8
Larry O. Daniel Prototype Integration Facility Larry O. Daniel Prototype Integration Facility A Government Owned and Government Operated Organization Established in July 2002 In 2008 the name PIF was adopted throughout RDECOM.

Larry O. Daniel Prototype Integration Facility

  • Upload
    adolfo

  • View
    81

  • Download
    0

Embed Size (px)

DESCRIPTION

Larry O. Daniel Prototype Integration Facility A Government Owned and Government Operated Organization Established in July 2002. Larry O. Daniel Prototype Integration Facility . In 2008 the name PIF was adopted throughout RDECOM. . Prototype Integration Facility. - PowerPoint PPT Presentation

Citation preview

Page 1: Larry  O. Daniel  Prototype  Integration Facility

1

Larry O. Daniel Prototype Integration Facility Larry O. Daniel Prototype Integration Facility A Government Owned and Government

Operated Organization Established in July 2002

In 2008 the name PIF was adopted throughout RDECOM.

Page 2: Larry  O. Daniel  Prototype  Integration Facility

2

Prototype Integration FacilityPremier Provider of Rapid Response and Integrated Hardware Solutions

A Government Owned and Government Operated (GOGO) contractor supported Enterprise established to meet the most compelling and urgent needs of the U.S. Government and our allies

PIF Products rapidly fielded directly to the warfighter• PIF products save lives• Unique Streamlined Processes developed from

Lessons Learned and Best Government and Industry Practices

• Collocation of all People in the Value Stream

PIF products cover a very broad range of requirements• Unforecasted warfighter requirements daily• Very rapid response required• Innovation with a sense of urgency

•Proven 10 Year History of Success• Unique teams for each project• 300+ Subcontractors• 2000 material vendors

“This is a technology hub for our Army, and I have been impressed with Redstone Arsenal, especially in an area called the PIF.” GEN George W Casey Jr.

US Army Chief of Staff

ISO9001:2008 Registered

Page 3: Larry  O. Daniel  Prototype  Integration Facility

3

WIDE RANGE of INNOVATION with a sense of URGENCY

Blue Force Tracker4000 fielded, 150 ConfigurationsLess than 5 yrs2004 Top Ten Greatest Inventions

WARFIGHTER FOCUSED RAPID RESPONSE APPROACH

Naval Autonomous Underwater VehicleFabricating piece parts within 2 weeks

ASPIDesign to Fielding Less than 1 year

Aviation M4 Gun Mounts 2322 sets fielded, 6 configurations

Jet Ranger5 Aircraft for Iraqi Air Force, 10 months

GMD Rocket RestraintEnabled Largest Rocket test in DOD history, 6 months

SLAMRAAM onHIMARS DEMOConcept to Test – 8 Months

RECCE VehicleFully integrated system in 120 days2007 Top Ten Greatest Inventions

FIDO/PackBot Remote Explosive Detector Initiation to field in 90 days2006 RDA Award Winner2006 Top Ten Greatest Inventions

UAV CRS - Communication Relay SystemDeveloped & fielded in 1 year2007 RDA Award Winner2007 Top Ten Greatest Inventions

Crew Extraction Brackets800 fielded in 2 weeks2006 Top Ten Greatest Inventions

Tandem HUSKYProvided improved capabilities for route clearance teams2010 Top Ten Greatest Inventions

Broad Mission

Page 4: Larry  O. Daniel  Prototype  Integration Facility

4

Engineering Design and Analysis Circuit Card Design/Layout Simulation, Analysis and Modeling Visualization Based Design Test and Documentation Obsolescence Management

Fabrication Machining and Sheet Metal Cable/Wiring Harness Assembly Circuit Assembly and test Circuit Board Fabrication and Plating Electrical and Mechanical Assembly

Integration Ground Platforms Aviation Platforms

• GGFR Assigned for Ground Operations• GFR Assigned for Flight Operations

Program Management Govt to Govt Interface Acquisition Corp Members Experienced TS/SCI PM Team On-Site Budget Office On-Site Contracting Officers

Test On-Site Airworthiness Coordination ATEC Test Coordination

Documentation Technical Data Packages Technical Manuals Maintenance Work Orders Acquisition Packages for Future

Acquisitions

Operations Support Quality Assurance Production Planning and Control Inventory Control Purchasing

One-Stop-Shop Capabilities

RAPIDLY INTEGRATE Core Competencies with other Government andIndustry Expertise to get the RIGHT TEAM for EACH PROJECT

Page 5: Larry  O. Daniel  Prototype  Integration Facility

5

GOGO Project Execution

PIF Gov PM TeamDefines Requirements

with Customer

GOGO Project Execution

PIF Gov PM TeamCreates SOW for

Contract

Prime DevelopsSOW(s) for Subs

Prime Requests Proposals from Subs

Sub(s) Draft Proposal(s)

Internal

Internal

Government Action

Prime Contractor Action

Sub-Contractor(s) Action

LEGEND

ProcureMaterials

Best Value Selection of Subs and Material Vendors

TeamingRequiredw/Subs

Dedicate internal staffor develop teaming

arrangements

PIF Gov Team DefinesExecution Strategy

Dedicate internal staffor develop teaming

arrangements

PrimeContractor Determines

Execution Strategy

ProcureMaterials

Right team rapidly responding to the WarfighterDifferent teams assembled for each taskAutomated tool for contracted activity

Project is Executed through TEAMING

Page 6: Larry  O. Daniel  Prototype  Integration Facility

6

GovernmentPrime Contractor - RDSSubcontractors

PM Design Materials Facilities Fabrication Integration

AH-64 ASPI

PM Design Materials Facilities Fabrication Integration

RECCE (JIEDDO)

PM Design Materials Facilities Fabrication Integration

FidoPackbot

PM Design Materials Facilities Fabrication Integration

PM Design Materials Facilities Fabrication Integration

A2C2S

COMM Relay

PIF projects require flexible and rapid teaming

Teaming Flexibility

Page 7: Larry  O. Daniel  Prototype  Integration Facility

7

Industry Days

December 4-6, 2013, Redstone Defense Systems will be hosting an Industry Days for the PIF at 631 Discovery Dr., Huntsville, AL

• Industry is invited to brief their capabilities &/or resources for consideration on future tasks

POCs: Jeanette Watson, (256) 313-5155, [email protected] Julio C. Driggs, (256) 876-2275, [email protected]

Teamwork

Page 8: Larry  O. Daniel  Prototype  Integration Facility

8

Summary

PIF provides rapid development and fielding of hardware directly to the warfighter

• PIF products save lives, delays cost lives PIF products cover a very broad range of

requirements• No two projects are alike• Unforecasted customer requirements• Wide range of customers and needs

PIF effectiveness and rapid response enabled by:• Flexible contract vehicle allowing rapid

contract action and subcontracting w/o limitation of companies used

• Core PIF team augmented by government network and subcontracted SMEs as required

Engineering Computer Aided Design Manufacturing Integration & Fielding