Upload
amina
View
26
Download
0
Embed Size (px)
DESCRIPTION
LANL’s Implementation of LANMAS. Los Alamos National Laboratory Benny J. Martinez Michael Kaufman Randy Fraser. Background. Previous Nuclear Material Tracking System (MASS) Over 20 years old No on-site technical support Number of users Over 280 users Hardwired infrastructure - PowerPoint PPT Presentation
Citation preview
Los Alamos National LaboratoryBenny J. MartinezMichael Kaufman
Randy Fraser
Los Alamos National Laboratory LA-UR 10-02748 1
Previous Nuclear Material Tracking System (MASS)◦ Over 20 years old◦ No on-site technical support
Number of users◦ Over 280 users
Hardwired infrastructure◦ Direct Modem and STU-III access
Security plan expiring
Los Alamos National Laboratory LA-UR 10-02748 2
Build◦ Cost of developing new NMTS◦ Time frame to develop new NMTS
Use existing DOE approved system (LANMAS)◦ Develop Site-Specific modules
Los Alamos National Laboratory LA-UR 10-02748 3
Los Alamos Nuclear Control and Accounting System (LAMCAS)◦ LANMAS core
18 months from time of funding to implementation which included:◦ Gap analysis◦ Security Plan◦ QA Process◦ Development◦ Purchase and setup of hardware◦ Testing◦ Data Migration
Los Alamos National Laboratory LA-UR 10-02748 4
Historical View Historical 741 Shipment and Receipts Historical Remarks Site-Wide Rollup LANL Specific Reports Measurement Control Data Feeds
◦ Current Inventory◦ Historical Transactions◦ Material at Risk (MAR), etc
Cost Accounting
Los Alamos National Laboratory LA-UR 10-02748 5
Los Alamos National Laboratory LA-UR 10-02748 6
Los Alamos National Laboratory LA-UR 10-02748 7
Los Alamos National Laboratory LA-UR 10-02748 8
Los Alamos National Laboratory LA-UR 10-02748 9
Los Alamos National Laboratory LA-UR 10-02748 10
Project Plan Requirements Software Design Document Test Plans Test documentation User Guides
Los Alamos National Laboratory LA-UR 10-02748 11
Diverse set of users◦ Super Coders◦ Knowledgeable set of MC&A users
Full time job◦ Operational set of users
Part time Many ways of doing the same function Just in time training Continuous training Quick Reference reminders
Los Alamos National Laboratory LA-UR 10-02748 12
LANMAS◦ Plug-Ins
Allows users to view and edit Remarks in LANMAS Set Attractiveness Level by SMT/IDC to meet LANL’s
requirements for MIX/SPLIT/ADJUSTMENT◦ Peer Review turned on◦ AssayMethod used to track type of instrument used to
measure material ADMIN/Gridset
◦ For each LANMAS form display fields that are of used by LANL
ADMIN/Security◦ Create >100 User groups to manage security
permissions
Los Alamos National Laboratory LA-UR 10-02748 13
Training◦ Just in time training/re-training
Security Plan Approval◦ Time and effort to get approved
Deployment infrastructure model◦ Secure Desktop on Demand (Thin client
environment) Data Migration issues
◦ LSAuto versus direct insert into LANMAS
Los Alamos National Laboratory LA-UR 10-02748 14
Cyber security requirements◦ Separation of duties
System Administrators Database Administrators MC&A LAMCAS Operations
Single point of contact for all issues◦ LAMCAS Operations
Great LANMAS Support
Los Alamos National Laboratory LA-UR 10-02748 15
Physical Inventory Module◦ Label printing Barcodes◦ Statistical Sampling for Item Monitoring
Measurement Control enhancements◦ Data Feed Option for Statisticians◦ Trending enhancements
Inventory Evaluation◦ From-To Trace◦ Propagation of Variance (POV) Data Feeds
Process Monitoring◦ Exception reports
Automated roll-up calculation◦ Outside TA-55, CMR
Classified Beta System◦ Procure and install classified test environment
Los Alamos National Laboratory LA-UR 10-02748 16
Maintenance◦ LANMAS 3.3◦ SQL Server 2008 R2◦ LAMCAS Visual Studio 2010 and 3rd party tools
On-going support◦ Responding to new requirements◦ MAR
Phase II MAR Tracker Interface◦ COST
Create new LANL COST module Update SRS COST module with updated version
Automate Physical Inventory process ◦ Portable Barcode Scanners, Reconciliation
Process Monitoring◦ Reports◦ POV Automation
Automate TID inventory◦ Portable Barcode Scanners, Reconciliation
Measurement Control◦ Trending
WCATS◦ Create interface to automate waste shipments
Los Alamos National Laboratory LA-UR 10-02748 17
Change is Hard System is operational Training is on-going Continue to add functionality Different users require different views of the
data
Los Alamos National Laboratory LA-UR 10-02748 18