Land Acquisition and Resettlement Due Diligence Report ____________________________________________________________________________
Document Stage: Draft Project Number: 40648-037 February 2018
IND: Infrastructure Development Investment Program for Tamil Nadu (Project 4) - Tranche 4
Appendix 2 - Land Possession Certificates of SubprojectsAppendix 3 - Public Consultations
Prepared by the Department of Tourism, Government of Tamil Nadu for the Asian Development Bank.
This due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
368 Appendix 2
LAND POSSESSION CERTIFICATES OF SUBPROJECTS
Table A2.1: Summary of Land Possession Certificates of Subprojects No. Package No. Contents Page No.
1 IDIPT/TN/P4/T4/CBO1/ 2017-18
2. (i) Land Possession Certificate issued by Joint Commissioner/ Executive Officer Sri, Ranganathaswamy Temple, for construction of “High Quality Western Toilet” at Srirangam in Tiruchirappallli District
369
2 2. (ii) Land Possession Certificate issued by Executive Officer of Sri, NaganatahSwamy Temple, for Installation of 2 Temple and 1 Tourist Information boards at Keelaperumpallam,Tranqbar Taluk, Nagappattinam District
370
3 2. (iii) Land Possession Certificate issued by Executive Officer of Sri, SwetharanyeswaraSwamy Temple, for Installation of 2 Temple & 1 Tourist Information boards at Sri, SwetharanyeswaraSwamy Temple, Thiruvengadu, Sirkali Taluk, Nagappattinam District
371
4 IDIPT/TN/T4/T4/ICB/02/2017 2. (iv) Land Possession Certificate issued by Executive Officer of Sri, SwetharanyeswaraSwamy Temple, for Installation of 2 Temple and 1 Tourist Information boards at Sri, SwetharanyeswaraSwamy Temple, Thiruvengadu, Sirkali Taluk, Nagappattinam District
372
5 IDIPT/TN/T4/NCB/04/2017 2. (v) Land Possession Certificate issued by Additional Commissioner (Tirupanni) HR&CE Dept, for Construction of YatriNivas in Kanchipuram, Kanchipuram District
373
6 IDIPT/TN/T4/NCB/05/2017 2. (vi) Land Possession Certificate issued by Assistant Engineer, H.R. & C.E. Admin Department, for Developmnet of Sri, Ramanujar’s Birth Place in Sriperumbudur, Sri Adhikesava Perumal & Bashyakara Swami Temple under Tranche IV.
374
7 IDIPT/TN/T4/NCB/06/2017 2. (vii) Land Possession Certificate issued by Project Engineer Tamilnadu Tourism Development Corporation Ltd. For Construction of Tourist accommodation (YatriNivas type) and Tourist Reception Centre at Chidambaram in Cuddalore District
375
369 Appendix 2
Figure A2.1: Land Possession Certificate – Package No. IDIPT/TN/P4/T4/ICB/01/2017-18
2. (i) Land Possession Certificate issued by Joint Commissioner /Executive Officer Sri, Ranganathaswamy Temple, for construction of “High Quality Western
Toilet” at Srirangam in Tiruchirappallli District
Appendix 3 370
2. (ii) Land Possession Certificate issued by Executive Officer of Sri, NaganatahSwamy Temple, for Installation of 2 Temple & 1 Tourist Information
boards at Keelaperumpallam,Tranqbar Taluk, Nagappattinam District
Appendix 2 371
2. (iii) Land Possession Certificate issued by Executive Officer of Sri, SwetharanyeswaraSwamy Temple, for Installation of 2 Temple & 1 Tourist
Information boards at Sri, SwetharanyeswaraSwamy Temple, Thiruvengadu, Sirkali Taluk, Nagappattinam District
372 Appendix 2
Figure A2.2: Land Possession Certificate – Package No. IDIPT/TN/T4/ICB/02/2017
2. (iv) Land Possession Certificate issued by Executive Officer of Sri, SwetharanyeswaraSwamy Temple, for Installation of 2 Temple & 1 Tourist Information boards at Sri, SwetharanyeswaraSwamy
Temple, Thiruvengadu, Sirkali Taluk, Nagappattinam District
Appendix 2 373
Figure A2.3: Land Possession Certificate – Package No. IDIPT/TN/T4/NCB/04/2017
2. (v) Land Possession Certificate issued by Additional Commissioner (Tirupanni) H.R. & C.E. Dept, for Construction of YatriNivas in Kanchipuram, Kanchipuram
District
374 Appendix 2
Figure A2.4: Land Possession Certificate – Package No. IDIPT/TN/T4/NCB/05/2017
2. (vi) Land Possession Certificate issued by Assistant Engineer, H.R. & C.E. Admin Department, for Developmnet of Sri, Ramanujar’s Birth Place in Sriperumbudur, Sri
Adhikesava Perumal & Bashyakara Swami Temple under Tranche IV.
Appendix 2 375
Figure A2.5: Land Possession Certificate – Package No. IDIPT/TN/T4/NCB/06/2017
2. (vii) Land Possession Certificate issued by Project Engineer Tamilnadu Tourism Development Corporation Ltd. For Construction of Tourist accommodation (YatriNivas type)
and Tourist Reception Centre at Chidambaram in Cuddalore District
376 Appendix 3
PUBLIC CONSULTATION UNDER DIFFERENT SUBPROJECTS
Table A3.1: Summary of Public Consultation No Contents Page No.
1 Work Package 3 377
2 Work Package 4 379
3 Work Package 5 381
4 Work Package 6 383
5 Work Package 7 385
6 Work Package 8 389
7 Work Package 11 398
8 Work Package 13 400
Appendix 3 377
Table A3.2: Summary of Public Consultation - Works Package 3
Date and Location No. of Participants
Issues Discussed Photographs
7 June 2017 Arulmigu Abathsagayeswarar Temple at Alangudi Village
Male: 10 Female: 3 Total: 13
• It was informed to the community members that drinking water facility with treatment and adequate toilet facilities shall be given priority.
• The participants agreed that the infrastructure is needed for tourists and it will help in tourist inflow.
• They also suggested the need for maintenance of the new components to be introduced; this needs to be taken care of by the line department with full participation of the local community.
• The local educated men/women within the age group of 15-35 with minimum qualification of 10+2 can be selected by the line Department for providing the need based skill development to function as guides and volunteers and securities at the tourist facilities.
• The local community members especially self-help groups can be given entrepreneur training to manage the souvenir and mini restaurants and to provide assistance to the Tourists.
• The local community members are willing to take the training.
• The present component of cement road could be replaced by the latest technology of paver blocks. Waste collection, segregation and final disposal need to be planned and implemented.
378 Appendix 3
Table A3.3: List of Participants - Works Package 3
Appendix 3 379
Table A3.4: Summary of Public Consultation - Works Package 4
Date and Location
No. of Participants
Issues Discussed Photographs
16 May 2017 Ekambareswarar Temple Kancheepuram
Male: 12 Female: 4 Total: 16
• The participants concurred with the selection of components for the infrastructure development for Ekambareswarar Temple.
• The Project will propagate the religious & cultural values of the State amongst visitors on a national as well as international level.
• Livelihood index for local people will increase with the flourishing tourism scope.
• Local educated youth should be trained and provided opportunity to take part in Operation & Maintenance of the assets to be created through the Project.
• The local community members especially the self help groups could be given the entrepreneur training to manage the souvenir and mini restaurants to provide assistance to the Tourists.
• Proper Sanitation & supply of potable water in the area should be focused upon.
• Waste collection, segregation and final disposal needs to be planned and implemented.
380 Appendix 3
Table A3.5: List of Participants - Works Package 4
Appendix 3 381
Table A3.6: Summary of Public Consultation - Works Package 5
Date and Location
No. of Participants
Issues Discussed Photographs
16 May 2017 Sri Ramanujars Birth place, Sriperumpudur
Male: 11 Female: 2 Total: 13
• The participants concurred with the selection of components for the infrastructure development for Ekambareswarar Temple.
• The Project will propagate the religious & cultural values of the State amongst visitors on a national as well as international level.
• Livelihood opportunities for local traders, transporters etc. will increase with the flourishing tourism scope.
• Local educated youth should be trained and provided opportunity to take part in Operation & Maintenance of the assets to be created through the Project.
• The local community members especially the self help groups could be given entrepreneur training to manage the souvenir and mini restaurants to provide assistance to the Tourists.
• Drinking water facility with treatment and adequate toilet facilities to be given priority.
• Waste collection, segregation and final disposal needs to be planned and implemented.
382 Appendix 3
Table A3.7: List of Participants - Works Package 5
Appendix 3 383
Table A3.8: Summary of Public Consultation - Works Package 6
Date and Location
No. of Participants
Issues discussed Photographs
6 June 2017
Chidambaram
Male: 10 Female: 3
• The participants concurred with the selection of components for the infrastructure development for Ekambareswarar Temple.
• The Project will propagate the religious & cultural values of the State among the visitors from national as well as international level.
• Livelihood opportunities for local traders, transporters etc. will increase with the flourishing tourism scope.
• The local educated men/women within the age group of 15-35 with minimum qualification of Degree or 10+2 could be selected by the line Department for providing the need based skill development for guides and volunteers and securities.
• The local community members especially the self help groups could be given entrepreneur training to manage the souvenir and mini restaurants to provide assistance to the Tourists.
• Drinking water facility with treatment and adequate toilet facilities to be given priority.
• Waste collection, segregation and final disposal needs to be planned and implemented.
384 Appendix 3
Table A3.9: List of Participants – Works Package 6
Appendix 3 385
Table A3.10: Summary of Public Consultation - Works Package 7
Date and Location
No. of Participants
Issues Discussed Photographs
6 June 2017 Trichey
Male: 12 Total: 12
• The participants concurred with the selection of components for the infrastructure development for Ekambareswarar Temple.
• The Project will propagate the religious & cultural values of the state among the visitors from national as well as international level.
• Livelihood opportunities for local traders, transporters etc will increase with the flourishing tourism scope.
• The local educated men/women within the age group of 15-35 with minimum qualification of Degree or 10+2 could be selected by the line Department for providing the need based skill development for guides and volunteers and securities.
• The local community members especially the self help groups could be given entrepreneur training to manage the souvenir and mini restaurants to provide assistance to the Tourists.
• Drinking water facility with treatment and adequate toilet facilities to be given priority.
• Waste collection, segregation and final disposal needs to be planned and implemented.
386 Appendix 3
Table A3.11: List of Participants- Works Package 7
387 Appendix 3
Eight public consultations took place at different locations under the subproject areas. Table below shows the summary of public consultation.
Table A3.12: Summary of Public Consultation - Works Package 8 No. Name of Places for Public
Consultation No. of Participants Total Participants
1 Thiruvenkadu 15 Male: 121
2 Keelaperumpallam 15
3 Alagarkoil 15
4 Alangudi 15
5 Thirunageswaram 13
6 Thingalur 15
7 Veerapur 15
8 Ammapet 18
The key points of the consultation program are appended:
• The participants concurred with the selection of components for the infrastructure development for Ekambareswarar Temple.
• The Project will propagate the religious & cultural values of the state among the visitors from national as well as international level.
• Livelihood opportunities for local traders, transporters etc. will increase with the flourishing tourism scope.
• The local educated men/women within the age group of 15-35 with minimum qualification of Degree or 10+2 could be selected by the line Department for providing the need based skill development for guides and volunteers and securities.
• The local community members especially the self help groups could be given entrepreneur training to manage the souvenir and mini restaurants to provide assistance to the Tourists.
• Drinking water facility with treatment and adequate toilet facilities to begiven priority.
• Waste collection, segregation and final disposal needs to be planned and implemented.
Appendix 3 388
Photographs of Public Consultations
1. Thiruvenkadu 2. Keelaperumpallam
3. Alagarkoil
4. Alangudi
5. Thirunageswaram
6. Thingalur
Appendix 3 389
7. Veerapur 8. Ammapet
Appendix 3 390
Participants List of Community Consultations
Table A3.13: List of Participants in Thiruvenkadu
Appendix 3 391
Table A3.14: List of Participants in Keelaperumpallam
Appendix 3 392
Table A3.15: List of Participants in Alagarkoil
393 Appendix 3
Table A3.16: List of Participants in Alangudi
394 Appendix 3
Table A3.17: List of Participants in Thirunageswaram
395 Appendix 3
Table A3.18: List of Participants in Thingalur
396 Appendix 3
Table A3.19: List of Participants in Veerapur
Appendix 3 397
Table A3.20: List of Participants in Ammapet
398 Appendix 3
Table A3.21: Summary of Public Consultation - Works Package 11
Date and Location
No. of Participants
Issues Discussed Photographs
24 February 2018
Egmore Museum
Male: 4 Female: 11 Total: 15
• The participants concurred with the selection of components for the infrastructure development for Ekambareswarar Temple.
• The Project will propagate the religious and cultural values of the state among the visitors from national as well as international level.
• Livelihood opportunities for local traders, transporters etc. will increase with the flourishing tourism scope.
• The local educated men/women within the age group of 15-35 with minimum qualification of Degree or 10+2 could be selected by the line Department for providing the need based skill development for guides and volunteers and securities.
• The local community members especially the self help groups could be given entrepreneur training to manage the souvenir and mini restaurants to provide assistance to the Tourists.
• Drinking water facility with treatment and adequate toilet facilities to be given priority.
• Waste collection, segregation and final disposal needs to be planned and implemented.
Appendix 3 399
Table A3.22: List of Participants – Works Package 11
400 Appendix 3
Eight public consultations took place at different locations under the subproject areas. Table below shows the summary of public consultation.
Table A3.23: Summary of Public Consultation – Works Package 13 Name of Places for Public Consultation No. of Participants Total Participants
Alamparai Fort (Kanchipuram) 11 95
Thyagadurgam Fort (Vilupuram) 5
Manora Fort (Thanjavur) 15
Marudhupandiyan Fort (Sivagangai) 10
Thirumalai Naicker Mahal 13
Poondi Arugar temple 16
Chinniyanpettaikulam (Thiruvannamalai) 17
KattabommanKottai (Thoothukudi) 8
The key points of the consultation program are appended:
• The participants concurred with the selection of components for the infrastructure development for Ekambareswarar Temple.
• The Project will propagate the religious & cultural values of the state among the visitors from national as well as international level.
• Livelihood opportunities for local traders, transporters etc. will increase with the flourishing tourism scope.
• The local educated men/women within the age group of 15-35 with minimum qualification of Degree or 10+2 could be selected by the line Department for providing the need based skill development for guides and volunteers and securities.
• The local community members especially the self help groups could be given entrepreneur training to manage the souvenir and mini restaurants to provide assistance to the Tourists.
• Drinking water facility with treatment and adequate toilet facilities to be given priority.
• Waste collection, segregation and final disposal needs to be planned and implemented.
Appendix 3 401
Photographs of Public Consultations
1. AlamparaiFort 2. ThyagadurgamFort
3. ManoraFort 4. MarudhupandiyanFort
5. ThirumalaiNaickerMahal
6. PoondiArugartemple
402 Appendix 3
7. Chinniyanpettaikulam
8. KattabommanKottai
Appendix 3 403
Table A3.24: List of Participants in Alamparai Fort
404 Appendix 3
Table A3.25: List of Participants in Thyagadurgam Fort
Appendix 3 405
Table A3.26: List of Participants in Manora Fort
406 Appendix 3
Table A3.27: List of Participants in Marudhupandiyan Fort
Appendix 3 407
Table A3.28: List of Participants in Thirumalai Naicker Mahal
408 Appendix 3
Table A3.29: List of Participants in Poondi Arugar Temple
7.
Appendix 3 409
Table A3.30: List of Participants in Chinniyanpettaikulam(Thiruvannamalai)
410 Appendix 3
Table A3.31: List of Participants in KattabommanKottai (Thoothukudi)