  • 1. Resume Hasil Pengukuran Getaran Peledakan Batubara di KalSel (Tutupan)

    Hari/Tanggal Lokasi Peledakan

    CT2 Block 87-88 Stripe 48 1465ST2-PN1 Block 50-51 Stripe 52 2950

    ST2-PN1 Block 40-42 Stripe 57-58 1021BUMA 1082

    ST2-Hill 6A Block 46-48 Stripe 55-56 1072ST2-Hill 6B Block 46-47 Stripe 54-55 1164ST2-Hill 5 Block 50-52 Stripe 52-53 1451

    Hill 6 Timur Block 48-49 Stripe 54-55 (Act 92-97) 3872Hill 6 Barat Block 47 Stripe 56 (Act 82-88) 3616Hill 8-9 Block 36-37 Stripe 57 (Act 12-19) 2788PAMA 2/CT 2 Block 85 Stripe 46 (Act 8-17) 2748

    ST2-PN 1 Block 52-53 Stripe 52 (Act 117-119) 31723172

    2/CT 2 Block 80-81 Stripe 46 (Act 2-7)377337733773

    ST2-PN 1 Block 47-48 Stripe 54 (Act 87-88) 40673885

    ST2-PN 1 Block 51-42 Stripe 51-52 (Act 116-117)326232623262

    Jarak (m)

    Sabtu, 26 Juni 2004

    Minggu, 27 Juni 2004

    Selasa, 29 Juni 2004

    Rabu, 30 Juni 2004

    Kamis, 1 Juli 2004

  • 1. Resume Hasil Pengukuran Getaran Peledakan Batubara di KalSel (Tutupan)

    HASIL PENGUKURAN

    Transversal Vertikal Longitudinal

    mm/s Hz g mm/s Hz g mm/s Hz97.5 0.540 3.9 0.007 0.587 2.7 0.007 0.683 4.195.9 0.381 128 0.053 0.254 > 200 0.053 0.508 2.1108 2.540 4.7 0.106 2.290 5.3 0.106 4.19 4.5

    107.5 69 1.270 3.4 0.106 0.635 1.9 0.106 1.4 3.6123.9 62 1.650 2.7 0.106 1.020 11.8 0.106 1.4 3.2114.8 57 1.020 3.9 0.106 1.114 13.6 0.106 1.27 3.8113.8 61.1 0.889 2.7 0.106 0.762 2.6 0.106 0.889 2.9112.8 52 0.222 4.1 0.007 0.143 3.6 0.008 0.222 3.4< 88 50 0.111 4.8 0.005 0.079 8.1 0.007 0.222 3.797.5 41 0.317 5.5 0.007 0.159 5.1 0.008 0.286 2< 88 0.190 6.8 0.007 0.111 10 0.007 0.238 8.898.8 0.317 5.3 0.007 0.444 9.1 0.008 0.476 2.8100 0.206 6.1 0.007 0.254 2.1 0.007 0.349 2.7< 88 0.079 6.8 0.007 0.095 7.5 0.007 0.159 2< 88 0.095 6.8 0.007 0.111 2 0.007 0.159 3.295.9 0.079 7.1 0.003 0.111 2.1 0.007 0.159 2.3< 88 0.175 4.5 0.007 0.111 7.5 0.007 0.175 2.5< 88 0.095 64 0.007 0.079 43 0.007 0.159 64102.8 0.254 1.9 0.007 0.159 16 0.007 0.444 2.7104.2 0.206 3.6 0.008 0.159 1.5 0.007 0.317 2.9106 0.190 3.8 0.005 0.159 1.4 0.005 0.317 2.2

    Hasil Pengukuran AirBlast

    BlastMate dB (L)

    Sound Level Meter dB (A)

  • 1. Resume Hasil Pengukuran Getaran Peledakan Batubara di KalSel (Tutupan)

    HASIL PENGUKURAN

    KeteranganLongitudinal PVS

    g mm/s0.008 0.557 Office Tutupan0.053 0.568 Office Tutupan0.106 1.38 Timbunan0.106 1.49 Timbunan0.106 1.32 Timbunan0.106 1.35 Timbunan0.106 1.05 Timbunan0.007 0.265 Dahai Office0.005 0.222 Dahai Office0.007 0.349 Dahai Office0.007 0.271 Lamida0.008 0.483 Lamida0.008 0.384 Lamida0.007 0.178 Trans0.005 0.171 Trans0.008 0.163 Trans0.007 0.2 Leburan0.008 0.166 Leburan0.007 0.459 Trans0.007 0.324 Trans0.007 0.34 Trans

  • 2. Resume Hasil Pengukuran Getaran Peledakan di Upe Pongkor

    Tanggal Jam Lokasi JarakBlasting Monitoring m7/27/2005 15.44.01 BP1-SDIA BA8917 50

    15.44.17 BP1-SDIA BA5372 15015.44.52 BP2-BIV Central BA5372 6015.53.35 BP2-BIV Central BA8917 6023.24.34 BP3-BIV Central BA8917 4523.24.50 BP3-BIV Central BA5372 2523.24.53 BP3-BIV Central BE8090 35

    7/23/2005 07.21.57 BP4-BIII Central BA8917 7007.22.12 BP4-BIII Central BA5372 64

    7/24/2005 16.23.40 BP5-BIV South BA8917 5016.23.53 BP5-BIV South BA5372 4016.23.58 BP5-BIV South BE8090 25

    7/24/2005 23.19.38 BP6-BIV Central BA5372 2023.19.39 BP6-BIV Central BA8917 2523.19.43 BP6-BIV Central BE8090 50

    7/25/2005 23.26.01 BP7-BIA BA5372 7023.26.03 BP7-BIA BA8917 75

    7/25/2005 23.50.43 BP8-BIII Central BA5372 3023.50.44 BP8-BIII Central BA8917 3523.50.48 BP8-BIII Central BE8090 25

    7/27/2005 00.06.14 BP9-BIV South BA5372 2500.06.14 BP9-BIV South BA8917 50

  • 2. Resume Hasil Pengukuran Getaran Peledakan di Upe PongkorIsian Hasil Pengukuran (mm/s) Keterangankg Trans Vert Long PVS11.6 5.59 3.94 9.65 10.411.6 1.14 0.0889 1.27 1.669.0 7.75 7.75 6.35 10.449.0 6.98 12.3 9.65 12.69.0 5.16 9.13 4.76 9.599.0 74.3 25.1 63.6 96.999.0 12.2 54.5 16.5 54.97.5 5.46 7.24 5.71 9.077.5 6.35 12.0 6.51 9.629.0 6.86 12.2 6.22 12.99.0 7.87 13.5 11.3 15.59.0 6.10 17.7 5.71 17.89.0 20.6 28.8 23.1 30.669.0 8.25 21.2 8.51 22.49.0 2.92 3.43 4.19 5.267.5 1.24 0.492 1.54 1,6527.5 0.651 0.762 1.05 1.257.5 4.27 12.5 4.78 12.997.5 4.05 11.9 6.22 12.57.5 8.25 13.3 6.22 14.89.0 8.13 21.4 12.5 21.739.0 6.08 10.2 3.51 11.8

  • 3. Hasil Pengukuran Getaran Tanah Akibat Peledakan Batubara di Sangata

    Alat Ukur

    HASIL PENGUKURAN

    Transversal

    PPV f

    (kg) (mmps) (Hz)BA 5657 Pit J 1500 2000 0.889 5.8 BA 8916 Pit J 1200 2000 2,300 4.5BA 8917 Pit J 1500 2000 0.952 5.8BA 9570 Pit J 1500 2000 1,000 5.8BE 10292 Pit J 1200 2000 2,760 4.5TEXCEL Pit J 1200 2000 1,940BA 5657 Pit J 1500 1000 0.683 4.1BA 8916 Pit J 1500 1000 0.905 3.0BA 8917 Pit J 1200 1000 2,140 4.7BA 9570 Pit J 1200 1000 2,270 4.6BE 10292 Pit J 1200 1000 2,330 4.7TEXCEL Pit J 1200 1000BA 5657 DIPAKAI UNTUK MENGUKUR VIBRASI PELEDAKAN DI PIT BENGALONBA 8916 TIDAK DAPAT MEREKAM GETARAN PELEDAKAN *)BA 8917 Pit J 1200 1000 0.968 3.4BA 9570 Pit J TIDAK DAPAT MEREKAM GETARAN PELEDAKAN *)BE 10292 Pit J 1200 1000 1.33 4.8TEXCEL Pit J 1200 1000

    2.65 & 3.19 Getaran terasa, bangunan tidak terpengaruh, masyarakat tidak komplain

    Hari / Tanggal

    Lokasi Peledakan

    Jarak (m)

    Muatan / delay maks

    Selasa, 22 November

    2005

    Rabu, 23 November

    2005

    Jumat, 25 November

    2005

  • 3. Hasil Pengukuran Getaran Tanah Akibat Peledakan Batubara di Sangata

    HASIL PENGUKURAN

    Transversal Vertikal Longitudinal

    d a PPV f d a PPV f d

    (mm) (g) (mmps) (Hz) (mm) (g) (mmps) (Hz) (mm)0.036 0.006 1,430 13.0 0.036 0.007 0.905 5.9 0.0440.083 0.017 1,650 9.5 0.040 0.015 2,700 5.6 0.0660.041 0.008 1,490 11.0 0.028 0.015 0.968 3.3 0.0450.042 0.008 1,480 13.0 0.027 0.015 0.937 6.0 0.0460.076 0.017 1,900 8.3 0.042 0.022 2,480 6.0 0.061

    1,830 1,6200.037 0.005 0.889 3.9 0.029 0.008 1,240 4.1 0.0470.048 0.008 0.921 4.0 0.030 0.008 1,350 4.0 0.0510.051 0.015 1,600 5.3 0.044 0.010 2,030 4.7 0.0640.055 0.013 1,540 5.3 0.041 0.010 1,970 6.9 0.0570.055 0.013 1,570 5.2 0.043 0.012 1,940 6.8 0.058

    DIPAKAI UNTUK MENGUKUR VIBRASI PELEDAKAN DI PIT BENGALONTIDAK DAPAT MEREKAM GETARAN PELEDAKAN *)

    0.053 0.010 1.48 8.7 0.031 0.013 0.905 3.1 0.057TIDAK DAPAT MEREKAM GETARAN PELEDAKAN *)

    0.047 0.008 1.7 10 0.039 0.013 1.56 5.9 0.061

    Getaran terasa, bangunan tidak terpengaruh, masyarakat tidak komplain

  • 3. Hasil Pengukuran Getaran Tanah Akibat Peledakan Batubara di Sangata

    HASIL PENGUKURAN

    Lokasi PengukuranLongitudinal

    PVSa

    (g) (mmps)0.008 1.46 Masjid Singa Gembara0.017 3.1 Depan Kantor Bupati Lama0.008 1.53 Masjid Singa Gembara0.010 1.52 Masjid Singa Gembara0.017 3.19 Depan Kantor Bupati Lama

    2.65 Depan Kantor Bupati Lama0.007 1.29 Masjid Singa Gembara0.008 1.4 Masjid Singa Gembara0.013 2.6 Depan Kantor Bupati Lama0.013 2.57 Depan Kantor Bupati Lama0.012 2.61 Depan Kantor Bupati Lama

    1.78 Depan Kantor Bupati LamaDIPAKAI UNTUK MENGUKUR VIBRASI PELEDAKAN DI PIT BENGALON

    TIDAK DAPAT MEREKAM GETARAN PELEDAKAN *) Masjid Singa Gembara0.010 1.55 Depan Kantor Bupati Lama

    TIDAK DAPAT MEREKAM GETARAN PELEDAKAN *) Depan Kantor Bupati Lama0.010 1.65 Depan Kantor Bupati Lama

    1.05 Depan Kantor Bupati Lama

  • 4. RESUME HASIL PENGUKURAN GETARAN TANAH AKIBAT PELEDAKAN DI KUARI GAMPING DI CIBINONG

    Tanggal Alat Ukur Blasting PointJarak

    HASIL PENGUKURAN

    (m) (kg)

    17 Jan-06 Blasting IBA 8916

    PAT174 300

    BE 10292 539 300BA 8917 1240 300

    17 Jan-06 Blasting II BA 8916 PAB 618 350BE 10292 773 350

    18 Jan-06 Blasting IIIBA 8916

    PR212 400

    BE 10292 468 400BA 8917 1210 400

    18 Jan-06 Blasting IVBA 8916

    PK325

    350BE 10292 691BA 8917 497

    ### BA 8917 90 0BA 8917 90 0

    19 Jan-06 Blasting V BE 10292 PAT 228 400BA 8917 90019 Jan-06 Blasting VI BE 10292 PAT 378 250

    19 Jan-06 Blasting VII BA 8916 PAB 653 270BE 10292 783

    ### BE 10292 Truk Kosong 5Truk Isi 57.36 & 9.34 Getaran relatif besar, dinding retak-retak, masyarakat komplain

    10.7 Konstruksi beton, tidak terpengaruh

    Muatan / delay maks

    DT Tumpahkan Batu

  • 4. RESUME HASIL PENGUKURAN GETARAN TANAH AKIBAT PELEDAKAN DI KUARI GAMPING DI CIBINONGHASIL PENGUKURAN

    Transversal Vertikal LongitudinalPPV f PPV f PPV f

    (mmps) (Hz) (mmps) (Hz) (mmps) (Hz)5.59 18.3 5.59 20 8.25 141.37 5.3 1.57 6.0 1.29 4.4

    0.317 4.0 0.206 7.0 0.556 4.40.254 0 0.127 0 0.127 0

    0.0794 47 0.0635 43 0.0952 101.78 37 4.32 8.5 3.94 202.89 9.7 1.06 8.1 1.48 7.81.11 4.9 0.587 3.7 0.778 4.34.57 4.1 5.59 3.0 4.06 2.56.5 2.9 3.0 3.2 6.01 2.97.1 3.5 4.8 4.1 7.38 2.3

    1.14 0 1.32 0.7620.857 0 0.46 0.734.00 7.9 2.73 39 4.75 8.4

    0.397 5.4 0.365 3.3 0.54 2.91.90 30 2.08 47 1.64 15

    0.889 21 0.509 57 0.635 260.413 5.0 0.270 7.1 0.429 8.10.111 8.7 0.159 13 0.111 130.46 16 0.889 15 0.286 13

    Getaran relatif besar, dinding retak-retak, masyarakat komplain

  • 4. RESUME HASIL PENGUKURAN GETARAN TANAH AKIBAT PELEDAKAN DI KUARI GAMPING DI CIBINONG

    PPV Air BlastBlasting Monitoring

    (mmps) dB (L/A)10.7 126 - L Gedung BKK2.02 121.8 - L RM Manaf

    0.596 71.6 - A K Tegal0.284 110.9 - L Jl. Transport0.100 101.0 - L K. Pangkalan4.38 129.2 - L Jl. Truk3.00 123.9 - L Jl. Transport1.30 63.9 - L Mushola Walahir7.12 117.1 - L Belt Conveyor7.71 113.1 - L RM Manaf9.32 72.0 - L Mushola Walahir1.69 Mushola Walahir1.045.03 122.0 - L RM Manaf

    0.642 63.2 - L Klapa Nunggal Asri2.28 115.6 - L RM Manaf

    0.933 108.4 - L Bl. Container0.515 114.8 - L RM Manaf0.163 < 88 - L RM Manaf0.914 97.5 - L RM Manaf

  • 5. Hasil Pengukuran Getaran Tanah Akibat Peledakan Batubara di Sangata

    Alat UkurHASIL PENGUKURAN

    Transversal(m) (kg) mm/s Hz d

    BA 8916 3300

    1736

    0.79 4.5 0.039BA 8917 3300 0.62 3.7 0.028BA 5657 1800 2.78 4.8 0.081BA 9570 2100 3.13 4.1 0.114BA 8916 3300

    368

    1.21 3.4 0.040BA 8917 3300 0.38 4.2 0.013BA 5657 1800 3.10 6.7 0.137BA 9570 2100 2.76 4.5 0.145BA 8916 3300

    1046

    1.10 4.4 0.038BA 8917 3300 0.35 3.5 0.016BA 5657 2500 1.35 5.2 0.094BA 9570 2500 1.54 4.7 0.080BA 8916 3300

    830

    0.95 4.2 0.034BA 8917 3300 0.33 3.7 0.017BA 5657 1800 2.41 5.4 0.063BA 9570 3000 1.00 5.0 0.034

    3.4 & 4.34 Getaran di depan rumah bupati lebih kecil dibanding di K. Tator (lokasi lebih jauh)

    Hari / Tanggal

    Jarak Pengukuran

    Muatan / delay maks

    Selasa, 14 Desember

    2004

    Rabu, 15 Desember

    2004

    Kamis, 16 Desember

    2004

    Sabtu, 18 Desember

    2004

  • 5. Hasil Pengukuran Getaran Tanah Akibat Peledakan Batubara di Sangata

    HASIL PENGUKURAN

    Transversal Vertikal Longitudinalg mm/s Hz d g mm/s Hz d g

    0.008 1.33 17.0 0.012 0.015 1.35 6.4 0.039 0.0120.007 1.05 13.0 0.012 0.013 0.67 7.3 0.028 0.0070.015 3.32 6.0 0.083 27,400 2.73 7.6 0.087 13,8000.015 4.05 12.0 0.087 0.035 2.87 5.0 0.113 0.0150.010 0.84 17.0 0.026 0.012 1.02 5.3 0.034 0.0080.007 0.95 12.0 0.013 0.010 0.38 5.3 0.015 0.0070.022 4.11 6.0 0.099 0.071 6.11 5.1 0.181 0.0400.013 3.33 13.0 0.098 0.037 4.21 4.1 0.166 0.0200.007 1.44 16.0 0.014 0.018 0.87 4.6 0.035 0.0080.007 0.52 15.0 0.008 0.008 0.40 2.7 0.019 0.0070.007 1.65 1.9 0.070 0.015 1.73 3.1 0.081 0.0070.010 1.64 2.5 0.066 0.013 1.79 3.1 0.092 0.0090.008 1.05 17.0 0.014 0.015 1.05 3.6 0.030 0.0080.007 0.59 11.0 0.008 0.007 0.29 8.5 0.011 0.0070.013 2.24 7.4 0.057 0.077 2.59 5.1 0.077 0.0170.008 0.59 13.0 0.017 0.010 0.78 4.5 0.027 0.008

    Getaran di depan rumah bupati lebih kecil dibanding di K. Tator (lokasi lebih jauh)

  • 5. Hasil Pengukuran Getaran Tanah Akibat Peledakan Batubara di Sangata

    HASIL PENGUKURANKeteranganPVS

    mm/s1.39 Gang Dayung1.05 Perum Munthe3.43 Depan Rumah Bupati4.34 Kampung Tator

    2,255 Gang Dayung0.954 Perum Munthe6.18 Depan Rumah Bupati4.23 Kampung Tator1.64 Gang Dayung

    0.573 Perum Munthe1.79 Kampung Tator1.94 Kampung Tator1.12 Gang Dayung

    0.617 Perum Munthe2.8 Depan Rumah Bupati

    1.09 Gang Delima

  • 6. RESUME PENGUKURAN GETARAN PELEDAKAN Batubara di Sangata

    Pit

    DATA PELEDAKAN

    Alat Ukur Jarak PVS

    (kg) (m) (mm/s)

    AB - Bangau 650BM 1 500 2.16BM 2 600 2.70BM 3 700 2.01

    Monyet 650BM 1 500 2.08BM 2 600 1.64BM 4 800 1.65

    Harapan South 750BM 1 300 2.53BM 3 750 16.05BM 4 1000 6.36

    Pelikan 650

    BM 1 300 25.20BM 2 500 9.56BM 3 650 4.25BM 4 1000 3.52

    AB* Phase 2 650

    BM 1 300 8.08BM 2 500 3.12BM 3 750 3.01BM 4 1000 4.05

    AB - Monyet 150BM 1 500 1.68BM 2 500 14.60BM 4 1700 3.04

    650 BM 1 500 6.15BM 2 1000 2.11

    AB* 650

    BM 1 500 3.46BM 2 600 2.82BM 3 850 2.34BM 4 1000 2.12

    Melawan* 750BM 1 400 11.63BM 2 500 8.70BM 3 600 7.14

    550 BM 1 600 5.21BM 3 1000 3.69

    400 BM 1 500 8.85BM 2 750 2.44Peledakan jauh dari bangunan

    Hari, Tanggal

    Muatan / Delay maks

    Senin, 19/4/04

    Selasa, 20/4/04

    Rabu, 21/4/04

    Kamis, 22/4/04

    Jumat, 23/4/04

    Sabtu, 24/4/04

    Harapan* South

    Minggu, 25/4/04

    Monyet - AB Phase 2

    Rabu, 28/4/04

    Harapan South*

  • 6. RESUME PENGUKURAN GETARAN PELEDAKAN Batubara di SangataDATA PELEDAKAN

    Scaled Distance Air Blast BM

    (Hz) dB (L) Hz5 -- 25 19.61 - - 4 -- 35 23.53 - - 6 -- 19 27.46 - - 4 -- 11 19.61 130.9 12.04 -- 11 23.53 - - 5 -- 10 31.38 131.3 - 3 -- 25 10.95 136.9 21.02 -- 29 27.39 134.6 26.01 -- 20 36.51 126.7 8.1

    2 -- 100 11.77 143.7 45.04 -- 49 19.61 132.5 10.41 -- 45 25.50 130.6 6.83 -- 35 39.22 124.4 9.84 -- 40 11.77 133.4 5.94 -- 40 19.61 124.3 26.91 -- 35 29.42 126.1 8.43 -- 40 39.22 123.9 7.83 -- 5 40.82 126.7 16.4

    3 -- 40 23.57 142.6 27.33 -- 10 80.14 125.8 11.02 -- 40 19.61 136.4 13.71 -- 15 39.22 127.4 8.73 -- 30 19.61 132.7 19.93 -- 27 23.53 129.5 19.35 -- 17 33.34 125.5 9.34 -- 21 39.22 125.6 8.31 -- 60 14.61 139.1 9.12 -- 90 18.26 142.2 12.21 -- 41 21.91 136.6 9.52 -- 50 25.58 133.8 11.53 -- 27 42.64 134.2 4.22 -- 30 25.00 134.5 6.52 -- 12 37.50 130.0 6.6

    Selang Freq

    5,0/WR

  • 7. HASIL PENGUKURAN GETARAN AKIBAT PELEDAKAN BATU GAMPING DI TUBAN

    Lokasi PengukuranJarak Peak Particle Velocity (mm/s) & Frequency (Hz)

    (m) (kg) Trans FreqBP-1 (D 18) BM-1 Ds. Ngetuk 250 23.5 1.79 18BP-2 (W 15) BM-2 Ds. Ngetuk 250 187.1 1.10 19BP-3 (X 15) BM-3 Ds. Ngetuk 250 475.0 4.03 24BP-4 (D 16) BM-4 Ds. Ngetuk 250 357.5 1.81 13BP-5 (X 14) BM-5 Blk. Lokasi 250 365.0 0.270 9.3BP-6 (W 14) BM-6 Blk. Lokasi 250 360.0 0.810 20BP-7 (D 17) BM-7 Bts. SIPD 400 214.5 0.413 11BP-8 (X 14) BM-8 Pos 400 479.0 2.78 20BP-9 (V 14) BM-9 Pos 400 322.5 1.00 17

    BP-10 (D 18) BM-10 Kebun 275 353.7 0.524 21BP-11 (D 18) BM-11 Kebun 275 353.7 0.413 23BP-12 (D 18) BM-12 Crusher II 1200 350.7 N/A N/ABP-13 (V 18) BM-13 Crusher II 1200 321.6 N/A N/ABP-14 (D 18) BM-14 Kebun 400 18.5 0.175 16BP-15 (V 18) BM-15 Pos 400 216.4 1.60 21BP-16 (V 18) BM-14 Pos 400 216.4 0.476 13

    4.11 PVS akibat peledakan gamping, tidak ada keluhan bangunan retak, hanya kenyamanan terganggu

    Lokasi Peledakan

    Bahan Pld / delay

  • 7. HASIL PENGUKURAN GETARAN AKIBAT PELEDAKAN BATU GAMPING DI TUBAN

    Peak Particle Velocity (mm/s) & Frequency (Hz) SRSD

    Vert Freq Long Freq PVS PSPL1.65 26 1.73 21 2.32 134 dB 51.65

    0.698 20 1.52 17 1.61 121 dB 18.282.89 21 3.13 27 4.11 137 dB 11.471.52 14 1.86 12 2.17 128 dB 13.22

    0.365 57 0.270 9.7 0.374 137 dB 13.080.714 21 0.698 17 0.955 138 dB 13.170.619 9.7 0.524 9.8 0.687 124 dB 27.322.37 18 2.24 19 3.33 124 dB 18.28

    0.587 18 0.825 13 1.07 131 dB 22.270.841 N/A 0.762 15 0.938 130 dB 14.620.937 16 0.698 16 1.07 123 dB 14.62N/A N/A N/A N/A N/A N/A 64.07N/A N/A N/A N/A N/A N/A 66.93

    0.143 14 0.254 12 0.267 123 dB 93.020.937 16 1.49 23 1.85 122 dB 27.190.333 8.3 0.397 11 0.529 127 dB 27.19

    PVS akibat peledakan gamping, tidak ada keluhan bangunan retak, hanya kenyamanan terganggu

    5.0kgm

  • 8. CONTO EVALUASI HASIL PENGUKURAN GETARAN PELEDAKAN DOLOMIT TUBAN

    No.JARAK

    (m) (Kg) (Kg)BM-1 500 20 4 6,125 24.50BM-2 750 10 2 17.70 35.4BM-3 550 11 4 32.18 128.72BM-4 550 11 4 32.18 128.72BM-5 400 20 4 8.95 44.75

    6 650 20 5 8.95 44.757 400 20 5 8.95 44.758 3 0 0 0 09 550 26 7 11.73 82.2

    4,870 PVS akibat peledakan dolomit, tidak ada keluhan12.50 Getaran dump truck (banyak keluhan) - rumah banyak yang retak

    JUMLAH LUBANG TOTAL

    JUMLAH LUBANG PER DELAY SAMA

    ISIAN PER LUBANG

    BAHAN PELEDAK

    PER DELAY

  • 8. CONTO EVALUASI HASIL PENGUKURAN GETARAN PELEDAKAN DOLOMIT TUBAN

    PVS SPLKETERANGAN

    (mm/s) (dB)4,870 138 < NAB1,000 101 < NAB3,100 146 < NAB3,090 155 < NAB0.167 140 < NAB0.203 132 < NAB0.987 140 < NAB12.50 95.9 Dump Truck2.53 138 < NAB

  • 9. HASIL PENGUKURAN GETARAN PELEDAKAN GAMPING CIREBON

    Lokasi PengukuranJarak Peak Particle Velocity (mm/s) & Frequency (Hz)

    (m) (kg) Trans FreqBP-1 (A130) BM-1 Citotok 350 257.2 1.59 4.8BP-2 (A130) BM-2 Citotok 350 257.2 3.19 7.2BP-3 (C100) BM-3 Citotok 650 392.2 0.603 8.4BP-4 (C100) BM-4 Citotok 650 387.1 0.190 5.9BP-5 (B130) BM-5 Cupang 1000 151.1 0.381 51BP-6 (B130) BM-6 Cupang 1000 121.1 0.190 9.5BP-7 (B150) BM-7 Cupang 1000 151.1 0.111 0BP-8 (A140) BM-8 Citotok 600 186.8 0.619 16BP-9 (C110) BM-9 Handak 600 170.6 1.05 12

    BP-10 (C110) BM-10 Handak 600 199 0.143 6.13.65 PVS akibat peledakan gamping, ada keluhan, keretakan, karena struktur pasangan bata tidak ada slop

    Lokasi Peledakan

    Bahan Pld / delay

  • 9. HASIL PENGUKURAN GETARAN PELEDAKAN GAMPING CIREBON

    Peak Particle Velocity (mm/s) & Frequency (Hz) SRSD

    Vert Freq Long Freq PVS PSPL0.984 8.1 1.56 7.4 1.68 16 pa 21.830.968 7.1 3.02 6.6 3.65 26.3 pa 23.30.349 7.8 0.952 9.5 0.979 9.25 pa 32.820.095 7.1 0.222 5.3 0.231 8.25 pa 33.051.62 6.5 0.286 51 1.63 1.00 pa 81.36

    0.175 7.9 0.302 8 0.344 125 pa 90.91.33 0 0.270 0 1.34 122 pa 81.36

    0.921 11 0.098 5.7 1.16 10.3 pa 43.920.698 13 1.52 6.6 1.63 10.3 pa 45.940.175 5.4 0.159 0 0.228 17.8 pa 42.85

    PVS akibat peledakan gamping, ada keluhan, keretakan, karena struktur pasangan bata tidak ada slop

    5.0kgm

  • BS IS Azimuth Sudut Lurus Az + SL Jarak BearingA 1 70 20 N 70 E1 2 170 280 350 25 S 10 E2 3 40 50 220 20 S 140 E3 4 290 70 110 15 N 70 W4 5 290 180 470 30 N 70 W5 6 100 350 640 20 S 80 E6 7 200 280 380 25 N 160 W7 8 220 200 400 25 N 140 W