1. Resume Hasil Pengukuran Getaran Peledakan Batubara di KalSel (Tutupan)
Hari/Tanggal Lokasi Peledakan
CT2 Block 87-88 Stripe 48 1465ST2-PN1 Block 50-51 Stripe 52 2950
ST2-PN1 Block 40-42 Stripe 57-58 1021BUMA 1082
ST2-Hill 6A Block 46-48 Stripe 55-56 1072ST2-Hill 6B Block 46-47 Stripe 54-55 1164ST2-Hill 5 Block 50-52 Stripe 52-53 1451
Hill 6 Timur Block 48-49 Stripe 54-55 (Act 92-97) 3872Hill 6 Barat Block 47 Stripe 56 (Act 82-88) 3616Hill 8-9 Block 36-37 Stripe 57 (Act 12-19) 2788PAMA 2/CT 2 Block 85 Stripe 46 (Act 8-17) 2748
ST2-PN 1 Block 52-53 Stripe 52 (Act 117-119) 31723172
2/CT 2 Block 80-81 Stripe 46 (Act 2-7)377337733773
ST2-PN 1 Block 47-48 Stripe 54 (Act 87-88) 40673885
ST2-PN 1 Block 51-42 Stripe 51-52 (Act 116-117)326232623262
Jarak (m)
Sabtu, 26 Juni 2004
Minggu, 27 Juni 2004
Selasa, 29 Juni 2004
Rabu, 30 Juni 2004
Kamis, 1 Juli 2004
1. Resume Hasil Pengukuran Getaran Peledakan Batubara di KalSel (Tutupan)
HASIL PENGUKURAN
Transversal Vertikal Longitudinal
mm/s Hz g mm/s Hz g mm/s Hz97.5 0.540 3.9 0.007 0.587 2.7 0.007 0.683 4.195.9 0.381 128 0.053 0.254 > 200 0.053 0.508 2.1108 2.540 4.7 0.106 2.290 5.3 0.106 4.19 4.5
107.5 69 1.270 3.4 0.106 0.635 1.9 0.106 1.4 3.6123.9 62 1.650 2.7 0.106 1.020 11.8 0.106 1.4 3.2114.8 57 1.020 3.9 0.106 1.114 13.6 0.106 1.27 3.8113.8 61.1 0.889 2.7 0.106 0.762 2.6 0.106 0.889 2.9112.8 52 0.222 4.1 0.007 0.143 3.6 0.008 0.222 3.4< 88 50 0.111 4.8 0.005 0.079 8.1 0.007 0.222 3.797.5 41 0.317 5.5 0.007 0.159 5.1 0.008 0.286 2< 88 0.190 6.8 0.007 0.111 10 0.007 0.238 8.898.8 0.317 5.3 0.007 0.444 9.1 0.008 0.476 2.8100 0.206 6.1 0.007 0.254 2.1 0.007 0.349 2.7< 88 0.079 6.8 0.007 0.095 7.5 0.007 0.159 2< 88 0.095 6.8 0.007 0.111 2 0.007 0.159 3.295.9 0.079 7.1 0.003 0.111 2.1 0.007 0.159 2.3< 88 0.175 4.5 0.007 0.111 7.5 0.007 0.175 2.5< 88 0.095 64 0.007 0.079 43 0.007 0.159 64102.8 0.254 1.9 0.007 0.159 16 0.007 0.444 2.7104.2 0.206 3.6 0.008 0.159 1.5 0.007 0.317 2.9106 0.190 3.8 0.005 0.159 1.4 0.005 0.317 2.2
Hasil Pengukuran AirBlast
BlastMate dB (L)
Sound Level Meter dB (A)
1. Resume Hasil Pengukuran Getaran Peledakan Batubara di KalSel (Tutupan)
HASIL PENGUKURAN
KeteranganLongitudinal PVS
g mm/s0.008 0.557 Office Tutupan0.053 0.568 Office Tutupan0.106 1.38 Timbunan0.106 1.49 Timbunan0.106 1.32 Timbunan0.106 1.35 Timbunan0.106 1.05 Timbunan0.007 0.265 Dahai Office0.005 0.222 Dahai Office0.007 0.349 Dahai Office0.007 0.271 Lamida0.008 0.483 Lamida0.008 0.384 Lamida0.007 0.178 Trans0.005 0.171 Trans0.008 0.163 Trans0.007 0.2 Leburan0.008 0.166 Leburan0.007 0.459 Trans0.007 0.324 Trans0.007 0.34 Trans
2. Resume Hasil Pengukuran Getaran Peledakan di Upe Pongkor
Tanggal Jam Lokasi JarakBlasting Monitoring m7/27/2005 15.44.01 BP1-SDIA BA8917 50
15.44.17 BP1-SDIA BA5372 15015.44.52 BP2-BIV Central BA5372 6015.53.35 BP2-BIV Central BA8917 6023.24.34 BP3-BIV Central BA8917 4523.24.50 BP3-BIV Central BA5372 2523.24.53 BP3-BIV Central BE8090 35
7/23/2005 07.21.57 BP4-BIII Central BA8917 7007.22.12 BP4-BIII Central BA5372 64
7/24/2005 16.23.40 BP5-BIV South BA8917 5016.23.53 BP5-BIV South BA5372 4016.23.58 BP5-BIV South BE8090 25
7/24/2005 23.19.38 BP6-BIV Central BA5372 2023.19.39 BP6-BIV Central BA8917 2523.19.43 BP6-BIV Central BE8090 50
7/25/2005 23.26.01 BP7-BIA BA5372 7023.26.03 BP7-BIA BA8917 75
7/25/2005 23.50.43 BP8-BIII Central BA5372 3023.50.44 BP8-BIII Central BA8917 3523.50.48 BP8-BIII Central BE8090 25
7/27/2005 00.06.14 BP9-BIV South BA5372 2500.06.14 BP9-BIV South BA8917 50
2. Resume Hasil Pengukuran Getaran Peledakan di Upe PongkorIsian Hasil Pengukuran (mm/s) Keterangankg Trans Vert Long PVS11.6 5.59 3.94 9.65 10.411.6 1.14 0.0889 1.27 1.669.0 7.75 7.75 6.35 10.449.0 6.98 12.3 9.65 12.69.0 5.16 9.13 4.76 9.599.0 74.3 25.1 63.6 96.999.0 12.2 54.5 16.5 54.97.5 5.46 7.24 5.71 9.077.5 6.35 12.0 6.51 9.629.0 6.86 12.2 6.22 12.99.0 7.87 13.5 11.3 15.59.0 6.10 17.7 5.71 17.89.0 20.6 28.8 23.1 30.669.0 8.25 21.2 8.51 22.49.0 2.92 3.43 4.19 5.267.5 1.24 0.492 1.54 1,6527.5 0.651 0.762 1.05 1.257.5 4.27 12.5 4.78 12.997.5 4.05 11.9 6.22 12.57.5 8.25 13.3 6.22 14.89.0 8.13 21.4 12.5 21.739.0 6.08 10.2 3.51 11.8
3. Hasil Pengukuran Getaran Tanah Akibat Peledakan Batubara di Sangata
Alat Ukur
HASIL PENGUKURAN
Transversal
PPV f
(kg) (mmps) (Hz)BA 5657 Pit J 1500 2000 0.889 5.8 BA 8916 Pit J 1200 2000 2,300 4.5BA 8917 Pit J 1500 2000 0.952 5.8BA 9570 Pit J 1500 2000 1,000 5.8BE 10292 Pit J 1200 2000 2,760 4.5TEXCEL Pit J 1200 2000 1,940BA 5657 Pit J 1500 1000 0.683 4.1BA 8916 Pit J 1500 1000 0.905 3.0BA 8917 Pit J 1200 1000 2,140 4.7BA 9570 Pit J 1200 1000 2,270 4.6BE 10292 Pit J 1200 1000 2,330 4.7TEXCEL Pit J 1200 1000BA 5657 DIPAKAI UNTUK MENGUKUR VIBRASI PELEDAKAN DI PIT BENGALONBA 8916 TIDAK DAPAT MEREKAM GETARAN PELEDAKAN *)BA 8917 Pit J 1200 1000 0.968 3.4BA 9570 Pit J TIDAK DAPAT MEREKAM GETARAN PELEDAKAN *)BE 10292 Pit J 1200 1000 1.33 4.8TEXCEL Pit J 1200 1000
2.65 & 3.19 Getaran terasa, bangunan tidak terpengaruh, masyarakat tidak komplain
Hari / Tanggal
Lokasi Peledakan
Jarak (m)
Muatan / delay maks
Selasa, 22 November
2005
Rabu, 23 November
2005
Jumat, 25 November
2005
3. Hasil Pengukuran Getaran Tanah Akibat Peledakan Batubara di Sangata
HASIL PENGUKURAN
Transversal Vertikal Longitudinal
d a PPV f d a PPV f d
(mm) (g) (mmps) (Hz) (mm) (g) (mmps) (Hz) (mm)0.036 0.006 1,430 13.0 0.036 0.007 0.905 5.9 0.0440.083 0.017 1,650 9.5 0.040 0.015 2,700 5.6 0.0660.041 0.008 1,490 11.0 0.028 0.015 0.968 3.3 0.0450.042 0.008 1,480 13.0 0.027 0.015 0.937 6.0 0.0460.076 0.017 1,900 8.3 0.042 0.022 2,480 6.0 0.061
1,830 1,6200.037 0.005 0.889 3.9 0.029 0.008 1,240 4.1 0.0470.048 0.008 0.921 4.0 0.030 0.008 1,350 4.0 0.0510.051 0.015 1,600 5.3 0.044 0.010 2,030 4.7 0.0640.055 0.013 1,540 5.3 0.041 0.010 1,970 6.9 0.0570.055 0.013 1,570 5.2 0.043 0.012 1,940 6.8 0.058
DIPAKAI UNTUK MENGUKUR VIBRASI PELEDAKAN DI PIT BENGALONTIDAK DAPAT MEREKAM GETARAN PELEDAKAN *)
0.053 0.010 1.48 8.7 0.031 0.013 0.905 3.1 0.057TIDAK DAPAT MEREKAM GETARAN PELEDAKAN *)
0.047 0.008 1.7 10 0.039 0.013 1.56 5.9 0.061
Getaran terasa, bangunan tidak terpengaruh, masyarakat tidak komplain
3. Hasil Pengukuran Getaran Tanah Akibat Peledakan Batubara di Sangata
HASIL PENGUKURAN
Lokasi PengukuranLongitudinal
PVSa
(g) (mmps)0.008 1.46 Masjid Singa Gembara0.017 3.1 Depan Kantor Bupati Lama0.008 1.53 Masjid Singa Gembara0.010 1.52 Masjid Singa Gembara0.017 3.19 Depan Kantor Bupati Lama
2.65 Depan Kantor Bupati Lama0.007 1.29 Masjid Singa Gembara0.008 1.4 Masjid Singa Gembara0.013 2.6 Depan Kantor Bupati Lama0.013 2.57 Depan Kantor Bupati Lama0.012 2.61 Depan Kantor Bupati Lama
1.78 Depan Kantor Bupati LamaDIPAKAI UNTUK MENGUKUR VIBRASI PELEDAKAN DI PIT BENGALON
TIDAK DAPAT MEREKAM GETARAN PELEDAKAN *) Masjid Singa Gembara0.010 1.55 Depan Kantor Bupati Lama
TIDAK DAPAT MEREKAM GETARAN PELEDAKAN *) Depan Kantor Bupati Lama0.010 1.65 Depan Kantor Bupati Lama
1.05 Depan Kantor Bupati Lama
4. RESUME HASIL PENGUKURAN GETARAN TANAH AKIBAT PELEDAKAN DI KUARI GAMPING DI CIBINONG
Tanggal Alat Ukur Blasting PointJarak
HASIL PENGUKURAN
(m) (kg)
17 Jan-06 Blasting IBA 8916
PAT174 300
BE 10292 539 300BA 8917 1240 300
17 Jan-06 Blasting II BA 8916 PAB 618 350BE 10292 773 350
18 Jan-06 Blasting IIIBA 8916
PR212 400
BE 10292 468 400BA 8917 1210 400
18 Jan-06 Blasting IVBA 8916
PK325
350BE 10292 691BA 8917 497
### BA 8917 90 0BA 8917 90 0
19 Jan-06 Blasting V BE 10292 PAT 228 400BA 8917 90019 Jan-06 Blasting VI BE 10292 PAT 378 250
19 Jan-06 Blasting VII BA 8916 PAB 653 270BE 10292 783
### BE 10292 Truk Kosong 5Truk Isi 57.36 & 9.34 Getaran relatif besar, dinding retak-retak, masyarakat komplain
10.7 Konstruksi beton, tidak terpengaruh
Muatan / delay maks
DT Tumpahkan Batu
4. RESUME HASIL PENGUKURAN GETARAN TANAH AKIBAT PELEDAKAN DI KUARI GAMPING DI CIBINONGHASIL PENGUKURAN
Transversal Vertikal LongitudinalPPV f PPV f PPV f
(mmps) (Hz) (mmps) (Hz) (mmps) (Hz)5.59 18.3 5.59 20 8.25 141.37 5.3 1.57 6.0 1.29 4.4
0.317 4.0 0.206 7.0 0.556 4.40.254 0 0.127 0 0.127 0
0.0794 47 0.0635 43 0.0952 101.78 37 4.32 8.5 3.94 202.89 9.7 1.06 8.1 1.48 7.81.11 4.9 0.587 3.7 0.778 4.34.57 4.1 5.59 3.0 4.06 2.56.5 2.9 3.0 3.2 6.01 2.97.1 3.5 4.8 4.1 7.38 2.3
1.14 0 1.32 0.7620.857 0 0.46 0.734.00 7.9 2.73 39 4.75 8.4
0.397 5.4 0.365 3.3 0.54 2.91.90 30 2.08 47 1.64 15
0.889 21 0.509 57 0.635 260.413 5.0 0.270 7.1 0.429 8.10.111 8.7 0.159 13 0.111 130.46 16 0.889 15 0.286 13
Getaran relatif besar, dinding retak-retak, masyarakat komplain
4. RESUME HASIL PENGUKURAN GETARAN TANAH AKIBAT PELEDAKAN DI KUARI GAMPING DI CIBINONG
PPV Air BlastBlasting Monitoring
(mmps) dB (L/A)10.7 126 - L Gedung BKK2.02 121.8 - L RM Manaf
0.596 71.6 - A K Tegal0.284 110.9 - L Jl. Transport0.100 101.0 - L K. Pangkalan4.38 129.2 - L Jl. Truk3.00 123.9 - L Jl. Transport1.30 63.9 - L Mushola Walahir7.12 117.1 - L Belt Conveyor7.71 113.1 - L RM Manaf9.32 72.0 - L Mushola Walahir1.69 Mushola Walahir1.045.03 122.0 - L RM Manaf
0.642 63.2 - L Klapa Nunggal Asri2.28 115.6 - L RM Manaf
0.933 108.4 - L Bl. Container0.515 114.8 - L RM Manaf0.163 < 88 - L RM Manaf0.914 97.5 - L RM Manaf
5. Hasil Pengukuran Getaran Tanah Akibat Peledakan Batubara di Sangata
Alat UkurHASIL PENGUKURAN
Transversal(m) (kg) mm/s Hz d
BA 8916 3300
1736
0.79 4.5 0.039BA 8917 3300 0.62 3.7 0.028BA 5657 1800 2.78 4.8 0.081BA 9570 2100 3.13 4.1 0.114BA 8916 3300
368
1.21 3.4 0.040BA 8917 3300 0.38 4.2 0.013BA 5657 1800 3.10 6.7 0.137BA 9570 2100 2.76 4.5 0.145BA 8916 3300
1046
1.10 4.4 0.038BA 8917 3300 0.35 3.5 0.016BA 5657 2500 1.35 5.2 0.094BA 9570 2500 1.54 4.7 0.080BA 8916 3300
830
0.95 4.2 0.034BA 8917 3300 0.33 3.7 0.017BA 5657 1800 2.41 5.4 0.063BA 9570 3000 1.00 5.0 0.034
3.4 & 4.34 Getaran di depan rumah bupati lebih kecil dibanding di K. Tator (lokasi lebih jauh)
Hari / Tanggal
Jarak Pengukuran
Muatan / delay maks
Selasa, 14 Desember
2004
Rabu, 15 Desember
2004
Kamis, 16 Desember
2004
Sabtu, 18 Desember
2004
5. Hasil Pengukuran Getaran Tanah Akibat Peledakan Batubara di Sangata
HASIL PENGUKURAN
Transversal Vertikal Longitudinalg mm/s Hz d g mm/s Hz d g
0.008 1.33 17.0 0.012 0.015 1.35 6.4 0.039 0.0120.007 1.05 13.0 0.012 0.013 0.67 7.3 0.028 0.0070.015 3.32 6.0 0.083 27,400 2.73 7.6 0.087 13,8000.015 4.05 12.0 0.087 0.035 2.87 5.0 0.113 0.0150.010 0.84 17.0 0.026 0.012 1.02 5.3 0.034 0.0080.007 0.95 12.0 0.013 0.010 0.38 5.3 0.015 0.0070.022 4.11 6.0 0.099 0.071 6.11 5.1 0.181 0.0400.013 3.33 13.0 0.098 0.037 4.21 4.1 0.166 0.0200.007 1.44 16.0 0.014 0.018 0.87 4.6 0.035 0.0080.007 0.52 15.0 0.008 0.008 0.40 2.7 0.019 0.0070.007 1.65 1.9 0.070 0.015 1.73 3.1 0.081 0.0070.010 1.64 2.5 0.066 0.013 1.79 3.1 0.092 0.0090.008 1.05 17.0 0.014 0.015 1.05 3.6 0.030 0.0080.007 0.59 11.0 0.008 0.007 0.29 8.5 0.011 0.0070.013 2.24 7.4 0.057 0.077 2.59 5.1 0.077 0.0170.008 0.59 13.0 0.017 0.010 0.78 4.5 0.027 0.008
Getaran di depan rumah bupati lebih kecil dibanding di K. Tator (lokasi lebih jauh)
5. Hasil Pengukuran Getaran Tanah Akibat Peledakan Batubara di Sangata
HASIL PENGUKURANKeteranganPVS
mm/s1.39 Gang Dayung1.05 Perum Munthe3.43 Depan Rumah Bupati4.34 Kampung Tator
2,255 Gang Dayung0.954 Perum Munthe6.18 Depan Rumah Bupati4.23 Kampung Tator1.64 Gang Dayung
0.573 Perum Munthe1.79 Kampung Tator1.94 Kampung Tator1.12 Gang Dayung
0.617 Perum Munthe2.8 Depan Rumah Bupati
1.09 Gang Delima
6. RESUME PENGUKURAN GETARAN PELEDAKAN Batubara di Sangata
Pit
DATA PELEDAKAN
Alat Ukur Jarak PVS
(kg) (m) (mm/s)
AB - Bangau 650BM 1 500 2.16BM 2 600 2.70BM 3 700 2.01
Monyet 650BM 1 500 2.08BM 2 600 1.64BM 4 800 1.65
Harapan South 750BM 1 300 2.53BM 3 750 16.05BM 4 1000 6.36
Pelikan 650
BM 1 300 25.20BM 2 500 9.56BM 3 650 4.25BM 4 1000 3.52
AB* Phase 2 650
BM 1 300 8.08BM 2 500 3.12BM 3 750 3.01BM 4 1000 4.05
AB - Monyet 150BM 1 500 1.68BM 2 500 14.60BM 4 1700 3.04
650 BM 1 500 6.15BM 2 1000 2.11
AB* 650
BM 1 500 3.46BM 2 600 2.82BM 3 850 2.34BM 4 1000 2.12
Melawan* 750BM 1 400 11.63BM 2 500 8.70BM 3 600 7.14
550 BM 1 600 5.21BM 3 1000 3.69
400 BM 1 500 8.85BM 2 750 2.44Peledakan jauh dari bangunan
Hari, Tanggal
Muatan / Delay maks
Senin, 19/4/04
Selasa, 20/4/04
Rabu, 21/4/04
Kamis, 22/4/04
Jumat, 23/4/04
Sabtu, 24/4/04
Harapan* South
Minggu, 25/4/04
Monyet - AB Phase 2
Rabu, 28/4/04
Harapan South*
6. RESUME PENGUKURAN GETARAN PELEDAKAN Batubara di SangataDATA PELEDAKAN
Scaled Distance Air Blast BM
(Hz) dB (L) Hz5 -- 25 19.61 - - 4 -- 35 23.53 - - 6 -- 19 27.46 - - 4 -- 11 19.61 130.9 12.04 -- 11 23.53 - - 5 -- 10 31.38 131.3 - 3 -- 25 10.95 136.9 21.02 -- 29 27.39 134.6 26.01 -- 20 36.51 126.7 8.1
2 -- 100 11.77 143.7 45.04 -- 49 19.61 132.5 10.41 -- 45 25.50 130.6 6.83 -- 35 39.22 124.4 9.84 -- 40 11.77 133.4 5.94 -- 40 19.61 124.3 26.91 -- 35 29.42 126.1 8.43 -- 40 39.22 123.9 7.83 -- 5 40.82 126.7 16.4
3 -- 40 23.57 142.6 27.33 -- 10 80.14 125.8 11.02 -- 40 19.61 136.4 13.71 -- 15 39.22 127.4 8.73 -- 30 19.61 132.7 19.93 -- 27 23.53 129.5 19.35 -- 17 33.34 125.5 9.34 -- 21 39.22 125.6 8.31 -- 60 14.61 139.1 9.12 -- 90 18.26 142.2 12.21 -- 41 21.91 136.6 9.52 -- 50 25.58 133.8 11.53 -- 27 42.64 134.2 4.22 -- 30 25.00 134.5 6.52 -- 12 37.50 130.0 6.6
Selang Freq
5,0/WR
7. HASIL PENGUKURAN GETARAN AKIBAT PELEDAKAN BATU GAMPING DI TUBAN
Lokasi PengukuranJarak Peak Particle Velocity (mm/s) & Frequency (Hz)
(m) (kg) Trans FreqBP-1 (D 18) BM-1 Ds. Ngetuk 250 23.5 1.79 18BP-2 (W 15) BM-2 Ds. Ngetuk 250 187.1 1.10 19BP-3 (X 15) BM-3 Ds. Ngetuk 250 475.0 4.03 24BP-4 (D 16) BM-4 Ds. Ngetuk 250 357.5 1.81 13BP-5 (X 14) BM-5 Blk. Lokasi 250 365.0 0.270 9.3BP-6 (W 14) BM-6 Blk. Lokasi 250 360.0 0.810 20BP-7 (D 17) BM-7 Bts. SIPD 400 214.5 0.413 11BP-8 (X 14) BM-8 Pos 400 479.0 2.78 20BP-9 (V 14) BM-9 Pos 400 322.5 1.00 17
BP-10 (D 18) BM-10 Kebun 275 353.7 0.524 21BP-11 (D 18) BM-11 Kebun 275 353.7 0.413 23BP-12 (D 18) BM-12 Crusher II 1200 350.7 N/A N/ABP-13 (V 18) BM-13 Crusher II 1200 321.6 N/A N/ABP-14 (D 18) BM-14 Kebun 400 18.5 0.175 16BP-15 (V 18) BM-15 Pos 400 216.4 1.60 21BP-16 (V 18) BM-14 Pos 400 216.4 0.476 13
4.11 PVS akibat peledakan gamping, tidak ada keluhan bangunan retak, hanya kenyamanan terganggu
Lokasi Peledakan
Bahan Pld / delay
7. HASIL PENGUKURAN GETARAN AKIBAT PELEDAKAN BATU GAMPING DI TUBAN
Peak Particle Velocity (mm/s) & Frequency (Hz) SRSD
Vert Freq Long Freq PVS PSPL1.65 26 1.73 21 2.32 134 dB 51.65
0.698 20 1.52 17 1.61 121 dB 18.282.89 21 3.13 27 4.11 137 dB 11.471.52 14 1.86 12 2.17 128 dB 13.22
0.365 57 0.270 9.7 0.374 137 dB 13.080.714 21 0.698 17 0.955 138 dB 13.170.619 9.7 0.524 9.8 0.687 124 dB 27.322.37 18 2.24 19 3.33 124 dB 18.28
0.587 18 0.825 13 1.07 131 dB 22.270.841 N/A 0.762 15 0.938 130 dB 14.620.937 16 0.698 16 1.07 123 dB 14.62N/A N/A N/A N/A N/A N/A 64.07N/A N/A N/A N/A N/A N/A 66.93
0.143 14 0.254 12 0.267 123 dB 93.020.937 16 1.49 23 1.85 122 dB 27.190.333 8.3 0.397 11 0.529 127 dB 27.19
PVS akibat peledakan gamping, tidak ada keluhan bangunan retak, hanya kenyamanan terganggu
5.0kgm
8. CONTO EVALUASI HASIL PENGUKURAN GETARAN PELEDAKAN DOLOMIT TUBAN
No.JARAK
(m) (Kg) (Kg)BM-1 500 20 4 6,125 24.50BM-2 750 10 2 17.70 35.4BM-3 550 11 4 32.18 128.72BM-4 550 11 4 32.18 128.72BM-5 400 20 4 8.95 44.75
6 650 20 5 8.95 44.757 400 20 5 8.95 44.758 3 0 0 0 09 550 26 7 11.73 82.2
4,870 PVS akibat peledakan dolomit, tidak ada keluhan12.50 Getaran dump truck (banyak keluhan) - rumah banyak yang retak
JUMLAH LUBANG TOTAL
JUMLAH LUBANG PER DELAY SAMA
ISIAN PER LUBANG
BAHAN PELEDAK
PER DELAY
8. CONTO EVALUASI HASIL PENGUKURAN GETARAN PELEDAKAN DOLOMIT TUBAN
PVS SPLKETERANGAN
(mm/s) (dB)4,870 138 < NAB1,000 101 < NAB3,100 146 < NAB3,090 155 < NAB0.167 140 < NAB0.203 132 < NAB0.987 140 < NAB12.50 95.9 Dump Truck2.53 138 < NAB
9. HASIL PENGUKURAN GETARAN PELEDAKAN GAMPING CIREBON
Lokasi PengukuranJarak Peak Particle Velocity (mm/s) & Frequency (Hz)
(m) (kg) Trans FreqBP-1 (A130) BM-1 Citotok 350 257.2 1.59 4.8BP-2 (A130) BM-2 Citotok 350 257.2 3.19 7.2BP-3 (C100) BM-3 Citotok 650 392.2 0.603 8.4BP-4 (C100) BM-4 Citotok 650 387.1 0.190 5.9BP-5 (B130) BM-5 Cupang 1000 151.1 0.381 51BP-6 (B130) BM-6 Cupang 1000 121.1 0.190 9.5BP-7 (B150) BM-7 Cupang 1000 151.1 0.111 0BP-8 (A140) BM-8 Citotok 600 186.8 0.619 16BP-9 (C110) BM-9 Handak 600 170.6 1.05 12
BP-10 (C110) BM-10 Handak 600 199 0.143 6.13.65 PVS akibat peledakan gamping, ada keluhan, keretakan, karena struktur pasangan bata tidak ada slop
Lokasi Peledakan
Bahan Pld / delay
9. HASIL PENGUKURAN GETARAN PELEDAKAN GAMPING CIREBON
Peak Particle Velocity (mm/s) & Frequency (Hz) SRSD
Vert Freq Long Freq PVS PSPL0.984 8.1 1.56 7.4 1.68 16 pa 21.830.968 7.1 3.02 6.6 3.65 26.3 pa 23.30.349 7.8 0.952 9.5 0.979 9.25 pa 32.820.095 7.1 0.222 5.3 0.231 8.25 pa 33.051.62 6.5 0.286 51 1.63 1.00 pa 81.36
0.175 7.9 0.302 8 0.344 125 pa 90.91.33 0 0.270 0 1.34 122 pa 81.36
0.921 11 0.098 5.7 1.16 10.3 pa 43.920.698 13 1.52 6.6 1.63 10.3 pa 45.940.175 5.4 0.159 0 0.228 17.8 pa 42.85
PVS akibat peledakan gamping, ada keluhan, keretakan, karena struktur pasangan bata tidak ada slop
5.0kgm
BS IS Azimuth Sudut Lurus Az + SL Jarak BearingA 1 70 20 N 70 E1 2 170 280 350 25 S 10 E2 3 40 50 220 20 S 140 E3 4 290 70 110 15 N 70 W4 5 290 180 470 30 N 70 W5 6 100 350 640 20 S 80 E6 7 200 280 380 25 N 160 W7 8 220 200 400 25 N 140 W
FS23456789
Sheet1Sheet2Sheet3Sheet4Sheet5Sheet6Sheet7Sheet8Sheet9Hitung Az