1
Access will be a detailed matter for consideration in the outline planning application. A detailed Transport Assessment and Framework Travel Plan will be produced to support the forthcoming planning application. Accessibility West Street provides a direct route to Farnham town centre and is provided with footways on both sides for the majority of the route. The closest bus stops are also located just 200m from the site, which serve the Stagecoach 65, providing a route between Guildford and Winchester. Farnham railway station is also accessible via a 26-minute walk/8-minute cycle journey. The site’s proximity to local amenities provides an excellent opportunity for sustainable travel. Access It is proposed the site will be served via a right turn lane junction on West Street. The proposed arrangement will ensure the access does not disrupt traffic flow exiting Farnham towards Coxbridge Roundabout. The access arrangements will also include a pedestrian refuge island to facilitate safe crossing to the existing footway on the southern aspect of West Street. The internal road layout will be designed to create an attractive and permeable pedestrian and cycle environment. The site’s spine road will be wide enough to accommodate a car and larger vehicle passing simultaneously. Footways will flank each side of all internal roads to provide an attractive and continuous pedestrian route. Car parking will be provided in accordance with Waverley Borough Council Parking Guidelines and each unit will be provided with dedicated cycle storage either within a shed or garage. Traffic Impact We are currently in pre-application discussions with the local highway authority, Surrey County Council. Initial assessments conclude that the traffic impact of the development will be modest in comparison with the existing traffic flows on the surrounding highway network, however further assessment will be undertaken ahead of application submission. The initial traffic distribution exercise which applies Census data, forecasts that a high proportion of trips arising from the site will head to the strategic road network via Coxbridge Roundabout, minimising the impact upon the town centre and associated Air Quality Management Area. During pre-application discussions, Surrey County Council have highlighted current congestion during peak periods on the A31 corridor, including Coxbridge roundabout and the proportionate impact of the development upon the operation of this junction will be assessed in detail via the Transport Assessment. The outline planning application will include details of any proposals to upgrade the local highway network once discussions with SCC have been concluded. Public Exhibition Access and Highways BOARD G Land at Coxbridge Farm, Farnham A 31 400m 800m KEY Site Bus Stops Educational Facilities Restaurants and Drinking Establishments Sports and Recreational Facilities Religious Facilities Retail Footpath Supermarket Bridleway 74.50 74.50 75.00 75.50 75.50 75.00 75.00 482900E 146100N creative minds safe hands www.wyg.com Footpaths to be provided within green buffer Footpaths to be provided within green buffer

Land at Coxbridge Farm, Farnham - WYG · COXBRIDGE FARM, FARNHAM PROPOSED RIGHT TURN LANE PRELIMINARY BW 20.01.17 EK 18.01.17 AS SHOWN. 076.0001.002-B. WEWERWR. A REVISED PROJECT

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Land at Coxbridge Farm, Farnham - WYG · COXBRIDGE FARM, FARNHAM PROPOSED RIGHT TURN LANE PRELIMINARY BW 20.01.17 EK 18.01.17 AS SHOWN. 076.0001.002-B. WEWERWR. A REVISED PROJECT

Access will be a detailed matter for consideration in the outline planning

application. A detailed Transport Assessment and Framework Travel Plan will

be produced to support the forthcoming planning application.

AccessibilityWest Street provides a direct route to Farnham town centre and is provided with

footways on both sides for the majority of the route. The closest bus stops are

also located just 200m from the site, which serve the Stagecoach 65, providing

a route between Guildford and Winchester. Farnham railway station is also

accessible via a 26-minute walk/8-minute cycle journey. The site’s proximity to

local amenities provides an excellent opportunity for sustainable travel.

AccessIt is proposed the site will be served via a right turn lane junction on West Street.

The proposed arrangement will ensure the access does not disrupt traffic flow

exiting Farnham towards Coxbridge Roundabout. The access arrangements will

also include a pedestrian refuge island to facilitate safe crossing to the existing

footway on the southern aspect of West Street.

The internal road layout will be designed to create an attractive and permeable

pedestrian and cycle environment.

The site’s spine road will be wide enough to accommodate a car and larger

vehicle passing simultaneously. Footways will flank each side of all internal

roads to provide an attractive and continuous pedestrian route.

Car parking will be provided in accordance with Waverley Borough Council

Parking Guidelines and each unit will be provided with dedicated cycle storage

either within a shed or garage.

Traffic ImpactWe are currently in pre-application discussions with the local highway authority,

Surrey County Council. Initial assessments conclude that the traffic impact of the

development will be modest in comparison with the existing traffic flows on the

surrounding highway network, however further assessment will be undertaken

ahead of application submission.

The initial traffic distribution exercise which applies Census data, forecasts that

a high proportion of trips arising from the site will head to the strategic road

network via Coxbridge Roundabout, minimising the impact upon the town centre

and associated Air Quality Management Area.

During pre-application discussions, Surrey County Council have highlighted

current congestion during peak periods on the A31 corridor, including Coxbridge

roundabout and the proportionate impact of the development upon the operation

of this junction will be assessed in detail via the Transport Assessment.

The outline planning application will include details of any proposals to upgrade

the local highway network once discussions with SCC have been concluded.

Public Exhibition

Access and Highways

B O A R D G

Land at Coxbridge Farm, Farnham

A31

400m

800m

1.2km KEY

Site

Bus Stops

Educational Facilities

Restaurants and Drinking Establishments

Sports and Recreational Facilities

Religious Facilities

Retail

Post Office

Supermarket

Footpath

Bridleway

A31

400m

800m

1.2km KEY

Site

Bus Stops

Educational Facilities

Restaurants and Drinking Establishments

Sports and Recreational Facilities

Religious Facilities

Retail

Post Office

Supermarket

Footpath

Bridleway

A31

400m

800m

1.2km KEY

Site

Bus Stops

Educational Facilities

Restaurants and Drinking Establishments

Sports and Recreational Facilities

Religious Facilities

Retail

Post Office

Supermarket

Footpath

Bridleway

A31

400m

800m

1.2km KEY

Site

Bus Stops

Educational Facilities

Restaurants and Drinking Establishments

Sports and Recreational Facilities

Religious Facilities

Retail

Post Office

Supermarket

Footpath

Bridleway

A31

400m

800m

1.2km KEY

Site

Bus Stops

Educational Facilities

Restaurants and Drinking Establishments

Sports and Recreational Facilities

Religious Facilities

Retail

Post Office

Supermarket

Footpath

Bridleway

A31

400m

800m

1.2km KEY

Site

Bus Stops

Educational Facilities

Restaurants and Drinking Establishments

Sports and Recreational Facilities

Religious Facilities

Retail

Post Office

Supermarket

Footpath

Bridleway

A31

400m

800m

1.2km KEY

Site

Bus Stops

Educational Facilities

Restaurants and Drinking Establishments

Sports and Recreational Facilities

Religious Facilities

Retail

Post Office

Supermarket

Footpath

Bridleway

A31

400m

800m

1.2km KEY

Site

Bus Stops

Educational Facilities

Restaurants and Drinking Establishments

Sports and Recreational Facilities

Religious Facilities

Retail

Post Office

Supermarket

Footpath

Bridleway

A31

400m

800m

1.2km KEY

Site

Bus Stops

Educational Facilities

Restaurants and Drinking Establishments

Sports and Recreational Facilities

Religious Facilities

Retail

Post Office

Supermarket

Footpath

Bridleway

A31

400m

800m

1.2km KEY

Site

Bus Stops

Educational Facilities

Restaurants and Drinking Establishments

Sports and Recreational Facilities

Religious Facilities

Retail

Post Office

Supermarket

Footpath

Bridleway

A31

400m

800m

1.2km KEY

Site

Bus Stops

Educational Facilities

Restaurants and Drinking Establishments

Sports and Recreational Facilities

Religious Facilities

Retail

Post Office

Supermarket

Footpath

Bridleway

A31

400m

800m

1.2km KEY

Site

Bus Stops

Educational Facilities

Restaurants and Drinking Establishments

Sports and Recreational Facilities

Religious Facilities

Retail

Post Office

Supermarket

Footpath

Bridleway

A31

400m

800m

1.2km KEY

Site

Bus Stops

Educational Facilities

Restaurants and Drinking Establishments

Sports and Recreational Facilities

Religious Facilities

Retail

Post Office

Supermarket

Footpath

Bridleway

A31

400m

800m

1.2km KEY

Site

Bus Stops

Educational Facilities

Restaurants and Drinking Establishments

Sports and Recreational Facilities

Religious Facilities

Retail

Post Office

Supermarket

Footpath

Bridleway

A31

400m

800m

1.2km KEY

Site

Bus Stops

Educational Facilities

Restaurants and Drinking Establishments

Sports and Recreational Facilities

Religious Facilities

Retail

Post Office

Supermarket

Footpath

Bridleway

A31

400m

800m

1.2km KEY

Site

Bus Stops

Educational Facilities

Restaurants and Drinking Establishments

Sports and Recreational Facilities

Religious Facilities

Retail

Post Office

Supermarket

Footpath

Bridleway

74.50

74.50

75.00

75.50

75.5075.00

75.00

482900E

146100N

Phoenix 2-15W (with Elite 2 6x2ML chassis)

74.50

74.50

75.00

75.50

Phoenix 2-15W (with Elite 2 6x2ML chassis)Phoenix 2-15W (with Elite 2 6x2ML chassis)Skoda Octavia

75.5075.00

75.00

Phoenix 2-15W (with Elite 2 6x2ML chassis)

Phoenix 2-15W (with Elite 2 6x2ML chassis)

Title

Drawn By

Scale

Checked DateChecked By

Project Phase

Drawn Date

Client Drawing No.

Revision

(AT A1 SIZE)PBA Drawing No.

Project Name

Client

The drawings, information and data recorded in this document ("the information") is theproperty of Paul Basham Associates.This document and the information are solely for theuse of the authorized recipient and this document may not be used, copied or reproduced inwhole or part for any purposes other than which it was supplied by Paul Basham Associates.Paul Basham Associates makes no representation, undertakes no duty and accepts noresponsibilities to any third party who may use or rely upon this document or the information.

Paul Basham Associates LtdLancaster Court, 8 Barnes Wallis Road, Fareham, PO15 5TU

01489 668134 [email protected] www.paulbashamassociates.com

COXBRIDGE FARM,FARNHAM

PROPOSED RIGHT TURN LANE

PRELIMINARY

BW 20.01.17 EK 18.01.17

AS SHOWN

076.0001.002

-

B

WEWERWR

A REVISED PROJECT NAME 26.01.17 EK BW

Rev Description By ChkdDate

NORTH

B REVISED ACCESS WITH TOPOGRAPHICALSURVEY AND HIGHWAY BOUNDARY

12.10.18 SB MS

creative minds safe hands www.wyg.com

Footpaths to be provided within green buffer

Footpaths to be provided

within green buffer