Large D&B process
Framework - deliverables
Contract
Budget
Timeplan
SOW
Brief Specificatio
n
Product Go live Project review
Initiate Explore Concept
Produce Release Review
Requirements log
Technical review
KPI framework
Ambition document
Summary
presentation
Sitemap
Annotated
wireframes
Taxonomy
Content audit
KPI metrics
Tagging schema
Style tiles
Template designs
Design kit
QA test plan
Analytics review
2% 11% 18% 4%1%64%Budget
guideline:
Risk log
Launch plan
Documents are for thinking, not just filling in
Make the tough calls early
You can’t do everything you want to in the first release
Zone it wants
Progressive enhancement, not graceful degradation
Use the same language
InitiateSet up project in Timezone including any add-onsFollow D&B checklist and ensure SoW convers all pointsSet up appropriate PM tool: Agile Jira / AgileZen / BasecampInternal kick offClient kick off
Risk log – List of all potential project risks, status and mitigation plans. To keep updated throughout project (PM)
ExploreActivities to include workshops, interviews, data analysis and document review
Requirements log – List of prioritised business and user requirements with internal estimates of time. Explicitly states which are in/out of scope (PM/BA)
KPI framework – How we’ll measure success. Doesn’t necessarily include specific metric and rarely (at this stage) includes explicit targets e.g. Engagement, probably measuring downloads, no target set yet (Strategy)
Technical review – Proposed approach to / details of hosting, architecture, CMS, 3rd party integrations (Tech)
Ambition document – Project principals / goals
Summary presentation – Outline of work carried out and findings. Summarises other docs
ConceptSitemap – Site navigation structure but not all pages. Named template for each page (UX)
Annotated wireframes – For every template on desktop. At least 20% of them for mobile. Common elements page e.g. WYWIWYG styling options (UX)
Taxonomy – Tagging structure and initial list of tags / categories (UX + Editorial)
Content audit – Review of site content, recommendation on cut / keep / rewrite (Editorial)
KPI metrics – Evolution of KPI framework with specific metrics e.g. downloads, likes (Strategy)
Tagging schema – Analytics tagging plan for event tracking, goals, funnels etc. (Strategy)
Style tiles – Look and feel for site (UX)
ProduceTemplate designs – Designs for minimum 50% of templates, desktop (UX)
Design kit – All page elements and action states e.g. buttons, links, images, roll overs (UX)
QA Test plan – Quantity, types and timings of testing. Test script, entry/exit criteria (Tech)
ReleaseActivities to include checking analytics working, especially event tracking
Launch plan – Document outlining key actions (e.g. moving from staging server to live, repointing IP), timings, owner and status
ReviewAnalytics review – At least 1 review of analytics data post go-live to measure results against objectives (Strategy)
Proportion of project days by department
49%
Technical scoping
Back end
Front end
QA
Bug fixing
25%
Research
IA
Visual design
21%
Project management
Account
management
5%
Strategy
Editorial
Creative campaig
ns
(+/- 4%)