12
ERECO--RÁBA 1 Landfill Landfill costs costs Main Main stakeholders stakeholders Illegal Illegal waste waste disposal disposal Central European University June 30 th , 2008 David McCall WAMPUM Kft. www.wampum.hu www.wampum.hu 2 Non Non- recyclable materials recyclable materials Incineration Golden Rule: Min. 500,000 people, limited land Landfilling Golden Rule: Min. 80-120,000 people

Landfill costs Main stakeholders Illegal waste disposalweb.rec.org/.../session4_david_mccall_zoltan_illes.pdf · ERECO--RÁBA 1 Landfill costs Main stakeholders Illegal waste disposal

  • Upload
    others

  • View
    15

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Landfill costs Main stakeholders Illegal waste disposalweb.rec.org/.../session4_david_mccall_zoltan_illes.pdf · ERECO--RÁBA 1 Landfill costs Main stakeholders Illegal waste disposal

ERECO--RÁBA 1

LandfillLandfill costscostsMain Main stakeholdersstakeholders

IllegalIllegal wastewaste disposaldisposal

Central European University

June 30th, 2008

David McCall

WAMPUM Kft.

www.wampum.hu

www.wampum.hu 2

NonNon--recyclable materialsrecyclable materials

• Incineration

–Golden Rule: Min. 500,000 people, limited land

• Landfilling

–Golden Rule: Min. 80-120,000 people

Page 2: Landfill costs Main stakeholders Illegal waste disposalweb.rec.org/.../session4_david_mccall_zoltan_illes.pdf · ERECO--RÁBA 1 Landfill costs Main stakeholders Illegal waste disposal

ERECO--RÁBA 2

www.wampum.hu 3

LandfillLandfill MManagementanagementYesterdayYesterday

www.wampum.hu 4

LandfillLandfill MManagementanagementTodayToday & Tomorrow& Tomorrow

Page 3: Landfill costs Main stakeholders Illegal waste disposalweb.rec.org/.../session4_david_mccall_zoltan_illes.pdf · ERECO--RÁBA 1 Landfill costs Main stakeholders Illegal waste disposal

ERECO--RÁBA 3

www.wampum.hu 5

www.wampum.hu 6

WhenWhen is a is a landfilllandfill breakbreak eveneven??

InvestmentInvestment: 50 : 50 €€/m/m22

((excludingexcluding otherother infrastructureinfrastructure))EgEg: 20.000 m: 20.000 m22 x 50 x 50 €€/m/m22 = 1 = 1 millionmillion €€

OperatingOperating CostsCosts: : 80% fix80% fix

onlyonly 20% 20% variablevariable

Page 4: Landfill costs Main stakeholders Illegal waste disposalweb.rec.org/.../session4_david_mccall_zoltan_illes.pdf · ERECO--RÁBA 1 Landfill costs Main stakeholders Illegal waste disposal

ERECO--RÁBA 4

www.wampum.hu 7

Cost Structure: Collection and LandfillCost Structure: Collection and Landfill

Landfill cost elements

Fixed costs • Depreciation

• financing, etc.

Operational costs• Personnel

• fuel, etc.

Topping-off costs

Post-operational costs (30-year requirement)

Collection cost elements

Fixed costs • Depreciation

• financing, etc.

Operational costs• Personnel

• Repairs

• fuel, etc.

Golden Rule: 60-40% split

International average: 1% of disposable income

www.wampum.hu 8

Garbage CollectionGarbage CollectionYesterdayYesterday

Page 5: Landfill costs Main stakeholders Illegal waste disposalweb.rec.org/.../session4_david_mccall_zoltan_illes.pdf · ERECO--RÁBA 1 Landfill costs Main stakeholders Illegal waste disposal

ERECO--RÁBA 5

www.wampum.hu 9

Garbage CollectionGarbage CollectionToday & TomorrowToday & Tomorrow

www.wampum.hu 10

IT: IT: Management and ControlManagement and Control

Page 6: Landfill costs Main stakeholders Illegal waste disposalweb.rec.org/.../session4_david_mccall_zoltan_illes.pdf · ERECO--RÁBA 1 Landfill costs Main stakeholders Illegal waste disposal

ERECO--RÁBA 6

www.wampum.hu 11

Transfer stationsTransfer stationsCombined with residential waste

collection yards, reuseyards

www.wampum.hu 12

TransferTransfer stationsstations –– II. II.

Page 7: Landfill costs Main stakeholders Illegal waste disposalweb.rec.org/.../session4_david_mccall_zoltan_illes.pdf · ERECO--RÁBA 1 Landfill costs Main stakeholders Illegal waste disposal

ERECO--RÁBA 7

www.wampum.hu 13

Waste transportation, haulingWaste transportation, hauling

www.wampum.hu 14

Sorting PlantsSorting Plants

Page 8: Landfill costs Main stakeholders Illegal waste disposalweb.rec.org/.../session4_david_mccall_zoltan_illes.pdf · ERECO--RÁBA 1 Landfill costs Main stakeholders Illegal waste disposal

ERECO--RÁBA 8

www.wampum.hu 15

ConstructionConstruction & & DemolitionDemolition WasteWaste1414--25% of 25% of thethe entireentire wastewaste streamstream

Profit or Loss?

Virgin material – 30%

Gross Margin

Dumping Costs – 30%

www.wampum.hu 16

Main stakeholdersMain stakeholders

Financial stakeholders

Investors

Operators

Municipalities

Subsidies

Non-financial stakeholders

Municipalities

NGOs

Authorities

Residents

Page 9: Landfill costs Main stakeholders Illegal waste disposalweb.rec.org/.../session4_david_mccall_zoltan_illes.pdf · ERECO--RÁBA 1 Landfill costs Main stakeholders Illegal waste disposal

ERECO--RÁBA 9

www.wampum.hu 17

Illegal dumpingIllegal dumping

www.wampum.hu 18

Costs of illegal dumpingCosts of illegal dumping

„Operating” expenses

Post-operation clean-up expenses:

•Monitoring

•Topping-off

•Localization, containment, decontamination

Page 10: Landfill costs Main stakeholders Illegal waste disposalweb.rec.org/.../session4_david_mccall_zoltan_illes.pdf · ERECO--RÁBA 1 Landfill costs Main stakeholders Illegal waste disposal

ERECO--RÁBA 10

www.wampum.hu 19

Costs of illegal dumpingCosts of illegal dumping

Short-term low costs often lead to long-term high costs

Who pays the bill?

Municipalities, government:

Taxpayers

www.wampum.hu 20

Illegal Illegal landfillinglandfilling in Hungary in Hungary

• Campaigns against illegal landfilling by the Ministry as well as HUMUSZ, NGO

• Ministry supports it by 245,8 million HUF

• It is possible to give 1 % from tax for illegal landfilling (HUF 250 million arrived to HUMUSZ from this in 2008)

– www.tisztamagyarorszagert.hu

– http://www.tajsebeszet.hu

Page 11: Landfill costs Main stakeholders Illegal waste disposalweb.rec.org/.../session4_david_mccall_zoltan_illes.pdf · ERECO--RÁBA 1 Landfill costs Main stakeholders Illegal waste disposal

ERECO--RÁBA 11

www.wampum.hu 21

Illegal Illegal landfillinglandfilling -- NGO campaign NGO campaign

• Tajsebeszet campaign by HUMUSZ from 2003,

–School children detect the landfills and call the authorities

–The authorities call the companies to remove the waste

www.wampum.hu 22

Waste `commando` Waste `commando`

• Started in Nyiregyhaza in June 2004 by E-Mission NGO

• Participants: authority, police, NGO• The people who landfilled the waste illegally were caught and 98% removed the waste as it is an offence

• They monitor the area every2nd week

• Waste commando planned inSzekesfehervar, ZalaszentgrótSzekszard, Szolnok as well

Page 12: Landfill costs Main stakeholders Illegal waste disposalweb.rec.org/.../session4_david_mccall_zoltan_illes.pdf · ERECO--RÁBA 1 Landfill costs Main stakeholders Illegal waste disposal

ERECO--RÁBA 12

ThankThank youyou forfor youryourattentionattention and and participationparticipation!!

David McCall

WAMPUM Kft.

www.wampum.hu