ATTACHMENT “C”
LACTO ASIA
A. Main Equipment:
Figure 1. Receiving Hopper, 2 units with a unit price of P1,330,987.14 for the total
amount of P2,661,794.24;
Figures 2, 3, 4,& 5.(2) Parallel Conveyor, (3) Cut-off Conveyor, (4) Conveyor Leading
to Trommel Screener, 2 units each has a unit price of P484,670.20 for the total
amount of P2,908,021.20;
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 2/22
Page 2 of 22
Page 2
Figures 6 & 7. Trommel Screener, 1 unit with a price of P605,854.80;
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 3/22
Page 3 of 22
Page 3
Figure 8. Plastic Blower Equipment, 1 unit with a price of P547,888.06. This plastic
blower could not be installed as to specifications due to lack of building space thus
reducing the efficiency of the Trommel Screener by at least 10 (%) per cent to
separate plastics from the solid waste due to plastic blockage of the trommel sieves.
Equipment is now stored in the warehouse.
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 4/22
Page 4 of 22
Page 4
Figure 9. Four (4) way sorting with in and out Mechanical Conveyor (1 set Main
conveyor, 4 units and 1 set out feed conveyor, 4 units) in the amount of
P2,925,307.16.
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 5/22
Page 5 of 22
Page 5
Figure 10 & 11. Out Feed Extension Conveyor, 1 unit with a price of P387,736.16;
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 6/22
Page 6 of 22
Page 6
Figure 12. Hammermill Loading Conveyor, 2 units with unit price of P442,816.73 forthe total cost of P885,632.54.
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 7/22
Page 7 of 22
Page 7
Figure 13. Hammermill / Shredder / Decorticator, 3 units with unit price of
P872,662.64 for the total cost of P2,617,987.92.
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 8/22
Page 8 of 22
Page 8
Figures 14. Hammermill off-loading mechanical convey, 2 units with unit price of
P348,170.20 for the total cost of P696,340.20.
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 9/22
Page 9 of 22
Page 9
Figure 15. Steel Trolleys, 6 units with unit price of P37,930.71 for the total cost of
P227,584.26.
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 10/22
Page 10 of 22
Page 10
Figure 16. Portable Power Sprayer, 2 units with unit price of P151,722.84 for the
total cost of P303,445.68. These units are stored in the warehouse. These sprayers
are the same sprayers used in car wash.
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 11/22
Page 11 of 22
Page 11
B. For Composting System and Support Equipment
Figures 17 & 18. Rotary Composter Drum 2000 liter capacity, 27 units with unit
price of P360,341.63 for the total cost of P9,729,224.01. These 27 drums were
placed on the Material Recovery Bldg. 2. and only 14 drums were used for compose
drying.
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 12/22
Page 12 of 22
Page 12
Figure 19. Steel Ladder to Composter Drum, 2 units with unit price of P160,464.11
for the total cost of P320,968.2. The ladder has seven (7) steps and if the
computation of costing is made per step, each step costs P22,923.44.
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 13/22
Page 13 of 22
Figures 20 & 21. Compost Buggy, 10 units with unit price of P37,930.71 for the total
cost of P379,307.10.
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 14/22
Page 14 of 22
Page 14
Figure 22. Rotary Screener, 3 units with price of P330, 065.05 and total cost of
P990,195.15.
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 15/22
Page 15 of 22
Page 15
Figure 23. Bagging Equipment, 1 set with price of P66,196.17. This baggingequipment is not in storage and could not be accounted for, although documents
showed the units have been delivered and received. What remained is the weighing
scale.
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 16/22
Page 16 of 22
Page 16
C. Baling and Composting Equipment
Figure 24. Mechanical Baler/Compactor, 1 unit with price of P1,222,742.60. This
baling machine is manually operated and could not perform the specifications of six
bales per hour. When used, baling machine produced only one baling per hour.
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 17/22
Page 17 of 22
Page 17
D. Residuals to Concrete Block Equipment
Figure 25. Residuals Crusher, 1 unit with price of P1,300,012.45. This unit was notused but tested on the coconut husk and not on residuals.
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 18/22
Page 18 of 22
Page 18
Figure 26. Tools and Spare Parts and Others in the total amount of P522,193.66. The
total cost of the entire project is P29,683,485.27.
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 19/22
Page 19 of 22
Page 19
Figure 27. Hammermill in the amount of P170,000.00, intended for Barangay MRF,and awarded to Barangay Luinab in 2006 that has no functional MRF.
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 20/22
Page 20 of 22
Page 20
Figure 28. The current state of the Pilot project in Del Carmen showed a dilapidatedstructure and a failed system of the Barangay MRF.
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 21/22
Page 21 of 22
Page 21
Figure 29. Bucket Loader in the amount of P4,429,824.92. The said equipment
detached the backhoe and compactor since the same could not be used in the
facility.
8/12/2019 LACTO ASIA Photos - Task Force CMRCF Report
http://slidepdf.com/reader/full/lacto-asia-photos-task-force-cmrcf-report 22/22
Page 22 of 22
Page 22
Figures 30 and 31. Detached backhoe and compactor.