LAGUNA/LBNO WP4: secondary beam line status report. LAGUNA/LBNO DS meeting / December 2012. M. Calviani , P. Velten , A. Ferrari, I. Efthymiopoulos, C. Lazaridis (CERN) + M. Zito , V. Galymov (CEA), A. Rubbia, S. Murphy, S. Di Luise (ETHZ). Organization of the WG and activities. - PowerPoint PPT Presentation

Citation preview

Page 1: LAGUNA/LBNO WP4:  secondary beam line  status report

LAGUNA/LBNO WP4: secondary beam line status

report

M. Calviani, P. Velten, A. Ferrari, I. Efthymiopoulos, C. Lazaridis (CERN)+ M. Zito, V. Galymov (CEA), A. Rubbia, S. Murphy, S. Di Luise (ETHZ)

LAGUNA/LBNO DS meeting / December 2012

Page 2: LAGUNA/LBNO WP4:  secondary beam line  status report

2 M. Calviani -- LAGUNA/LBNO DS General Meeting

Organization of the WG and activities

Focused (for the moment) on: Agreement on the main physics parameters (ok now!) Optimization of beam/target optimization Configurations of horn Muons in the ND and configuration of the decay pipe

CERN-oriented meetings held on a ~monthly basis to discuss the activities within the sub-WG Steering the activities on the LAGUNA/LBNO

secondary beam line Participation to external members working on

some aspects of the beam line in other institutes Important input from the experiment!

17th December 2012

Page 3: LAGUNA/LBNO WP4:  secondary beam line  status report

3 M. Calviani -- LAGUNA/LBNO DS General Meeting

Target-horn distance and horn current optimization

17th December 2012

Page 4: LAGUNA/LBNO WP4:  secondary beam line  status report

4 M. Calviani -- LAGUNA/LBNO DS General Meeting

Horn-reflector distance and reflector current

optimization

17th December 2012

Page 5: LAGUNA/LBNO WP4:  secondary beam line  status report

5 M. Calviani -- LAGUNA/LBNO DS General Meeting

17th December 2012

Page 6: LAGUNA/LBNO WP4:  secondary beam line  status report

6 M. Calviani -- LAGUNA/LBNO DS General Meeting

17th December 2012

Page 7: LAGUNA/LBNO WP4:  secondary beam line  status report

7 M. Calviani -- LAGUNA/LBNO DS General Meeting

nm fluence in ND/FD

dTH=0 cm / IH=220 kA

dHR=6 m / IR=275 kA

17th December 2012

Page 8: LAGUNA/LBNO WP4:  secondary beam line  status report

8 M. Calviani -- LAGUNA/LBNO DS General Meeting

17th December 2012

Page 9: LAGUNA/LBNO WP4:  secondary beam line  status report

9 M. Calviani -- LAGUNA/LBNO DS General Meeting

m± fluence with passive shielding

17th December 2012

Page 10: LAGUNA/LBNO WP4:  secondary beam line  status report

10 M. Calviani -- LAGUNA/LBNO DS General Meeting

m± fluence with active toroidal shielding

17th December 2012

with 29 Tm bending power

Page 11: LAGUNA/LBNO WP4:  secondary beam line  status report

11 M. Calviani -- LAGUNA/LBNO DS General Meeting

17th December 2012

Page 12: LAGUNA/LBNO WP4:  secondary beam line  status report

12 M. Calviani -- LAGUNA/LBNO DS General Meeting

Conclusions

Much work to do still…!

17th December 2012