18
Los Alamos National Laboratory Benny J. Martinez Michael Kaufman Randy Fraser Los Alamos National Laboratory LA- UR 10-02748 1

LANL’s Implementation of LANMAS

  • Upload
    amina

  • View
    26

  • Download
    0

Embed Size (px)

DESCRIPTION

LANL’s Implementation of LANMAS. Los Alamos National Laboratory Benny J. Martinez Michael Kaufman Randy Fraser. Background. Previous Nuclear Material Tracking System (MASS) Over 20 years old No on-site technical support Number of users Over 280 users Hardwired infrastructure - PowerPoint PPT Presentation

Citation preview

Page 1: LANL’s Implementation of LANMAS

Los Alamos National LaboratoryBenny J. MartinezMichael Kaufman

Randy Fraser

Los Alamos National Laboratory LA-UR 10-02748 1

Page 2: LANL’s Implementation of LANMAS

Previous Nuclear Material Tracking System (MASS)◦ Over 20 years old◦ No on-site technical support

Number of users◦ Over 280 users

Hardwired infrastructure◦ Direct Modem and STU-III access

Security plan expiring

Los Alamos National Laboratory LA-UR 10-02748 2

Page 3: LANL’s Implementation of LANMAS

Build◦ Cost of developing new NMTS◦ Time frame to develop new NMTS

Use existing DOE approved system (LANMAS)◦ Develop Site-Specific modules

Los Alamos National Laboratory LA-UR 10-02748 3

Page 4: LANL’s Implementation of LANMAS

Los Alamos Nuclear Control and Accounting System (LAMCAS)◦ LANMAS core

18 months from time of funding to implementation which included:◦ Gap analysis◦ Security Plan◦ QA Process◦ Development◦ Purchase and setup of hardware◦ Testing◦ Data Migration

Los Alamos National Laboratory LA-UR 10-02748 4

Page 5: LANL’s Implementation of LANMAS

Historical View Historical 741 Shipment and Receipts Historical Remarks Site-Wide Rollup LANL Specific Reports Measurement Control Data Feeds

◦ Current Inventory◦ Historical Transactions◦ Material at Risk (MAR), etc

Cost Accounting

Los Alamos National Laboratory LA-UR 10-02748 5

Page 6: LANL’s Implementation of LANMAS

Los Alamos National Laboratory LA-UR 10-02748 6

Page 7: LANL’s Implementation of LANMAS

Los Alamos National Laboratory LA-UR 10-02748 7

Page 8: LANL’s Implementation of LANMAS

Los Alamos National Laboratory LA-UR 10-02748 8

Page 9: LANL’s Implementation of LANMAS

Los Alamos National Laboratory LA-UR 10-02748 9

Page 10: LANL’s Implementation of LANMAS

Los Alamos National Laboratory LA-UR 10-02748 10

Page 11: LANL’s Implementation of LANMAS

Project Plan Requirements Software Design Document Test Plans Test documentation User Guides

Los Alamos National Laboratory LA-UR 10-02748 11

Page 12: LANL’s Implementation of LANMAS

Diverse set of users◦ Super Coders◦ Knowledgeable set of MC&A users

Full time job◦ Operational set of users

Part time Many ways of doing the same function Just in time training Continuous training Quick Reference reminders

Los Alamos National Laboratory LA-UR 10-02748 12

Page 13: LANL’s Implementation of LANMAS

LANMAS◦ Plug-Ins

Allows users to view and edit Remarks in LANMAS Set Attractiveness Level by SMT/IDC to meet LANL’s

requirements for MIX/SPLIT/ADJUSTMENT◦ Peer Review turned on◦ AssayMethod used to track type of instrument used to

measure material ADMIN/Gridset

◦ For each LANMAS form display fields that are of used by LANL

ADMIN/Security◦ Create >100 User groups to manage security

permissions

Los Alamos National Laboratory LA-UR 10-02748 13

Page 14: LANL’s Implementation of LANMAS

Training◦ Just in time training/re-training

Security Plan Approval◦ Time and effort to get approved

Deployment infrastructure model◦ Secure Desktop on Demand (Thin client

environment) Data Migration issues

◦ LSAuto versus direct insert into LANMAS

Los Alamos National Laboratory LA-UR 10-02748 14

Page 15: LANL’s Implementation of LANMAS

Cyber security requirements◦ Separation of duties

System Administrators Database Administrators MC&A LAMCAS Operations

Single point of contact for all issues◦ LAMCAS Operations

Great LANMAS Support

Los Alamos National Laboratory LA-UR 10-02748 15

Page 16: LANL’s Implementation of LANMAS

Physical Inventory Module◦ Label printing Barcodes◦ Statistical Sampling for Item Monitoring

Measurement Control enhancements◦ Data Feed Option for Statisticians◦ Trending enhancements

Inventory Evaluation◦ From-To Trace◦ Propagation of Variance (POV) Data Feeds

Process Monitoring◦ Exception reports

Automated roll-up calculation◦ Outside TA-55, CMR

Classified Beta System◦ Procure and install classified test environment

Los Alamos National Laboratory LA-UR 10-02748 16

Page 17: LANL’s Implementation of LANMAS

Maintenance◦ LANMAS 3.3◦ SQL Server 2008 R2◦ LAMCAS Visual Studio 2010 and 3rd party tools

On-going support◦ Responding to new requirements◦ MAR

Phase II MAR Tracker Interface◦ COST

Create new LANL COST module Update SRS COST module with updated version

Automate Physical Inventory process ◦ Portable Barcode Scanners, Reconciliation

Process Monitoring◦ Reports◦ POV Automation

Automate TID inventory◦ Portable Barcode Scanners, Reconciliation

Measurement Control◦ Trending

WCATS◦ Create interface to automate waste shipments

Los Alamos National Laboratory LA-UR 10-02748 17

Page 18: LANL’s Implementation of LANMAS

Change is Hard System is operational Training is on-going Continue to add functionality Different users require different views of the

data

Los Alamos National Laboratory LA-UR 10-02748 18