YOUR PARTNER IN GROUND ENGINEERING L&M Foundation Specialist Pte Ltd (A member of CSC Holdings Limited) CONTRACT T306 TANJONG KATONG STATION Construction of Tanjong Katong Station and Tunnels for Thomson East Coast Line Developer Land Transport Authority, Singapore Consultant Mott Macdonald Singapore Pte Ltd Main Contractor Woh Hup Pte Ltd Contract Sum Approximately (SGD) $ 17.0 Million Construction Period Dec 2016 to Aug 2019 Scope of Works Diaphragm Wall, Cross Wall and Installation of King Post Location Tanjong Katong South Road

L&M Foundation Specialist Pte Ltd - CSCHL

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: L&M Foundation Specialist Pte Ltd - CSCHL

YOUR PARTNER IN

GROUND ENGINEERING

L&M Foundation Specialist Pte Ltd(A member of CSC Holdings Limited)

CONTRACT T306 – TANJONG KATONG STATION

Construction of Tanjong Katong Station and Tunnels for Thomson East Coast Line

Developer Land Transport Authority, Singapore

Consultant Mott Macdonald Singapore Pte Ltd

Main Contractor Woh Hup Pte Ltd

Contract Sum Approximately (SGD) $ 17.0 Million

Construction Period Dec 2016 to Aug 2019

Scope of Works Diaphragm Wall, Cross Wall and

Installation of King Post

Location Tanjong Katong South Road

Page 2: L&M Foundation Specialist Pte Ltd - CSCHL

YOUR PARTNER IN

GROUND ENGINEERING

Scope of Works

• Construction of 74 panels 1200mm thick Diaphragm Wall up to 49m deep.

• Construction of 35 panels 800mm thick Diaphragm Wall up to 75m deep

• Installation of King Post (356x406x990kg/m) up to 24m long into 1200mm diaphragm wall

• Construction of Cross Wall 1000mm thick up to 36m deep

• Total 15,000m3 of treatment volume for Deep Cement Mixing (DCM) and Jet Grouting Pile (JGP) works

(drilling depth up to 42m with 24m grouting thick)

The challenges of this project include;

• Deep Excavation

Construction of diaphragm wall as deep as 75m from ground level with presence of OA(A) soil up to 35m

thick required high skill operator, intensive koden check and a close supervision in order to achieve good

trench verticality.

CONTRACT T306 –

TANJONG KATONG STATION

Page 3: L&M Foundation Specialist Pte Ltd - CSCHL

YOUR PARTNER IN

GROUND ENGINEERING

The challenges of this project include;

• Site Constraint

Constructing cross wall at the center of the site and diaphragm wall at the same time required a great planning

and sequencing of work in order to ensure both work can be carried out smoothly.

• Kingpost Installation

Installing of huge king posts into the narrow space of d-wall cage required detail technical study as well as

close supervision to ensure smooth king post installation.

• Road and Utility Diversion

Great communication and coordination with Main Contractor were required in order to ensure all the

diaphragm wall can be constructed within the given space and time.

CONTRACT T306 –

TANJONG KATONG STATION