Laboratory Examination of Smelt Spouts 2011 TAPPI PEERS CONFERENCE Portland, Oregon Craig Reid Acuren Group Inc

Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

  • Upload
    others

  • View
    23

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Laboratory Examination of Smelt Spouts

2011 TAPPI PEERS CONFERENCEPortland, Oregon

Craig ReidAcuren Group Inc

Page 2: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

BLRBAC Safe Firing• Inspect spouts every scheduled outage• Replace all spouts at least annually • cut up at least one removed spout to inspect

the water side• Field hydro test new spouts• Never rebuild, repair, or modify a spout• Clean and inspect head tank and collecting

tank annually • Periodically inspect cooling water piping

Page 3: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

BLRBAC SAFE FIRINGcompliance varies

• Spouts not changed annually• Fireside inspection practice varies –

(clean, dry, full access)• Rebuilt spouts used• Water side examination of sacrificial

spout not documented

Page 4: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

MaterialsCarbon steel

– Bare– Thermal sprayed– Chromized– Roll clad with stainless– Roll clad with Alloy 825

Fabricated 304L stainless steel50Cr/50 Ni Cast Dry spouts

Page 5: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Damage Mechanisms• water side corrosion and/or deposition

• fireside corrosion by smelt

• fireside corrosion by condensed vapor

• fireside thermal fatigue

• fireside rodding damage

Page 6: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Water SideDefined water passages

– the “CE” Spout– water makes several longitudinal passages– analogous to water flow through a tube

Not so defined water passages– assorted designs– water flow is more or less directly from inlet

to outlet

Page 7: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

“CE” Spout

Page 8: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 9: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

SummaryDamage Mechanisms

• water side deposition or corrosion not a factor in damage

• no overheating of either carbon steel or stainless steel

• corrosion of bare carbon steel

• corrosion of carbon steel exposed by loss of thermal spray and chromizing

• thermal fatigue cracking of carbon steel, stainless steel, roll clad plate, and 50 Cr/50 Ni dry spouts

• “mechanical” fatigue cracking of chromized spouts – after four years

Page 10: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

SummaryThermal fatigue

• not found with CE style spouts

• analogous to thermal fatigue of composite smelt spout opening tubes and primary air port tubes

• occurs without corrosion

• driven by smelt side heat flux variations (in dry and water cooled spouts)

• related to cooling water flow pattern in water cooled spouts with “not so defined cooling water passages”

Page 11: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

SummaryThermal fatigue

• No “easy” solution available to boiler operator

• Parallel with ORNL/Paprican research program on composite tube cracking

• Smelt side thermal flux variations inherent in operation

• Spout water passage design expertise resides with suppliers

• Spout water supply system design depends on suppliers

• Operator can monitor and trend cooling water parameters – e.g. flow rate and temperature

Page 12: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

SummaryInspection

• Observed damage occurs without significant water side corrosion or deposition

• Monitor water side by other means than spout sacrifice

• Keep spouts in service by visual inspection, UT thickness, MT or PT for cracking

• If significant damage is found or the type or pattern of damage changes then trigger a water side examination

• Always to a visual inspection with good lighting

• surface preparation is essential for sensitive MT or PT

• “if you ain’t grindin/sandin then you ain’t findin”

• UT thickness must be a scan using a screen display – no point “doinking” by test robots

Page 13: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

CHRONOLOGICAL BACKGROUND

Page 14: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Powell – “CE” chromized. Service up to 4 years with no deterioration

1990 -1995

Powell – 2 thermal spray and 2 chromized spouts installed. Thermal spray lost after 6 months.

1990

Powell – thermal spray used with mixed success1985 -1989

Powell - “CE” bare - after boiler rebuild spout life decreased from 1 year to 6 months - tide line thinning

1985

Harmac - cast Hastelloy C spout leaked in short service – due to casting defects

1982

Harmac - average spout life 11 months1982

Harmac - average spout life 7 weeks1968

Page 15: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Mill N – “CE” bare - 2 boilers – no deterioration 2001

Swedish report of a smelt spout leaking incident due to start up overheat . Also mentioned thermal fatigue cracking as a common problem

1997

Powell – started changing chromized annually1995

Powell – 3 new “CE” chromized leaked after 6 months - a 4th spout which had been in service for 2 years did not leak

1995

Harmac – 50Cr/50Ni dry spout trial. Reverted to water cooled.

1993 -1994

Page 16: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Mill E1 - “CE” bare – no deterioration aside from rodding damage.

2004

Mill C1 - solid 304 – cracking and 25% wall loss at inlet. Plate sensitized at inlet and outlet – maybe from stress relief heat treatment.

2004

Mill G – “CE” rebuilt spouts thermal sprayed -cooling water lost for 3 minutes – ran another week then 3 spouts examined. One showed shallow surface overheating but no loss of spray.

2003

Mill G – “CE” bare – upper side of cooling tube thinned inside furnace – one small weep. Speculated due to refractory issues

2003Mill N – “CE” bare - 2 boilers – no deterioration 2002

Mill D – “CE” bare – thinning and leak in discharge end cooling tube

2002

Page 17: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Mill S2 – Dry spouts – full thickness loss2008

Mill E- Dry spouts – thermal fatigue cracking2008

Mill A – roll clad 304L plate – thermal fatigue cracking in 304L entered carbon steel

2007

Mill N - “CE” chromized – 3 years – chromized loss at discharge lip on one spout due to rodding damage – 20% wall loss on exposed carbon steel

2007

Mill S1 – “CE” chromized – chromized lost on upper side of cooling tube inside furnace – exposed tube thinned

2006

Rebuilder - 5 carbon steel spouts after 1 year – no deterioration

2006

Mill N – “CE” chromized – no deterioration2004

Page 18: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Rebuilder – 2 year examination of the 5 carbon steel spouts examined in 2006 – thermal fatigue at inlet, thinning at outlet end plate

2008

Mill H – “CE” thermal spray with 50Cr/50Ni – 1 year - widespread spray loss but no loss of exposed carbon steel - upper side of cooling tube thinned inside furnace similar to mills G and S – may not have been sprayed

2008

Mill D – bare carbon steel – thermal fatigue cracking to 75% of wall near discharge end on the two right side spouts - cracking coincided with cooling water discharge chamber. Left side spouts no cracking

2008

Mill C1 – solid 304L with weld overlay at inlet and discharge - thermal fatigue cracking to 50% of wall

2008

Page 19: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Mill D – bare carbon steel – thermal fatigue cracking all 4 spouts – 40 to 80% of trough wall. Cracking coincided with cooling water discharge chamber

2009

Mill A – roll clad alloy 825 plate – thermal fatigue cracking in alloy 825 did not reach carbon steel after 12 months service

2009

Mill C1 – solid 304L – 9 months - thermal fatigue cracking to 70% of wall at smelt inlet – shallower cracking along trough

2009

Mill C3 – solid 304L (same design as Mill C) – no cracking

2009

Mill C2 – bare carbon steel – two variants – 12% wall loss on inlet end plate –okay for multi year use - weld overlay could be used to extend life

2009

Page 20: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Mill S1 – “CE” bare – 13 months. No corrosion –10 grams/ft2 maximum DWD

2010

Mill D – bare carbon steel – thermal fatigue cracking to 50% of wall near discharge end on the rightmost spout only - cracking coincided with cooling water discharge chamber.

2010

Mill C4 – “CE” bare – 2 years. Thinned. Max. loss 0.110” from 0.250” original. 87 – 99 grams/ft2 DWD in high heat flux channels.

2010

Mill T – carbon steel. Transverse thermal fatigue by in place PT. No lab exam.

2009

Mill H – “CE” chromized – 11 months – 40% of chromized layer on outlet end cooling tube corroded at tide line. No exposed carbon steel.

2009

Page 21: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Mill D – bare carbon steel – thermal fatigue cracking to 80% of wall near discharge end on the 2nd spout from right side only - cracking coincided with cooling water discharge chamber. Spout allegedly stress relieved.

2011

Mill N – “CE” chromized – 4 years – three spouts on one side found leaking on shutdown PT. Replaced. The spouts on other side cracking ground on and left in place.

2010

Page 22: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Mill D – 2002 – Bare “CE” – one yearwater leak at smelt outlet

Page 23: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Damage mode – General thinning

Smelt inlet end

Smelt outlet end

Page 24: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Mill G – 2003 – Bare “CE”

Page 25: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 26: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 27: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

THERMAL SPRAYED SPOUTS

Mill H – one year

Page 28: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 29: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 30: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Chromizing

Page 31: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Chromizing

Page 32: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

ChromizingPowell River – 1995 – 6 months

Page 33: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Suspected cause of failure was overheating – not accepted by mill

Page 34: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 35: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

1997 Swedish Incident

• Subatmospheric cooling water• Start up with low smelt and start up burners to

maintain steaming• Hot smelt corroded inside ends of spouts• Smelt sucked into hole in one spout• Internal explosion in spout - then new smelt

sucked in and another explosion – explosions repeated several times a minute

• Cooling water ejected from spout into furnace • Hot water ejected out over dissolving tank roof

Page 36: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

• Furnace ESP’d• Silver Lining:“no thermal fatigue cracks found in spout

troughs which is a frequent trouble of spouts here in Sweden”

Page 37: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Mill H 2009

Page 38: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 39: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 40: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Chromizing

• Spouts left in service with annual PT• Cooling water leaks found at four year

inspection• Suspected “mechanical fatigue”• Three leaking spouts replaced• Three non-leaking spouts left in place

Page 41: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Water leaking from cracks

Water leaking from cracks

Page 42: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 43: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 44: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

WATER SIDE EXAMINATION

Page 45: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 46: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

DWD Measurement

Page 47: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 48: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Mill C1 – 2008 Solid 304L with Weld Overlay – 1 Year

Page 49: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 50: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 51: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Smelt Inlet End

Page 52: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 53: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Butt Weld in Trough

Page 54: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Weld Overlay at Smelt Outlet End

Page 55: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Cross Section of Crack Adjacent to Weld Overlay

Page 56: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Crack at Surface

Page 57: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Crack Tip

Page 58: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Crack Adjacent to Weld Overlay Broken Open

Page 59: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Crack SurfaceThere are Clear Fatigue Striations

Page 60: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Mill C1 – 2009 Solid 304L– 9 Months

Page 61: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 62: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Trough at Smelt Outlet End

Page 63: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 64: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Mill D – 2008 – Bare carbon steel

Page 65: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 66: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 67: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 68: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 69: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 70: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 71: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 72: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 73: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 74: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Mill D – 2011 – Bare carbon steel

Page 75: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 76: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 77: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 78: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Mill A – 2007 – 304L Clad Plate

Page 79: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 80: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 81: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 82: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 83: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 84: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 85: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 86: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Mill A – 2009 – Alloy 825 Clad Plate12 months

Page 87: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 88: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

825/carbon steel interface

Page 89: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Mill E – 2008 – Dry Spout

Page 90: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 91: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 92: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 93: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 94: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 95: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 96: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Mill S2 – 2008 – Dry Spouts

Page 97: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout
Page 98: Laboratory Examination of Smelt Spouts...BLRBAC Safe Firing • Inspect spouts every scheduled outage • Replace all spouts at least annually • cut up at least one removed spout

Proverbs 3:5

Trust in suppliers with all thine heart and lean not unto thine own understanding