    Building Information - Riverside Local Local SD (47894) - LaMuth Middle School

    Program Type Expedited Local Partnership Program (ELPP)

    Setting Small City

    Assessment Name Copy of LaMuth Middle School - Final

    Assessment Date 2008-03-17

    Cost Set: 2007

    Building Name LaMuth Middle School

    Building IRN 61895

    Building Address 6700 Auburn Rd

    Building City Painesville

    Building Zipcode 44077

    Building Phone (440) 354-4394

    Acreage 48

    Current Grades 6-7

    Teaching Stations 38

    Number of Floors 2

    Student Capacity 633

    Current Enrollment 732

    Enrollment Date 2007-08-23

    Enrollment Date is the date in which the current enrollment was taken.

    Number of Classrooms 33

    Historical Register NO

    Buildings Principal Mr. Eric Kujala

    Building Type Middle

    Next Page

    Report Generated at 26 Aug 2008 16Building Information - Riverside Local Local SD (47894) - LaMuth Middle School Page 1

  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    2/46

    Building Pictures - Riverside Local Local SD(47894) - LaMuth Middle School(61895)

    North elevation photo: East elevation photo:

    South elevation photo: West elevation photo:

    GENERAL DESCRIPTION

    89,837 Total Existing Square Footage

    1969,1994 Building Dates

    6-7 Grades

    732 Current Enrollment

    38 Teaching Stations

    48 Site Acreage

    LaMuth Middle School is a two (2) story structure totaling 89,837 s.f. The original facility of 35,174 s.f. was constructed in 1969. A large building addition totaling 54,663 s.f. wasconstructed in 1994. The complex contains one (1) gymnasium of 9,322 s.f., one (1) student dining of 4,859 s.f., one (1) kitchen of 1,842 s.f. and one (1) media center of 2,945 sLaMuth Middle School currently provides space for grades 6-7. The complex provides partial accessibility but does not fully conform to the provisions of the Americans withDisabilities Act Guidelines. Typical classrooms throughout the complex are undersized and do not conform to the current standards established by the State of Ohio. The schoolfacility is located on a 48 acre site in a residential area. School buses load/unload along the main entry drive which shares access with vehicular traffic. The existing structure is

    outfitted with a motion sensor security system and a fire alarm system. A limited portion of the complex is equipped with an air conditioning system.

    Previous Page

    Next Page

    Report Generated at 26 Aug 2008 16Building Pictures - Riverside Local Local SD(47894) - LaMuth Middle School(61895) Page 2

  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    3/46

    Building Construction Information - Riverside Local Local SD (47894) - LaMuth Middle School (61895)

    Name Year Handicapped Access Floors Square Feet

    Original Building 1969 no 2 35,174

    Building Addition 1994 yes 2 54,663

    Previous Page

    Next Page

    Report Generated at 26 Aug 2008 16Building Construction Information - Riverside Local Local SD (47894) - LaMuth Middle School (61895) Page 3

  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    4/46

    Building Component Information - Riverside Local Local SD (47894) - LaMuth Middle School (61895)

    AdditionAuditorium

    FixedSeating

    CorridorsAgriculturalEducation

    Lab

    PrimaryGymnasium

    MediaCenter

    VocationalSpace

    StudentDining

    Kitchen NatatoriumIndoorTracks

    AdultEducation

    BoardOffices

    OutsideAgencies

    AuxiliaryGymnasiu

    Original Building(1969)

    5395 4859 1842

    Building Addition(1994)

    8275 9322 2945

    Master Planning Considerations

    Previous Page

    Next Page

    Report Generated at 26 Aug 2008 16Building Component Information - Riverside Local Local SD (47894) - LaMuth Middle School (61895) Page 4

  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    5/46

    Existing CT Programs for AssessmentNext Page

    Previous Page

    Program Type Program Name Related Space Square Feet

    No Records Found

    Legend:

    Not in current design manual

    In current design manual but missing from assessment

    Report Generated at 26 Aug 2008 16: Page 5

  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    6/46

    Main Assessment Menu - Riverside Local Local SD (47894) - LaMuth Middle School (61895)

    Building Summary - LaMuth Middle School (61895)

    District: Riverside Local Local SD

    Name: LaMuth Middle School

    Address: 6700 Auburn Rd

    Painesville,OH 44077

    Bldg. IRN: 61895

    County: Lake Area: Northeastern Ohio (8)

    Contact: Mr. Eric Kujala

    Phone: (440) 354-4394

    Date Prepared: 2008-03-17 By: Tony Schorr

    Date Revised: 2008-08-26 By: Jeff Tuckerman

    Current Grades 6-7 Acreage: 48

    Proposed Grades N/A Teaching Stations: 38

    Current Enrollment 732 Classrooms: 33

    Projected Enrollment N/A

    Addition Date HA Number of Floors Current Square Feet

    Original Building 1969 no 2 35,174

    Building Addition 1994 yes 2 54,663

    Total 89,837

    *HA = Handicapped Access

    *Rating =1 Satisfactory

    =2 Needs Repair

    =3 Needs Replacement

    *Const P/S = Present/Scheduled Construction

    FACILITY ASSESSMENTCost Set: 2007 Rating

    DollarAssessment C

    A. Heating System 3 $2,605,273.00 -

    B. Roofing 3 $399,777.00 -C. Ventilation / Air Conditioning 1 $0.00 -

    D. Electrical Systems 3 $553,990.50 -

    E. Plumbing and Fixtures 3 $100,400.00 -

    F. Windows 3 $83,520.00 -

    G. Structure: Foundation 1 $0.00 -

    H. Structure: Walls and Chimneys 2 $78,610.00 -

    I. Structure: Floors and Roofs 1 $0.00 -

    J. General Finishes 3 $1,214,111.80 -

    K. Interior Lighting 3 $449,185.00 -

    L. Security Systems 3 $224,592.50 -

    M. Emergency/Egress Lighting 3 $89,837.00 -

    N. Fire Alarm 3 $134,755.50 -

    O. Handicapped Access 3 $258,723.70 -

    P. Site Condition 3 $563,535.50 -

    Q. Sewage System 3 $164,700.00 -

    R. Water Supply 1 $0.00 -

    S. Exterior Doors 3 $32,000.00 -

    T. Hazardous Material 3 $189,000.00 -

    U. Life Safety 3 $341,970.25 -

    V. Loose Furnishings 3 $179,674.00 -

    W. Technology 3 $671,082.39 -

    - X. Construction Contingency /Non-Construction Cost

    - $2,028,175.18 -

    Total $10,362,913.32

    CEFPI Appraisal Summary

    Section Points Possible Points Earned Percentage Rating CategoCover Sheet

    1.0The School Site 200 186 93% Excelle

    2.0Structural and Mechanical Features 400 286 72% Satisfacto

    3.0Plant Maintainability 200 150 75% Satisfacto

    4.0Building Safety and Security 400 292 73% Satisfacto

    5.0Educational Adequacy 400 290 73% Satisfacto

    6.0Environment for Education 400 304 76% Satisfacto

    Commentary

    Total 2000 1508 75% Satisfacto

    C=Under Contract

    Renovation Cost Factor 104.16

    Cost to Renovate (Cost Factor applied) $10,794,010

    The Replacement Cost Per SF and the Renovate/Replace ratio are only provided when this summary irequested from a Master Plan.

    Previous Page

    Report Generated at 26 Aug 2008 16Main Assessment Menu - Riverside Local Local SD (47894) - LaMuth Middle School (61895) Page 6

  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    7/46

    Main Assessment Menu - Riverside Local Local SD (47894) - LaMuth Middle School (61895)

    Original Building (1969) Summary

    District: Riverside Local Local SD

    Name: LaMuth Middle School

    Address: 6700 Auburn Rd

    Painesville,OH 44077

    Bldg. IRN: 61895

    County: Lake Area: Northeastern Ohio (8)

    Contact: Mr. Eric Kujala

    Phone: (440) 354-4394

    Date Prepared: 2008-03-17 By: Tony Schorr

    Date Revised: 2008-08-26 By: Jeff Tuckerman

    Current Grades 6-7 Acreage: 48

    Proposed Grades N/A Teaching Stations: 38

    Current Enrollment 732 Classrooms: 33

    Projected Enrollment N/A

    Addition Date HA Number of Floors Current Square Feet

    Original Building 1969 no 2 35,174

    Building Addition 1994 yes 2 54,663

    Total 89,837

    *HA = Handicapped Access

    *Rat ing =1 Sat isfactory

    =2 Needs Repair

    =3 Needs Replacement

    *Const P/S = Present/Scheduled Construction

    FACILITY ASSESSMENTCost Set: 2007 Rating

    DollarAssessment C

    A. Heating System 3 $1,020,046.00 -

    B. Roofing 3 $123,151.00 -C. Ventilation / Air Conditioning 1 $0.00 -

    D. Electrical Systems 3 $553,990.50 -

    E. Plumbing and Fixtures 3 $84,600.00 -

    F. Windows 3 $73,920.00 -

    G. Structure: Foundation 1 $0.00 -

    H. Structure: Walls and Chimneys 2 $20,460.00 -

    I. Structure: Floors and Roofs 1 $0.00 -

    J. General Finishes 3 $779,745.00 -

    K. Interior Lighting 3 $175,870.00 -

    L. Security Systems 3 $87,935.00 -

    M. Emergency/Egress Lighting 3 $35,174.00 -

    N. Fire Alarm 3 $52,761.00 -

    O. Handicapped Access 3 $194,337.40 -

    P. Site Condition 3 $304,171.00 -

    Q. Sewage System 3 $164,700.00 -

    R. Water Supply 1 $0.00 -

    S. Exterior Doors 3 $16,000.00 -

    T. Hazardous Material 3 $189,000.00 -

    U. Life Safety 3 $154,315.50 -

    V. Loose Furnishings 3 $70,348.00 -

    W. Technology 3 $262,749.78 -

    - X. Construction Contingency /Non-Construction Cost

    - $1,061,759.14 -

    Total $5,425,033.32

    CEFPI Appraisal Summary

    Section Points Possible Points Earned Percentage Rating CategoCover Sheet

    1.0The School Site 200 186 93% Excelle

    2.0Structural and Mechanical Features 400 286 72% Satisfacto

    3.0Plant Maintainability 200 150 75% Satisfacto

    4.0Building Safety and Security 400 292 73% Satisfacto

    5.0Educational Adequacy 400 290 73% Satisfacto

    6.0Environment for Education 400 304 76% Satisfacto

    Commentary

    Total 2000 1508 75% Satisfacto

    C=Under Contract

    Renovation Cost Factor 104.16

    Cost to Renovate (Cost Factor applied) $5,650,714

    The Replacement Cost Per SF and the Renovate/Replace ratio are only provided when this summary irequested from a Master Plan.

    Report Generated at 26 Aug 2008 16Main Assessment Menu - Riverside Local Local SD (47894) - LaMuth Middle School (61895) Page 7

  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    8/46

    Main Assessment Menu - Riverside Local Local SD (47894) - LaMuth Middle School (61895)

    Building Addition (1994) Summary

    District: Riverside Local Local SD

    Name: LaMuth Middle School

    Address: 6700 Auburn Rd

    Painesville,OH 44077

    Bldg. IRN: 61895

    County: Lake Area: Northeastern Ohio (8)

    Contact: Mr. Eric Kujala

    Phone: (440) 354-4394

    Date Prepared: 2008-03-17 By: Tony Schorr

    Date Revised: 2008-08-26 By: Jeff Tuckerman

    Current Grades 6-7 Acreage: 48

    Proposed Grades N/A Teaching Stations: 38

    Current Enrollment 732 Classrooms: 33

    Projected Enrollment N/A

    Addition Date HA Number of Floors Current Square Feet

    Original Building 1969 no 2 35,174

    Building Addition 1994 yes 2 54,663

    Total 89,837

    *HA = Handicapped Access

    *Rat ing =1 Sat isfactory

    =2 Needs Repair

    =3 Needs Replacement

    *Const P/S = Present/Scheduled Construction

    FACILITY ASSESSMENTCost Set: 2007 Rating

    DollarAssessment C

    A. Heating System 3 $1,585,227.00 -

    B. Roofing 3 $276,626.00 -C. Ventilation / Air Conditioning 1 $0.00 -

    D. Electrical Systems 3 $0.00 -

    E. Plumbing and Fixtures 3 $15,800.00 -

    F. Windows 3 $9,600.00 -

    G. Structure: Foundation 1 $0.00 -

    H. Structure: Walls and Chimneys 2 $58,150.00 -

    I. Structure: Floors and Roofs 1 $0.00 -

    J. General Finishes 3 $434,366.80 -

    K. Interior Lighting 3 $273,315.00 -

    L. Security Systems 3 $136,657.50 -

    M. Emergency/Egress Lighting 3 $54,663.00 -

    N. Fire Alarm 3 $81,994.50 -

    O. Handicapped Access 3 $64,386.30 -

    P. Site Condition 3 $259,364.50 -

    Q. Sewage System 3 $0.00 -

    R. Water Supply 1 $0.00 -

    S. Exterior Doors 3 $16,000.00 -

    T. Hazardous Material 3 $0.00 -

    U. Life Safety 3 $187,654.75 -

    V. Loose Furnishings 3 $109,326.00 -

    W. Technology 3 $408,332.61 -

    - X. Construction Contingency /Non-Construction Cost

    - $966,416.04 -

    Total $4,937,880.00

    CEFPI Appraisal Summary

    Section Points Possible Points Earned Percentage Rating CategoCover Sheet

    1.0The School Site 200 186 93% Excelle

    2.0Structural and Mechanical Features 400 286 72% Satisfacto

    3.0Plant Maintainability 200 150 75% Satisfacto

    4.0Building Safety and Security 400 292 73% Satisfacto

    5.0Educational Adequacy 400 290 73% Satisfacto

    6.0Environment for Education 400 304 76% Satisfacto

    Commentary

    Total 2000 1508 75% Satisfacto

    C=Under Contract

    Renovation Cost Factor 104.16

    Cost to Renovate (Cost Factor applied) $5,143,295

    The Replacement Cost Per SF and the Renovate/Replace ratio are only provided when this summary irequested from a Master Plan.

    Report Generated at 26 Aug 2008 16Main Assessment Menu - Riverside Local Local SD (47894) - LaMuth Middle School (61895) Page 8

  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    9/46

    Facility Assessment

    A. Heating System

    Description: The existing system for the entire complex is a gas fired hot water system. The boilers were installed in 1983 and 2004. A limited portion of thecomplex is equipped with air conditioning. Typical classrooms are equipped with a 2 pipe ventilator system that will not permit simultaneousoperation of the boiler and chiller units. District officials noted the facilitys conditioning requirements have been difficult to manage duringmoderate temperature cycles.

    Rating: 3 Needs Replacement

    Recommendations: Provide for complete replacement of the entire heating, ventilation, and cooling system throughout the entire complex due to condition and lack of

    proper ventilation and air conditioning. Convert to a fully ducted system to conform to OSDM standards and current ventilation requirements.

    Item Cost Unit WholeBuilding

    Original Building(1969)35,174 ft

    Building Addition(1994)54,663 ft

    Sum Comments

    HVAC SystemReplacement:

    $22.00sq.ft. Required Required $1,976,414.00(includes demo of existing system and reconfiguration of piping layout andnew controls, air conditioning)

    Convert To DuctedSystem Replacement

    $7.00sq.ft. Required Required $628,859.00(includes cost for vert. & horz. chases, cut openings, soffits, etc. Must beused in addition to HVAC System Replacement if the existing HVAC systeis non-ducted)

    Sum: $2,605,273.00$1,020,046.00 $1,585,227.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 9

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    10/46

    Facility Assessment

    B. Roofing

    Description: The existing roof asseembly for the complex is a modified bituminous roof system installed at various dates from 1978-2007. The majority of theexisting system installations exceed 15 years of age.

    Rating: 3 Needs Replacement

    Recommendations: Provide for complete replacement of the existing roof systems due to condition and extent of dated system installations. Provide an OSDMcompliant membrane system at all areas.

    Item Cost Unit Whole BuildingOriginal Building (1969)35,174 ft

    Building Addition (1994)54,663 ft

    Sum Comments

    Membrane (all types):$7.00sq.ft. (Qty) 17,593 Required 39,518 Required $399,777.00(unless under 10,000 sq.ft.)

    Sum: $399,777.00 $123,151.00 $276,626.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 10

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    11/46

    Facility Assessment

    C. Ventilation / Air Conditioning

    Description: A limited portion of the complex is equipped with an air conditioning system typically provided by roof top chiller units. The conditioned areas ofthe complex include the media center, technology labs, band and choral classroom areas, and administrative spaces. Window cooling units areprovided in a few areas.

    Rating: 1 Satisfactory

    Recommendations: Provide an air conditioning system throughout the entire complex to confrom to OSDM standards. Provisions identified in Plate A.

    Item CostUnitWhole BuildingOriginal Building (1969)35,174 ft

    Building Addition (1994)54,663 ft

    SumComments

    Sum: $0.00 $0.00 $0.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 11

    http://-/?-http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    12/46

  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    13/46

    Facility Assessment

    E. Plumbing and Fixtures

    Description: The school facility contains 8 group restrooms (4 girls, 4 boys), 2 locker room toilets and 13 single occupancy restrooms. Fixtures are acombination of newer and older equipment. A portion of water closets/toilets are floor mounted. The majority of the restrooms at the 1969 buidingare not accessible and do not conform to the provisions of the ADA guidelines. The majority of the toilet rooms at the 1994 addition provideaccessible accommodations except for original portions of the facility that were incorporated into the new addition area. A portion of the urinalsare equipped with a continual flush system. District officials noted domestic supply piping was copper.

    Rating: 3 Needs Replacement

    Recommendations: Provide for replacement of select wall and floor mounted fixtures due to age, condition, and OSDM requirements.

    Item Cost Unit Whole BuildingOriginal Building (1969)35,174 ft

    Building Addition (1994)54,663 ft

    Sum Comments

    Toilet: $3,800.00unit 10 Required 1 Required $41,800.00(new)

    Urinal: $3,800.00unit 7 Required $26,600.00(new)

    Sink: $2,500.00unit 8 Required 1 Required $22,500.00(new)

    Other: Shower Valve/Faucet $500.00each 19 Required $9,500.00Shower Valve/Faucet

    Sum: $100,400.00 $84,600.00 $15,800.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 13

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    14/46

    Facility Assessment

    F. Windows

    Description: The majority of the existing window and storefront installations at the 1969 building are not equipped with thermally efficient units. Typical windowinstallations contain single pane glazing and are deteriorated. The 1994 media center addition is equipped with thermally efficient windowassemblies with insulated glazing. The window installations are operable and cannot be equipped with integral blinds.

    Rating: 3 Needs Replacement

    Recommendations: Provide for complete replacement of all window assemblies at the 1969 addition to conform to OSDM standards and include integral blinds. Thewindow installations at the media center addition are satisfactory.

    Item Cost Unit Whole BuildingOriginal Building (1969)35,174 ft

    Building Addition (1994)54,663 ft

    Sum Comments

    Insulated Glass/Panels: $55.00sq.ft. (Qty) 1,344 Required $73,920.00(includes blinds)

    Curtain Wall/Storefront System:$60.00sq.ft. (Qty) 160 Required $9,600.00(remove and replace)

    Sum: $83,520.00 $73,920.00 $9,600.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 14

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    15/46

    Facility Assessment

    G. Structure: Foundation

    Description: The existing complex contains a masonry/concrete foundation system. There were no significant areas of deterioration, cracking, or settlement.

    Rating: 1 Satisfactory

    Recommendations: No work is required at this time.

    Item CostUnitWhole BuildingOriginal Building (1969)

    35,174 ft

    Building Addition (1994)

    54,663 ft

    SumComments

    Sum: $0.00 $0.00 $0.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 15

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    16/46

    Facility Assessment

    H. Structure: Walls and Chimneys

    Description: The existing structure is constructed with masonry bearing wall asemblies with brick and concrete masonry exteriors. There are a few minorareas of deterioration. The complex is equipped with control joints. District officials noted the facility underwent masonry renovations in 2004.

    Rating: 2 Needs Repair

    Recommendations: Provide masonry cleaning, sealing, and exteiror caulking as a preventative measure for routine maintenance.

    Item Cost Unit Whole BuildingOriginal Building (1969)35,174 ft Building Addition (1994)54,663 ft Sum Comments

    Exterior Masonry Cleaning:$1.50sq.ft. (Qty) 7,968 Required 22,636 Required $45,906.00(wall surface)

    Exterior Masonry Sealing: $1.00sq.ft. (Qty) 7,968 Required 22,636 Required $30,604.00(wall surface)

    Exterior Caulking: $2.50ln.ft. 216 Required 624 Required $2,100.00(removing and replacing)

    Sum: $78,610.00 $20,460.00 $58,150.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 16

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    17/46

    Facility Assessment

    I. Structure: Floors and Roofs

    Description: The floor construction for the entire complex is slab on grade construction and a steel joist system. The roof system for the structure is a steeljoist system. There was no significante evidence of deterioration.

    Rating: 1 Satisfactory

    Recommendations: No work is required at this time.

    Item CostUnitWhole BuildingOriginal Building (1969)35,174 ft Building Addition (1994)54,663 ft SumComments

    Sum: $0.00 $0.00 $0.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 17

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    18/46

    Facility Assessment

    J. General Finishes

    Description: The current finishes at the 1969 building are dated. The quantity of casework is limited. Portions of the existing locker installations are dated.District officials did not provide the specific date of construction but noted the majority of the equipment is original to the date of construction. Themajority of the finishes at the 1994 addition are satisfactory. A portion of the toilet partitions are deteriorated. Asbestos tile is suspected at thegymnasium, the flooring is deteriorated.

    Rating: 3 Needs Replacement

    Recommendations: Provide for replacement of all finishes, casework, and lockers due to age, condition, and extent of renovation work at the 1969 structure. Replace

    dated kitchen equipment. Replace/repair finishes disturbed by proposed renovation work at the 1994 building addition. Include replacement of thegymnasium flooring.

    Item Cost Unit WholeBuilding

    Original Building(1969)35,174 ft

    BuildingAddition (1994)54,663 ft

    Sum Comments

    Paint: $2.00sq.ft. Required $109,326.00(partial finish - floor area/prep and installation)

    Acoustic Ceiling: $3.50sq.ft.(Qty)

    54,663 Required$191,320.50(partial finish - tear out and replace per area)

    Complete Replacement ofFinishes and Casework:

    $14.30sq.ft. Required $502,988.20(elementary, per building area, with removal of existing)

    Toilet Partitions: $1,000.00perstall

    10 Required 3 Required $13,000.00(removing and replacing)

    Toilet AccessoryReplacement

    $0.20sq.ft. Required Required $17,967.40(per building area)

    Resilient Wood/SyntheticFlooring

    $12.85sq.ft.(Qty)

    9,322 Required $119,787.70(tear-out and replace per area)

    Total Kitchen EquipmentReplacement:

    $141.00sq.ft.(Qty)

    1,842 Required $259,722.00(square footage based upon only existing area of food preparation,serving, kitchen storage areas and walk-ins. Includes demolit ion andremoval of existing kitchen equipment)

    Sum: $1,214,111.80$779,745.00 $434,366.80

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 18

    http://-/?-http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    19/46

    Facility Assessment

    K. Interior Lighting

    Description: The entire complex contains fluorescent and incandescent lighting. The lighting levels are: gymnasium11.8 FC, student dining 78 FC, kitchen85.5 FC, media center 42 FC, science lab-43.9 FC, and typical classrooms-38.4 FC-66.3 FC. A portion of the classrooms are equipped with duallevel lighting.

    Rating: 3 Needs Replacement

    Recommendations: Provide complete replacement of lighting due to addition of a suppression system and HVAC systems.

    Item Cost Unit Whole BuildingOriginal Building (1969)35,174 ft

    Building Addition (1994)54,663 ft

    Sum Comments

    Complete Building Lighting Replacement$5.00sq.ft. Required Required $449,185.00Includes demo of existing fixtures

    Sum: $449,185.00 $175,870.00 $273,315.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 19

    http://-/?-http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    20/46

    Facility Assessment

    L. Security Systems

    Description: The current security system is a motion sensor security system with magnetic lock controlled entry. Site lighting is provided by a combination ofbuilding mounted and a few pole mounted fixtures. The provisions provide limited illumination of the exterior site.

    Rating: 3 Needs Replacement

    Recommendations: Provide upgrade of the current security system and exterior lighting due to OSDM standards.

    Item Cost Unit Whole BuildingOriginal Building (1969)35,174 ft Building Addition (1994)54,663 ft Sum Comments

    Security System: $1.50sq.ft. Required Required $134,755.50(complete, area of building)

    Exterior Site Lighting:$1.00sq.ft. Required Required $89,837.00building

    Sum: $224,592.50 $87,935.00 $136,657.50

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 20

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    21/46

    Facility Assessment

    M. Emergency/Egress Lighting

    Description: The complex is equipped with exit signs and emergency egress lighting. The system was updated in the recent past. A portion of the existingfixture installations are ceiling mounted and will be disturbed by recommended renovation work.

    Rating: 3 Needs Replacement

    Recommendations: Provide complete replacement of the emergency/egress lighting due to addition of sprinkler and HVAC systems.

    Item Cost Unit Whole BuildingOriginal Building (1969)35,174 ft Building Addition (1994)54,663 ft Sum Comments

    Emergency/Egress Lighting:$1.00sq.ft. Required Required $89,837.00(complete, area of building)

    Sum: $89,837.00 $35,174.00 $54,663.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 21

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    22/46

    Facility Assessment

    N. Fire Alarm

    Description: The complex is equipped with a fire alarm system with manual pull stations with zoned detection and horn/strobe signals. The existing system islacking horn/strobe signals in a portion of the occupiable rooms/spaces. The 1994 building addition is equipped with smoke detectors. A portionof equipment is ceiling mounted and wil l be disturbed by recommended renovation work.

    Rating: 3 Needs Replacement

    Recommendations: Provide complete replacement of the fire alarm system. Provide an addressable system with horn/strobe signals in all occupiable rooms/spacesthroughout the entire complex.

    Item Cost Unit Whole BuildingOriginal Building (1969)35,174 ft

    Building Addition (1994)54,663 ft

    Sum Comments

    Fire Alarm System:$1.50sq.ft. Required Required $134,755.50(complete new system, including removal of existing)

    Sum: $134,755.50 $52,761.00 $81,994.50

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 22

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    23/46

    Facility Assessment

    O. Handicapped Access

    Description: The existing complex provides partial accessibility but does not fully conform to the provisions of the ADA guidelines in all areas. A portion of thetoilet rooms/restrooms at the 1969 addition were renovated to provide accessible accommodations. However, the modifications are incompleteand/or are an inappropriate application of the ADA guidelines. The majority of the drinking fountains at the 1969 addition are not accessible. Aportion of the existing door assemblies do not provide the required maneuvering clearances or are not equipped wi th accessible hardware. The1994 addition was designed to provide accessible accommmodations but a portion of the existing lavatories are lacking pipe insulation protectionor accessible hardware. The original toilet/shower facilities that were incorporated into the new addition area were not renovated to provideaccessible accommodations. A portion of the toilet partitions at the 1994 building are deteriorated. The complex is equipped with an elevator.

    Rating:3 Needs Replacement

    Recommendations: Provide for full accessibility throughout the entire complex in conformance with the provisions of the ADA and OSFC requirements.

    Item Cost Unit WholeBuilding

    Original Building(1969)35,174 ft

    BuildingAddition (1994)54,663 ft

    Sum Comments

    Signage: $0.10sq.ft. Required Required $8,983.70(per building area)

    Ramps: $40.00sq.ft.(Qty)

    28 Required 28 Required $2,240.00(per ramp/interior-exterior complete)

    Electric Water Coolers: $3,000.00unit 3 Required $9,000.00(new double ADA)

    Toilet/Urinals/Sinks: $3,800.00unit 21 Required 9 Required $114,000.00(new ADA)

    Toilet Partitions: $1,000.00stall 5 Required $5,000.00(ADA - grab bars, accessories included)

    ADA Assist Door &Frame:

    $7,500.00unit 1 Required $7,500.00(openers, electrical, patching, etc)

    Replace Doors: $1,100.00leaf 44 Required 2 Required $50,600.00(standard 3070 wood door, HM frame-classroom door/light, includeshardware)

    Replace Doors: $5,000.00leaf 5 Required 2 Required $35,000.00(rework narrow opening to provide 3070 wood door, HM frame, door/light,includes hardware)

    Replace Doors: $5,000.00leaf 4 Required $20,000.00(rework opening and corridor wall to accommodate ADA standards whendoor opening is set back from edge of corridor and cannot accommodate awheelchair.)

    Other: ADA Shower $5,000.00each 1 Required $5,000.00ADA Shower

    Other: ShowerControls/Faucets

    $500.00each 1 Required $500.00Shower Controls/Faucets

    Other: Pipe Insulation $100.00each 9 Required $900.00Pipe Insulation

    Sum: $258,723.70 $194,337.40 $64,386.30

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 23

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    24/46

    Facility Assessment

    P. Site Condition

    Description: Buses load/unload at the main entry to the school complex and share a common path of travel with vehicular traffic. Asphalt pavements displaysigns of deterioration. Sidewalks are cracked and raised in some areas. A portion of the existing egress doors are lacking an accessible path oftravel. Portions of the site were covered with snow at the time of the site visit, thus hindering full assessment of site conditions.

    Rating: 3 Needs Replacement

    Recommendations: Replace deteriorated walks and pavements. Provide a dedicated bus loading/unloading zone. Provide a walkway system and an accessible pathof travel from all egress doors.

    Item Cost Unit WholeBuilding

    OriginalBuilding (1969)35,174 ft

    BuildingAddition (1994)54,663 ft

    Sum Comments

    Replace Existing Asphalt Paving: $30.00sq. yard 3,454 Requi red 5,403 Requi red $265,710.00( including drainage / tear out for light or heavy dutyasphalt)

    Bus Drop-Off for Middle $110.00perstudent

    800 Required $88,000.00(Number of students should be rounded up to thenearest 100. $5500 per bus; 40 students per bus; 80of middle school students riding)

    Concrete Curb: $15.00ln.ft. 78 Required 120 Required $2,970.00(new)

    Concrete Sidewalk: $4.00sq.ft.(Qty)

    2,155 Required 3,370 Required $22,100.00(5 in exterior slab)

    Base Sitework Allowance for UnforeseenCircumstances

    $50,000.00allowance Required $50,000.00Include this and one of the next two. (Applies for whobuilding, so only one addition should have this item)

    Sitework Allowance for UnforeseenCircumstances for buildings between 0 SFand 100,000 SF

    $1.50sq.ft. Required Required $134,755.50Include this one or the next. (Each addition should hathis item)

    Sum: $563,535.50 $304,171.00 $259,364.50

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 24

    http://-/?-http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    25/46

    Facility Assessment

    Q. Sewage System

    Description: The facility is served by an on-site sewage treatment plant. District officials noted the system was not appropriately sized for the scope of theschool complex and identified the maintenance of the system has been an ongoing issue of concern.

    Rating: 3 Needs Replacement

    Recommendations: Replace/redesign on-site sewage treatment system.

    Item Cost Unit Whole BuildingOriginal Building (1969)35,174 ft Building Addition (1994)54,663 ft Sum Comments

    On-Site Sewage Treatment System:$225.00per student 732 Required $164,700.00(per student at middle/high)

    Sum: $164,700.00 $164,700.00 $0.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 25

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    26/46

    Facility Assessment

    R. Water Supply

    Description: The complex water supply is copper. The structure is served by the local municipal system. District officials noted the system was satisfactory.

    Rating: 1 Satisfactory

    Recommendations: No work is required at this time.

    Item CostUnitWhole BuildingOriginal Building (1969)

    35,174 ft

    Building Addition (1994)

    54,663 ft

    SumComments

    Sum: $0.00 $0.00 $0.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 26

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    27/46

    Facility Assessment

    S. Exterior Doors

    Description: The existing door assemblies are a combination of newer and dated installations. A portion of the assemblies are deteriorated and/or containsingle pane glazing. The storefront door assemblies at the 1994 building addition contain single pane glazing.

    Rating: 3 Needs Replacement

    Recommendations: Provide for replacement of dated/deteriorated door assemblies. Replace door assemblies equipped with single pane glazing with thermallyefficient installations.

    Item Cost Unit Whole BuildingOriginal Building (1969)35,174 ft

    Building Addition (1994)54,663 ft

    Sum Comments

    Door Leaf/Frame and Hardware:$2,000.00per leaf 8 Required 8 Required $32,000.00(includes removal of existing)

    Sum: $32,000.00 $16,000.00 $16,000.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 27

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    28/46

    Facility Assessment

    T. Hazardous Material

    Description: District officials have provided information identifying hazardous materials in this facility.

    Rating: 3 Needs Replacement

    Recommendations: Remove all hazardous materials as identified by the Hazardous Materials Consultant. A full EEHA assessment will be required to verify theaccuracy of the provided information.

    Item Cost Unit Whole BuildingOriginal Building (1969)35,174 ft Building Addition (1994)54,663 ft Sum Comments

    Environmental Hazards Form EHA Form

    Resilient Flooring Removal, Including Mastic$3.00sq.ft. (Qty) 63,000 Required $189,000.00See J

    Sum: $189,000.00 $189,000.00 $0.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 28

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    29/46

    Facility Assessment

    U. Life Safety

    Description: The entire complex is not equipped with an automatic fire suppression system. A portion of the interior stair assemblies are not enclosed and thehandrail/guardrail systems do not conform to current code provisions or ADA accessibility requirements.

    Rating: 3 Needs Replacement

    Recommendations: Provide an automated fire suppression system throughout the entire complex. Enclose open stair assemblies and provide compliant handrailsystems.

    Item Cost Unit WholeBuilding

    Original Building(1969)35,174 ft

    Building Addition(1994)54,663 ft

    Sum Comments

    Sprinkler / Fire SuppressionSystem:

    $3.25sq.ft.(Qty)

    35,174 Required 54,663 Required $291,970.25(includes increase of service piping, if required)

    Interior Stairwell Closure: $5,000.00per level 4 Required $20,000.00(includes associated doors, door frames andhardware)

    Handrails: $5,000.00level 4 Required 2 Required $30,000.00

    Sum: $341,970.25 $154,315.50 $187,654.75

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 29

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    30/46

    Facility Assessment

    V. Loose Furnishings

    Description: Typical classrooms are furnished with a combination of newer and older equipment. The majority of the 1994 building addition is equipped withnewer aged furnishings.

    Rating: 3 Needs Replacement

    Recommendations: Provide for furnishing replacement based upon the rating of 7 given for item 6.17 of the attached CEFPI rating.

    Item Cost Unit Whole BuildingOriginal Building (1969)35,174 ft Building Addition (1994)54,663 ft Sum Comments

    CEFPI Rating 7$2.00sq.ft. Required Required $179,674.00

    Sum: $179,674.00 $70,348.00 $109,326.00

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 30

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    31/46

    Facility Assessment

    W. Technology

    Description: Typical classrooms are equipped with 1-5 data ports for teacher and student use, televisions, ceiling mounted projectors and smart boards.Classrooms are not equipped with telephones.

    Rating: 3 Needs Replacement

    Recommendations: Replace all wiring due to extensive renovation to be undertaked and to fully conform to OSDM standards.

    Item Cost Unit Whole BuildingOriginal Building (1969)35,174 ft Building Addition (1994)54,663 ft Sum Comments

    MS portion of building with total SF 67,951 to 91,650$7.47sq.ft. (Qty) 35,174 Required 54,663 Required $671,082.39

    Sum: $671,082.39 $262,749.78 $408,332.61

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 31

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    32/46

    Facility Assessment

    X. Construction Contingency / Non-Construction Cost

    Renovation Costs (A-W) $8,334,738.14

    7.00% Construct ion Contingency $583,431.67

    Subtotal $8,918,169.81

    16.20% Non-Construct ion Costs $1,444,743.51

    Total Project $10,362,913.32

    Construction Contingency $583,431.67

    Non-Construction Costs $1,444,743.51

    Total for X. $2,028,175.18

    Non-Construction Costs Breakdown

    Land Survey 0.03% $2,675.45

    Soil Borings 0.10% $8,918.17

    Agency Approval Fees 0.15% $13,377.25

    Construction Testing 0.25% $22,295.42

    Printing 0.27% $24,079.06

    Advertising 0.03% $2,675.45

    Builders Risk 0.11% $9,809.99

    Design Professional Compensation 7.50% $668,862.74

    CM Compensation 6.00% $535,090.19

    Commissioning 0.33% $29,429.96

    Maintenance Plan Advisor 0.11% $9,809.99

    Non-Construction Contingency (includes partnering and mediation services) 1.32% $117,719.84

    Total Non-Construction Costs 16.20% $1,444,743.51

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:Facility Assessment Page 32

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    33/46

    School Facility Appraisal

    Name of Appraiser Jeff Tuckerman Date of Appraisal 2008-03-17

    Building Name LaMuth Middle School

    Street Address 6700 Auburn Rd

    City/Town, State, Zip Code Painesville, OH 44077

    Telephone Number(s) (440) 354-4394

    School District Riverside Local Local SD

    Setting: Small City

    Site-Acreage 48 Building Square Footage 89,837

    Grades Housed 6-7 Student Capacity 633

    Number of Teaching Stations 38 Number of Floors 2

    Student Enrollment 732

    Dates of Construction 1969,1994

    Energy Sources: Fuel Oil Gas Electric Solar

    Air Conditioning: Roof Top Windows Units Central Room Units

    Heating: Central Roof Top Individual Unit Forced Air

    Hot Water Steam

    Type of Construction

    Load bearing masonry

    Steel frame

    Concrete frame

    Wood

    Steel Joists

    Exterior Surfacing

    Brick

    Stucco

    Metal

    Wood

    Stone

    Floor Construction

    Wood Joists

    Steel Joists

    Slab on grade

    Structural slab

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:School Facility Appraisal Page 33

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    34/46

    CEFPI Ratings Sheet

    1.0 The School Site

    School Facility Appraisal

    Points Allocated Points

    1.1 Site is large enough to meet educational needs as defined by state and local requirements 25 25

    The building sits on a 48 acre site.

    1.2 Site is easily accessible and conveniently located for the present and future population 20 18

    The site is geographically located to serve the school community.

    1.3 Location is removed from undesirable business, industry, traffic, and natural hazards 10 10

    The site is located in a residential area with light traffic.

    1.4 Site is well landscaped and developed to meet educational needs 10 9

    The site contains mature trees, low shrubbery, lawn areas and nearby woods.

    1.5 ES Well equipped playgrounds are separated from streets and parking areas 10 9

    MS Well equipped athletic and intermural areas are separated from streets and parking

    HS Well equipped athletic areas are adequate with sufficient solid-surface parking

    The site is equipped with athletic fields and large parking areas.

    1.6 Topography is varied enough to provide desirable appearance and without steep inclines 5 5

    The site is relatively flat without steep inclines.

    1.7 Site has stable, well drained soil free of erosion 5 5

    There were no significant areas of ponding or erosion.

    1.8 Site is suitable for special instructional needs, e.g., outdoor learning 5 4

    There was no designated area for this activi ty. Portions of the site surrounding the school complex are wooded.

    1.9 Pedestrian services include adequate sidewalk with designated crosswalks, curb cuts, and correct slopes 5 3

    Sidewalks are deteriorated in some areas. Portions of the site are lacking a continuous path of travel.

    1.10 ES/MS Sufficient on-site, solid surface parking for faculty and staff is provided 5 5

    HS Sufficient on-site, solid surface parking is provided for faculty, students, staff and community

    District officals noted there was adequate parking at this facility.

    TOTAL - The School Site 100 93

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 34

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    35/46

    CEFPI Ratings Sheet

    2.0 Structural and Mechanical Features

    School Facility Appraisal

    StructuralPoints

    AllocatedPoints

    2.1 Structure meets all barrier-free requirements both externally and internally 15 10

    A portion of the complex provides accessible accommodations but the provisions do not fully conform to the ADA guidelines.

    2.2 Roofs appear sound, have positive drainage, and are weather tight 15 10

    The roofs are comprised of modified bituminous systems. Installations are a combination of newer and older assemblies. A portion of the roofs are dated.

    2.3 Foundations are strong and stable with no observable cracks 10 8

    There were no significant signs of deterioration, settlement, or cracking.

    2.4 Exterior and interior walls have sufficient expansion joints and are free of deterioration 10 9

    A portion of the complex was equipped wi th control joints. There were no significant areas of deterioration.

    2.5 Entrances and exits are located so as to permit efficient student traffic flow 10 8

    The location of exits is adequate for student circulation.

    2.6 Building envelope generally provides for energy conservation (see criteria) 10 7

    The majority of the existing window assemblies are dated and contain single pane glazing at the original facility.

    2.7 Structure is free of friable asbestos and toxic materials 10 7

    District officials provided a hazardous materials report indicating areas of known asbestos.

    2.8 Interior walls permit sufficient flexibility for a variety of class sizes 10 7

    The original 1969 facility was not designed for flexibility of use.

    Mechanical/ElectricalPoints

    AllocatedPoints

    2.9 Adequate light sources are well maintained, and properly placed and are not subject to overheating 15 12

    Lighting levels do not conform to OSDM standards in some areas.

    2.10 Internal water supply is adequate with sufficient pressure to meet health and safety requirements 15 13

    Domestic supply piping is copper. No pressure problems were reported by District officials.

    2.11 Each teaching/learning area has adequate convenient wall outlets, phone and computer cabling for technology applications 15 9

    Typical classrooms are equipped with 1-5 data ports and a portion of the classrooms are equipped with projectors and smart boards. Classrooms are not equippedwith telephones.

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 35

  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    36/46

    2.12 Electrical controls are safely protected with disconnect switches easily accessible 10 8

    Electrical sevice panels are located in the mechanical areas.

    2.13 Drinking fountains are adequate in number and placement, and are properly maintained including provisions for thedisabled

    10 6

    A portion of drinking fountains were not accessible and do not provide multi-height accommodations.

    2.14 Number and size of restrooms meet requirements 10 7

    A portion of the toilet facilities were not accessible and do not conform to the provisions of the ADA.

    2.15 Drainage systems are properly maintained and meet requirements 10 7

    The complex is served by an on site sewage system. District officials noted the system was oversized and as a result is not functioning appropriately.

    2.16 Fire alarms, smoke detectors, and sprinkler systems are properly maintained and meet requirements 10 6

    The facility is not equipped wi th a suppression system. The fire alarm system is lacking horn/strobe signals in some occupiable areas.

    2.17 Intercommunication system consists of a central unit that allows dependable two-way communication between the officeand instructional areas

    10 5

    Classrooms are not equipped with telephones.

    2.18 Exterior water supply is sufficient and available for normal usage 5 4

    Hose bibb connections are provided at the exterior of the structure.

    TOTAL - Structural and Mechanical Features 200 143

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 36

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    37/46

    CEFPI Ratings Sheet

    3.0 Plant Maintainability

    School Facility Appraisal

    Points Allocated Points

    3.1 Windows, doors, and walls are of material and finish requiring minimum maintenance 15 10

    The majority of window installations at the 1969 building are dated and are equipped with single pane glazing.

    3.2 Floor surfaces throughout the building require minimum care 15 12

    Floor surfaces were terrazzo, carpet, and vinyl tile.

    3.3 Ceilings and walls throughout the building, including service areas, are easily cleaned and resistant to stain 10 8

    Suspended acoustic ceilings are provided in most areas.

    3.4 Built-in equipment is designed and constructed for ease of maintenance 10 7

    Casework installations are limited. The majority of casework is dated at older portions of the complex.

    3.5 Finishes and hardware, with compatible keying system, are of durable quality 10 7

    The majority of the door assemblies were not equipped with lever/ADA compliant hardware at older portions of the complex.

    3.6 Restroom fixtures are wall mounted and of quality finish 10 7

    The fixtures were a combination of wall and floor mounted units. Original/dated installations remain in some areas.

    3.7 Adequate custodial storage space with water and drain is accessible throughout the building 10 8

    Custodial space is typically provided near toilet rooms.

    3.8 Adequate electrical outlets and power, to permit routine cleaning, are available in every area 10 8

    School officials noted electrical provisions were adequate to serve the facilitys current needs.

    3.9 Outdoor light fixtures, electrical outlets, equipment, and other fixtures are accessible for repair and replacement 10 8

    Exterior lighting was provided primarily by building mounted fixtures.

    TOTAL - Plant Maintainability 100 75

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 37

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    38/46

    CEFPI Ratings Sheet

    4.0 Building Safety and Security

    School Facility Appraisal

    Site Safety Points Allocated Points

    4.1 Student loading areas are segregated from other vehicular traffic and pedestrian walkways 15 10

    Bus circulation shares a common path of travel with vehicular traffic.

    4.2 Walkways, both on and offsite, are available for safety of pedestrians 10 6

    Walkways are deteriorated in some areas. A portion of the site is lacking a continuous path of travel.

    4.3 Access streets have sufficient signals and signs to permit safe entrance to and exit from school area 5 3

    The main ingress/egress drive is not equipped with a signal system.

    4.4 Vehicular entrances and exits permit safe traffic flow 5 4

    Vehicular entrances were not equipped with turning lanes.

    4.5 ES Playground equipment is free from hazard 5 4

    MS Location and types of intramural equipment are free from hazard

    HS Athletic field equipment is properly located and is free from hazard

    The facility is equipped with athletic fields.

    Building Safety Points Allocated Points

    4.6 The heating unit(s) is located away from student occupied areas 20 15

    The boilers were located in the mechanical areas. Classrooms were equipped with unit ventilators.

    4.7 Multi-story buildings have at least two stairways for student egress 15 12

    The facility contains multiple stair assemblies. A portion of the installations were not enclosed in rated assemblies.

    4.8 Exterior doors open outward and are equipped with panic hardware 10 8

    Exterior doors open outward and are equipped with panic devices. A portion of installations are dated.

    4.9 Emergency lighting is provided throughout the enti re bui lding wi th exit signs on separate electrical circuits 10 8

    The facility was equipped with an emergency/egress lighting system.

    4.10 Classroom doors are recessed and open outward 10 7

    A portion of classroom doors are recessed and open outward.

    4.11 Building security systems are provided to assure uninterrupted operation of the educational program 10 5

    The facility contains a motion sensor system. District officials noted the system was not adequate to serve the needs of the school.

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 38

  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    39/46

    4.12 Flooring (including ramps and stairways) is maintained in a non-slip condition 5 4

    Classrooms/educational areas were equipped with vinyl tile. Corridors were terrazzo. A portion of finishes were deteriorated.

    4.13 Stair risers (interior and exterior) do not exceed 6 1/2 inches and range in number from 3 - 16 5 4

    Stair risers do not exceed 7.

    4.14 Glass is properly located and protected with wire or safety material to prevent accidental student injury 5 4

    Safety glazing was identified at some locations.

    4.15 Fixed Projections in the traffic areas do not extend more than eight inches from the corridor wall 5 4

    Drinking fountains project into corridors.

    4.16 Traffic areas terminate at an exit or a stairway leading to an egress 5 3

    Main corridors lead to exits. A portion of the exits were unenclosed and do not egress directly to the exterior.

    Emergency Safety Points Allocated Points

    4.17 Adequate fire safety equipment is properly located 15 13

    Fire extinguishers were provided throughout the facility.

    4.18 There are at least two independent exits from any point in the building 15 12

    Remote means of egress were provided from most areas. A portion of the exits from the second floor do not discharge directly to the exterior.

    4.19 Fire-resistant materials are used throughout the structure 15 8

    Rated assemblies could not be identified at the older portions of the structure.

    4.20 Automatic and manual emergency alarm system with a distinctive sound and flashing light is provided 15 12

    The facility is equipped with a fire alarm system with manual pull stations. A portion of the occupiable spaces are lacking horn/strobe signals.

    TOTAL - Building Safety and Security 200 146

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 39

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    40/46

    CEFPI Ratings Sheet

    5.0 Educational Adequacy

    School Facility Appraisal

    Academic Learning Space Points Allocated Points

    5.1 Size of academic learning areas meets desirable standards 25 20

    Typical classrooms are undersized and do not conform to the current standards established by the State of Ohio.

    5.2 Classroom space permits arrangements for small group activity 15 10

    There is no designated space for this activi ty. Classrooms are undersized.

    5.3 Location of academic learning areas is near related educational activities and away from disruptive noise 10 9

    The media center was centrally located on the main floor near the classroom wing.

    5.4 Personal space in the classroom away from group instruction allows privacy time for individual students 10 5

    There is no designated space for this activi ty. Classrooms are undersized.

    5.5 Storage for student materials is adequate 10 7

    A portion of locker installations are dated.

    5.6 Storage for teacher materials is adequate 10 5

    Storage space is limited. There is little casework in classrooms.

    Special Learning Space Points Allocated Points

    5.7 Size of special learning area(s) meets standards 15 9

    Classrooms are undersized and do not conform to current standards established by the State of Ohio.

    5.8 Design of specialized learning area(s) is compatible with instructional need 10 7

    Classrooms are undersized and do not conform to current standards established by the State of Ohio.

    5.9 Library/Resource/Media Center provides appropriate and attractive space 10 10

    The media center is a recent addition to the complex and provides a pleasant environment.

    5.10 Gymnasium (or covered P.E. area) adequately serves physical education instruction 5 3

    Vinyl asbestos tile is suspected at the gymnasium floor.

    5.11 ES Pre-kindergarten and kindergarten space is appropriate for age of students and nature of instruction 10 7

    MS/HS Science program is provided sufficient space and equipment

    Classrooms are undersized and do not conform to the current standards established by the State of Ohio.

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 40

  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    41/46

    5.12 Music Program is provided adequate sound treated space 5 4

    Music education takes place in dedicated classrooms. Band and choir are provided separate classroom areas.

    5.13 Space for art is appropriate for special instruction, supplies, and equipment 5 3

    Classrooms are undersized and do not conform to the current standard established by the State of Ohio.

    School Facility Appraisal Points Allocated Points

    5.14 Space for technology education permits use of state-of-the-art equipment 5 5

    Technology education takes place in a dedicated classroom at the 1994 complex.

    5.15 Space for small groups and remedial instruction is provided adjacent to classrooms 5 1

    There is no designated space for this activity.

    5.16 Storage for student and teacher material is adequate 5 3

    Classroom storage provisions are limited.

    Support Space Points Allocated Points

    5.17 Teachers lounge and work areas reflect teachers as professionals 10 9

    Teacher lounge/work areas are provided adjacent to the classroom wings.

    5.18 Cafeteria/Kitchen is attractive with sufficient space for seating/dining, delivery, storage, and food preparation 10 8

    The student dining and kitchen are located in the original 1969 structure. The majority of kitchen equipment is dated.

    5.19 Administrative offices provided are consistent in appearance and function with the maturi ty of the students served 5 4

    Administrative offices are located adjacent to the main entry at the 1994 addition.

    5.20 Counselors office insures privacy and sufficient storage 5 4

    Counselors office is located at the administration area.

    5.21 Clinic is near administrative offices and is equipped to meet requirements 5 4

    The clinic is equipped with accessible toilet facilities. The lavatory is lacking accessible hardware and insulation.

    5.22 Suitable reception space is available for students, teachers, and visitors 5 4

    Administrative areas are located near the main entry of the complex at the 1994 addition. The area provides a pleasant environment.

    5.23 Administrative personnel are provided sufficient work space and privacy 5 4

    The administrative area provides a pleasant environment.

    TOTAL - Educational Adequacy 200 145

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 41

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    42/46

    CEFPI Ratings Sheet

    6.0 Environment for Education

    School Facility Appraisal

    Exterior Environment Points Allocated Points

    6.1 Overall design is aesthetically pleasing to age of students 15 14

    Exterior masonry construction is appropriate for educational design. The 1994 addition provides a pleasant design.

    6.2 Site and building are well landscaped 10 9

    The site contains mature trees, low shrubbery, open lawn, and nearby woods.

    6.3 Exterior noise and poor environment do not disrupt learning 10 10

    The site is located in a residential area with overhangs.

    6.4 Entrances and walkways are sheltered from sun and inclement weather 10 5

    The majority of entrances were not equipped with overhangs.

    6.5 Building materials provide attractive color and texture 5 4

    The 1994 building addition provides an attractive design wi th varied materials and colors.

    Interior Environment Points Allocated Points

    6.6 Color schemes, building materials, and decor provide an impetus to learning 20 16

    Interior finishes at the 1994 addition provide a pleasant environment with a unif ied color scheme.

    6.7 Year around comfortable temperature and humidity are provided throughout the building 15 7

    A limited poriton of the facility is not equipped with air conditioning.

    6.8 Ventilating system provides adequate quiet circulation of clean air and meets 15cfm VBC requirement 15 9

    The ventilation system does not conform to current OSDM standards at older portions of the complex.

    6.9 Lighting system provides proper intensity, diffusion, and distribution of illumination 15 10

    Lighting levels are below OSDM standards in some areas.

    6.10 Drinking fountains and restroom facilities are conveniently located 15 10

    Toilet rooms are located at dispersed areas. A portion of the facilities provide accessible accommodations.

    6.11 Communication among students is enhanced by commons area(s) for socialization 10 9

    The gymnasiums, student dining, media center, and lobby provide common areas for socialization.

    6.12 Traffic flow is aided by appropriate foyers and corridors 10 9

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 42

  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    43/46

    Corridors are sized for student circulation.

    6.13 Areas for students to interact are suitable to the age group 10 9

    The gymnasiums, student dining area, lobby, and the media center provide areas for interaction.

    6.14 Large group areas are designed for effective management of students 10 8

    The gymnasium is equipped with a retracting screen.

    6.15 Acoustical treatment of ceilings, walls, and floors provides effective sound control 10 8

    Acoustic ceilings are provided in most areas.

    6.16 Window design contributes to a pleasant environment 10 8

    The majority of the window assemblies at the 1969 addition are equipped with single pane glazing and narrow openings.

    6.17 Furniture and equipment provide a pleasing atmosphere 10 7

    The majority of the existing furniture is a combination of newer and dated equipment.

    TOTAL - Environment for Education 200 152

    Back to Assessment Summary

    Report Generated at 26 Aug 2008 16:CEFPI Ratings Sheet Page 43

    http://-/?-http://-/?-
  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    44/46

  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    45/46

    Main Assessment Menu - Riverside Local Local SD (47894) - LaMuth Middle School (61895)

    Building Summary - LaMuth Middle School (61895)

    District: Riverside Local Local SD

    Name: LaMuth Middle School

    Address: 6700 Auburn Rd

    Painesville,OH 44077

    Bldg. IRN: 61895

    County: Lake Area: Northeastern Ohio (8)

    Contact: Mr. Eric Kujala

    Phone: (440) 354-4394

    Date Prepared: 2008-03-17 By: Tony Schorr

    Date Revised: 2008-08-26 By: Jeff Tuckerman

    Current Grades 6-7 Acreage: 48

    Proposed Grades N/A Teaching Stations: 38

    Current Enrollment 732 Classrooms: 33

    Projected Enrollment N/A

    Addition Date HA Number of Floors Current Square Feet

    Original Building 1969 no 2 35,174

    Building Addition 1994 yes 2 54,663

    Total 89,837

    *HA = Handicapped Access

    *Rating =1 Satisfactory

    =2 Needs Repair

    =3 Needs Replacement

    *Const P/S = Present/Scheduled Construction

    FACILITY ASSESSMENTCost Set: 2007 Rating

    DollarAssessment C

    A. Heating System 3 $2,605,273.00 -

    B. Roofing 3 $399,777.00 -C. Ventilation / Air Conditioning 1 $0.00 -

    D. Electrical Systems 3 $553,990.50 -

    E. Plumbing and Fixtures 3 $100,400.00 -

    F. Windows 3 $83,520.00 -

    G. Structure: Foundation 1 $0.00 -

    H. Structure: Walls and Chimneys 2 $78,610.00 -

    I. Structure: Floors and Roofs 1 $0.00 -

    J. General Finishes 3 $1,214,111.80 -

    K. Interior Lighting 3 $449,185.00 -

    L. Security Systems 3 $224,592.50 -

    M. Emergency/Egress Lighting 3 $89,837.00 -

    N. Fire Alarm 3 $134,755.50 -

    O. Handicapped Access 3 $258,723.70 -

    P. Site Condition 3 $563,535.50 -

    Q. Sewage System 3 $164,700.00 -

    R. Water Supply 1 $0.00 -

    S. Exterior Doors 3 $32,000.00 -

    T. Hazardous Material 3 $189,000.00 -

    U. Life Safety 3 $341,970.25 -

    V. Loose Furnishings 3 $179,674.00 -

    W. Technology 3 $671,082.39 -

    - X. Construction Contingency /Non-Construction Cost

    - $2,028,175.18 -

    Total $10,362,913.32

    CEFPI Appraisal Summary

    Section Points Possible Points Earned Percentage Rating CategoCover Sheet

    1.0The School Site 200 186 93% Excelle

    2.0Structural and Mechanical Features 400 286 72% Satisfacto

    3.0Plant Maintainability 200 150 75% Satisfacto

    4.0Building Safety and Security 400 292 73% Satisfacto

    5.0Educational Adequacy 400 290 73% Satisfacto

    6.0Environment for Education 400 304 76% Satisfacto

    Commentary

    Total 2000 1508 75% Satisfacto

    C=Under Contract

    Renovation Cost Factor 104.16

    Cost to Renovate (Cost Factor applied) $10,794,010

    The Replacement Cost Per SF and the Renovate/Replace ratio are only provided when this summary irequested from a Master Plan.

    Previous Page

    Report Generated at 26 Aug 2008 16Main Assessment Menu - Riverside Local Local SD (47894) - LaMuth Middle School (61895) Page 45

  • 8/14/2019 LaMuth Middle School - Riverside School District - State Facilities Report

    46/46

    Environmental Hazards - Riverside Local Local SD (47894) - LaMuth Middle School (61895) - Original Building

    Environmental Hazards - Riverside Local Local SD (47894) - LaMuth Middle School (61895) - Original Building

    Owner: Riverside Local Local SD Bldg. IRN: 61895

    Facility: LaMuth Middle School BuildingAdd: Original Building

    Date: Consultant Name:

    A. Asbestos Containing Material (ACM) AFM=Asbestos Free Materia

    ACM Found Status Quantity Unit Cost Estimated Cost

    1. Boiler/Furnace/Breeching Insulation Removal Not Present 0 $10.00 $0.002. Tank/Duct Insulation Removal Not Present 0 $8.00 $0.00

    3. Pipe Insulation Removal Not Present 0 $8.00 $0.00

    4. Pipe Fitting Insulation Removal Not Present 0 $20.00 $0.00

    5. Acoustical Plaster Removal Not Present 0 $7.00 $0.00

    6. Fireproofing Removal Not Present 0 $15.00 $0.00

    7. Hard Plaster Removal Not Present 0 $7.00 $0.00

    8. Gypsum Board Removal Not Present 0 $6.00 $0.00

    9. Acoustical Panel/Tile Ceiling Removal Not Present 0 $3.00 $0.00

    10. Resilient Flooring Removal, Including Mastic Reported Asbestos-Containing Material 63000 $3.00 $189,000.00

    11. Roofing Removal Not Present 0 $2.00 $0.00

    12. (Sum of Lines 1-11) Total Asb. Hazard Abatement Cost for Renovation Work $189,000.00

    13. (Sum of Lines 1-9) Total Asb. Hazard Abatement Cost for Demolition Work $0.00

    B. Removal Of Underground Storage Tanks None Reported

    Tank No. Location Age Product Stored Size Est.Rem.Cost

    1. (Sum of Lines 1-0) Total Cost For Removal Of Underground Storage Tanks $0.00

    C. Lead-Based Paint (LBP) - Renovation Only Addition Constructed after 1980

    1. Estimated Cost For Abatement Contractor to Perform Lead Mock-Ups $0.00

    2. Special Engineering Fees for LBP Mock-Ups $0.00

    3. (Sum of Lines 1-2) Total Cost for Lead-Based Paint Mock-Ups $0.00

    D. Fluorescent Lamps & Ballasts Recycling/Incineration Not Applicable

    Area Of Building Addition Square Feet w/Fluorescent Lamps & Ballasts Unit Cost Total Cost

    1. 35174 0 $0.05 $0.00

    E. Other Environmental Hazards/Remarks None Reported

    Description Cost Estimate

    1. (Sum of Lines 1-0) Total Cost for Other Environmental Hazards - Renovation $0.00

    2. (Sum of Lines 1-0) Total Cost for Other Environmental Hazards - Demolition $0.00

    F. Environmental Hazards Assessment Cost Estimate Summaries

    1. A12, B1, C3, D1, and E1 Total Cost for Env. Hazards Work - Renovation $189,000.002. A13, B1, D1, and E2 Total Cost for Env. Hazards Work - Demolition $0.00

    * INSPECTION ASSUMPTIONS for Reported/Assumed Asbestos-Free Materials (Rep/Asm AFM):

    a. Unless reported otherwise by the District, materials installed after 1980 are assumed to be asbestos-free.

    b. Unless reported otherwise by the District, small quantities (less than 1,000 square feet) of the following materials are assumed to be asbestos free: hard plaster,acoustical plaster and gypsum board systems; acoustical panels and ti les; fireproofing; 12"12" floor tile and mastic.

    c. Unless reported otherwise by the District, all roofing materials are assumed to be asbestos-free.

    THESE MATERIALS SHOULD BE PROPERLY SAMPLED AND ANALYZED FOR ASBESTOS PRIOR TO DISTURBING THEM.