.014
15.03.31.12.3.
52.015
15.03.31.12.3.
52.016
15.03.31.13.6.
52.004
15.06.31.13.2.
55.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 30 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
397 Godhra Yard: TBR & casual renewal of sleepers of DRF 89,49 57,74 5,00 26,75
line No. 1, and up & Dn line total 6.50 Kms.
(BRC/U/10‐11)
398 Vadodara division ‐ Casual Renewal of Channel DRF 90,33 80 15,00 74,53
Sleepers fittings.
Complete Track Renewal
399 PRTN BG Yard:‐Through Turn out renewal of DRF 1,70,60 79,59 40,00 51,01
existing 90R 1 in 8.5 turnouts with new 52 kg 1 in R. 7,11
8.5 turnouts on PRC sleepers including deep
screening and recoupment of ballast to 250mm
Total11 Nos including complete Track Renewal of
Complete Track Renewal
400 Godhra‐Nagda:‐CTR of 52Kg rails laid on wooden DRF 87,36 21,33 11,00 55,03
sleepers/blocks on CC apron by new 60Kg (90 UTS) R. 6,70
rails on PRC sleepers 1660 Nos./Km.with 300mm
clean ballast cushion on Line No. 4 at Godhra
Yard. Total length 0.65 Kms.
Through Rail Renewal
401 Surat‐Miyagam Section:‐TRR(P) Up Km. 302.150 to DRF 88,62 .. 13,00 75,62
Km. 303.150=1.00 Kms with 60kg rails
Through Rail Renewal
402 Surat‐Vadodara‐Godhra DN line:‐TRR(P) of 60Kg DRF 56,67 46,67 10,00 ..
rails laid on steel channel sleepers with 60 Kg
rails from Km. 380.750 to Km. 381.350=0.600 Kms.
on Major Bridge No. 566, 567 & 100m of its
approaches.
Through Rail Renewal
403 Surat‐Godhra Section UP line:‐TRR(P) of 60Kg DRF 56,67 41,38 10,00 5,29
rails on steel channel sleepers with 60 Kg rails
from Km. 380.750 to Km. 381.350=0.600 Kms. on
Major Bridge No. 566, 567 & its approaches
Through Rail Renewal
404 Surat‐Godhra Section DN line :‐TRR of 60Kg rails DRF 70,48 61,33 1,00 8,15
laid on PRC sleepers with 60 Kg rails from Km.
393.26 to Km. 396.050=0.814 Kms. on DN line
Through Rail Renewal
405 Surat‐Godhra Section UP & DN :‐TRR(P) of 60Kg DRF 80,20 59,56 4,00 16,64
rails laid on PRC sleepers with 60 Kg rails from
Km. 371.690 to Km. 372.120=0.430 Kms. on Major
Bridge No. 550, 551 & its approaches
Through Rail Renewal
406 Surat‐Godhra UP line:‐TRR(P) of 60Kg rails laid on DRF 60,27 99 10,00 49,28
PRC sleepers with 60 Kg ) rails from Km. 395.305
to Km. 395.997=0.692 Kms.
Through Rail Renewal
407 Vadodara‐Godhra UP line:‐TRR(P) of 60 Kg rails DRF 68,72 61,50 1,00 6,22
laid on PRC sleepers with 60 Kg 90 UTS rails from
Km. 400.21 to Km. 401.00=0.79 Kms.
TRACK RENEWALS
15.06.31.10.3.
55.003
15.06.31.11.3.
55.011
15.06.31.13.2.
55.001
15.06.31.13.3.
55.028
15.06.31.14.3.
55.002
15.06.31.13.3.
55.024
15.06.31.13.3.
55.008
15.06.31.13.3.
55.020
15.06.31.13.3.
55.022
15.06.31.13.3.
55.021
15.06.31.13.3.
55.017
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 31 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Through Rail Renewal
408 Vadodara‐Gerathpur Dn Line:‐TRR(P)Km. 477.50 to DRF 61,38 61,08 30 ..
Km. 478.20 = 0.70Kms. .
Through Rail Renewal
409 Vadodara‐Gerathpur Dn Line:‐ TRR(P) Km. 474.60 to DRF 85,36 72,76 2,00 10,60
Km. 475.00 & Km. 475.40 to 476.00 Total 1.00 Kms.
Through Rail Renewal
410 Vadodara ‐ Gerathpur (Dn Line):‐TRR(P) from Km. DRF 92,01 59,27 6,00 26,74
429.25 to Km. 429.40 & Km. 429.40 to 490.30 Total
1.05 Kms.
Through Rail Renewal
411 Vadodara‐ Gerathpur Up Line:‐TRR(P) from Km. DRF 93,15 61,47 6,00 25,68
449.80 to Km. 450.30 & Km. 450.50 to Km. 451.10
Total 1.10 Kms.
Through Rail Renewal
412 Vadodara Division:‐TRR(P) of 52 Kg (90 UTS) rails DRF 79,52 60,17 2,00 17,35
laid on PRC sleepers with 52Kg (90 UTS) rails
from Km. 0.00 to 1.080 of Bajuwa Bypass line.
Ballast
413 Vadodara Division:‐Surat‐Godhra Section (Dn DRF 72,80 28,81 10,00 33,99
line):‐Deep Screening and recoupment of ballast to
the existing standard of 300mm from Km. 273.15 to
Km. 274.80, Km. 279.73 to Km. 281.08 & Km. 288.61
to Km. 291.60. Total TBR 5.99 Kms.
Ballast
414 Vadodara Division:‐Surat‐Godhra Section (Dn DRF 71,13 28,66 12,00 30,47
line):‐Deep Screening and recoupment of ballast to
the existing standard of 300mm from Km. 291.60 to
Km. 296.75 & Km. 297.34 to Km. 298.19 Total TBR
6.00 Kms.
Ballast
415 Vadodara Division:‐Surat‐Godhra Section (Dn DRF 46,98 10,66 10,00 26,32
line):‐Deep Screening and recoupment of ballast to
the existing standard of 300mm from Km. 298.19 to
Km. 300.00, Km. 315.28 to Km. 316.32, Km. 344.00
to Km. 344.26 & Km. 394.94 to Km. 395.04 Total TBR
Ballast
416 Vadodara Division:‐Surat‐Godhra Section (Dn DRF 61,85 .. 20,00 41,85
line):‐Deep Screening and recoupment of ballast to
the existing standard of 300mm from Km. 333.55 to
Km. 339.00 Total TBR 5.45 Kms.
Ballast
417 Vadodara Division:‐Surat‐Godhra Section (Up DRF 77,62 19,07 20,00 38,55
line):‐Deep Screening and recoupment of ballast to
the existing standard of 300mm from Km. 268.89 to
Km. 270.98, Km. 273.26 to Km. 274.11, Km. 276.32
to Km. 278.00 & Km. 297.89 to Km. 299.29 Total TBR
TRACK RENEWALS
15.06.31.13.3.
55.019
15.06.31.13.3.
55.015
15.06.31.13.3.
55.014
15.06.31.13.3.
55.023
15.06.31.13.3.
55.016
15.06.31.12.3.
55.015
15.06.31.12.3.
55.016
15.06.31.12.3.
55.019
15.06.31.12.3.
55.020
15.06.31.12.3.
55.023
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 32 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Ballast
418 Vadodara Division:‐Surat‐Godhra Section (Up DRF 61,40 .. 10,00 51,40
line):‐Deep Screening and recoupment of ballast to
the existing standard of 300mm from Km. 27930 to
Km. 281.08, Km. 289.30 to 290.76, Km. 293.82 to
Km. 293.93, Km. 315.25 to Km. 315.74 & Km. 395.00
Ballast
419 Vadodara Division:‐Surat‐Godhra Section (Up DRF 49,25 17,88 20,00 11,37
line):‐Deep Screening and recoupment of ballast to
the existing standard of 300mm from Km. 327.15 to
Km. 331.49 otal TBR 4.34 Kms.
Ballast
420 Vadodara Division:‐Surat‐Godhra Section (Up DRF 68,09 .. 30,00 38,09
line):‐Deep Screening and recoupment of ballast to
the existing standard of 300mm from Km. 384.00 to
Km. 390.00 Total TBR 6.00 Kms.
Ballast
421 Vadodara Division:‐Surat‐Godhra Section (Up DRF 56,74 .. 20,00 36,74
line):‐Deep Screening and recoupment of ballast to
the existing standard of 300mm from Km. 390.00 to
Km. 395.00 Total TBR 5.00 Kms.
Points & Crossings
422 Surat‐Godhra section:‐ TTR of 4 P&Cs (2 at Bharuch DRF 95,83 .. 13,00 82,83
& 2 at Palej) on wooden/ST sleepers by PRC and R. 2,96
casual renewal of sleepers for one Km
Points & Crossings
423 Vadodara Division:‐Replacement of double slip DRF 92,16 .. 18,00 74,16
scissor X‐ing in Anand yard by new double slip R. 3,80
scissor X‐ing on PRC sleeper layout.
Points & Crossings
424 Vadodara Division:‐Replacement of 15 Nos. of Trap DRF 84,69 44 12,00 72,25
points laid on wooden sleepers layouts with new R. 6,76
trap points on PRC sleepers layout in various
station yards under jurisdiction of Sr. DEN(N)‐BRC
Points & Crossings
425 Vadodara Division:‐Replacement of 12 Nos. of Trap DRF 67,08 3 10,00 57,05
points laid on wooden sleepers layouts with new R. 5,41
trap points on PRC sleepers layout in various
station yards under AEN‐ANND section.
Others
426 Surat Godhra section:‐ Development of Track DRF 96,68 .. 13,00 83,68
Machine siding at Bharuch and Palej Stations
Others
427 Surat‐Godhra UP line:‐Replacement of existing DRF 91,15 88,63 1,00 1,52
broken/cracked steel channel sleeers on Bridge No.
452 (Tapti River) Total 475 Nos.
TRACK RENEWALS
15.06.31.12.3.
55.034
15.06.31.12.3.
55.025
15.06.31.12.3.
55.026
15.06.31.12.3.
55.027
15.06.31.14.3.
55.001
15.06.31.13.3.
55.025
15.06.31.13.3.
55.027
15.06.31.13.3.
55.030
15.06.31.14.3.
55.003
15.06.31.13.3.
55.029
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 33 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Others
428 Surat‐Godhra section:‐TBTR of existing DRF 91,31 88,19 1,00 2,12
broken/cracked steel channel sleepers on DN line
of Bridge No. 452 i.e. Tapti River Total 476
Nos.
Others
429 Vadodara Division:‐Deep Screening of 25 Nos. 1 in DRF 68,71 10,02 11,00 47,69
12 Turnouts on main line, its approaches and
renewal of grooved rubber sole plate for 60 Kg 1
in 12 turnouts under jurisdiction of ADEN‐Anand
under jurisdiction of Sr. DEN(N)‐BRC
Others
430 Vadodara Division:‐Deep Screening of 25 Nos. 1 in DRF 68,71 5,60 8,00 55,11
12 Turnouts on main line, its approaches and
renewal of grooved rubber sole plate for 60 Kg 1
in 12 turnouts under jurisdiction of ADEN‐Nadiad
under jurisdiction of Sr. DEN(N)‐BRC
Others
431 Surat‐Vadodara‐Godhra Section:‐Replacement of DRF 69,86 24,02 6,00 39,84
Rubber Pads and GFN lines on Up & Dn Main lines at
isolated location under jurisdiction of Sr.
DEN(S)‐BRC
Others
432 Vadodara Division:‐Removal of special layouts of DRF 95,97 .. 10,00 85,97
turnouts at Anand Yard.
Others
433 Vadodara Division:‐ Rectification of badlayout in DRF 99,52 35,87 11,00 52,65
Godhra yard to prevent accidents
Ratlam
434 Ngda‐Ujjain‐Indore Section‐Spot renewal of 1:12 DRF 63,00 52,78 2,00 8,22
(60/52 Kg.) switches.TTR=118 Nos. (RTM/U/10‐11)
435 Ujjain‐Maksi & IDU Section:‐ Deep screening of DRF 70,00 12,46 10,00 47,54
turn outs in different location of various yards‐(
1 in 12 ‐ 43, 1 in 8 1/2 ‐22 & derailing
switches‐2).
436 Ujjain‐Maksi Section:‐TBR of DN line at km DRF 1,02,65 24,06 14,00 64,59
87/0‐95/0= 8.0 Km bet TAN –MKC section and line
no.5 MKC yard=700 TRM.
437 NAD‐BPL section‐ Casual Rail Renewal with 60 DRF 1,24,93 90,83 14,00 20,10
kg/90 UTS new rails in AEN (E) UJN
438 CNA – RTM Section :‐ Casual renewal of worn out & DRF 1,27,71 41,41 9,00 77,30
defective curved switches 52kg 1 In 12, 52kg 1 in
8.5
439 GDA‐NAD SEC:‐ Through weld renewal by renewal of DRF 1,20,81 57,73 20,00 43,08
SKV welds with FB welds
TRACK RENEWALS
15.06.31.13.3.
55.026
15.06.31.12.3.
55.029
15.06.31.12.3.
55.030
15.06.31.12.3.
55.018
15.06.31.12.3.
55.014
15.06.31.12.6.
55.001
15.05.31.10.3.
54.004
15.05.31.11.3.
54.017
15.05.31.11.3.
54.018
15.05.31.12.3.
54.012
15.05.31.12.3.
54.005
15.05.31.12.3.
54.020
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 34 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Complete Track Renewal
440 IDU section ‐CTR of loops and siding UJN yard DRF 1,14,06 95,51 3,00 15,55
L/9=339.50,yard L/10=617.20 & IOW Sdg.=200 & CTR
of loops and siding UJN IOW Sdg.=100, UJN loco
line no.1=268.00, loco line no. 2 =444.93.
(RTM/U/09‐10)
Through Rail Renewal
441 GDA‐NAD Section ‐ Removal of speed restriction of DRF 1,04,20 40,54 14,00 49,66
75 KMPH to normal speed at MAM & USRA stations.
Through Rail Renewal
442 Chanderiya ‐ Nimach section :‐ TRR (P) on Major DRF 1,29,13 .. 25,00 1,04,13
bridge No. 491, 229, 232, 256, 271 & 272 Total
1.728 Km
Through Rail Renewal
443 Nagda‐Bhopal:‐ Casual Renewal of rails on DRF 96,93 68,71 6,00 22,22
Makshi‐Sujalpur section under ADEN(E) Ujjain
Through Rail Renewal
444 Nagda‐Bhopal:‐ Casual Rail Renewal of rails on DRF 96,93 86,25 8,00 2,68
Sujalpur‐Bhopal section under ADEN(E) Ujjain
Through Rail Renewal
445 NAD‐BPL Section:‐ Casual renewal of 1:12 ( 60kg) DRF 1,04,03 9,02 20,00 75,01
& 1:8.5( 60kg) switches.
Through Rail Renewal
446 NAD‐BPL Section:‐ Casual renewal of 1:12( 60kg)& DRF 1,06,45 .. 20,00 86,45
1:8.5( 60kg) CMS x‐ing.
Through Rail Renewal
447 NAD‐BPL section‐Casual renewal of SEJ's. DRF 1,22,24 27,14 21,00 74,10
Through Rail Renewal
448 NAD‐BPL section‐Casual renewal of Glued joints. DRF 1,27,14 13,25 20,00 93,89
Through Rail Renewal
449 GDA‐NAD Sec:‐ Through Rail renewal with 60(kg) 90 DRF 99,50 96,00 1,00 2,50
UTS rails between Km 597.82 to 599.20 ( DN Line)
Through Rail Renewal
450 IDU Section ‐ ‐ Through rail renewal by 52Kg( DRF 1,27,78 1,00,29 10,00 17,49
90UTS) of line no. 1 & 5 of INDORE station.
Through Sleeper Renewal
451 Chanderia ‐ Ratlam : ‐ TSR (S) with Deep Screening DRF 2,02,67 1,32,85 7,00 62,82
of Main/loop line (8.02 Km.) at‐.����� R. 8,18
Through Sleeper Renewal
452 GDA‐NAD Sec.:‐ Through sleeper renewal at sharp DRF 1,28,06 99,56 2,00 26,50
curves 3 to 5 degree with slack gauge PRC R. 4,22
sleepers.
TRACK RENEWALS
15.05.31.09.3.
54.008
15.05.31.12.3.
54.024
15.05.31.14.2.
54.001
15.05.31.13.3.
54.012
15.05.31.13.3.
54.013
15.05.31.12.3.
54.025
15.05.31.12.3.
54.026
15.05.31.12.3.
54.014
15.05.31.12.3.
54.015
15.05.31.12.3.
54.008
15.05.31.12.3.
54.006
15.05.31.12.2.
54.001
15.05.31.12.3.
54.019
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 35 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Ballast
453 GDA‐NAD (BG) Section :‐Through ballast recoupment DRF 1,85,16 62,16 16,00 1,07,00
of existing ballast laid under 60Kg rails and PRC
sleepers by deep screening and recoupment of
ballast to the existing standard of 30 Cms. on
GDA‐NAD (UP & DN Line) Sec..= 23.83 Km
Points & Crossings
454 GDA‐NAD Section:‐ Casual renewal of 1:12 & 1:8.5 DRF 1,06,04 29,91 13,00 63,13
(60 KG) switches.
Points & Crossings
455 Chanderiya – Ratlam Section :‐ Casual Renewal of DRF 1,26,45 49,97 17,00 59,48
52 kg CMS X‐ings 1 in 12/1 in 8.5 (Total 58 Nos.)
Others
456 Godhra‐Nagda section‐Casual Renewal of Switches, DRF 90,52 .. 17,00 73,52
crossings and SEJs
Others
457 Godhra‐Nagda section:‐ Renewal of fittings of DRF 91,06 .. 17,00 74,06
channel sleepers, Riubber pads of points and
crossings and other fittings.
Others
458 Nagda‐Bhopal :‐ Casual Renewal of rails on DRF 95,42 46,63 7,00 41,79
Nagda‐Makshi section under ADEN(W) Ujjain.
Others
459 NAD‐UJN‐BPL, IDU , DWX‐MKC (BG) Section DRF 2,48,60 1,65,82 15,00 67,78
:‐Replacemnt of damaged/ Decayed slpeers with new
galvanised steel channel sleepers with all
fixtureson NAD‐UJN‐BPL & IDU, DWX‐MKC
section.Bridge Nos. Nad‐UJN‐8Up/Dn, 12Up/dn, 32A,
Others
460 Indore‐Dewas‐Ujjain :‐ TWR Km.0 to 43.65 Km DRF 1,73,90 .. 30,00 1,43,90
Others
461 Nagda‐Bhopal Section. :‐ Supplying and fixing of DRF 99,63 65 18,00 80,98
new Insulated fittings for steel Channel sleepers
on different bridges
Others
462 Ratlam Division Godhra‐Nagda Section (UP /Dn Line) DRF 1,63,95 1,48,30 .. 15,65
:‐TWR = 56.85
Others
463 Indore‐Dewas ‐Ujjain Section : ‐ WFT=14.00kms. DRF 2,46,61 94,64 60,00 91,97
Formation Treatment using blaxial Geo ‐ Grid from
km 27/0 ‐ 32/0, 35/0‐36/0,44/0 ‐ 48/1 and59/0 ‐
63/0 =14.00 kms.
Others
464 MGN ‐RTM Sec:‐Easing of slopes and Widening of DRF 98,27 10,88 18,00 69,39
Deep Cutting in section of SE (P. WAY) BOG under
AEN (E) RTM. (RTM/U/09‐10)
TRACK RENEWALS
15.05.31.12.2.
54.002
15.05.31.12.3.
54.027
15.05.31.12.3.
54.007
15.05.31.14.3.
54.002
15.05.31.14.3.
54.001
15.05.31.13.3.
54.019
15.05.31.12.2.
54.003
15.05.31.13.2.
54.001
15.05.31.13.3.
54.020
15.05.31.08.2.
54.004
15.05.31.09.2.
54.002
15.05.31.09.3.
54.011
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 36 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Others
465 TAN‐Providing stabling siding for track DRF 84,33 42,80 7,00 34,53
machine.(173 RM). (RTM/U/09‐10)
Others
466 Godhra‐Nagda.:‐ Development of ballast siding for DRF 44,50 21,43 6,00 17,07
full length to accommodate 30 hoppers including
top wiring at Morwani station.
Others
467 Nagda‐Bhopal:‐ .‐Development of ballast siding at DRF 58,43 27,61 10,00 20,82
Ujjain including top wiring.
Others
468 GDA‐NAD Sec.:‐ Casual renewal of SEJs. DRF 1,04,29 68,64 10,00 25,65
Others
469 GDA‐NAD Sec.:‐ Casual renewal of Glued Joints. DRF 1,25,19 46,61 10,00 68,58
Others
470 GDA‐NAD Sec.:‐ Casual renewal of Channel Sleeper & DRF 1,20,74 67,01 10,00 43,73
Fittings in ADEN(S)‐DHD Section.
Others
471 GDA‐NAD Sec.:‐ Casual renewal of Channel sleepers DRF 1,22,49 70,02 10,00 42,47
and fittings in ADEN(E)‐RTM Section.
Others
472 RATLAM ‐ CHANDERIYA section‐ Through Weld Renewal DRF 1,25,59 61,77 20,00 43,82
of defective joints
Ahmedabad
473 Jhund‐Kharagoda: TTR ‐5 sets DRF 94,00 .. 5,00 89,00
R. 3,17
474 Ahmedabad‐Viramgam:‐ TRR(P) of 52Kg. rails laid on DRF 98,81 .. 20,00 78,81
M+7 density with new 52Kg rails on Major bridge No
733 from Km 499.00 to 500.30. Total 1.3Km
475 Gerathpur‐Ahmedabad section:‐ Through turn out DRF 92,28 40,00 10,00 42,28
renewal(P) 4 Nos 1 in 8.5 on PRC layout after R. 59
removal of 2 Nos double slip in KKFY yard
476 Ahmedabad‐Viramgam‐Samakhiali section:‐ TTR of 5 DRF 91,50 60,00 6,00 25,50
sets of 1 in 8.5 and 1 set 1 in 12 P&Cs on R. 1,71
wooden/ST layout by PRC lay out.
477 Ahmedabad division:‐ TTR(P) of 6 Nos 1 in 8.5 P&Cs DRF 80,02 57,69 5,00 17,33
on 90R/52 Kg rails laid on wooden/ST layout by R. 7,00
52/60 Kg rail on PRC lay out in the jurisdiction
of CPWI DHG and CPWI VG.
478 Ahmedabad division:‐ TTR (P) of 11 Nos trap point DRF 60,96 49,70 5,00 6,26
in the jurisdiction of ADEN(N/W)ADI R. 11,53
479 Viramgam‐Samikhiali:‐ Casual renewal of channel DRF 80,06 40,00 10,00 30,06
sleeper fittings between HVD‐SIOB section under
jurisdiction of CPWI MALB
TRACK RENEWALS
15.05.31.09.3.
54.018
15.05.31.11.3.
54.020
15.05.31.11.3.
54.021
15.05.31.12.3.
54.028
15.05.31.12.3.
54.001
15.05.31.12.3.
54.002
15.05.31.12.3.
54.003
15.05.31.12.3.
54.010
15.01.31.14.3.
50.006
15.01.31.13.3.
50.014
15.01.31.13.3.
50.018
15.01.31.13.3.
50.019
15.01.31.13.3.
50.021
15.01.31.13.3.
50.020
15.01.31.13.3.
50.022
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 37 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
480 Viramgam‐Okha:‐ Casual renewal of channel sleeper DRF 30,06 .. 2,00 28,06
fittings between JN‐HVD section under jurisdiction
of CPWI DHG
481 Ahmedabad‐TRR(S) of 52Kg. rails laid on PRC DRF 58,18 30,00 6,00 22,18
sleepers at M+7 density with 52Kg rails (SH) in
ADI yard PF line No 2 & 7. Total TRR=1.1 Km
482 Viramgaon ‐ Samakhyali Section:‐ SEJR=82 Nos. DRF 39,34 5,68 5,00 28,66
(ADI/U/10‐11)
483 Ahmedabad‐Viramgaon Section:‐ TSEJR = 32 Nos. DRF 39,34 5,68 5,00 28,66
(ADI/U/10‐11)
484 Ahmedabad ‐ Viramgaon (DN )Section:‐ TWR =1550 DRF 90,41 69 10,00 79,72
Nos. (ADI/U/10‐11)
485 Ahmedabad yard:‐TRR (S) =1.54 Kms. on goods line DRF 37,00 5,68 5,00 26,32
No. 7 & 9. (ADI/U/10‐11)
486 Ahmedabad Yard:‐ TRR (S)=1.66 Kms. on goods line DRF 40,00 5,68 5,00 29,32
No.6 & 8. (ADI/U/10‐11)
487 Replacement of corroded fittings of turnout under DRF 78,00 26,34 10,00 41,66
SSE (Pway) ADI.
488 Renewals of wornout rails of various turnouts in DRF 89,88 34,60 5,00 50,28
the jurisdiction of SSE (P.Way) ADI.
489 Through Switch Renewal (P) of chipped/wornout 1:12 DRF 84,53 36,05 10,00 38,48
switches with new 52 kg/60kg sawitches on
ADI‐VG‐SIOB section.
490 Through Weld Renewal in Chandlodiya‐Khodiyar DRF 90,23 24,70 10,00 55,53
Section.
491 Through Weld Renewal in Ahmedabad‐Geratpur DRF 77,33 22,26 10,00 45,07
Section.
492 Renewals of wornout rails of various turnouts in DRF 81,50 32,31 10,00 39,19
the jurisdiction of SSE (P.Way) SBI .
493 Ahmedabad division ‐ Casual Renewal of Channel DRF 90,00 29,66 12,00 48,34
Sleepers fittings.
494 Ahmedabad division‐ Casual renewal of sleepers on DRF 92,00 57,85 7,00 27,15
P&C.
495 Ahmedabad division‐ Casual renewal of fittings of DRF 86,00 35,53 10,00 40,47
P&C.
496 Ahmedabad division‐ Casual renewal of glued DRF 88,00 34,08 10,00 43,92
joints.
497 Ahmedabad division ‐ Casual renewal of rails on DRF 94,00 35,72 10,00 48,28
points & crossings.
TRACK RENEWALS
15.01.31.13.3.
53.023
15.01.31.13.3.
50.024
15.01.31.10.3.
50.025
15.01.31.10.3.
50.014
15.01.31.10.3.
50.007
15.01.31.10.3.
50.013
15.01.31.10.3.
50.012
15.01.31.11.3.
50.017
15.01.31.11.3.
50.015
15.01.31.11.3.
50.024
15.01.31.11.3.
50.026
15.01.31.11.3.
50.025
15.01.31.11.3.
50.016
15.01.31.11.3.
50.001
15.01.31.11.3.
50.005
15.01.31.11.3.
50.003
15.01.31.11.3.
50.004
15.01.31.11.3.
50.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 38 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
498 Ahmedabad division‐Casual renewal of SEJs. DRF 96,00 36,87 12,00 47,13
499 Khodiyar yard : Through Rail Renewal (S) of DRF 84,86 38,01 10,00 36,85
existing 90 R rails with 52 Kg (SH) rails on line
No. 1 & 2 of Khodiyar yard =TRR 1.49 (S) Kms.
500 Khodiyar yard : Through Rail Renewal (S) of DRF 83,22 43,40 8,00 31,82
existing 90 R rails with 52 Kg (SH) rails on line
No. 4 & 5 of Khodiyar yard =TRR 1.48 (S) Kms.
501 Ahmedabad‐SHB section‐TTR(P) with 60 kg 1:12 PRC DRF 86,33 39,93 10,00 36,40
fan shaped layout including deep screening (5
sets).
502 CTR of line No. 1 & TSR of line No. 2 along with DRF 96,56 5,00 10,00 81,56
deep screening at Asarava yard. R. 2,03
503 Through fitting renewal between KHD‐PNU section. DRF 84,11 5,00 15,00 64,11
504 Through Bridge Timber Renewal‐ Replacement of DRF 70,17 58,08 3,00 9,09
existing wooden sleeper with new galvanized steel
channel sleepers with all fittings and fixtures on
HMT‐KDBM(MG section) of DEN(N)’s jurisdiction
(total Nos 372).
505 Replacement of Curved switches & CMS Xing for PSC DRF 90,82 15,46 15,00 60,36
fan shaped layout on age cum condition basis in R. ..
the section of Sr. DEN (NW)‐ADI
506 Replacement of Curved switches & CMS Xing for PSC DRF 90,82 10,00 15,00 65,82
fan shaped layout on age cum condition basis in R. ..
the section of Sr. DEN (W)‐ADI
507 Replacement of Curved switches & CMS Xing for PSC DRF 90,82 10,00 5,00 75,82
fan shaped layout on age cum condition basis in R. ..
the section of DEN (N)‐ADI
508 Replacement of Glued joint & SEJs with web DRF 89,96 10,00 5,00 74,96
stiffener on age cum condition basis in the
section of Sr. DEN (W)‐ADI
509 TBTR with steel channel sleepers on Br. No 731‐A DRF 93,61 .. 20,00 73,61
and casual renewal of steel channel sleepers on
Br. No.733 ADI‐VG section
510 Scattered renewal of switches & crossings on 1:12 DRF 97,80 31,91 15,00 50,89
(52 Kg) points under ADEN(NW)ADI R. ..
511 Through deep screening between section GER‐ADI DRF 84,28 28,41 10,00 45,87
R. 12,84
512 Replacement of Glued joint & SEJs with web DRF 76,18 10,00 10,00 56,18
stiffener on age cum condition basis in the
section of Sr. DEN (NW)‐ADI
513 Replacement of Glued joint & SEJs with web DRF 76,18 10,00 15,00 51,18
stiffener on age cum condition basis in the
section of DEN (N)‐ADI
TRACK RENEWALS
15.01.31.11.3.
50.006
15.01.31.11.3.
50.012
15.01.31.11.3.
50.013
15.01.31.11.3.
50.007
15.01.31.12.3.
50.011
15.01.31.12.3.
50.012
15.01.31.12.3.
50.018
15.01.31.12.3.
50.013
15.01.31.12.3.
50.014
15.01.31.12.3.
50.015
15.01.31.12.3.
50.016
15.01.31.12.3.
50.005
15.01.31.12.3.
50.006
15.01.31.12.3.
50.007
15.01.31.12.3.
50.009
15.01.31.12.3.
50.010
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 39 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
514 Renewal of three single slip Diamond crossing in DRF 98,32 13,10 10,00 75,22
GER‐ADI Section R. 20
515 Renewal of Scissors Crossover in ADI Yard DRF 88,10 40,00 10,00 38,10
516 Renewal of 2 Nos diamond crossing (BG/MG) in DRF 65,13 12,05 10,00 43,08
Jurisduction of SSE(PWay)ADI
Through Rail Renewal
517 Gerathpur–Ahmedabad‐Viramgam & DRF 2,26,81 .. 40,00 1,86,81
Chandlodiya‐Khodiyar:‐ TRR(P)2.762Km
Through Rail Renewal
518 Viramgam‐Samakhiali:‐ TRR (P) on curve No52 from DRF 89,34 .. 15,00 74,34
Km 700.80 to 701.90 = 1.10 Km
Through Rail Renewal
519 Viramgam‐Samakhiali:‐TRR(P) on curve No53 from Km DRF 89,34 .. 15,00 74,34
702.10 to 703.20 = 1.10 Km
Through Rail Renewal
520 Samakhiali‐Gandhidham Section:‐TRR(P) of 52kg rail DRF 96,31 13,00 15,00 68,31
laid on PRC sleepers with new 52kg (90UTS) rails
from km 781.20 to 782.50=1.30 kms
Through Rail Renewal
521 Samakhiali‐Gandhidham Section:‐TRR(P) of 52kg rail DRF 88,90 .. 20,00 68,90
laid on PRC sleepers with new 52kg (90UTS) rails
from km 764.30 to 765.50=1.20 kms
Through Rail Renewal
522 Samakhiali‐Gndhidham :‐TRR (P) of 52kg rail laid DRF 74,08 .. 15,00 59,08
on PRC sleepers with new 52kg (90UTS) rails from
km 757.00 to 758.00=1.00 kms
Through Sleeper Renewal
523 Gandhidham yard:‐ TSR(P)5.157 Km of existing CST‐9 DRF 1,99,16 1,21,32 20,00 57,84
sleepers with PSC sleepers @1660 nos/Km
Points & Crossings
524 Ahmedabad yard:‐Renewal of two Nos scissors DRF 2,25,79 7,55 40,00 1,78,24
crossing and one diamond withhout slip. R. 16,35
Points & Crossings
525 Ahmedabad division:‐ TTR of one P&C at Kharaghoda DRF 54,87 .. 10,00 44,87
and five trap points at Jhund, Kkodiyar & R. 4,88
Ahmedabad yards on wooden/ST sleeper by PRC layout
Points & Crossings
526 Ahmedabad‐Palanpur Section:‐ TTR(P) of existing DRF 1,32,21 25,98 20,00 86,23
points and X‐ings 50R/60R/75R/90R rails on wooden R. 11,34
sleeper layout with new 52Kg (90 UTS) points and
X‐ings on PRC sleeper layout including deep
screening and recoupment of ballast on BG station
TRACK RENEWALS
15.01.31.12.3.
50.003
15.01.31.12.3.
50.017
15.01.31.12.6.
50.001
15.01.31.14.2.
50.001
15.01.31.14.3.
50.002
15.01.31.14.3.
50.004
15.01.31.13.3.
50.016
15.01.31.13.3.
50.011
15.01.31.13.3.
50.015
15.01.31.10.2.
50.005
15.01.31.13.1.
50.003
15.01.31.14.3.
50.005
15.01.31.13.2.
50.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 40 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Points & Crossings
527 Ahmedabad Division:‐TTR(P) of existing points and DRF 1,48,25 6,19 30,00 1,12,06
X‐ings 50R/60R/75R/90R rails on wooden sleeper R. 11,85
layout with new 52Kg (90 UTS) points and X‐ings on
PRC sleeper layout including deep screening and
recoupment of ballast on MG station yards 1 in
Points & Crossings
528 Sabarmati ‐ Renewal of 3 Nos Gauntelated Diamond DRF 95,61 60,00 7,00 28,61
crossing (BG/MG)
Points & Crossings
529 ADI‐PNU & GER‐VG Section: ‐ Through Switch Renewal DRF 47,69 10,36 10,00 27,33
(P) of chipped/ worn out 1: 12 switches with new
52kg/60kg switches. (ADI/U/08‐09)
Points & Crossings
530 GER ‐ SIOB section : Through switch Renewal (P) of DRF 86,54 18,00 15,00 53,54
existing worn out crossings with new 52 kg/60kg.
crossing. (ADI/U/09‐10)
Points & Crossings
531 Renewal of scrissors crossover in GER‐ADI section. DRF 88,10 20,00 15,00 53,10
Others
532 Through Fitting Renewal on Jhund ‐Samakhiali DRF 2,24,18 5,00 40,00 1,79,18
section Total = TFR 31.40 Kms.
Others
533 Through Fitting Renewal from km 769.900 to 795.910 DRF 1,64,99 15,00 30,00 1,19,99
on Samakhiali ‐ Gandhidham section Total = TFR
26.01 Kms.
Others
534 Palanpur‐Gandhidham section:‐ Providing facilities DRF 64,45 .. 10,00 54,45
for track machine siding at Gandhidham & Bhildi
Others
535 Mehasana‐ Viramgam‐Samakhiali:‐ Providing DRF 96,67 .. 20,00 76,67
facilties for track machine sidings at Mehasana,
Dharangadhara & Halvad
Others
536 Through Weld Renewal and related track works on DRF 85,60 27,07 5,00 53,53
JN ‐ VG ‐ ADI (UP) section Total TWR = 1450 Nos.
(ADI/U/09‐10)
Others
537 Through Fitting Renewal from km 721.24 ‐ 732.0 DRF 58,36 22,47 7,00 28,89
on JN ‐ SIOB section Total = TFR 10.76 Km.
(ADI/U/09‐10)
Others
538 ADI‐VG section :‐ Conversion of free rails into DRF 84,44 27,79 10,00 46,65
LWR on loop lines of Total=14 loop lines.
(ADI/U/09‐10)
TRACK RENEWALS
15.01.31.13.2.
50.002
15.01.31.13.3.
50.017
15.01.31.08.3.
50.001
15.01.31.09.3.
50.019
15.01.31.12.3.
50.002
15.01.31.12.2.
50.001
15.01.31.12.2.
50.002
15.01.31.14.3.
50.003
15.01.31.14.3.
50.001
15.01.31.09.3.
50.032
15.01.31.09.3.
50.031
15.01.31.09.3.
50.016
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 41 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Others
539 Through Fitting Renewal from km 508.93 to 522.60 DRF 74,19 13,38 12,00 48,81
(UP) on ADI ‐ VG section Total = TFR 13.67 Km.
(ADI/U/09‐10)
Others
540 ADI ‐ VG ‐ JN Section : Providing gapless joints DRF 88,29 27,18 10,00 51,11
at CMS crossings in the yards. (ADI/U/09‐10)
Others
541 Replacement of U/S sleepers in track circuited DRF 99,72 96,38 1,00 2,34
portion with PRC sleepers(MG) and 60R rails with
90‐R SH rails in ADI yard. (ADI/U/09‐10)
Others
542 GER ‐ SIOB section : Through crossing Renewal (P) DRF 90,50 21,38 12,00 57,12
of existing worn out crossings with new 52
kg/60kg. crossing. (ADI/U/09‐10)
Others
543 Through Weld Renewal and related track works on DRF 88,69 67,70 5,00 15,99
SIOB‐GIM‐BVJ section Total = TWR 1550 Nos.
(ADI/U/09‐10)
Others
544 Viramgam‐Samakhiali Through SEJ renewal of DRF 65,02 20,00 9,00 36,02
existing SEJs to be replaced with new 52Kg SEJ on
PRC sleepers (50 Nos)
Rajkot
545 Rajkot Yard ‐ CTR =1.30 Kms. on R&D and IOC DRF 99,99 17,10 15,00 67,89
siding. (RJT/U/10‐11)
546 Jaliyadewani Yard ‐ TRR(S) = 1.60 Kms.in line DRF 72,13 17,10 10,00 45,03
No.1&3. (RJT/U/10‐11)
547 Sikka Yard ‐ TRR = 2.40 Kms. in line No.1,2&3. DRF 99,93 38,25 10,00 51,68
(RJT/U/10‐11)
548 Rajkot division ‐ Casual Renewal of Channel EBR(IRFC) 59,91 2,53 .. 57,38
Sleepers fittings.
Complete Track Renewal
549 Lavanpur Yard ‐ Complete Track Renewal of DRF 67,55 11,65 1,00 54,90
existing 52Kg rails on PRC with 52 Kg.SH rails R. 2,00
(SWR) on new PRC sleepers at M+4 density (1340
Nos./Km.) including deep screening on salt loading
line .Total 0.80 Kms.
Through Rail Renewal
550 Viramgam ‐ Surendranagar ; TRR (P) on major DRF 89,31 .. 19,41 69,90
bridges & its approaches .
Others
551 Creating of necessary facilities for Machine DRF 98,79 7,92 20,00 70,87
Maintenance of track in Rajkot Division costing
Rs. 98.79 Lakhs. (RJT/U/09‐10)
TRACK RENEWALS
15.01.31.09.3.
50.030
15.01.31.09.3.
50.011
15.01.31.09.3.
50.026
15.01.31.09.3.
50.018
15.01.31.09.3.
50.033
15.01.31.11.3.
50.030
15.04.31.10.3.
53.006
15.04.31.10.3.
53.002
15.04.31.10.3.
53.007
15.04.31.11.3.
53.004
15.04.31.12.3.
53.005
15.04.31.13.3.
53.004
15.04.31.09.3.
53.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 42 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Others
552 Rajkot Division ; Through Weld Renewal of DRF 95,59 95,00 59 ..
defective flash butt welds and AT welds (fracture
prone location) on various locations between
Chamaraj and Lakhamanchi stations.Total 13.50 Kms.
Bhavnagar
553 Kanalus‐Porbandar Section : Through bridge timber DRF 98,36 73,17 25,00 19
replacement = 880 Nos. of girder bridges with span
above 6.1m. (BVP/S/10‐11/OT)
Complete Track Renewal
554 CTR 0.91Km Yard Line (MG) in JUNAGADH. DRF 52,57 8,47 25,00 19,10
R. 9,92
Through Rail Renewal
555 Rajkot‐Veeraval section:‐ TRR(S) 0.70 Km on pit DRF 44,62 .. 25,00 19,62
line
Others
556 BVP Division ‐ Casual renewal of P. Way fittings DRF 96,53 .. 25,00 71,53
Mumbai
557 Works costing below DRM's Power DRF 14,92 .. 14,92 ..
Ratlam
558 Works costing below DRM's Power DRF 14,59 .. 14,59 ..
Ahmedabad
559 Works costing below DRM's Power DRF 29,00 .. 29,00 ..
Bhavnagar
560 Works costing below DRM's Power DRF 1,41,49 .. 1,41,49 ..
TOTAL‐WORKS IN PROGRESS DRF .. .. 31,90,00 ..
B ‐ New Works
Mumbai
561 Virar‐Surat Sec. Casual renewal of eutectic weld DRF 89,26 .. 40,00 49,26
rails in various location in SSE(P.way) PLG
Section (Approx. 1.0km).
Through Rail Renewal
562 Virar‐Surat: Casual renewal of Eutectic weld rails DRF 89,26 .. 40,00 49,26
in SSE(P‐way) Vapi section.
Through Rail Renewal
563 Churchgate‐Virar:‐ Casual Renewal of 60 Kg rails DRF 89,26 .. 40,00 49,26
under SSE(P.Way) DDR Section.
Through Rail Renewal
564 Churchgate‐Virar:‐ Casual Renewal of 60 Kg rails DRF 89,26 .. 40,00 49,26
under SSE(P.Way) ADH Section.
Through Rail Renewal
565 Churchgate‐Virar:‐ Casual Renewal of 60 Kg rails DRF 89,26 .. 40,00 49,26
under SSE(P.Way) BVI Section.
TRACK RENEWALS
15.04.31.12.3.
53.007
15.02.31.10.3.
51.004
15.02.31.12.3.
51.002
15.02.31.13.3.
51.001
15.02.31.12.3.
51.001
15.03.31.15.3.
00.999
15.05.31.15.3.
00.999
15.01.31.15.3.
00.999
15.02.31.15.3.
00.999
15.03.31.15.3.
52.069
15.03.31.15.3.
52.066
15.03.31.15.3.
52.077
15.03.31.15.3.
52.078
15.03.31.15.3.
52.079
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 43 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Through Rail Renewal
566 Churchgate‐Virar:‐ Casual Renewal of 60 Kg rails DRF 89,26 .. 40,00 49,26
under SSE(P.Way) BYR Section.
Through Rail Renewal
567 Udhna ‐ Jalgaon section:‐ Casual Renewal of 52kg DRF 78,26 .. 40,00 38,26
rails under AEN‐ Vyara
Through Rail Renewal
568 Udhna‐Jalgaon Section. Casual renewal of 52kg DRF 78,26 .. 40,00 38,26
90UTS rail under AEN(E)Nandurbar
Others
569 Churchgate‐Virar Section: Casual renewal of PSC DRF 89,70 .. 36,00 53,70
sleepers
Others
570 Virar Surat section: Replacement of steel channel DRF 88,03 .. 36,00 52,03
sleeper fittings
Others
571 Udhna‐Jalgaon: Through Channel sleeper fitting DRF 97,84 .. 36,00 61,84
Renewals
Others
572 Churchgate‐Virar ‐ Replacement of existing 60 Kg DRF 85,81 .. 36,00 49,81
switches by new switches
Others
573 Churchgate‐Virar:‐Replacement of Existing SEJs DRF 90,63 .. 36,00 54,63
Others
574 Virar‐Surat:Replacement of SEJ (52kg/60kg) by DRF 97,88 .. 36,00 61,88
improved SEJ in AEN/BL section.
Others
575 Virar‐Surat: Replacement of Glued joints DRF 80,26 .. 36,00 44,26
(52kg/60kg) by in‐situ glued joints in SE(P‐way)BL
section.
Others
576 Udhna‐Jalgaon section: Replacement of Glued joints DRF 88,21 .. 36,00 52,21
(52kg/60kg) by in‐situ glued joints in ADEN‐VYA
and AEN‐NDB section
Others
577 Virar‐Surat section: Renewal of defective welds DRF 58,30 .. 36,00 22,30
Others
578 Virar‐Surat Sec. Rehabilitation of existing track DRF 89,87 .. 36,00 53,87
machine stabling lines and its allied facilities
Vadodara
579 Vadodara Division:‐Casual Renewal of defective DRF 89,26 .. 40,00 49,26
rails and rails on turnouts with 60 Kg (90 UTS)
rails on Up & Dn Main lines between Surat‐Bharuch.
TRACK RENEWALS
15.03.31.15.3.
52.080
15.03.31.15.3.
52.072
15.03.31.15.3.
52.073
15.03.31.15.3.
52.074
15.03.31.15.3.
52.075
15.03.31.15.3.
52.076
15.03.31.15.3.
52.067
15.03.31.15.3.
52.068
15.03.31.15.3.
52.064
15.03.31.15.3.
52.071
15.03.31.15.3.
52.070
15.03.31.15.3.
52.065
15.03.31.15.3.
52.081
15.06.31.15.3.
55.061
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 44 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
580 Vadodara Division:‐Casual Renewal of defective DRF 89,26 .. 40,00 49,26
rails and rails on turnouts with 60 Kg (90 UTS)
rails on Up & Dn Main lines between
Bharuch‐Miyagam.
581 Vadodara Division:Casual renewal of existing DRF 89,70 .. 36,00 53,70
broken and unserviceable 60kg PRC sleepers at
isolated location between Bharuch‐Miyagam on Up &
Dn line under ADEN(N)Bharuch 3000 Nos.
582 Dakor & Sevaliya:‐Rehabilitation of existing track DRF 63,18 .. 36,00 27,18
machine stabling line and its allied facilities.
583 Itola:‐Rehabilitation of existing track machine DRF 66,28 .. 30,00 36,28
stabling line and its allied facilities R. 2,90
Through Rail Renewal
584 Vadodara Division:‐Through Rail Renewal with 60 Kg DRF 72,19 .. 40,00 32,19
(90 UTS) rails from Km. 398.830 to Km. 399.680
Total TRR 0.85 Kms. On Dn Line between
Vadodara‐Godhra.
Through Rail Renewal
585 Vadodara Division:‐Through Rail Renewal with 60 Kg DRF 82,12 .. 40,00 42,12
(90 UTS) rails from Km. 398.600 to Km. 399.520
Total TRR 0.92 Kms. on Up Line between
Vadodara‐Godhra Section.
Through Rail Renewal
586 Vadodara‐Geratpur Section‐TRR with 60 Kg (90 UTS) DRF 71,40 .. 40,00 31,40
rails from Km. 430.14 to Km. 430.28(Up), Km.
431.94 to Km. 432.50(Up) & Km. 438.00 to Km.
438.10(Dn) Total TRR 0.80 Kms.
Through Rail Renewal
587 Vadodara‐Geratpur Section:‐TRR with 60 Kg (90 UTS) DRF 89,26 .. 40,00 49,26
rails from Km. 415.85 to 416.85 Total TRR 1.00
Kms. on Up line
Through Rail Renewal
588 Vadodara‐Geratpur Section:‐TRR with 60 Kg (90 UTS) DRF 89,26 .. 40,00 49,26
rails from Km. 471.637 to 472.637 Total TRR 1.00
Kms. on Dn line
Points & Crossings
589 Vadodara Division:‐ Casual renewal of broken and DRF 89,98 .. 36,00 53,98
cracked sleeper of Points and Xing under the
jurisdiction of DEN(S)BRC
Others
590 Vadodara Division:Casual renewal of existing DRF 89,70 .. 36,00 53,70
broken and unserviceable 60kg PRC sleepers at
isolated location between Surat‐Bharuch on Up & Dn
line under ADEN(S)Bharuch 3000 Nos.
TRACK RENEWALS
15.06.31.15.3.
55.062
15.06.31.15.3.
55.052
15.06.31.15.3.
55.063
15.06.31.15.3.
55.059
15.06.31.15.3.
55.054
15.06.31.15.3.
55.053
15.06.31.15.3.
55.058
15.06.31.15.3.
55.056
15.06.31.15.3.
55.057
15.06.31.15.3.
55.050
15.06.31.15.3.
55.051
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 45 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Others
591 Vadodara Division:‐Casual Renewal of Sleeper No. DRF 89,98 .. 30,00 59,98
64 to 76 of Points and X‐ings under the
jurisdiction of Sr. DEN(N)‐BRC on
Vadodara‐Geratpur Section.
Others
592 Vadodara Division:‐Replacement of existing channel DRF 98,98 .. 36,00 62,98
sleepers with new channel sleepers on Bridge No.
32‐B/DN, 40‐B/UP, 49‐A/Up & DN, 53‐A/ Up & Dn.
Total 472 Nos. of channel sleepers on
Vadodara‐Godhra Section.
Ratlam
593 Godhra‐ Nagda Sec:‐ Elimination of bad lay out by DRF 78,45 .. 36,00 42,45
easement of curve at point No. 194 ( Loco yard R. 15,57
Ratlam) , by shifting of point No. 206 and 208 at
MGN Yard, by Shifting of X‐over 206 & 207 at MGN
yard and by providing 1:8.5 t/ out at PCN Yard
Through Rail Renewal
594 Godhra‐Nagda Sec:‐ Casual Rail renewal with 60(kg) DRF 75,87 .. 36,00 39,87
90 UTS rails
Through Rail Renewal
595 Nagda‐Bhopal Section:‐ Casual Rail renewal with 60 DRF 99,97 .. 40,00 59,97
(kg) 90 UTS rails
Through Rail Renewal
596 Indore‐Dewas‐Ujjain Section:‐ Casual Rail renewal DRF 99,97 .. 40,00 59,97
with 60 (kg) 90 UTS rails in ADEN ‐West section.
Through Rail Renewal
597 Tajpur station:‐ :‐ Rehabilitation of existing DRF 67,21 .. 36,00 31,21
track machine stabling line and its allied R. 9,34
facilities
Through Sleeper Renewal
598 Nagda‐Ujjain section ‐ Through sleeper renewal (P) DRF 67,99 .. 36,00 31,99
with 60Kg PRC sleepers Up line from54.00 km to R. 6,46
54.98 km.
Points & Crossings
599 Chanderia ‐ Ratlam Section ‐ Deep screening of DRF 60,99 .. 36,00 24,99
Points & X‐ings of main line and yard's at‐ R. 36,07
Points & Crossings
600 Godhra‐Nagda Sec:‐ Casual renewal of old PRC DRF 43,44 .. 36,00 7,44
layout sleepers of points and X‐ings.
Points & Crossings
601 Chanderia‐Ratlam section ‐ Casual Renewal of CMS DRF 48,30 .. 36,00 12,30
crossings (1:12)
Points & Crossings
602 Nagda‐Bhopal & Indore‐Dewas‐Ujjain sections:‐ DRF 73,26 .. 36,00 37,26
Elimination of Bad layout at Akodia ( 101‐102 R. 18,57
X‐over),Baktal(119‐120 X‐over)Phanda ,(115‐116 X‐
over)& Bakanian Bhaunri (BQE( 139‐140 X‐over)MKC
&DWX .
TRACK RENEWALS
15.06.31.15.3.
55.060
15.06.31.15.3.
55.055
15.05.31.15.3.
54.075
15.05.31.15.3.
54.064
15.05.31.15.3.
54.071
15.05.31.15.3.
54.069
15.05.31.15.3.
54.080
15.05.31.15.3.
54.063
15.05.31.15.3.
54.081
15.05.31.15.3.
54.065
15.05.31.15.3.
54.074
15.05.31.15.3.
54.076
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 46 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Others
603 Nagda‐Bhopal TFR of rubber pads 98.12 Km. DRF 1,64,85 .. 1,00 1,63,85
Others
604 Godhra‐Nagda Sec:‐ Renewal of fittings of steel DRF 53,40 .. 36,00 17,40
channel sleepers of various bridges.
Others
605 Mhow ‐ Sanawad (MG) Sec. :‐ Supplying and fixing DRF 47,98 .. 36,00 11,98
of new Galvanized Steel channel sleeper with all
fitting and fixture under SSE (P. Way) Mhow and
KNW section (366 Nos.)
Others
606 Nagda‐Bhopal, Indore‐Dewas‐Ujjain & Dewas‐Maksi DRF 94,55 .. 36,00 58,55
section ‐Casual Renewal of 52KG Switches ( 1:12&
1in 8 1/2)Under jurisdiction of DEN(S) RTM.
Others
607 Chanderia‐Ratlam section ‐ Casual Renewal of DRF 99,04 .. 36,00 63,04
Switches ( 1:12 & 1in 8 1/2)
Others
608 Nagda‐Bhopal, Indore‐Dewas‐Ujjain & Dewas‐Maksi DRF 98,88 .. 36,00 62,88
section‐Casual Renewal of 52KG Crossings ( 1:12&
1in 8 1/2)Under jurisdiction of Den(S) RTM.
Others
609 Godhra‐ Nagda Section :‐ Casual renewal of glued DRF 83,38 .. 36,00 47,38
joints, SEJ's and provision of SEJ's in curves in
ADEN (E) RTM section.
Others
610 Godhra‐ Nagda Section :‐ Casual renewal of glued DRF 83,38 .. 36,00 47,38
joints, SEJ's and provision of SEJ's in curves in
ADEN (S) DHD section.
Others
611 Chanderiya ‐ Ratlam section: Casual renewal of DRF 86,54 .. 40,00 46,54
Glued joints (52kg) in ADEN‐NMH section.
Others
612 Indore Yard :‐ Elimination of bad lay out by DRF 33,39 .. 30,00 3,39
easement of curve and shifting of turnout R. 6,69
Others
613 Godhra‐Nagda section‐Casual Renewal of Switches ( DRF 95,52 .. 36,00 59,52
1:12& 1in 8 1/2)
Ahmedabad
614 Samakhiyali ‐ Gandhidham SECTION‐DN.Line‐TRR of DRF 70,71 .. 40,00 30,71
747/1‐748/0 with new 52 KG rails
615 Samakhiyali ‐ Gandhidham section DN line ‐ TRR of DRF 86,43 .. 40,00 46,43
Bhimasar entry from GIM side with new 52Kg rails.
TRACK RENEWALS
15.05.31.15.2.
54.001
15.05.31.15.3.
54.068
15.05.31.15.3.
54.079
15.05.31.15.3.
54.066
15.05.31.15.3.
54.073
15.05.31.15.3.
54.067
15.05.31.15.3.
54.070
15.05.31.15.3.
54.072
15.05.31.15.3.
54.078
15.05.31.15.3.
54.077
15.05.31.15.3.
54.082
15.01.31.15.3.
50.046
15.01.31.15.3.
50.051
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 47 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
616 Palanpur‐Mahesana section:‐ TWR 38.50 km DRF 1,76,63 .. 1,00 1,75,63
617 Sabarmati‐ Mehsana (MG) Sewction: Renewal of one DRF 77,19 .. 36,00 41,19
No scissors cross over 1 in 12 (MG) in the
jurisdiction of ADEN(NW) ADI...
618 Ratnal:‐ Rehabilitation of existing track machine DRF 89,59 .. 36,00 53,59
stabling line and its allied facilities R. 6,52
Complete Track Renewal
619 Jhund‐ Samakhiyali Section : Removal of PSR at Km DRF 29,42 .. 28,00 1,42
628/108 to 628/944 . R. 1,67
Through Rail Renewal
620 Viramgam‐Samakhiyali section : TRR(P) 52 kg 90 UTS DRF 47,14 .. 40,00 7,14
of existing 52 Kg 90 UTS rail of curve No 54 total
0.6 Km..
Through Rail Renewal
621 Jhund‐ Samakhiyali : TRR (P) of existing 52 Kg 90 DRF 98,18 .. 40,00 58,18
UTS rail laid on PRC sleeper at 1660 density with
new 60 Kg 90UTS rail at Km 639.260 to 640.360 bet
GSY‐CUL on JN‐SIOB section Total TRR 1.1 Km
Through Rail Renewal
622 Viramgam‐Samakhiyali Section : TSR (P) 60 Kg of Km DRF 58,28 .. 36,00 22,28
606.2 to 607.100 total 0.9 Km with renewal of R. 5,93
channel sleeper fitting of Br No 53 .
Through Rail Renewal
623 Jhund‐Samakhiyali sect.:Removal of PSR at Km DRF 90,36 .. 36,00 54,36
707/03 to 708/0
Points & Crossings
624 Ahmedabad‐Palanpur & Kalol to Ranuj :‐ TTR of DRF 1,16,32 .. 40,00 76,32
diamond crossings at Mahesana & Katosan Yards = 2 R. 10,87
Nos.
Points & Crossings
625 Ahmedabad ‐ Palanpur section : ‐ TTR = 10 Nos. (CS DRF 1,58,11 .. 1,00 1,57,11
‐ 10 Nos. + CMS ‐ 10 Nos.)TBR 5.00 kms. & TFR R. 32,96
5.00 kms.
Points & Crossings
626 Samakhiali ‐ Gandhidham ‐ Kandlaport :‐ DRF 1,58,76 .. 1,00 1,57,76
TTR(CS+CMS) 27 Nos (60kg 1 in 12 = 26 & 1 in 8½ =
1 Nos.)
Points & Crossings
627 Through Switch renewal 52 Kg (P) 1 in 8.5 and 1 in DRF 92,26 .. 36,00 56,26
12 in the jurisdiction of DEN(N)ADI
Points & Crossings
628 Ahmedabad Division :Through crossing renewal 52 kg DRF 50,32 .. 36,00 14,32
(P) in the jurisduction of SrDEN(W) ADI.
TRACK RENEWALS
15.01.31.15.2.
50.004
15.01.31.15.3.
50.048
15.01.31.15.3.
50.054
15.01.31.15.3.
50.045
15.01.31.15.3.
50.044
15.01.31.15.3.
50.050
15.01.31.15.3.
50.052
15.01.31.15.3.
50.047
15.01.31.15.2.
50.001
15.01.31.15.2.
50.005
15.01.31.15.2.
50.006
15.01.31.15.3.
50.043
15.01.31.15.3.
50.049
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 48 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Others
629 Ahmedabad‐Viramgam‐Samakhiali & Ahmedabad‐ DRF 1,09,31 .. 53,00 56,31
Mehasana sections:‐ TBTR of wooden sleepers by
H‐beam sleepers 579 Nos..
Others
630 Ahmedabad‐ Palanpur Section :‐ TFR of only Rubber DRF 1,60,45 .. 1,00 1,59,45
Pads ‐ 95.50 Km
Others
631 Viramgam ‐ Samakhiali section : ‐ TFR 21.57 Km DRF 1,87,24 .. 1,00 1,86,24
Others
632 Palanpur‐Mahesana Section:‐ TFR of only Rubber DRF 92,41 .. 36,00 56,41
Pads ‐ 55.00 Km
Rajkot
633 Wankaner ‐ Rajkot Section; TRR(P) on major bridges DRF 94,29 .. 40,00 54,29
& its approaches.
634 Rajkot Division ; Casual Renewal of rails on DRF 98,21 .. 40,00 58,21
various locations under DEN (East & West) Rajkot's
jurisdiction.
635 Rajkot Division ; Casual Renewal of Switches under DRF 97,15 .. 36,00 61,15
DEN (East) RJT's jurisdiction Total 25 Nos.
636 Rajkot Division ; Casual Renewal of switches under DRF 97,15 .. 36,00 61,15
DEN (West) RJT's jurisdiction Total 25 Nos.
637 Rajkot Division ; Casual Renewal of crossings DRF 46,22 .. 36,00 10,22
under DEN (East) RJT's jurisdiction Total 23 Nos.
638 Rajkot Division ; Casual Renewal of crossings DRF 92,51 .. 36,00 56,51
under DEN (West) RJT's jurisdiction Total 46 Nos.
639 Rajkot Division ; Casual Renewal of SEJs under DEN DRF 96,89 .. 36,00 60,89
(East) RJT's jurisdiction Total 38Nos.
640 Rajkot Division‐ Casual renewal of glued joints DRF 80,48 .. 36,00 44,48
under DEN (East) RJT's jurisdiction Total 186 Nos.
641 Rajkot Division; Casual Renewal of glued joints DRF 77,02 .. 36,00 41,02
under DEN (West) RJT's jurisdiction Total 178 Nos.
642 Rajkot Division‐ Rehabilitation of existing track DRF 94,77 .. 36,00 58,77
machine stabling line and its allied facilities at
Dwakara, Khambaliya & Hadmatiya
Others
643 Rajkot Division ; Casual Renewal of SEJs under DEN DRF 84,14 .. 36,00 48,14
(W) RJT's jurisdiction Total 33 Nos.
Bhavnagar
644 Bhavnagar Division: Casual renewal of SEJ (Non DRF 91,79 .. 36,00 55,79
PRCL BG section).
TRACK RENEWALS
15.01.31.15.2.
50.002
15.01.31.15.2.
50.007
15.01.31.15.2.
50.003
15.01.31.15.3.
50.053
15.04.31.15.3.
53.041
15.04.31.15.3.
53.042
15.04.31.15.3.
53.040
15.04.31.15.3.
53.044
15.04.31.15.3.
53.043
15.04.31.15.3.
53.045
15.04.31.15.3.
53.037
15.04.31.15.3.
53.039
15.04.31.15.3.
53.046
15.04.31.15.3.
53.047
15.04.31.15.3.
53.038
15.02.31.15.3.
51.025
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 49 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
645 Bhavnagar Division : Through Fitting renewal on DRF 78,70 .. 36,00 42,70
RLA‐MHV section
646 Bhavnagar Division ‐ Casual renewal of defective DRF 82,58 .. 38,00 44,58
weld at verious locations (Non‐PRCL Sections)
Through Rail Renewal
647 Bhavnagar Terminus : Through Rail Renewal ‐1.6 TKm DRF 90,06 .. 38,00 52,06
of Pit line at
Ballast
648 Talala‐Veraval (MG section) :‐ TBR 10 Kms DRF 1,11,44 .. 1,00 1,10,44
R. 65,91
Points & Crossings
649 Bhavnagar Division: Casual renewal of CMS DRF 99,23 .. 36,00 63,23
crossings (Non PRCL BG section)
Others
650 Bhavnagar Division :‐ Casual Renueval of Track BG DRF 95,68 .. 36,00 59,68
section.
Others
651 Wansjaliya :‐ Rehabilitation of existing track DRF 93,40 .. 36,00 57,40
machine stabling line and its allied facilities R. 6,56
Others
652 Bhavnagar Division :‐ Casual Renueval of Track MG DRF 95,68 .. 36,00 59,68
Section.
TOTAL‐NEW WORKS DRF .. .. 31,62,00 ..
TOTAL‐Track Renewals DRF .. .. 63,52,00 ..
A ‐ Works in Progress
Headquarter
653 Providing man refuges on different open web DF(4) 86,29 .. 1,00 85,29
through type steel girder bridges as per RDSO
DRG.No.CBS‐0028 in Western Railway
Mumbai
654 Replacement of Elastomeric Bearing on PSC‐Box DRF 38,78 .. 1,00 37,78
Girder Bridge NO. 75UP/DN(11X48.50MTS0 Local Line
between BYR‐NIG Stations on CCG‐VR Section in
Mumbai Division W.Rly
655 Virar‐Surat Section:‐ Replacement & strengthening DRF 2,31,18 2,19,72 11,46 ..
of cracked stringer angles in Br.No. 275 and 313
and replacement of corroded bracing gussets and
metallising of flooring system of Br. No.313.
(BCT/S/06‐07)
656 Nallasopara ‐ Vasai Road ‐ Construction / DRF 3,87,37 .. 1,00 3,86,37
strengthening of cast iron screw piles (bridge No
78) at Km. 53/6‐7. (BCT/S/06‐07) XEN/BR/DDR
TRACK RENEWALS
15.02.31.15.3.
51.023
15.02.31.15.3.
51.021
15.02.31.15.3.
51.027
15.02.31.15.2.
51.001
15.02.31.15.3.
51.024
15.02.31.15.3.
51.022
15.02.31.15.3.
51.026
15.02.31.15.3.
51.028
BRIDGE WORKS
15.00.32.14.6.
11.001
15.03.32.13.3.
11.002
15.03.32.06.2.
11.003
15.03.32.06.2.
52.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 50 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
657 Churchgate‐Virar Section:‐ Replacement of small DRF 1,58,92 86,71 10,00 62,21
span girders by PSC slabs upto 6.10m span bridges
(Br.No. 15,24,25,32, 38,40,53, 54 & 58 = 9
bridges.). (BCT/U/06‐07)
658 Virar ‐ Surat Section ‐ Replacement of cracked top DRF 1,16,37 54,85 31,00 30,52
flange, bracing and gussets etc. of Br.No. 417 UP
& DN (13 x 18.30m) at km 249/11‐29.
659 Replacement of Elastomeric Bearings on PSC BOX DRF 93,70 .. 1,00 92,70
Girder of bridge No.73 UP/DN Local Line between
BYR‐NIG stns on CCG‐VR section on Mumbai Division.
Vadodara
660 Vadodara Division ‐ Replacement of existing aged DRF 1,05,58 52,70 50,00 2,88
steel girders by providing 9.15 m spans PSC slabs
on Br. No.537, 539, 568, 549 on Surat‐Godhra
Sectoin and Br. No.51A on Anand‐Godhra Section
(Total 9 spans). (BRC/S/08‐09)
661 Ankleshwar ‐ Bharuch Section:‐ Replacement of DRF 49,75 43,65 3,00 3,10
chequered plate & top hand railing of foot path &
trolley refuge on Bridge No. 502.(BRC/S/08‐09)
(Dy.CE(BR)‐BL)
662 Vadodara Division:‐ Replacement of bearing and DRF 1,54,48 .. 1,00 1,53,48
rehabilitation of PSC/RCC girders. (BRC/S/09‐10)
663 Sr.DEN(N)BRC's Jurisdiction:‐ Replacement of aged DRF 84,81 69,92 13,00 1,89
steel girders by providing PSC/RCC slabS up to
6.10 m span (25 bridges). (BRC/U/11‐12)
664 Regirdering of Br.No.102 including channel DRF 96,95 55,02 20,00 21,93
sleepers. (BRC/U/11‐12)
665 Vadodara Division:‐Rebuilding of Bridge No. 531 at DRF 42,17 21,21 20,96 ..
Km on Surat‐Vadodara Section with 5.10m RCC Box.
Ratlam
666 Godhra‐Meghnagar Section:‐ Re‐building of Bridge DRF 89,50 66,40 14,00 9,10
No. R‐01 (UP & DN) at Km. 514/15‐17 & R‐21 (DN) at
Km. 521/14‐16 and R‐22 (DN) at Km. 622/22‐24 .
667 UJN ‐BPL Sec.:‐ Replacement of Earley steel DRF 99,48 32,86 30,00 36,62
girders by providing PSC/PRC slabs of 9.15m span
on NAD‐UJN‐ BPL,IDU, DWX‐MKC section at ORN‐2
Bridge Nos. 134 Dn( 1X9.15m),135 ( 1X9.15m) ,137
Dn( 2X9.15m), 175 Dn( 3X9.15m),176 Dn (
668 Indore ‐ Dewas ‐Ujjain section‐Rebuilding of S.Fund 96,52 95,66 .. 86
bridge no.32. ( 2x091 M hume pipe),46(2X0.91),49(
2X0.91) by RCC box.
669 MKC‐BPL section‐Rebuilding of bridge no.105 Dn DRF 93,18 32,86 40,00 20,32
(1x1.22 M),166Dn(2X.91m),167Dn(2X0.91m) ( ORN‐2)
by RCC box.
BRIDGE WORKS
15.03.32.06.2.
52.001
15.03.32.10.2.
11.001
15.03.32.13.3.
11.001
15.06.32.08.2.
55.001
15.06.32.08.3.
11.002
15.06.32.09.3.
11.002
15.06.32.11.3.
55.002
15.06.32.11.3.
55.001
15.06.32.12.3.
55.001
15.05.32.09.3.
54.001
15.05.32.12.3.
54.003
15.05.32.12.3.
54.001
15.05.32.12.3.
54.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 51 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Ahmedabad
670 Planpur ‐ Ahmedabad Section ‐ Rebuilding of Br.No. DRF 1,47,02 1,04 77,28 68,70
1016 at Km. 744/9‐10 between DNW‐JUL.
671 Mehasana ‐ Palanpur Section ‐ Regirdering Br. DRF 1,92,72 72,09 20,00 1,00,63
No.945 (3x24). (ADI/S/08‐09)
672 Ahmedabad‐Viramgam Section:‐ Rebuilding of Br. No. DRF 96,23 .. 1,00 95,23
5,7 in Viramgam‐ Jhund Section & Br. No. 24,29,
29Dn, 33Dn of Ahmedabad‐Viramgam & Br. No. 38 of
Jhund‐Kharaghoda Section. (ADI/U/09‐10)
673 Samakhiali‐Gandhidham‐Kandla Port Section:‐ DRF 98,20 11 1,00 97,09
Replacement of small span girder by providing PSC
slab at Br. No. 313 (6 x 3.05m) & Br. No. 277 (5 x
8.23m) & 279 ( 3 x 8.23m). (ADI/U/10‐11)
674 Ahmedabad ‐Viramgam ‐Jhund Section‐:‐ Replacement DRF 36,89 1 1,00 35,88
of small span girders by providing PSC slab.(
Br.No.26DN,89 Up,89L1,715). (ADI/U/11‐12)
675 Chandlodiya‐Khodiyar‐Gandhinagar section:‐ DRF 83,50 29,05 30,00 24,45
Replacement of small span girders by providing PSC
slab.( Br.No.28,20,70,2up,4up). (ADI/U/11‐12)
676 Jhund‐Kharaghoda section:‐ Replacement of small DRF 69,62 1 1,00 68,61
span girders by providing PSC slab.
(Br.No.13,14,17,19A). (ADI/U/11‐12
677 Ambli Road‐Sanand:‐ Rebuilding of Br.No.12 at km DRF 88,29 43,00 30,00 15,29
515/5‐6(Up&Dn line). (ADI/U/11‐12)
678 Samakhiali‐Gandhidham Section:‐ Replacement of DRF 94,22 1 1,00 93,21
steel girders by PSC slab of BrNo. 314(1x3.05
m)and Br.No.316(6x12.19m)(Total span 9 nos.).
(ADI/U/11‐12)
679 Sabarmati (Engg.W/S):‐ Replacement of broken AC C.Fund 93,95 1 .. 93,94
sheets with aluminium sheets and polycorbonate
sheets and down take pipes in STR shop.
(ADI/U/11‐12)
680 Sabarmati:‐ Improvement to flooring in STR shop DRF 93,07 2,98 50,00 40,09
and other allied Engineering works. (ADI/U/11‐12)
Rajkot
681 Viramgam‐Surendranagar Section:‐ New Bridge No. DRF 48,11 1 1,00 47,10
20X (RCC Box 2x 3.05m) at Km. 587.15.
(RJT/S/10‐11)
682 Rajkot Division:‐ New Bridge No.380/A‐ Proposed DRF 59,71 1 1,00 58,70
R.C.C. Box ( 2x6.10m RCC Box) at Km 838/0‐1.
(RJT/S/10‐11)
683 Viramgam‐Okha Section:‐ Replacement of old girder DRF 32,50 1 32,00 49
Bridge No.39(1x6.10m) by RCC Box (1x4.72 m+1x3.90
m) at km 616/9‐617/1 between BLRD‐SUNR section.
(RJT/U/11‐12)
BRIDGE WORKS
15.01.32.10.1.
30.001
15.01.32.08.3.
11.001
15.01.32.09.3.
50.001
15.01.32.10.3.
50.001
15.01.32.11.3.
50.001
15.01.32.11.3.
50.003
15.01.32.11.3.
50.004
15.01.32.11.3.
50.002
15.01.32.11.3.
50.008
15.01.32.11.3.
50.006
15.01.32.11.3.
50.007
15.04.32.10.3.
53.002
15.04.32.10.3.
53.001
15.04.32.11.3.
53.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 52 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Bhavnagar
684 Kanalus Porbandar Section ‐ Replacement of steel DRF 2,71,70 1,52,83 75,98 42,89
girders up to 6.10 m span by RCC/PSC (41 spans)
685 Replacement of damaged RCC slab of Br. No. 46 (3 X DRF 68,53 50,30 13,00 5,23
2.42) & Br. No. 59 (3 X 3.02) on SBI‐BTD Section.
Mumbai
686 Works costing below DRM's Power DRF 1,22 .. 1,22 ..
Ratlam
687 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
Ahmedabad
688 Works costing below DRM's Power DF(4) 9,00 .. 9,00 ..
Bhavnagar
689 Works costing below DRM's Power DF(3) 10,00 .. 10,00 ..
TOTAL‐WORKS IN PROGRESS DRF .. .. 5,88,90 ..
DF(3) .. .. 10,00 ..
DF(4) .. .. 10,00 ..
B ‐ New Works
Mumbai
690 Churchgate‐Virar Section: Regirdering of Bridge DRF 1,07,98 .. 50 1,07,48
No. 40 on UP THROUGH / Down THROUGH Line under
ADEN (T/S) Lower Parel Section.
691 Churchgate ‐ Virar Section:‐ Regirdering of Bridge DRF 1,87,00 .. 50 1,86,50
No. 20 on UP Through Line under Jurisdiction of
ADEN(T/S) Lower Parel Section.
Vadodara
692 Surat‐Miyagam Section:‐Replacement of Steel Girder DRF 37,43 .. 50 36,93
of Bridge No. 464 at km. 274/22‐24 on Up & Dn line
by provding PSC slab.
Ratlam
693 Maksi‐Bhopal Section.‐Rebuilding of of stone Slab DRF 65,60 .. 50 65,10
by RCC BOX. (Bridges No.106 span Dn
2X0.91m,Br.No.107span DN 2X0.91m) ( ORN‐2).( Total
Bridges =02Nos.)
TOTAL‐NEW WORKS DRF .. .. 2,00 ..
BRIDGE WORKS
15.02.32.09.2.
51.001
15.02.32.12.3.
51.001
15.03.32.15.3.
00.999
15.05.32.15.3.
00.999
15.01.32.15.3.
00.999
15.02.32.15.3.
00.999
15.03.32.15.2.
52.001
15.03.32.15.2.
52.002
15.06.32.15.3.
55.001
15.05.32.15.3.
54.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 53 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
TOTAL‐Bridge Works DRF .. .. 5,90,90 ..
DF(3) .. .. 10,00 ..
DF(4) .. .. 10,00 ..
A ‐ Works in Progress
Mumbai
694 Churchgate‐ Virar :‐ Replacement of SDH / STM‐1 DRF 98,62 .. 50,00 48,62
equipment.
695 Marine Lines ‐ Replacement of signalling PI DRF 1,39,33 1,22,30 .. 17,03
equipments with centralised operation of points &
signals in Churchgate‐Virar section on 'C' route.
(BCT/S/08‐09)
696 Mumbai Suburban Section:‐ Replacement of Opto DRF 94,55 64,77 25,00 4,78
Coupler Boxes with FRP boxes & Opto coupler cards,
AWS clamps, Protection pipe from Track Magnet to
Optocoupler box with wiring. (BCT/S/09‐10)
697 Mumbai Division:‐ Providing Fuse Alarm System with DF(4) 97,46 66,04 31,42 ..
Automatic change over system in Relay Huts of
VR‐ST section and point health monitoring system
in Mumbai Division. (BCT/S/09‐10)
698 Valsad:‐ Replacement of over aged outdoor DRF 98,12 48,23 30,00 19,89
Signalling gears. (BCT/U/10‐11)
699 Churchgate‐Virar Section:‐ Replacement of DRF 96,26 50,84 30,00 15,42
corroded, rusty and worn‐out location boxes.
(BCT/U/10‐11)
700 Churchgate‐Virar Section: Replacement of worn out DRF 96,26 64,41 25,00 6,85
and corroded AWS Track‐Device Accessories /
Equipments. (BCT/S/10‐11)
701 Virar ‐Kelve Road Section:‐ Provision of battery DF(4) 1,19,26 .. 10,00 1,09,26
back up for relays through IPS at 9 Relay
Huts.(BCT/U/11‐12)
702 Kelve Road‐Boribali Section:‐ Provision of battery DF(4) 1,01,30 93,58 1,00 6,72
back up for relays through IPS at 9 Relay
Huts.(BCT/U/11‐12)
703 CSTE office Churchgate‐Provision of V‐LAN facility DF(3) 22,14 .. 22,14 ..
for CAD Centre in Drawing section.
704 CCG‐VR :‐ Replacement of Rusty Rail Track Circuits DRF 85,25 7,20 50,00 28,05
with Digital Axle Counterson CCG‐VR suburban
section
705 CCG‐VR :‐ Provision of additional locations and DF(3) 95,25 34,18 61,07 ..
laying of standby cables acrossthe bridges for
enhancing the availability of spare cables
duringemergency in CCG‐VR suburban section
706 CCG‐VR Section:‐ Casual renewal of defective and DRF 95,92 15,44 50,00 30,48
overaged signalling cables in MEL‐MRU & KHAR‐VLP
section of Mumbai suburban section
S & T WORKS
15.03.33.14.6.
52.001
15.03.33.08.2.
52.001
15.03.33.09.3.
52.004
15.03.33.09.3.
52.003
15.03.33.10.3.
52.017
15.03.33.10.3.
52.010
15.03.33.10.3.
52.009
15.03.33.11.3.
52.006
15.03.33.11.3.
52.004
15.03.33.12.3.
52.017
15.03.33.12.3.
52.008
15.03.33.12.3.
52.009
15.03.33.12.3.
52.016
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 54 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
707 CCG‐VR Section ‐ Strengthening of Datalogger DF(4) 73,67 1 63,00 10,66
network extending connectivity to HQ& field
offices, generation of various reports, alarms,
SMS andproviding centrallised monitoring in Mumbai
Suburban Section.
708 CCG‐BVI :‐ Provision of additional AWS track DF(4) 89,96 77,91 12,05 ..
devices at stop marks ahead ofstarter signals of
vulnerable stations in Churchgate‐Borivali section
709 BVI‐VR :‐ Provision of additional AWS track DF(4) 91,89 77,51 14,38 ..
devices at stop marks ahead ofstarter signals of
vulnerable stations in Borivali – Virar section.
710 Provision of Power Management System at DF(4) 59,16 28,60 25,00 5,56
signalling installations in CCG‐VR suburban
section
711 Palghar : Provision of High reliability digital DRF 1,09,76 4,88 50,00 54,88
axle counters (HRDAC ) for frequently failing
track circuits in flood prone area along with
replacement of associated signalling equipment.
712 Dhanu Road : Provision of High reliability digital DRF 1,04,28 5,24 50,00 49,04
axle counters (HRDAC ) for frequently failing
track circuits in flood prone area along with
replacement of associated signalling equipment
713 Replacement of track circuits by DAC in rusty rail DRF 1,07,12 .. 50,00 57,12
sections in VR ‐ DRD section
714 Strengthening of Datalogger network extending DF(4) 93,92 .. 58,00 35,92
connectivity to HQ & field offices, generation of
various reports, alarms, SMS and providing
centrallised monitoring in non suburban section of
Mumbai Div
715 Replacement of automatic change over panel at DRF 79,54 .. 50,00 29,54
stations between VR‐ST section
Vadodara
716 Replacement of Auto Telephone Exchange and DRF 30,00 27,99 2,01 ..
defective U/G cable at BRCP. (BRC/S/08‐09)
717 Replacement of Auto Telephone Exchange and DRF 30,00 2,05 25,00 2,95
defective U/G cable at GDA (BRC/S/08‐09)
718 Vadodara Division:‐ Replacement of over aged DRF 49,40 2,98 25,00 21,42
battery at 32 stations. (BRC/U/09‐10)
719 Surat‐Vadodara Section:‐ Provision of LED Signals DF(4) 99,82 88,49 11,33 ..
in auto signalling. (BRC/S/10‐11)
720 Vadodara‐Anand‐Vatva Section:‐ Provision of DF(4) 97,98 85,23 12,75 ..
Integrated power supply at relay huts for auto
signalling in Auto Section. (BRC/S/10‐11)
S & T WORKS
15.03.33.12.3.
52.010
15.03.33.12.3.
52.012
15.03.33.12.3.
52.013
15.03.33.12.3.
52.014
15.03.33.12.3.
52.004
15.03.33.12.3.
52.001
15.03.33.12.3.
52.005
15.03.33.12.3.
52.002
15.03.33.13.3.
52.001
15.06.33.08.3.
55.004
15.06.33.08.3.
55.005
15.06.33.09.3.
55.003
15.06.33.10.3.
55.004
15.06.33.10.3.
55.008
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 55 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
721 Vadodara Division:‐ Replacement of Overaged DRF 29,16 7,98 1,00 20,18
Universal Emergency Communication eqpts by VHF
Sets for communication of Guard and Driver with
Station Masters(BRC/U/11‐12)
722 Vadodara Division:‐ Replacement of defective DRF 99,89 82,07 17,82 ..
Signaling cable.(BRC/U/11‐12)
723 Surat‐Vadodara‐Godhra Section:‐ Provision of DF(3) 94,03 8,41 85,62 ..
Automatic fuse alarm system with automatic change
over at stations & Auto Huts.(BRC/U/11‐12)
724 Vadodara Division:‐ Replacement of overaged DRF 59,20 32,81 26,39 ..
Section Control, Emergency Control and Traction
Power Control HQ Control equipments & Control
Telephone system in ST ‐ BRC ‐ GER, BRC ‐ GDA ‐
ANND sections.(BRC/U/11‐12)
725 Casual renewal of defective signalling cables & DRF 95,47 5,02 90,00 45
signalling gears over Vadodara division
726 Vadodara Division:Replacement of CLS Shunt Signal DRF 98,62 69,45 20,00 9,17
lamp and 'A'/'AG', SPI lamp by LED type
727 Vadodara Division ‐ Shifting of Starter Signal to DF(4) 60,98 22,98 30,00 8,00
the boundary of Track circuit ahead in Itola
‐Ranoli & Vadodara ‐ Godhra Section
728 Vadodara Division ‐ Shifting of Starter Signal to DF(4) 61,13 20,66 30,00 10,47
the boundary of Track circuit ahead in Vasad ‐
Geratpur & Anand ‐ Godhra Section
729 Vadodara Division: Shifting of Starter Signal to DF(4) 70,04 22,29 30,00 17,75
the boundary of Track circuit ahead in Surat ‐
Kashipura & Pratapnagar ‐ Chhota Udepur Section
730 Kosamba: Provision of Multisection Digital Axle DF(4) 94,63 .. 25,00 69,63
Counters on vulnerable track circuits for
improving reliability of signalling systems at
731 Provision of Multisection Digital Axle Counters DF(4) 92,31 .. 25,00 67,31
for improving reliability of signaling system at
Ankleshwar‐Bharuch section in ST‐BRC section.
(Phase I)
732 Provision of Multisection Digital Axle Counters DF(4) 99,61 4,52 25,00 70,09
for improving reliability of signaling system at
Nabipur‐ Varediya section in ST‐BRC section (Phase
I)
Ratlam
733 Ratlam Division.‐‐Shifting of S&T equipments from DRF 81,02 .. 75,00 6,02
existing dilapidated S&T Rooms to new location
with PI System 1.Shifting of S&T equipments new
S&T rooms:‐Provision of new PI System for thr
entire Indoor replacement work Shifting of
S & T WORKS
15.06.33.11.3.
55.004
15.06.33.11.3.
55.002
15.06.33.11.3.
55.001
15.06.33.11.3.
55.003
15.06.33.12.3.
55.002
15.06.33.12.3.
55.004
15.06.33.13.3.
55.001
15.06.33.13.3.
55.002
15.06.33.13.3.
55.003
15.06.33.14.3.
55.002
15.06.33.14.3.
55.003
15.06.33.14.3.
55.001
15.05.33.14.3.
54.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 56 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
734 Godhra‐Kansudhi, Kansudhi‐Chanchelav and DRF 92,34 49,01 20,00 23,33
Chanchelav‐Sant Road. Section‐Replacement of
analog axle counters for BPAC/IBS by High
reliability digital axle counters (HRDAC ) of
Ratlam division.
735 Piplod‐Limkheda, Limkheda‐ Mangal Mahudhi, Mangal DRF 92,34 49,01 30,00 13,33
Mahudhi‐USRA, Section‐Replacement of analog axle
counters for BPAC/IBS by High reliability digital
axle counters (HRDAC ) of Ratlam division.
736 Punchpiplia‐Amargarh, Bhairongarh‐Raoti, DRF 96,24 .. 50,00 46,24
Bildi‐Morwani IBS, Replacement of analog axle
counters for BPAC by High reliability digital axle
counters (HRDAC) of Ratlam division.
737 Nagda‐Ujjain‐Bhopal Section ‐Provision of High DRF 93,29 46,85 25,00 21,44
reliability digital axle counters (HRDAC ) for
frequently failing track circuits in flood prone
area along with replacement of associated
signalling equipment at stations
738 Godhra‐Dahod Section and IBH:‐ Replacement of age DRF 94,89 43,39 28,59 22,91
old Data logger (9 Nos) for improving efficiency &
usefulness of Signaling System on RTM Division
739 Ratlam‐Nagda Section:‐ Replacement of age old DRF 1,03,01 86,80 9,26 6,95
Analog Axle counters and MUX of BPAC by DAC &
UFSBI in 2 block sections i.e
RNH‐KUH‐BRNA.(RTM/U/111‐12)
740 Jekot‐Usra, Rentiya‐Jekot and DRF 88,26 47,64 30,00 10,62
Bajranggarh‐Panchpipliya sections: Replacement of
analog axle counters for BPAC/IBS by High
reliability digital axle counters (HRDAC )
741 Nagda‐Berwaniya, Asloada‐ Pulsoramakrawan and DRF 88,27 31,60 55,41 1,26
Ujjain C‐Pingleshwar sections: Replacement of
analog axle counters for BPAC by HRDAC.
742 Ratlam‐Runkheda section: Replacement of analog DRF 90,13 44,57 30,00 15,56
axle counters for BPAC by High Reliability Digital
Axle cCounters (HRDAC) of Ratlam division.
743 Nagda‐Piploda Bagla and Nishadpura‐ Bairaghar: DF(4) 62,35 15,33 30,00 17,02
Provision of High reliability digital axle
counters (HRDAC ) for BPAC of Ratlam Division
744 Ratlam Division: Strengthening of Datalogger DF(4) 91,66 33,23 40,00 18,43
Network extending connectivity to HQ & Field
offices, generation of various reports, alarms,
sms and providing centrallised monitoring
745 Indore, Ujjain and Ratlam stations: Provision of DRF 79,95 46,83 20,00 13,12
High reliability digital axle counters (HRDAC )
for frequently failing track circuits in flood
prone area along withreplacement of associated
signalling equipment.
S & T WORKS
15.05.33.14.3.
54.005
15.05.33.14.3.
54.004
15.05.33.14.3.
54.001
15.05.33.12.3.
54.015
15.05.33.12.3.
54.013
15.05.33.11.3.
54.005
15.05.33.12.3.
54.007
15.05.33.12.3.
54.008
15.05.33.12.3.
54.009
15.05.33.12.3.
54.010
15.05.33.12.3.
54.005
15.05.33.12.3.
54.006
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 57 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
746 Chitoor‐Chanderia Section: Replacement of DC LED DRF 92,37 36,00 30,00 26,37
Signals & Nagda‐Ujjain old version LED Signals on
with revised RDSO Spec LED Signals on RATLAM
Division.
747 Ratlam Division: Provision of Parallel VDU with DF(3) 42,71 25,12 17,59 ..
version 3 at four electronic interlocking
installation.
748 Godhra‐Nagda Section: Casual renewal of signaling DRF 1,12,50 1,09,32 3,18 ..
gears & improving reliability on RATLAM Division.
749 Nagda‐ Bhopal, Indore ‐Dewas Ujjain & Chanderia DRF 1,30,17 65,90 40,00 24,27
‐Chittaur: Casual renewal of signaling gears &
improving reliability on RATLAM Division.
750 Godhra‐Nagda section ‐Provision of High DRF 88,29 46,48 25,00 16,81
reliability digital axle counters (HRDAC) for
frequently failing track circuits in flood prone
area along with replacement of associated
signaling equipment at stations
751 Dhameda‐Bordi, Bordi‐Anas, Anas‐Megnagar DRF 92,34 44,42 30,00 17,92
Section‐Replacement of analog axle counters for
BPAC/IBS by High reliability digital axle counters
(HRDAC ) of Ratlam division.
Ahmedabad
752 Khodiyar‐Dangarva Section:‐ Replacement of Low DRF 98,64 90,65 7,99 ..
insulation / defective cables. (ADI/S/10‐11)
753 Ahmedabad Division:‐ Replacement of worn out DRF 89,23 71,56 17,67 ..
location boxes of Vatva‐Geratpur automatic
section.(ADI/U/11‐12)
754 Ahmedabad Yard:‐ Replacement of shelf type relay DRF 92,24 69,06 23,18 ..
Track Circuit by MSDAC.(ADI/U/11‐12)
755 i)Supply and installation of HRDAC in MSH‐PNU and Cap. 1,35,51 1,23,12 12,39 ..
shifting of SSDAC from MSH‐PNU to ADI‐MSH section
for dual detection. & ii)Supply and installation
of HRDAC in CLDY‐ABD and shifting of SSDAC from
CLDY‐ABD to SBI‐CLDY section for dual detection.
756 Ahmedabad‐ Viramgam section‐ Provision of high DRF 98,63 49,97 40,00 8,66
reliability digital axle counter(HRDAC) for
frequently failing track circuit in flood prone
area along with replacement of associated
signalling equipment.
757 Ahmedabad yard‐ Provision of high reliability DRF 88,97 58,82 30,15 ..
digital axle counter (HRDAC) for frequently
failing track circuit in flood prone area along
with replacement of associated signalling
equipment.
S & T WORKS
15.05.33.12.3.
54.001
15.05.33.12.3.
54.004
15.05.33.12.3.
54.011
15.05.33.12.3.
54.012
15.05.33.12.3.
54.014
15.05.33.14.3.
54.003
15.01.33.10.3.
50.003
15.01.33.11.3.
50.002
15.01.33.11.3.
50.003
15.01.33.12.3.
50.002
15.01.33.12.3.
50.003
15.01.33.12.3.
50.004
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 58 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
758 Ahmedabad division‐Casual renewal of defective DRF 95,00 59,44 25,00 10,56
signalling cable .
759 Viramgam‐Mahesana‐Patan, Gandhinagar ‐ Kalol DRF 42,19 .. 30,00 12,19
section. ‐Replacement of old current regulators of
LED signals.
760 Ahmedabad division Strengthning of datalogger DF(4) 85,94 55,71 30,23 ..
network extending connectivity to HQ & field
official, generation of various report, alarm, SMS
and providing centralised monitoring..
761 Ahmedabad division‐Casual renewal of signalling DRF 76,50 51,28 25,00 22
gears at 25 station
762 Ahmedabad division‐ Replacement of defective DRF 63,25 22,80 30,00 10,45
telecom cables and Remote Location Unit (RLU).
763 To provide Electronic Interlocking System at S&T DF(4) 97,24 3,10 94,14 ..
Traning centre Sabarmat for setting up a training
facility on EI.
764 Ahmedabad Division‐ Shifting of Starter Signal to DF(4) 35,28 8,00 27,28 ..
the boundary of the Track Circuit ahead to
mitigate the risk in GER(Ex) –CLDY section.
765 Ahmedabad Division‐ Shifting of Starter Signal to DF(4) 36,80 7,35 29,45 ..
the boundary of the Track Circuit ahead to
mitigate the risk in SBI‐KLL‐GNC section.
766 Replacement of over aged Ahmedabad exchange of DRF 64,48 31,97 32,51 ..
Ahmedabad Division
Rajkot
767 Wankaner(Ex) ‐Navalakhi, Dahisara‐ Vavaniya DF(4) 59,92 52,00 7,92 ..
section Provision of IPS in Rajkot Division .
768 Rajkot Div.: Replacement of defective signaling DRF 71,72 59,16 12,56 ..
cables, provision of cable at various locations.
769 Rajkot Division : Provision of High reliability Cap. 62,70 47,08 7,50 8,12
digital axle counters ( HRDAC) for BPAC in VG‐VNRD
(2), SR‐BMM,BMM‐LPR ie 4 Block Section .
770 Surendranagar , Rajkot,Bhaktinagar and Modpur DRF 29,43 6,21 23,22 ..
stations :Replacement of old current regulatorof
LED Signals.
771 Rajkot Division : Provision of High reliability Cap. 62,70 47,08 7,50 8,12
digital axle counters (HRDAC) for BPAC in Lilapur
Rd.‐Kessariya Rd., Kesariya Rd.‐Lakhtar,
Lakhtar‐Bajrangpura & Bajrangpura‐Bala Road ie 4
Block Sections.
772 Rajkot Division : Replacement of CLS lamps with DRF 73,95 31,95 42,00 ..
LED signal aspects in Wankaner –Navlakhi,
Dahisara‐ Maliya section.
S & T WORKS
15.01.33.12.3.
50.005
15.01.33.12.3.
50.006
15.01.33.12.3.
50.007
15.01.33.12.3.
50.008
15.01.33.12.3.
50.001
15.01.33.12.6.
50.001
15.01.33.13.3.
50.002
15.01.33.13.3.
50.001
15.01.33.13.3.
50.003
15.04.33.12.3.
53.003
15.04.33.12.3.
53.004
15.04.33.12.3.
53.005
15.04.33.12.3.
53.006
15.04.33.12.3.
53.007
15.04.33.12.3.
53.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 59 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
773 Rajkot Division : Strengthening of Datalogger DF(4) 62,12 43,09 11,00 8,03
network extending connectivity to HQ & field
offices,generation of various reports, alarms,
SMS and providing centrallised monitoring.
774 Rajkot Division : Shifting of Starter Signal to DF(4) 53,81 7,29 40,00 6,52
the boundary of the Track Circuit ahead to
mitigate the risk in WKR‐WWA sec,SUNR, RJT BKNG &
MDPR .
Bhavnagar
775 Bhavnagar Division:‐ Upgradation of data logger DF(3) 43,45 29,77 5,00 8,68
and its connectivity at Signal Fault Control and
at SSE/Signal ‐ Dhola, Botad and Junagadh.
(BVP/S/09‐10)
776 Surendranagar‐Pipavav, Rajkot‐Somnath & DF(4) 98,59 .. 30,03 68,56
Jetalsar‐Wansjaliya sections:‐ Provision of fuse
indication and monitoring system at 35 Panel
interlocked stations .
777 Dhasa‐Pipavav and Rajula‐Mahuva section ‐Provision DF(3) 98,51 73,28 25,23 ..
of short haul OFC equipments.
Mumbai
778 Works costing below DRM's Power DF(4) 10,85 .. 10,85 ..
Vadodara
779 Works costing below DRM's Power DRF 15,50 .. 15,50 ..
DF(3) 17,00 .. 17,00 ..
DF(4) 1,00 .. 1,00 ..
Ahmedabad
780 Works costing below DRM's Power DRF 8,00 .. 8,00 ..
DF(4) 56,00 .. 56,00 ..
Rajkot
781 Works costing below DRM's Power DRF 19,00 .. 19,00 ..
DF(4) 17,50 .. 17,50 ..
Bhavnagar
782 Works costing below DRM's Power DRF 13,00 .. 13,00 ..
DF(3) 8,00 .. 8,00 ..
DF(4) 4,00 .. 4,00 ..
TOTAL‐WORKS IN PROGRESS Cap. .. .. 27,39 ..
DRF .. .. 15,63,44 ..
DF(3) .. .. 2,41,65 ..
DF(4) .. .. 8,33,33 ..
B ‐ New Works
Mumbai
783 Miraroad :‐ Provision of MSDAC on vulnerable DF(4) 94,56 .. 4,00 90,56
Track Circuits.
784 Naigaon :‐ Provision of MSDAC on Bridges / DF(4) 94,56 .. 4,00 90,56
vulnerable Track Circuits.
785 Vaitarna ‐ Valsad section :‐ Reliability DF(4) 78,15 .. 4,00 74,15
improvement by way of redundancies for track
occupancy detection on Bridge portion
S & T WORKS
15.04.33.12.3.
53.002
15.04.33.13.3.
53.001
15.02.33.09.3.
51.001
15.02.33.12.3.
51.005
15.02.33.12.3.
51.004
15.03.33.15.3.
00.999
15.06.33.15.3.
00.999
15.01.33.15.3.
00.999
15.04.33.15.3.
00.999
15.02.33.15.3.
00.999
15.03.33.15.3.
52.008
15.03.33.15.3.
52.001
15.03.33.15.3.
52.004
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 60 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
786 Virar‐Surat Section:‐ Provision of Fuse alarm DF(4) 44,43 .. 4,00 40,43
system for balance fuses at stations & relay huts.
787 Virar‐Surat Section:‐ Provision of Earth Leakage DF(4) 95,73 .. 4,00 91,73
Detector at 15 stations & 34 Relay huts.
788 Chuchgate ‐ Virar :‐ Replcement of relays which DRF 91,20 .. 7,00 84,20
have outlived their designed life
789 Valsad: Replacement of Telephone Exchange based on DRF 30,78 .. 7,00 23,78
IP Based technology.
790 Mumbai Division :‐ Provision of Video Conferencing DF(4) 21,37 .. 4,00 17,37
system for Board room of DRM office Mumbai
central.
791 Valsad‐Surat section :‐ Reliability improvement by DF(4) 78,15 .. 4,00 74,15
way of redundancies for track occupancy detection
on Bridge portion
Vadodara
792 Surat‐ Vadodara Section: Reliability Improvement DF(4) 82,93 .. 4,00 78,93
by way of redundancy for track occupancy at bridge
No. 474,478,480 and 514
793 Panoli‐Ankleswar Section :Reliability Improvement DF(4) 86,30 .. 4,00 82,30
by way of redundancy for track occupancy
794 Varedia‐Palej Section :Reliability Improvement by DF(4) 86,30 .. 4,00 82,30
way of redundancy for track occupancy
795 Vadodara Division:‐Provision of VOIP based control DF(4) 50,78 .. 4,00 46,78
communication system in Vadodara‐Geratpur,
Vadodara‐Godhra & Anand‐Godhra sections.
Ratlam
796 Ratlam‐Chittorgarh and Ujjain‐Bhopal section‐ DRF 51,20 .. 7,00 44,20
Provision of Route and shunt LED signal units.
797 Godhra‐Meghnagar Section: Replacement of Old aged DRF 95,61 .. 7,00 88,61
BPAC Mux & Analog Axle Counter by Digital Axle
counter with UFSBI
798 Godhra‐Ratlam Section:‐ Replacement of Defective DRF 98,69 .. 7,50 91,19
Signalling Cables to enhance safety and
reliability of S&T Gears .
799 Ratlam division‐ Provision of automatic media DF(4) 58,19 .. 4,00 54,19
change over system suitable for UFSBI.
800 Ratlam Division‐Replacement of Electronic exchange DRF 98,76 .. 7,00 91,76
128 lines at Hospital, Diesel Shed, RRI Tower &
over aged cable of local area for strengthening of
exchange network at.
S & T WORKS
15.03.33.15.3.
52.005
15.03.33.15.3.
52.006
15.03.33.15.3.
52.007
15.03.33.15.3.
52.002
15.03.33.15.3.
52.003
15.03.33.15.3.
52.009
15.06.33.15.3.
55.001
15.06.33.15.3.
55.002
15.06.33.15.3.
55.003
15.06.33.15.3.
55.004
15.05.33.15.3.
54.002
15.05.33.15.3.
54.003
15.05.33.15.3.
54.005
15.05.33.15.3.
54.006
15.05.33.15.3.
54.008
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 61 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
801 Ratlam division:‐ Provision of Track Feed Charger DF(4) 49,07 .. 5,00 44,07
Failure alarm system at leftover 38 stations.
802 Ratlam‐E ‐Bangrod‐Runkheda IBS: Shifting of DRF 74,41 .. 7,00 67,41
indoor signalling equipment from existing
dilapidate Porta cabin relay room to new location
and construction of new S&T rooms.
803 Ratlam division: Replacement of Defective VRLA DRF 79,04 .. 7,00 72,04
batteries for IPS.
Ahmedabad
804 Ahmedabad Division: Provision of Solar Power Cap. 1,52,93 .. 1 1,52,92
System for standby power supply arrangement at 19
stations of Samakhiali‐New Bhuj,
Mahesana‐Viramgaom & Mahesana‐Patan section.
805 Proposal covers complete division: Replacement of DRF 82,95 .. 7,00 75,95
101 km of cable, VG‐2, DHG‐ 34, SBI‐7, GIM‐3,
MSH‐25, ADI‐30. The estimate includes trenching
and laying along with laying materials. Supply of
cable not taken in the estimate, cable received
806 Supply, installation and wiring of ELD at 27 DF(4) 96,07 .. 4,00 92,07
stations. Two no of 12 channel ELD for PI and 4 no
for RRI. Stations of VG‐SIOB and KLL‐PNU section
not taken in the estimate as covered in doubling
and DFCIL work respectively. Remaning stations
807 Supply and installation of fire alarm system. DF(4) 48,62 .. 4,00 44,62
Proposal covers 15 station. SHB, CLDY A, CLDY B,
ADI RRI, MSH, PNU, VG, GIM, BLDI, KLL, KHD, DHG,
SBIRRI,MALB & SIOB.
808 The estimate covers replacement of neutral relay, DRF 98,48 .. 7,00 91,48
point group, SH group, QNN1, QNA1, QS3, QTA2 & QL1
of ADI RRI, GIM, MSH‐VG, PNU‐SIOB block ckt, KHD.
These station relays has completed its codal life.
809 Replacement of old version LED light unit of DRF 86,03 .. 7,00 79,03
SIOB‐GIM‐NBVJ & MSH‐VG section. The estimate
includes supply of main signal LED, SH LED, Route
LED and Calling signal LED. This also includes LED
ECR.
Rajkot
810 Supply, Installation Testing & Commissioning of DF(4) 28,01 .. 4,00 24,01
OFC base way station equipments with rack/Wall
mounting arrangement in RJT‐VG Section of RJT
Division.
811 Rajkot Division : Provision of Earth Leakage DF(4) 56,33 .. 4,00 52,33
Detector at 41 stations.
812 Rajkot Division: Provision of fuse alarm system at DF(4) 42,43 .. 4,00 38,43
Kanalus, Rajkot and Surendranagar.
S & T WORKS
15.05.33.15.3.
54.001
15.05.33.15.3.
54.007
15.05.33.15.3.
54.004
15.01.33.15.2.
50.001
15.01.33.15.3.
50.004
15.01.33.15.3.
50.005
15.01.33.15.3.
50.002
15.01.33.15.3.
50.001
15.01.33.15.3.
50.003
15.04.33.15.3.
53.003
15.04.33.15.3.
53.001
15.04.33.15.3.
53.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 62 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Bhavnagar
813 Bhavnagar Division: Provision of fuse indication DF(4) 48,97 .. 4,00 44,97
and monitoring system at 12 Panel interlocked
stations (RJT‐SMNH 05 stations, BVC‐DLJ ‐ 07
stations) and 19 LC interlocked gates.
814 Bhavnagar Division: Replacement of Earth Leakage DRF 82,27 .. 7,50 74,77
Detector at 41 location in RJT‐SMNH (14 stations &
11 LC gates), JLR‐WSJ (6 stations) BVC‐SOA (7
stations & 01 LC gate) and PIT & MHV stations.
815 Bhavnagar Division: Provision of Solar Power DF(4) 89,66 .. 4,00 85,66
System for standby power supply arrangement at
BVC‐DLJ (07 Stations) section and PIT station.
816 Bhavnagar Division: Provision of failure alarm DF(4) 91,61 .. 4,00 87,61
for track feed battery charger on BVC‐DLJ &
RJT‐SMNH sections.
817 Bhavnagar Division: Improving and strenghtening of DF(4) 32,97 .. 4,00 28,97
OFC hut at various locations.
Mumbai
818 Works costing below DRM's Power DRF 4,00 .. 4,00 ..
DF(4) 4,00 .. 4,00 ..
Vadodara
819 Works costing below DRM's Power Cap. 1,00 .. 1,00 ..
DRF 2,00 .. 2,00 ..
DF(4) 1,00 .. 1,00 ..
Ratlam
820 Works costing below DRM's Power Cap. 1,00 .. 1,00 ..
DRF 3,00 .. 3,00 ..
DF(4) 3,00 .. 3,00 ..
Ahmedabad
821 Works costing below DRM's Power DRF 2,00 .. 2,00 ..
DF(4) 1,00 .. 1,00 ..
Rajkot
822 Works costing below DRM's Power DRF 2,00 .. 2,00 ..
DF(4) 1,00 .. 1,00 ..
Bhavnagar
823 Works costing below DRM's Power Cap. 1,00 .. 1,00 ..
DRF 2,00 .. 2,00 ..
DF(4) 1,00 .. 1,00 ..
TOTAL‐NEW WORKS Cap. .. .. 3,01 ..
DRF .. .. 1,00,00 ..
DF(4) .. .. 1,00,00 ..
S & T WORKS
15.02.33.15.3.
51.001
15.02.33.15.3.
51.002
15.02.33.15.3.
51.005
15.02.33.15.3.
51.004
15.02.33.15.3.
51.003
15.03.33.15.3.
00.999
15.06.33.15.3.
00.999
15.05.33.15.3.
00.999
15.01.33.15.3.
00.999
15.04.33.15.3.
00.999
15.02.33.15.3.
00.999
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 63 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
TOTAL‐S & T Works Cap. .. .. 30,40 ..
DRF .. .. 16,63,44 ..
DF(3) .. .. 2,41,65 ..
DF(4) .. .. 9,33,33 ..
A ‐ Works in Progress
Vadodara
824 Vadodara Division ‐ Replacement of averaged, DRF 1,10,64 .. 1,10,64 ..
undersized AT cables at various places.
Ratlam
825 Western Railway:‐ Use of renewable energy sources DF(3) 2,26,09 27,75 1,50,00 48,34
for inproving energy efficiency and energy
conservation (Part of PB 2010‐11 item No.264 of
CR). (WRLY/U/10‐11)
826 RTM (P) Division:‐ Replacement of over aged LT DRF 55,13 44,42 3,19 7,52
distribution panels & Replacement of existing
worn out earthing at Rly. Power house, PRS &
Electrical sub station & replacement of worn out
earths in staff quarters. (RTM/U/11‐12)
Mumbai
827 Works costing below DRM's Power DRF 8,99 .. 8,99 ..
Vadodara
828 Works costing below DRM's Power DRF 60 .. 60 ..
Ratlam
829 Works costing below DRM's Power DRF 1 .. 1 ..
DF(3) 14,48 .. 14,48 ..
Rajkot
830 Works costing below DRM's Power DRF 5,00 .. 5,00 ..
Bhavnagar
831 Works costing below DRM's Power DRF 7,15 .. 7,15 ..
DF(3) 10,00 .. 10,00 ..
TOTAL‐WORKS IN PROGRESS DRF .. .. 1,35,58 ..
DF(3) .. .. 1,74,48 ..
B ‐ New Works
Mumbai
832 Churchgate‐GLO‐Replacement of overaged wiring & DRF 89,92 .. 40,00 49,92
switch boards in GLO office building.
833 Mumbai Division‐Improvement of earthings by DRF 79,93 .. 31,80 48,13
provision of maintenance free earthings
834 Churchgate‐Replacement of overaged wiring & switch DRF 79,93 .. 40,00 39,93
boards in CCG station office building
Vadodara
835 Pratapnagar:‐Replacement of over aged water DRF 22,22 .. 20,00 2,22
chilled AC package units 6 Nos of 10 TR capacity
for TPC/ EDPM / Controll office at DRM office.
Ratlam
836 Ratlam Division‐Replacement of worn out earths in DRF 23,04 .. 20,00 3,04
staff quarters & service buildings.
OTHER ELECTRICAL WORKS
15.06.36.14.2.
55.001
15.05.36.10.2.
54.001
15.05.36.11.3.
54.001
15.03.36.15.3.
00.999
15.06.36.15.3.
00.999
15.05.36.15.3.
00.999
15.04.36.15.3.
00.999
15.02.36.15.3.
00.999
15.03.36.15.3.
52.003
15.03.36.15.3.
52.002
15.03.36.15.3.
52.001
15.06.36.15.3.
55.001
15.05.36.15.3.
54.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 64 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Ahmedabad
837 Ahmedabad Area:‐ Replacement of overaged Power DRF 1,50,00 .. 10 1,49,90
transformers of 500 KVA, 250KVA, and VCB
838 Gandhidham:‐ Electrical work in connection with DF(3) 69,67 .. 10,00 59,67
Strengthening and improvement of HT power
distribution system of station cubical at.
Rajkot
839 Hapa:‐Replacement of Transformarof 2X300 Kva DRF 1,64,83 .. 10 1,64,73
capacity along with the associated HT control
gears at Hapa sub station.
840 Okha : Provision of Dyna Drive facility at. DF(3) 50,11 .. 7,50 42,61
Bhavnagar
841 Bhavnagar Term. depot: Providing of Dyna Drive for DF(3) 50,11 .. 7,50 42,61
25 KW alternators testing at
Mumbai
842 Works costing below DRM's Power DRF 16,00 .. 16,00 ..
DF(3) 5,00 .. 5,00 ..
Vadodara
843 Works costing below DRM's Power DRF 14,00 .. 14,00 ..
Ratlam
844 Works costing below DRM's Power DRF 13,00 .. 13,00 ..
Ahmedabad
845 Works costing below DRM's Power DRF 10,00 .. 10,00 ..
Rajkot
846 Works costing below DRM's Power DRF 8,00 .. 8,00 ..
Bhavnagar
847 Works costing below DRM's Power DRF 6,00 .. 6,00 ..
TOTAL‐NEW WORKS DRF .. .. 2,19,00 ..
DF(3) .. .. 30,00 ..
TOTAL‐Other Electrical Works DRF .. .. 3,54,58 ..
DF(3) .. .. 2,04,48 ..
A ‐ Works in Progress
Mumbai
848 Churchgate‐Marine Lines Seciton ‐ Replacement of DRF 1,99,60 .. 54,00 1,45,60
non standard OHE structures.
849 Churchgate‐Virar Section ‐ Provision of insulation DRF 69,82 .. 38,00 31,82
scheme for catenary wire under FOB/ROB.
850 Providing DC voltage (Battery) monitoring relay at DF(3) 66,59 30,59 35,02 98
traction sub stations in VR‐JL section of Mumbai
division
851 Churchgate‐ Virar section ‐ Replacement of non DRF 91,51 5,28 50,00 36,23
standard suspension adaptor fittings of OHE.
OTHER ELECTRICAL WORKS
15.01.36.15.2.
50.001
15.01.36.15.3.
50.001
15.04.36.15.2.
53.001
15.04.36.15.3.
53.001
15.02.36.15.3.
51.001
15.03.36.15.3.
00.999
15.06.36.15.3.
00.999
15.05.36.15.3.
00.999
15.01.36.15.3.
00.999
15.04.36.15.3.
00.999
15.02.36.15.3.
00.999
TRACTION DISTRIBUTION WORKS
15.03.37.14.2.
52.001
15.03.37.14.3.
52.001
15.03.37.14.3.
52.003
15.03.37.14.3.
52.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 65 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
852 Mahalaxi and Elphinstone Road:‐ Replacement of DRF 95,54 69,74 23,75 2,05
anchoring arrangement on two bridges by
independent structures. (BCT/U/11‐12)
Vadodara
853 Vadodara Division :‐ Strenghtening of OHE by DRF 49,79 .. 40,00 9,79
providing proper cross feeder, G jumper, C jumper
etc.
854 BRC Division‐Replacement of overaged 25 kV SP DRF 50,02 1 45,00 5,01
Isolator
855 BRC Division ‐ Re‐location of critical DRF 97,59 46,97 45,00 5,62
implantation locations‐
856 BRC Division‐ Augmentation of capacitor bank at DF(3) 35,97 19,59 16,38 ..
Godhra TSS.
Ratlam
857 Godhra‐Nadga Section ‐ Replacement of Oil type DRF 1,82,73 66,15 82,72 33,86
interrupter by Vacuum type Interrupter.
858 RTM Division:Replacement of relay and control DRF 60,00 .. 15,00 45,00
panel at DHD, BMI & NAD traction substation of RTM
division.
859 Replacement of existing isolator of OHE with DRF 50,01 39,53 6,48 4,00
higher rating isolator and replacement of cross
feeder at FP/SP/SSP of RTM division
860 RTM Division:Augmentation of capacitor bank at RTM DF(3) 40,64 .. 19,00 21,64
& NAD/TSS of Ratlam division, Western Railway.
Mumbai
861 Works costing below DRM's Power DRF 66,20 .. 66,20 ..
DF(3) 29,60 .. 29,60 ..
Vadodara
862 Works costing below DRM's Power DRF 52,00 .. 52,00 ..
Ratlam
863 Works costing below DRM's Power DRF 32,55 .. 32,55 ..
Ahmedabad
864 Works costing below DRM's Power DRF 36,00 .. 36,00 ..
TOTAL‐WORKS IN PROGRESS DRF .. .. 5,86,70 ..
DF(3) .. .. 1,00,00 ..
B ‐ New Works
Mumbai
865 Virar‐Surat Section‐Replacement of existing DRF 1,98,09 .. 1,00 1,97,09
underrated 25 kV single pole and double pole
isolators
866 Virar‐Surat Section ‐Maintain of OHE profile by DRF 2,49,90 .. 1,00 2,48,90
replacement of existing worn out inspan droppers
in connection with inputs required for running of
trains at 160 KMPH
TRACTION DISTRIBUTION WORKS
15.03.36.11.3.
52.001
15.06.37.14.3.
55.001
15.06.36.12.3.
55.002
15.06.36.12.3.
55.003
15.06.36.12.3.
55.001
15.05.36.12.2.
54.001
15.05.37.14.3.
54.001
15.05.36.12.3.
54.002
15.05.37.14.3.
54.002
15.03.37.15.3.
00.999
15.06.37.15.3.
00.999
15.05.37.15.3.
00.999
15.01.37.15.3.
00.999
15.03.37.15.2.
52.002
15.03.37.15.2.
52.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 66 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Vadodara
867 Vadodara Division ‐ Replacement of faded porcelain DRF 36,96 .. 75 36,21
insulators by long creepage path 1050 mm OHE
insulators at major yards of polluted area.
868 Vadodara division ‐ Augmentation of existing DRF 1,99,94 .. 1,00 1,98,94
transformer capacity by providing ONAF arrangement
at BH and MPR traction sub‐stations, in connection
with raising of speed potential of OHE from 140 to
160 KMPH.(Two trains in each direction)
Mumbai
869 Works costing below DRM's Power DRF 14,70 .. 14,70 ..
DF(3) 20,03 .. 20,03 ..
Vadodara
870 Works costing below DRM's Power DRF 4,71 .. 4,71 ..
DF(3) 6,29 .. 6,29 ..
Ratlam
871 Works costing below DRM's Power DRF 5,14 .. 5,14 ..
DF(3) 6,86 .. 6,86 ..
Ahmedabad
872 Works costing below DRM's Power DRF 1,70 .. 1,70 ..
DF(3) 2,27 .. 2,27 ..
TOTAL‐NEW WORKS DRF .. .. 30,00 ..
DF(3) .. .. 35,45 ..
TOTAL‐Traction Distribution DRF .. .. 6,16,70 ..
Works DF(3) .. .. 1,35,45 ..
A ‐ Works in Progress
Mumbai
873 PAREL WORKSHOP Improvement to storm water drainag DF(3) 2,42,41 .. 40,00 2,02,41
system and water pipe line to prevent water
logging and contamination of drinking water.
874 Valsad:‐ Providing one pit line & associated sick DF(3) 1,00,13 40,08 1 60,04
line facilities. (BCT/S/06‐07)
875 Mumbai Central (CFO Yard):‐ Extension of covered DF(3) 92,99 70,14 1 22,84
shed on extended pit lines. (BCT/U/10‐11)
876 Parel (CR Shop):‐ Improvement to flooring by DF(3) 43,20 .. 40,00 3,20
hardonite of Wheel shop , North side of ACC shop.
(BCT/U/10‐11)
877 Parel (CR Shop):‐ Providing CC apron at New Trail Cap. 84,15 71,10 1,00 12,05
Line (NTL) and Old Trial Line (OTL). (BCT/U/10‐11)
878 Bandra Terminus:‐ Provision of heavy duty DF(3) 1,06,00 35,23 1 70,76
industrial paver block pathway at STR Miatenance
Lines. (BCT/U/11‐12)
879 Lower Parel:‐ Replacement and laying of LT cables DRF 47,90 .. 1 47,89
of different sizes as per schedule of rate and
scope of work. (BCT/U/11‐12)
TRACTION DISTRIBUTION WORKS
15.06.37.15.3.
55.001
15.06.37.15.2.
55.001
15.03.37.15.3.
00.999
15.06.37.15.3.
00.999
15.05.37.15.3.
00.999
15.01.37.15.3.
00.999
WORKSHOPS INCLUDING PUS
15.03.42.11.1.
52.001
15.03.42.06.2.
52.001
15.03.42.10.3.
52.002
15.03.42.10.3.
52.003
15.03.42.10.3.
52.005
15.03.42.11.3.
52.001
15.03.42.11.3.
52.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 67 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
880 BCT (CFO Yard)‐Provision of CC Apron on washing DF(3) 99,59 .. 1 99,58
lines
Vadodara
881 Pratapnagar (Workshop):‐ Providing Hardonite DF(3) 83,11 46,49 21,09 15,53
Flooring in various shops & IOH facilities for ICF
Bogies. (BRC/S/10‐11)
882 BRCY ‐ Improvement to storm water drainage system DF(3) 87,95 33,57 1 54,37
and roof of electric loco shed.
Ratlam
883 Ratlam (D/Shed):‐ Rebuilding of heavily cracked DRF 99,40 50,66 10,00 38,74
and leaky administrative building. (RTM/S/09‐10)
884 Dahod (workshop):‐ Replacement of Old corroded DRF 98,51 37,83 1 60,67
steel member of structure and painting of all
steel structure to prevent rusting. (RTM/U/10‐11)
885 Dahod (workshop):‐ Renovation work of Battery DF(3) 34,66 21,69 1,00 11,97
Section. (RTM/U/10‐11)
Ahmedabad
886 ADI (BG):‐ Repair to cat walks of washing cum DRF 97,36 .. 1 97,35
inspection pit lines with portal lightings.
887 Ahmedabad ‐ Augmentation to BG pit line at ADI DF(3) 96,76 1 45,00 51,75
area
Lower Parel Workshop
888 Lower Parel Workshop ‐ MPCB compliance : Provision DF(3) 16,32 .. 16,32 ..
of ETP
Mumbai
889 Works costing below DRM's Power DF(3) 17,78 .. 17,78 ..
Ratlam
890 Works costing below DRM's Power Cap. 12,30 .. 12,30 ..
DF(3) 10,00 .. 10,00 ..
Lower Parel Workshop
891 Works costing below DRM's Power Cap. 10,55 .. 10,55 ..
DRF 2,39 .. 2,39 ..
TOTAL‐WORKS IN PROGRESS Cap. .. .. 23,85 ..
DRF .. .. 12,42 ..
DF(3) .. .. 1,91,24 ..
B ‐ New Works
Ratlam
892 Ratlam Diesel Shed ‐ Dust free Axle box Cap. 27,28 .. 5,00 22,28
overhauling and under frame component overhauling
room
Ahmedabad
893 Vatva Diesel shed:‐ Improvement to flooring of DF(3) 28,86 .. 5,00 23,86
store building and approach road upto SMM/DL/VTA.
WORKSHOPS INCLUDING PUS
15.03.42.12.3.
52.003
15.06.42.10.3.
55.001
15.06.42.12.3.
55.001
15.05.42.09.3.
54.003
15.05.42.10.3.
54.004
15.05.42.10.3.
54.003
15.01.42.12.3.
50.002
15.01.42.12.3.
50.001
15.10.42.14.3.
74.001
15.03.42.15.3.
00.999
15.05.42.15.3.
00.999
15.10.42.15.3.
00.999
15.05.42.15.3.
54.001
15.01.42.15.3.
50.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 68 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
TOTAL‐NEW WORKS Cap. .. .. 5,00 ..
DF(3) .. .. 5,00 ..
TOTAL‐Workshops including PUs Cap. .. .. 28,85 ..
DRF .. .. 12,42 ..
DF(3) .. .. 1,96,24 ..
A ‐ Works in Progress
Mumbai
894 Udhna ‐ Jalgaon Section (Corporate Welfare Plan) ‐ DRF 1,26,49 78,89 30,00 17,60
Rebuilding of 17 units type‐II quarters.
895 Virar‐Surat section:‐ Providing 12 units type II DRF 99,87 47,53 24,00 28,34
quarters in lieu of earlier demolished unsafe
quarter No 25/L at Udhna.
Vadodara
896 Ankleshwar :‐ Providing 15 units type‐II for DRF 1,18,92 21,21 20,00 77,71
gangmen in lieu of Gang chawl No. E/34.
(BRC/U/09‐10)
897 Vadodara Division:‐ Providing 7 units type‐III and Cap. 1,24,40 66,73 26,00 31,67
3 units type‐IV quarters for supervisors.
(BRC/U/09‐10)
898 Vadodara Division : Providing Type‐V bungalows for DRF 2,34,66 2,21,71 12,95 ..
officers (Total 10 units) on replacement account.
899 Vadodara Division: Providing 12 Units Type ‐ II DRF 1,13,76 1,06,70 1 7,05
quarters for gangman at Gothaj in lieu of
Gangchwal under the SSE (P.Way) MHD Jurisdiction.
(BRC/U/11‐12)
900 Vadodara Division:‐Providing new 8 Units Type II DRF 86,27 .. 7,00 79,27
quarters in lieu of abandoned staff quarters block
No. E/90 at Bharuch Railway station.
Ratlam
901 Mhow and Jaora:‐ Providing 5 units type‐IV Cap. 70,84 19,76 5,00 46,08
quarters for station superitendent & SE(P.Way) at
Mhow & JAO and Providing 2 units type‐III quarters
for Dy.SS & JE(P.Way) at Jaora. (RTM/U/09‐10)
902 CNA‐NMH Section:‐ Shifting of abandoned mid Cap. 94,00 73,96 1 20,03
section gang chawl No. 28 at Chanderia Station.
(RTM/U/11‐12)
903 GDA‐NAD Sec:‐ Providing 8 unit type III quarters Cap. 72,75 .. 65,00 7,75
for PWS at THDR, BJG, CCL, SAT, LMK, MAM, JKT &
KUH stations.
904 Indore ‐ Providing 10 units Type ‐II quarters DRF 99,37 .. 7,00 92,37
(multistoried) in lieu of abandoned quarters.
Ahmedabad
905 Ahmedabad ‐ Construction of 4 type V and 4 type IV Cap. 2,00,62 1,54,15 1 46,46
quarters for officers.
STAFF QUARTERS
15.03.51.10.2.
52.001
15.03.51.12.3.
52.001
15.06.51.09.3.
55.001
15.06.51.09.3.
55.002
15.06.51.09.2.
55.001
15.06.51.11.3.
55.001
15.06.51.14.3.
55.001
15.05.51.09.3.
54.001
15.05.51.11.3.
54.001
15.05.51.13.3.
54.001
15.05.51.14.3.
54.001
15.01.51.10.2.
30.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 69 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
906 GIM‐Providing 10 units type II Qrts on replacement DRF 1,00,49 10,00 1,00 89,49
account in lieu of SARVA colony.
Rajkot
907 RJT Divn:Replacement of 10 units type‐I DRF 83,84 74,85 6,73 2,26
substandard qtrs of Gang No 49 at KNLS by standard
type‐II quarters.
908 DWK: Providing 4 unit type‐II qtrs for RPF staff. Cap. 33,21 10,68 20,00 2,53
909 Than ‐ Replacement of non‐standard type I quarters DRF 89,87 .. 1,00 88,87
by type II standard quarters.(10 units)
910 RJT : Providing 2 units transit accomodation for Cap. 34,01 .. 25,00 9,01
Officers.
Bhavnagar
911 ADEN Botad Sub Division:‐ Providing 3 units Cap. 43,00 29,80 6,00 7,20
Type‐III Qtrs. for Dy. SS & ASM SEJ & Dy. SS
operating Deptt.at Dhandhuka. (BVP/U/08‐09)
912 Veraval:‐ Providing 3‐units type IV qtrs. For Cap. 39,95 36,31 1,00 2,64
CPWI,PWI,and IOW. (BVP/U/08‐09)
913 Jamjodhpur: Providing 6 units type II quarters and DRF 45,00 25,24 16,76 3,00
one Units type III quarter on replacement
accounts.
TOTAL‐WORKS IN PROGRESS Cap. .. .. 1,48,02 ..
DRF .. .. 1,26,45 ..
B ‐ New Works
Mumbai
914 Jogeshwari (East):‐ Providing 8 units type‐II Cap. 82,47 .. 15,00 67,47
quarters.
Vadodara
915 Bharuch:‐ Providing 8 unit Type II quartes in lieu DRF 75,27 .. 5,00 70,27
of existing abandoned staff quarters of Block No.
E/106 on replacement account.
Ratlam
916 Ratlam ‐ Providing 4 UNIT Type‐IV quarters. Cap. 93,57 .. 30,00 63,57
917 SEHORE‐Providing Type IV quarters 1 Unit,Type Cap. 86,05 .. 35,00 51,05
III‐2 Units and Type II‐2 Units for Engineering
Staff.
Ahmedabad
918 Detroj:‐ Providing 8 unit type‐II quarters in lieu DRF 93,41 .. 5,00 88,41
of sub standard quarters.
STAFF QUARTERS
15.01.51.12.3.
30.001
15.04.51.12.3.
53.001
15.04.51.12.3.
53.002
15.04.51.14.3.
53.001
15.04.51.14.3.
53.002
15.02.51.08.3.
51.001
15.02.51.08.3.
51.002
15.02.51.12.3.
51.001
15.03.51.15.3.
52.001
15.06.51.15.3.
55.001
15.05.51.15.3.
54.002
15.05.51.15.3.
54.001
15.01.51.15.3.
50.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 70 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
TOTAL‐NEW WORKS Cap. .. .. 80,00 ..
DRF .. .. 10,00 ..
TOTAL‐Staff Quarters Cap. .. .. 2,28,02 ..
DRF .. .. 1,36,45 ..
A ‐ Works in Progress
Headquarter
919 Vadodara and Ratlam Division ‐ Rewiring of staff DF(2) 1,50,00 43,94 17,00 89,06
quarters
Mumbai
920 Virar‐Surat Section ‐ Corporate Welfare plan ‐ DRF 1,44,89 1,39,84 4,99 6
Improvements to quarters, latrines, bathrooms,
kitchen, court‐yard, verandas, re‐roofing, decade
wood work raising of floors, Augmentation of water
supply.
921 Dahanu road:‐ Improvement to sub‐standard quarter DF(2) 54,40 27,35 15,00 12,05
type I. (BCT/S/08‐09)
922 Malad:‐ Segregation of domestic water suply to DF(2) 28,73 6,00 10,00 12,73
colony and distribution system improvement.
(BCT/S/08‐09)
923 Udhna‐Jalgaon Section:‐ Providing bathroom DF(2) 44,72 4,41 25,00 15,31
facilities in 60 type I qtrs at AEN/E/NDB.
(BCT/U/09‐10)
924 Santacruz (East) – Improvement to water supply by DRF 81,15 17,62 40,00 23,53
construction of 80,000 lit. Capacity underground
tank with pump room in lieu of underground tank.
(BCT/U/11‐12)
925 Bandra (West):‐ Improvement to water supply by DF(2) 1,02,15 22,57 40,00 39,58
providing overhead tanks to enhancement of BMC
water supply
Vadodara
926 Vadodara Division ‐ Improvement to drainage DRF 1,88,59 1,58,27 1 30,31
arrangements in Railway colony of various
stations.
927 Derol,Timba Road,Godhara:‐Improvement to watering Cap. 95,27 80,61 1 14,65
arrangement by providing 100000 liters capacity
RCC OH tank with 20mm dia. Bore and paipe line
arrangement
Ratlam
928 Dahod ‐ Standardization of Sub standard qtrs 200 DRF 1,23,32 35,85 80,00 7,47
Nos. in type‐II at Dhobighat, fiulter site area,
Sudaimata, Godhra road , char rasta & Bakri road
in connection with CWP
929 Ratlam ‐Khandawa Section:‐ Providing Individual Cap. 42,92 18,61 14,00 10,31
latrines in staff quarters. (RTM/S/08‐09)
AMENITIES FOR STAFF
15.00.52.11.2.
55.001
15.03.52.08.2.
52.001
15.03.52.08.3.
52.006
15.03.52.08.3.
52.008
15.03.52.09.3.
52.003
15.03.52.11.3.
52.001
15.03.52.12.3.
52.001
15.06.52.11.2.
55.001
15.06.52.10.2.
55.001
15.05.52.11.2.
54.001
15.05.52.08.3.
54.004
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 71 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
930 Ratlam ‐ Rebuilding of old Dilapidated DRF 2,38,77 49,56 1,20,00 69,21
senior/junior institute
931 Ratlam‐Chanderia Section:‐ Improvement to sub Cap. 91,27 88,09 1 3,17
standard quarters by providing basic facility like
lat, bath, kitchen & court yard & Raising of
plinth of staff quarters of Mandsaur(Gang chawl
No.47)& Jaora. (RTM/U/09‐10)
932 RTM‐Replacement of over aged filter plant at. DRF 99,99 51,27 48,72 ..
Ahmedabad
933 Sabarmati:‐ Replacement of 2 Nos. existing DRF 95,25 33,65 60,00 1,60
dilapidated tanks at township and near pump No. 4
with one bore and inter connectivity of various
bores. (ADI/U/09‐10)
934 MALB: Providing 1 lakh litres over head tank DF(2) 27,23 5,00 22,00 23
935 Kalol :‐Providing 1 lakh litres RCC OH tank on DRF 26,15 .. 25,00 1,15
replacement basis
936 Gandhidham (Colony) ‐ Providing 1 lac. Ltr DF(2) 41,32 .. 30,00 11,32
capacity RCC OH Tank at double storey quarters.
Rajkot
937 New Jamnagar:‐ Providing RCC O/H tank 100 kl Cap. 41,83 13,89 11,82 16,12
Capacity & RCC sump 100kl capacity, one No.
borewell of 250mm dia. (RJT/U/10‐11)
Mumbai
938 Works costing below DRM's Power DF(2) 12,36 .. 12,36 ..
Vadodara
939 Works costing below DRM's Power DF(2) 5,47 .. 5,47 ..
Ratlam
940 Works costing below DRM's Power DF(2) 2,00 .. 2,00 ..
Ahmedabad
941 Works costing below DRM's Power DF(2) 3,00 .. 3,00 ..
Rajkot
942 Works costing below DRM's Power DF(2) 2,03 .. 2,03 ..
Bhavnagar
943 Works costing below DRM's Power DRF 1,00 .. 1,00 ..
DF(2) 8,11 .. 8,11 ..
AMENITIES FOR STAFF
15.05.52.09.2.
54.001
15.05.52.09.3.
54.005
15.05.52.13.6.
54.001
15.01.52.09.3.
50.003
15.01.52.12.3.
50.002
15.01.52.13.3.
50.001
15.01.52.14.3.
50.001
15.04.52.10.3.
53.002
15.03.52.15.3.
00.999
15.06.52.15.3.
00.999
15.05.52.15.3.
00.999
15.01.52.15.3.
00.999
15.04.52.15.3.
00.999
15.02.52.15.3.
00.999
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 72 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
TOTAL‐WORKS IN PROGRESS Cap. .. .. 25,84 ..
DRF .. .. 3,79,72 ..
DF(2) .. .. 1,91,97 ..
B ‐ New Works
Mumbai
944 Jagjivan Ram Hospital ( BCT)‐procurement of semi DRF 37,42 .. 13,40 24,02
electric bed with mattress.
945 Bandra(East & West) Colony ‐ Structural repairs to DF(2) 1,43,61 .. 1,00 1,42,61
staff quarters by replastering,ceiling
repair,column and beam repair and drainage line.
946 Valsad (ZMC):‐ Provision of basic staff amenities DF(2) 97,68 .. 20,00 77,68
by providing Tiffin Room, Flooring, Roofing and
replacement of dilapidated health affecting AC
sheet by PPGI sheets including replacement of
windows.
947 Matunga :‐ Providing 2.25 lakhs OH tank to DF(2) 73,02 .. 1,00 72,02
rationalise water supply
948 Nandurbar : Providing RCC overhead /Under ground DF(2) 98,57 .. 50 98,07
water storage tank in lieu of old dilapidated
steel tank
Vadodara
949 Pratapnagar:‐Rewiring of staff quarters( TypeI & DRF 30,53 .. 1,00 29,53
Type II) in Railway colony.
950 Pratapnagar:‐Providing facilities for stem cell DF(2) 20,78 .. 10,00 10,78
threrapy in Railway Hospital in connection with
enhanced madical facilities as per guidelines.
Ratlam
951 Dahod:‐ Provision of toilets inside the compound DF(2) 78,22 .. 1,00 77,22
wall in quarters with old & dilapidated community
toilets
952 Chanderiya ‐ Ratlam section ‐ Providing New bore Cap. 1,13,85 .. 50 1,13,35
well with pipe line (at NMH, HKL, MLG, PIP, MDS, DRF 75,89 .. 20 75,69
JAO, DLD & BRLA stations) along with Over head RCC
water tank at NMH= 2.25 Lac lit., MDS= 1.0 Lac
lit. & JAO =1.0 Lac lit, NBH 1.0 Lac litres
953 Godhra‐Nagda Section ‐ Improvement to water supply Cap. 52,49 .. 50 51,99
network at various stations of staff colony. DRF 1,10,77 .. 20 1,10,57
954 Dahod:‐ Rewiring of 219 units Types I and 412 DRF 89,06 .. 1,00 88,06
units Type II (Total= 631 units) staff Quarter
at FLG Colony.
Ahmedabad
955 Ahmedabad Division:‐ Providing latrine & bathroom DF(2) 91,70 .. 1,00 90,70
in sub‐standard type‐I quarters under AEN/MG/SBI
Rajkot
956 Rajkot:‐ Rehabilitation of old staff quarters in DRF 88,61 .. 1,00 87,61
Loco & Construction colony.
15.03.52.15.3.
52.004
15.03.52.15.2.
52.001
15.03.52.15.3.
52.002
15.03.52.15.3.
52.003
15.03.52.15.3.
52.001
15.06.52.15.3.
55.001
15.06.52.15.3.
55.002
15.05.52.15.3.
54.002
15.05.52.15.2.
54.001
15.05.52.15.2.
54.002
15.05.52.15.3.
54.001
15.01.52.15.3.
50.001
15.04.52.15.3.
53.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 73 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
957 Rajkot:‐ Replacement of RCC Over Head Tank 2.50 KL DRF 92,65 .. 50 92,15
capacity in KC Colony.
Bhavnagar
958 Botad ‐ Improvement to staff quarters of outside DF(2) 88,52 .. 1,00 87,52
plaster, balcony, chajja, sunshade etc.
Mumbai
959 Works costing below DRM's Power Cap. 6,50 .. 6,50 ..
DRF 70 .. 70 ..
DF(2) 1,50 .. 1,50 ..
Vadodara
960 Works costing below DRM's Power Cap. 6,50 .. 6,50 ..
DRF 70 .. 70 ..
DF(2) 1,50 .. 1,50 ..
Ratlam
961 Works costing below DRM's Power Cap. 6,50 .. 6,50 ..
DRF 70 .. 70 ..
DF(2) 1,50 .. 1,50 ..
Ahmedabad
962 Works costing below DRM's Power Cap. 6,50 .. 6,50 ..
DRF 70 .. 70 ..
DF(2) 1,50 .. 1,50 ..
Rajkot
963 Works costing below DRM's Power Cap. 6,50 .. 6,50 ..
DRF 70 .. 70 ..
DF(2) 1,50 .. 1,50 ..
Bhavnagar
964 Works costing below DRM's Power Cap. 6,50 .. 6,50 ..
DRF 70 .. 70 ..
DF(2) 1,50 .. 1,50 ..
TOTAL‐NEW WORKS Cap. .. .. 40,00 ..
DRF .. .. 21,50 ..
DF(2) .. .. 44,50 ..
TOTAL‐Amenities For Staff Cap. .. .. 65,84 ..
DRF .. .. 4,01,22 ..
DF(2) .. .. 2,36,47 ..
A ‐ Works in Progress
Mumbai
965 Mumbai Central(L) to Bandra:Raising of suburban DF(1) 1,36,58 13,63 1,21,64 1,31
section platforms at BCT (L) plat no.1&2, MX
plat no 2&3, EPR plat no.1&2, BA plat no. 2&3
from 840mm to 920 mm (08 platforms)
966 Churchgate & Grant Road ‐Raising of suburban DF(1) 1,22,31 .. 1,20,00 2,31
section platforms at CCG plat .no 1&2,2&3,3&4 and
GTR plat no 2&3 from 840mm to 920 mm( 08
platforms)
967 Mumbai Central ‐ Design, Development, Supply, DF(1) 1,99,71 1,36,10 50,00 13,61
Installation, Testing & Commissioning of Machines
/ Equipments for setting up a Mechanized Laundry
of 3 Ton capacity on Turn Key Basis.
AMENITIES FOR STAFF
15.04.52.15.3.
53.002
15.02.52.15.3.
51.001
15.03.52.15.3.
00.999
15.06.52.15.3.
00.999
15.05.52.15.3.
00.999
15.01.52.15.3.
00.999
15.04.52.15.3.
00.999
15.02.52.15.3.
00.999
PASSENGER AMENITIES
15.03.53.14.3.
52.001
15.03.53.14.3.
52.002
15.03.53.13.3.
52.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 74 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
968 Surat ‐ Providing RCC overhead tank & water pipe DF(1) 1,75,69 1,25,69 50,00 ..
lines for segregation of coach watering
969 Dadar ‐ Renewal of deterioted COP covering and DRF 1,63,64 .. 75,00 88,64
structure.
Vadodara
970 Vadodara Division :‐ Dismantaling of corroded DRF 2,06,82 .. 75,00 1,31,82
existing covershed and providing new covershed at
Bharuch Railway station on platfom No. 1, 2, 3, 4
& 5.
971 Vadodara Division:‐Provision of of minimum DF(1) 2,19,69 .. 1,50,00 69,69
essantial amenities on various Railway station on
Vadodara Division to eliminate shortfall.
Ratlam
972 Chittorgarh : Providing CC apron on PF no. 02 DF(1) 1,59,97 .. 10,00 1,49,97
973 Augmentation of Laundry at IND & ETPat Junagad. DF(1) 1,23,36 .. 98,36 25,00
974 UJN ‐ Providing additional FOB with connectivity DF(1) 1,98,65 1,30,65 50,00 18,00
to all passenger platforms at IND end
975 UJN ‐Extension to existing FOB at NAD ends towards DF(1) 1,94,85 1,47,90 45,76 1,19
Passenger platform no 8
976 Ujjain ‐ Developing sitting space with covering DF(1) 1,90,32 1,62,69 27,63 ..
shed on PF No 1 ( Nagda end) at old goods PF area
and Extension of PF shelter of galvenium at PF No
2/3 in connection to Sinhastha 2016 at.
977 RTM Div‐ Provision of Multiline train display DF(1) 1,69,71 .. 1,50,00 19,71
boards at important stations in connection with
Simhastha Mela 2016.
978 Ratlam Division‐ Provision of 100 Toilets at DF(1) 1,72,04 .. 1,00,00 72,04
various stations.
Ahmedabad
979 Ahmedabad :‐ Providing two passenger lift at DF(1) 1,40,71 1,33,83 6,88 ..
platform No.1 and one passenger lift on platform
No.2‐3, 4‐5, and 6‐7.
980 ADI Division:‐ Removal of deficiencies in Minimum DF(1) 1,91,06 .. 1,25,00 66,06
Essential Amenities at stations over Ahmedabad
Division.
Mumbai
981 Works costing below DRM's Power DRF 2,15,01 .. 2,15,01 ..
DF(1) 6,00,00 .. 6,00,00 ..
Vadodara
982 Works costing below DRM's Power DRF 50,00 .. 50,00 ..
DF(1) 2,00,00 .. 2,00,00 ..
Ratlam
983 Works costing below DRM's Power DRF 1,37,00 .. 1,37,00 ..
DF(1) 6,00,00 .. 6,00,00 ..
PASSENGER AMENITIES
15.03.53.09.3.
52.002
15.03.53.14.3.
52.003
15.06.53.14.3.
55.001
15.06.53.14.3.
55.002
15.05.53.13.3.
54.003
15.05.53.14.3.
54.002
15.05.53.13.3.
54.001
15.05.53.13.3.
54.002
15.05.53.11.3.
54.001
15.05.53.14.3.
54.001
15.05.53.14.6.
54.001
15.01.53.08.3.
50.001
15.01.53.14.3.
50.001
15.03.53.15.3.
00.999
15.06.53.15.3.
00.999
15.05.53.15.3.
00.999
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 75 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Ahmedabad
984 Works costing below DRM's Power DRF 34,00 .. 34,00 ..
DF(1) 2,50,00 .. 2,50,00 ..
Rajkot
985 Works costing below DRM's Power DRF 78,00 .. 78,00 ..
DF(1) 2,00,00 .. 2,00,00 ..
Bhavnagar
986 Works costing below DRM's Power DRF 60,00 .. 60,00 ..
DF(1) 2,82,38 .. 2,82,38 ..
TOTAL‐WORKS IN PROGRESS DRF .. .. 7,24,01 ..
DF(1) .. .. 32,37,65 ..
B ‐ New Works
Mumbai
987 Dahanu Road ‐ Rasing of PF No.1, 2 ,3 and DF(1) 1,23,80 .. 30,00 93,80
improvement to roof covering of cover shed under
ADEN‐Dahanu Road Section.
988 Dahanu Road: Improvement to circulating area, DF(1) 1,90,08 .. 30,00 1,60,08
façade cover shed etc.
989 Navsari: Extension and raising of platforms to DF(1) 1,98,82 .. 1,50 1,97,32
accimodate 24 coaches trains At PF No. 1
990 Vapi: Extension of platforms to accommodate 24 DF(1) 1,92,57 .. 1,50 1,91,07
coaches trains‐Vapi PF No. 3
991 Santacruz‐Virar section: Replacement of AC sheet DRF 1,72,43 .. 40,00 1,32,43
COP by galvalume.
992 Virar: Extension of PF 03 at Virar to accommodate DF(1) 2,00,00 .. 2,00 1,98,00
18 coaches train.
Vadodara
993 Vadodara:‐Shifting of parcel office and booking DF(1) 1,90,25 .. 20,00 1,70,25
office at Vadodara (P)
994 Vadodara Yard:‐Improvement of facilities like DF(1) 1,24,86 .. 40,00 84,86
pucca handling area, all weather approach road,
adequate lighting, proper Cover shed etc at
Vadodara Goods shed
995 Derol:‐Extension of platforms of Dn & Up line DF(1) 1,79,69 .. 10,00 1,69,69
platforms to accomodate 22/24 coaches trains.
Ratlam
996 Maksi‐Provision of Minimum Essential Amenities DF(1) 1,59,76 .. 30,00 1,29,76
(MEA) at Raising of Level of PF No.1.
997 Bercha‐Provision of Minimum Essential DF(1) 1,60,48 .. 30,00 1,30,48
Amenities(MEA) at (PF No.2) by Raising the level
of Paltform from RL to ML.
998 Ratlam Division‐Extension of platform length of DF(1) 1,67,87 .. 30,00 1,37,87
Chittorgarh(PF No.4/5) & Nimbahera (PF No.1)
station for accommodating 24 coaches train over.
PASSENGER AMENITIES
15.01.53.15.3.
00.999
15.04.53.15.3.
00.999
15.02.53.15.3.
00.999
15.03.53.15.3.
52.001
15.03.53.15.3.
52.003
15.03.53.15.3.
00.004
15.03.53.15.3.
00.005
15.03.53.15.3.
52.002
15.03.53.15.3.
00.006
15.06.53.15.3.
55.002
15.06.53.15.3.
55.001
15.06.53.15.3.
55.003
15.05.53.15.3.
54.001
15.05.53.15.3.
54.003
15.05.53.15.3.
54.002
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 76 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
999 Ratlam Division‐Provision of passenger DF(1) 1,06,86 .. 50,00 56,86
announcement system, LCD display boards, VHF sets,
Fare repeaters in connection with Simhastha Mela
2016
1000 Ratlam Division‐Provision of Coach Guidance Boards DF(1) 1,58,01 .. 40,00 1,18,01
at Chittourgarh (PF No.3),Dewas(PF
No.1&2),Nimach(PF No.1),Mandsaur(PF No.1).
1001 Ratlam Division‐Replacement of coach guidance DRF 1,53,12 .. 60,00 93,12
display system at Ratlam, Ujjain & Chittourgarh
Statioin.
Ahmedabad
1002 Ahmedabad Division:‐ Final phase of removal of DF(1) 1,78,93 .. 50,00 1,28,93
deficiencies in Minimum Essential Amenities.
1003 Ambli Road : Provision of Medium level PF No. 1 & DF(1) 1,98,29 .. 50,00 1,48,29
2/3 and inter connecting pathway in connection
with Adarsh Station at.
Rajkot
1004 Rajkot:‐ Replacement of AC sheet, valley gutter DRF 1,39,08 .. 10,00 1,29,08
and storm water down take pipe at Platform no.1 to
5 at.
Mumbai
1005 Works costing below DRM's Power DRF 50,00 .. 50,00 ..
DF(1) 1,00,00 .. 1,00,00 ..
Vadodara
1006 Works costing below DRM's Power DRF 30,00 .. 30,00 ..
DF(1) 1,00,00 .. 1,00,00 ..
Ratlam
1007 Works costing below DRM's Power DRF 40,00 .. 40,00 ..
DF(1) 1,25,00 .. 1,25,00 ..
Ahmedabad
1008 Works costing below DRM's Power DRF 30,00 .. 30,00 ..
DF(1) 80,00 .. 80,00 ..
Rajkot
1009 Works costing below DRM's Power DRF 25,00 .. 25,00 ..
DF(1) 50,00 .. 50,00 ..
Bhavnagar
1010 Works costing below DRM's Power DRF 25,00 .. 25,00 ..
DF(1) 50,25 .. 50,25 ..
TOTAL‐NEW WORKS DRF .. .. 3,10,00 ..
DF(1) .. .. 9,20,25 ..
PASSENGER AMENITIES
15.05.53.15.3.
54.006
15.05.53.15.3.
54.004
15.05.53.15.3.
54.005
15.01.53.15.3.
50.002
15.01.53.15.3.
50.001
15.04.53.15.3.
53.001
15.03.53.15.3.
00.999
15.06.53.15.3.
00.999
15.05.53.15.3.
00.999
15.01.53.15.3.
00.999
15.04.53.15.3.
00.999
15.02.53.15.3.
00.999
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 77 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
TOTAL‐Passenger Amenities DRF .. .. 10,34,01 ..
DF(1) .. .. 41,57,90 ..
A ‐ Works in Progress
Mumbai
1011 Mumbai Division ‐ Providing RPF barracks at BL ( DF(2) 2,08,02 71,85 15,00 1,21,17
20 beds) and Vapi (10beds) dog kennels and
Malkhanas at BCT , BDTS and USD lock ups at BDTS,
UDN & BDTS , rest rooms at BSR, VR, and NDB for
RPF staff & cementing of parade ground at BL.
1012 Mahalaxmi (General Stores):‐ Replacement of DF(3) 63,61 11,76 39,00 12,85
dilapidated Non ‐ Ferrous Godown. (BCT/U/10‐11)
1013 Mumbai Central ‐ Installation of Effluent DF(3) 57,30 .. 9,99 47,31
treatment facility for JRH.
1014 JR Hospital, Mumbai Central ‐ Provision of smoke DF(3) 62,97 .. 20,00 42,97
detection & fire alarm system at JR hospital at
Mumbai Central
1015 Churchgate ‐ Modernization of office space at 3rd DRF 47,97 .. 25,00 22,97
floor of GLO building and 2nd floor of station DF(2) 47,98 .. 25,00 22,98
building..
Vadodara
1016 Pratapnagar (Railway Staff College) ‐ Upgradation DF(2) 2,22,48 .. 17,00 2,05,48
of sports facilities. (Vadodara division)
(S&C/U/07‐08)
1017 Bharuch (Yard) ‐ Provision of storm water drain DF(3) 2,30,00 2,23,58 1 6,41
in yard for disposal of water and flooding of
track.
1018 Vadodara Division:‐Consultancy for restoration of DF(3) 71,58 .. 20,00 51,58
Pratap Vilas Palace building in National Academey
(Railway Staff College) at Pratapnagar, Vadodara.
Ratlam
1019 Ratlam ‐ Replacement of 200 mm dia CI pipe line DRF 1,59,71 1,34,63 1 25,07
from Well No 572 to Well No 470 and 150 mm dia new
CI pipe line at from well No 470 to loco well at
1020 RTM ‐ Improvement to sports facilities at. DF(2) 51,54 32,43 1 19,10
1021 Indore‐Provision of open drain for LMNR Colony at. DRF 39,65 .. 30,00 9,65
1022 RTM‐Providing Effulent treatment plant in DF(3) 81,12 .. 25,00 56,12
Divisional Railway Hospital.
Ahmedabad
1023 Mahesana:‐ Replacement of existing two nos Bore DRF 52,33 23,96 12,00 16,37
Well 250mm dia. and 300m deep at Kalyaneshwar Bore
and Bala Hanuman ji Bore.
1024 Maninagar:‐ Providing RPF building including DF(3) 35,35 .. 15,00 20,35
IPF,SIPF,Clerical, Armed & CCTV room at PF No.1.
OTHER SPECIFIED WORKS
15.03.64.07.2.
52.001
15.03.64.10.3.
52.001
15.03.64.14.3.
52.001
15.03.64.14.3.
52.002
15.03.64.14.6.
52.001
15.06.64.07.2.
30.002
15.06.64.10.2.
55.001
15.06.64.14.3.
55.001
15.05.64.09.2.
54.001
15.05.64.12.3.
54.001
15.05.64.14.3.
54.002
15.05.64.14.3.
54.001
15.01.64.13.3.
50.001
15.01.64.14.3.
50.001
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 78 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
Rajkot
1025 Dwarka:‐ Providing two additional rooms in DF(2) 19,97 9,26 10,00 71
Officer's Rest House. (RJT/U/11‐12)
1026 RJT: Improvement to Divisional Hospital, OT, ICU, DF(2) 20,74 17,30 3,44 ..
Kitchen & Toilet etc.
1027 HAPA ‐ Supply, Installation, Testing and DF(3) 35,68 .. 20,00 15,68
Commissioning of Effluent Treatment Plant at C&W
Depot of Capacity 10cubic metre per day.
Bhavnagar
1028 Providing catch water drain, side drain at DF(3) 68,54 23,87 1 44,66
breaches locatons between Km: 18/11 ‐ 19/3 and Km:
23/5 to 23/11 on TAV ‐ DVA Section.
Mumbai
1029 Works costing below DRM's Power Cap. 12,19 .. 12,19 ..
DRF 6,06 .. 6,06 ..
DF(3) 46,07 .. 46,07 ..
Vadodara
1030 Works costing below DRM's Power DF(2) 5,76 .. 5,76 ..
DF(3) 6,18 .. 6,18 ..
Ratlam
1031 Works costing below DRM's Power DF(3) 9,75 .. 9,75 ..
Ahmedabad
1032 Works costing below DRM's Power DF(3) 17,27 .. 17,27 ..
Rajkot
1033 Works costing below DRM's Power DF(3) 13,10 .. 13,10 ..
Bhavnagar
1034 Works costing below DRM's Power Cap. 4,49 .. 4,49 ..
DRF 20,00 .. 20,00 ..
DF(3) 12,63 .. 12,63 ..
TOTAL‐WORKS IN PROGRESS Cap. .. .. 16,68 ..
DRF .. .. 93,07 ..
DF(2) .. .. 76,21 ..
DF(3) .. .. 2,54,01 ..
B ‐ New Works
Ratlam
1035 Indore‐Dewas‐Ujjain section‐Providing Boundary DF(3) 92,51 .. 3,50 89,01
wall to Protect Rly land from Encroachment. at
DWX(Stn Colony),NRGR(Behind Rly colony)&VRG stn.
Rajkot
1036 Rajkot:‐ Replacement of old temperary office shed DRF 95,33 .. 1,50 93,83
used as office for SSE(Pway) east
Rajkot,SSE(W)RJT, SSE(Tele) and SSE(Elect) office.
TOTAL‐NEW WORKS DRF .. .. 1,50 ..
DF(3) .. .. 3,50 ..
TOTAL‐Other Specified Works Cap. .. .. 16,68 ..
DRF .. .. 94,57 ..
DF(2) .. .. 76,21 ..
DF(3) .. .. 2,57,51 ..
OTHER SPECIFIED WORKS
15.04.64.11.3.
53.001
15.04.64.12.3.
53.002
15.04.64.15.3.
00.999
15.02.64.15.3.
00.999
15.05.64.15.3.
54.001
15.04.64.15.3.
53.001
15.04.64.14.3.
53.001
15.02.64.12.3.
51.001
15.03.64.15.3.
00.999
15.06.64.15.3.
00.999
15.05.64.15.3.
00.999
15.01.64.15.3.
00.999
List of Approved Works Costing Less Than Rupees Two Crore Fifty Lakhs Each
WESTERN RAILWAY
Assets‐Acquisition, Construction and Replacement for 2015‐16
Page No. : 79 .
(Figures in thousands of rupees) .
Item
No.
Project ID Particulars of Works Allocation Anticipated
Cost
Outlay
expected
to end of
2014‐15
Outlay
2015‐16
Balance to
complete
work
TOTAL‐WORKS IN PROGRESS Cap. .. .. 3,08,42 ..
DRF .. .. 77,70,29 ..
DF(1) .. .. 32,37,66 ..
DF(2) .. .. 2,68,18 ..
DF(3) .. .. 14,11,93 ..
DF(4) .. .. 8,44,33 ..
S.Fund .. .. 24,75,17 ..
TOTAL ‐ NEW WORKS Cap. .. .. 2,13,01 ..
DRF .. .. 40,30,91 ..
DF(1) .. .. 9,20,25 ..
DF(2) .. .. 44,50 ..
DF(3) .. .. 1,42,95 ..
DF(4) .. .. 1,00,00 ..
S.Fund .. .. 3,23,00 ..
GRAND TOTAL Cap. .. .. 5,21,43 ..
DRF .. .. 118,01,20 ..
DF(1) .. .. 41,57,91 ..
DF(2) .. .. 3,12,68 ..
DF(3) .. .. 15,54,88 ..
DF(4) .. .. 9,44,33 ..
S.Fund .. .. 27,98,17 ..