) LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that enforces its own Labor Compliance Program for all projects (Labor · • Report foe the reporting pedod 07/0 I /2014 . to 06/30/20_15 . 1. Name of Labor Compliance Program (LCP): (J J-6 Labor Compliance Program- City of Santa Clarita 2. LCP I.D. Number (assigned by DIR): 3. Date of Initial Approval: 2003.00362 November 20,2003 4. Contact person (include name, title, address, telephone, fax, and e-mail, if available): Harry Corder, Senior Engineer City of Santa Clarita, 23920 Valencia Boulevard, Santa Clarita, CA 91355-2196 (661) 286-4025 [email protected] 5. Did LCP perform any LC § 1771.5 enforcement activities during the 12 months in the reporting period? Please check one: PYes If Yes, proceed to item 6 on the next page I No If No, complete the information below, sign the form and submit to DIR, Office of the Director, Attn: LCP Special Assistant, 455 Golden Gate Avenue, lOth Floor, San Francisco CA 94102 / What suggestions do you have for the Department of Industrial Relations to better assist you with your program in the coming year? (attach additional sheets if necessary) SUBMITTED BY: /J Harry Corder, Senior Engineer/Labor Com11Iiance Officer I l 61 '- u I '[;; Signature Name and Title Date LCP ANNUAL REPORT 8 CCR 16431 -- AB all 2008 I

LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that

  • Upload
    votuong

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

Page 1: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that

)

LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT

RECEIVED

AUG 2 4 2015 Format for Awarding Body that enforces its own Labor Compliance Program for all projects (Labor C~~=j~7!a::, · •

Report foe the reporting pedod 07/0 I /2014 . to 06/30/20_15 . ~

1. Name of Labor Compliance Program (LCP): (J J-6 Labor Compliance Program- City of Santa Clarita

2. LCP I.D. Number (assigned by DIR): 3. Date of Initial Approval:

2003.00362 November 20,2003

4. Contact person (include name, title, address, telephone, fax, and e-mail, if available):

Harry Corder, Senior Engineer

City of Santa Clarita, 23920 Valencia Boulevard, Santa Clarita, CA 91355-2196

(661) 286-4025

[email protected]

5. Did LCP perform any LC § 1771.5 enforcement activities during the 12 months in the reporting period?

Please check one: PYes If Yes, proceed to item 6 on the next page

I No If No, complete the information below, sign the form and submit to DIR, Office of the Director, Attn: LCP Special Assistant,

455 Golden Gate Avenue, lOth Floor, San Francisco CA 94102

/

What suggestions do you have for the Department of Industrial Relations to better assist you with your program in the coming year? (attach additional sheets if necessary)

SUBMITTED BY:

/J ~~ Harry Corder, Senior Engineer/Labor Com11Iiance Officer I l ~o 61 '- u I '[;; ~ Signature Name and Title Date

LCP ANNUAL REPORT 8 CCR ~ 16431 -- AB all pr~jects 2008

I

Page 2: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that
Page 3: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that

LCP-AR2 6. LC § 1771.5 enforcement activities (provide all information requested, attaching as many sheets as necessary).

A. List projects handled by LCP within the past 12 months.

Project Name Bid Advertisement Date Prime Contractor Contract Amount

B3003 Sand Canyon Road/SR-14 Gateway 4/24/2013 Diversified Landscape Management $1,624,124 Beautification

S1037 McBean Parkway Bridge Widening 5/5/2013 Security Paving $6,728,427

P40 12 Central Park Phase 3 5/29/2013 R.C. Becker & Son $1,996,820

F2009 Santa Clarita Incubator 911/2013 R.L. Passarelli Enterprises $203,150

B3003 GVR/Centre Pointe Medians 9/25/2013 R.C. Becker & Son, Inc. $1,778,420

R0011 Aquatics Variable Frequency Drive Pump 9/27/2013 Hidden Valley Pump $50,883

F1017 City Hall Seismic Retrofit 10/2/2013 Fast-Track Construction $1,192,400

B20 14 Railroad A venue Beautification 10/25/2013 R.C. Becker & Son, Inc. $1,707,667

C4011 HSIP Signal Modifications 1/21/2014 Excel Company $564,657

M3019 JoAnne Darcy Canyon Country Library -Exterior Painting

1/23/2014 Sparta Builders $66,880

M0094 Jan Heidt/SC Metro Parking Lots 1/28/2014 California Pavement Service $218,841

M0098 2013-14 Annual Concrete Rehab 2/10/2014 F.S. Construction $920,575

M0096 2012-13 Federal Overlay 2/13/2014 All American Asphalt $2,066,750

T2009 Downtown Newhall Wayfinding Signage 3114/2014 PVL Signs & Graphics $51,500

M0097 2013-14 Annual Overlay & Slurry Seal 3/16/2014 Toro Enterprises $6,007,717

B3007 Sierra Highway Sidepanels 4/7/2014 Draper Construction $142,000

M3015 SCSC HV AC Phase 2 5/5/2014 Multizone,HV AC, Inc. $70,000

B0013 Canyon Country Monument Sign and 6/16/2014 Martinez Landscape Co,. Inc. $89,000

Landscape

14-00256 Traffic Signal Projects 7/10/2014 Taft Electric $15,990

14-0025 8 Loop Contract 7/11/2014 Taft Electric $28,500

14-00288 Time & Material for Traffic Signals 7/11/2014 Traffic Development Services $24,985

14-00260 Time & Material for ITS 7/11/2014 Crosstown Electrical and Data $25,000

R4003 Arundo Removal II 7/22/2014 R.A. Atmore & Sons $487,953

LCP ANNUAL REPORT 8 CCR ~ 16431 -- AB all projects 2008

Page 4: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that
Page 5: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that

LCP-AR2

R4003 Annual Arundo Removal 7/22/2014 R.A. Atmore & Sons, Inc. $487,953

M1 017 Valencia Library Roof Replacement 7/27/2014 Rey-Crest Roofing and Waterproofing $442,164

B3011 Soledad Canyon Road Median 8/24/2014 R.C. Becker & Son, Inc. $1,311,671 Refurbishment 14-00398 Backflow Prevention Device 8/29/2014 Backflow Prevention Device Tester $230,000 Maintenance 2year

14-00073 City Trail System Fence Replacement 9/5/2014 STL Landscape $88,840

TR-00103 MTS Fiber Optic Connection 9/10/2014 Crosstown Electrical and Data $17,988

T0040 Bus Stop Improvements Fed 9/15/2014 R.C. Becker & Son, Inc. $717,867 '

R1002A Paseo Pathways LED Conversion 9/24/2014 Express Energy Services, Inc. $916,027

T0043 Sidewalk Access Ramps CDBG 10/17/2014 F.S. Construction, Inc. $90,000

14-00383 LED Replacement Project 10/22/2014 Taft Electric $39,900

M0093 2012-13 Bridge Preventive Maintenance 11/2/2014 Peterson/Chase General Engineering $211,435

M3 022 SCSC HV AC Phase 3 11110/2014 United Mechanical Contractors, Inc. $91,425

S3028 SGV/SR-14 Bridge Widening 11110/2014 Security Paving Company $6,607,715

C3014 Signal Modification at Lyons Avenue and 11114/2014 Los Angeles Signal Construction $67,639

Newhall Avenue

T2008 Newhall Avenue HSIP 11114/2014 F.S. Construction $264,505

F1021 City hall Access Improvements 11114/2014 Draper Construction $157,072

M1016 TMF Floor Recoating 11114/2014 Specialty Flooring $101,967

B2015 Newhall Ave Beautification 12/9/2014 · R.C. Becker & Son, Inc. $1,615,244

R0012 Valencia Glen Parking Lot Low Impact 12/10/2014 Draper Construction $90,000 Development Retrofit

15-00064 Irrigation Controller Replacement PH3 1211112014 V alleyCrest Landscape Maintenance $308,590

M0103 2014-15 Annual Concrete Rehab 12/22/2014 F.S. Construction $1,318,000

P3020 Park Shade Structures- Various 115/2015 USA Shade $50,604

S1042 John Russel Drive POC Replacement 1111/2015 Taro Enterprises $429,419

Rubberized Playground Surface Replacement 1113/2015 Spectra Turf $107,393

15-00046 Decaro Access Ramps 2/2/2015 F.S. Construction. $30,000

M3021 SCSC Switchgear Replacement 2/4/2015 T &D Electric $49,500

M0106 NONG Parks Pool Renovations 2/8/2015 AMG Associates, Inc. $220,348

LCP ANNUAL REPORT 8 CCR ~ 16431 -- AB all projects 2008

Page 6: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that
Page 7: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that

I --------------

LCP-AR2

TR-00101 Blank-Out Sign Installations 2117/2015 Crosstown Electrical and Data $27,427

TR-00102 Signal Re-Wire Soledad Cyn Road at 2118/2015 Crosstown Electrical and Data $42,480 Camp Plenty & Via Princessa @ Whites Cyn Rd

TR-00100 2014-15 Striping Project 2/23i2015 Chrisp Company $34,429

15-LMD03 Old Orchard Bridge Painting 311/2015 Hahn Contractors $34,500

T0044 Crosswalk Improvements CDBG 3/2/2015 Ruiz Concrete & Paving $70,722

MO 1 02A 2014-15 Annual Overlay 3/12/2015 Sully-Miller Contracting Co. $6,013,964

M0102B 2014-15 Annual Slurry Seal 3/12/2015 Intermountain Slurry $1,302,253

LMD 15-15-20 TMF Landscape Improvement 4/9/2015 Venco Western $117,195

15-UF-02 TurfMedian Retrofit 4/16/2015 Stay Green, Inc. $33,532

15-UF-01 TurfMedian Retrofit 4116/2015 Oakridge Landscape, Inc. $34,118

P40 14 Pacific Crest Park Improvements 4/20/2015 AMG & Associates $517,450

B3014 Sierra Hwy Beautification & Intersection 4/24/2015 STL Landscape $1,068,000 Improvements C3014A Signal Modifications Whites and

4/29/2015 JFL Electric $116,630 Pleasantdale

M0102 2014-15 Annual Slurry Add'l Work 5/14/2015 Intermountain Slurry $888,001

GS-00 101 CNG Fueling Stations Repairs 6/112015 ALLSUP Corporations $18,000

GS-00 100 Corporate Yard Evaporative Coolers 6/1/2015 JCT Mechanical $36,000

120856 EMS Project 6/16/2015 Honeywell Building Solutions $49,814

11-003 87 LMD Zones T23A&B 8/12/2011 American Heritage Landscape $267,030

10-00236 LMD/UF Tree Service Requests 7/1/2014 Four Seasons Landscape $710,000

12-00324 LMD Zone T8 6/29/2012 Marina Landscape $279,192

12-00203 LMD Zone 28 7/112014 Marina Landscape $69,368

09-00048 LMD Zones 20,21,23 8/1/2013 Oak Springs Nursery $21,150

14-00029 LMD Lost Canyon Medians 2008-1 1116/2014 Oak Springs Nursery $19,198

12-00397 LMD Zone T51 Valencia High School 8/23/2012 Oakridge Landscape, Inc. $249,800

13-00245 LMD NRR Slopes 4/5/2013 Oakridge Landscape, Inc. $75,900

14-00091 LMD Zones 7, 19, & T1· 1/27/2014 Oakridge Landscape, Inc. $99,800

14-00198 LMD Zone 2008-1 J/21/2014 Oakridge Landscape, Inc. $1,019,816

LCP ANNUAL REPORT 8 CCR ~ 16431 -- AB all projects 2008

Page 8: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that
Page 9: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that

LCP-AR2

12-00149 LMD Zone 18, T1 AdVal (Cityscapes) 6/1/2014 Oakridge Landscape, Inc. $147,456

12-00262 LMD Transit Facilities. 8/1/2014 Oakridge Landscape, Inc. $76,064

10-00445 LMD Zones T46, T-47 12/112010 Stay Green, Inc. $523,780

12-00322 LMD Zones T2-T7 Old Orchard and 6/22/2012 Stay Green, Inc. $730,000 various Valencia Districts

12-00323 LMD Zone T17 6/29/2012 Stay Green, Inc. $30,280

12-00396 LMD Zones 17,T23,T29 8/23/2012 Stay Green, Inc. $294,500

12-00415 LMD Zones T33,T65,T65A 9/27/2012 Stay Green, Inc. $137,081

13-00177 LMD Heritage Park Slope 4/12/2013 Stay Green, Inc. $25,500

13-00341 Tree Maintenance Grid Work 5/23/2013 Stay Green, Inc. $853,550

09-00194 LMD Zones 2008-1 only-.1 month ext 7/1/2013 Stay Green, Inc. $50,000

14-00195 LMD Zones 4,8,26 4/4/2014 Stay Green, Inc. $49,536

14-00187 LMD Zones 15,16 4/4/2014 Stay Green, Inc. $99,058

14-00270 LMD Zone T8 (interim) 7/1/2014 Stay Green, Inc. $49,999

14-00316 LMD Zone T8 8/1/2014 Stay Green, Inc. $769,200

13-00384 LMD Zone 27 9/13/2013 V alleyCrest Landscape $97,080

13-00413 LMD Zone T52 9/25/2013 ValleyCrest Landscape $110,200

13-00439 LMD Zones 3,5,6,T31 9/25/2013 ValleyCrest Landscape $149,400

14-00409 LMD City/LMD Hybrid Parks (new) 10/8/2014 ValleyCrest Landscape $232,640

13-00317 LMD Zones T20,T44,T48,T62,T67, 711/2013 Venco Western, Inc. $315,777 T71,T72

12-00268 LMD City/LMD Hybrid Parks (end) 8/1/2014 V en co Western, Inc. $117,376

Total ·· ···.• .. ·~."~~~ii~ .;, . ''~(;~;:~;:·~~;?[;~~.·~'iii~~.~;:~~ .• :-~~(i;·.~f~~'~li'•·ii::,:.: • ·;:' ;:. i:t,ii'"i \~>;·~'"~"" $60,199,751

LCP ANNUAL REPORT 8 CCR ~ 16431 -- AB all pr~jects 2008

Page 10: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that
Page 11: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that

LCP-AR2 B. List any project subject to the limited exemption clause ofLC § 1771.5(a), if applicable.

- Project Name Description of Project Contract Amount

SEE ATTACHED LIST

Total ·.:: .~:; .;~_,;,·;:1;:S:c;::~'·~;:<~~:.i;:.~:~~~~

C. Summary of all wages and penalties assessed and/or recovered. Approval of

Affected Contractor Amount Amount Forfeiture Requested

Project Name (who directly employed the Assessed Recovered from Labor Description ofViolation

worker) Commissioner?

F2009 Santa Clarita Incubator R.L. Passarelli Enterprises P'Yes I No

Underpayment of prevailing wal $4,053.72 $4,053.72 and non-payment of training

funds F2009 Santa Clarita Incubator Patriot Striping

!Yes P'No Underpayment of prevailing waJ

$80 $80 and non-payment of training funds

I Yes I No

I Yes I No

!Yes I No

I Yes I No

I Yes I No

Total I•' • > : •• ' ;p:~-~~~~l\~'·i.,,0 ;·l~)\:.:~J~)\~~~~i~~~~'/ $4,133.72 $4,133.72 --~~li~~iif~,.,;,:<.2r':li~di!Ii,'~~~~H&.~· .·· ~~·' .. ~.

LCP ANNUAL REPORT 8 CCR § 16431--AB all projects 2008

Page 12: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that
Page 13: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that

" .I

LCP-AR2

D. For any amount identified in item C for which approval of forfeiture not requested from the Labor Commissioner, please explain below.

Project Name Amount Assessed Amount

Explanation Recovered

F2009 Santa Clarita Incubator Patriot Striping $80

Proof of payment to workers and CAC provided. Penalty collected. Summary of Violations sent to the Labor Commissioner.

!

Total

I

E. For any amount identified in item C for which approval of forfeiture was requested from the Labor Commissioner, please provide the following: '

Project Assesse Amount Recovere Amount d d

Name LC LC§ LC § Wages

Training Total

LC§ LC§ LC§ Wages

Training Total §1776(g) 1775 1813 Funds 1776(g) 1775 1813 Funds

F2009 Santa /

Clarita 0 $800 0 $2,325 $924.92 $4,053.72 0 $800 0 $2,325 $924.92 $4,053.72 Incubator

Total -- ---

LCP ANNUAL REPORT 8 CCR ~ 16431 -- AB all projects 2008

Page 14: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that
Page 15: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that

-----~-- -- ---

LCP-AR2 F. Identify cases that are or were the subject ofLC § 1742 proceedings.

Project Name Contractor Nature ofViolation ODLCase# Current Status

G. Did you refer any contractor to the Labor Commissioner for debarment per LC § 1777.1?

Please check one: I Yes ·17No

If yes, identify affected contractor(s) or subcontractor(s) and date(s) of referral:

H. Did you refer any apprenticeship violation to the Division of Apprenticeship Standards (DAS)?

Please check one: 17Yes I No

Ifyes, identify affected contractor(s) or subcontractor(s) and date(s) of referral: Specialized Terrazo 7/11/14, Carter Fence Co. 10/1/14

-

LCP ANNUAL REPORT 8 CCR ~ 16431-- AB all projects 2008

Page 16: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that
Page 17: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that

City of Santa Clarita Labor Compliance Report

Exempt Listing 7/1/2014 through 6/30/2015

Project Name Description of Project

GVR PEDESTAL REPAIR ELECTRICAL MAINTENANCE AND REPAIR OF PEDESTAL GOLDEN

VALLEY ROAD

HIDDEN OAK PEDESTAL ELECTRICAL MAINTENANCE AND REPAIR DAMAGED/EXPOSED

WIRES 29306 HIDDEN OAK PLACE LMD ZONE T52

JASON/FLYNN DRIVES METER ELECTRICAL MAINTENANCE AND REPAIR METER MAIN LMD ZONE

T33 (JASON DR/FLYNN DR)

OLD TOWN NEWHALL LIBRARY ELECTRICAL MAINTENANCE AND REPAIR SERVICES; EST NO.

13406.11.110; PROVIDE AND INSTALL NEW SURFACE MOUNT RECEPTACLE INSTALL

WI REMOLD AND RECEPTACLE AT OTNL

MISC ELEC REPAIRS ELECTRICAL MAINTENANCE AND REPAIR SERVICES

MAIN STREET REPAIR MAIN STREET TREE RECEPTACLE REPAIRS

LMD EMERGENCY ELECTRICAL EMERGENCY ELECTRICAL MAINTENANCE AND REPAIR SERVICES ALL

LMD ZONES-BLANKET PO

MISC ELEC REPAIRS ELECTRICAL MAINTENANCE AND REPAIR SERVICES

DOWNTOWN NEWHALL REPAIR LED TREE LIGHTS-NEWHALL

TV INSTALL CC LIBRARY INSTALLATION OF 2 NEW TV'S AT CANYON COUNTRY LIBRARY;

PROPOSAL 13406.16.160

TRANSFORMER REPLACEMENT REPLACE THE 225KVA TRANSFORMER AT NEWHALL PARK

NEW CIRCUIT RECEPTACLES 2 NEW 120V, 20A. CIRCUIT RECEPTACLES FOR BREAK ROOM

CONDUIT INSTALL INSTALL CONDUIT AND WIRING ON A NEW 208V 30A CIRCUIT

W/SAFETY DISCONNECT AND RELOCATING EXISTING LIFT #4

LMD METER REPLACEMENT ELECTRICAL MAINTENANCE AND REPAIR SERVICES 00 METER

REPLACEMENT, LMD T2

FURNISH AND EMERGENCY INSTALLATION OF NEW 3 POLE 200 A.

TMF NEW POLE INSTALL 600 V. 3 PHASE, PULSE ON AND PULSE OFF 2-STAGE LIGHTING AT

TMF.

NEW CEILING CURTAIN INSTALL INSTALL NEW 120V POWER TO EXISTING HIGH CEILING MOUNTED

ELECTRIC CURTAINS

INSTALLJUNCTION BOX FURNISH AND INSTALL NEW SUBMERSIBLE, ENCAPSULATED BRASS

JUNCTION BOX AND REPAIR DAMAGED CONDUIT.

LOST CANYON PEDASTAL ELECTRICAL MAINTENANCE AND REPAIR SERVICES EST# 15234MH,

LMD ZONE T65A PEDESTAL-LOST CYN/WINTER PINE

LMD MONUMENT SIGN ELECTRICAL WORK IN LMD T2- OLD ORCHARD MONUMENT

LIGHTING

CITY CLERK IMPROVEMENTS CITY CLERK 1ST FLOOR IMPROVEMENTS

CONCRETE REPAIR GENERAL CONSTRUCTION CONCRETE POSTS & RAILSLMD ZONE T8

GOLDCREST & DEL MONTE

CARRIZO BRIDGE REPAIR GENERAL CONSTRUCTION WROUGHT IRON REPAIR CARRIZO

BRIDGE

Contract

Amount

$5,161

$5,750

$5,750

$1,616

$2,650

$15,000

$2,850

$2,265

$8,868

$1,602

$1,967

$1,250

$4,178

$1,925

$2,840

$1,211

$1,845

$2,688

$5,375

$1,655

$1,634

$10,235

.I 1

Page 18: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that

City of Santa Clarita Labor Compliance Report Exempt Listing 7/1/2014 through 6/30/2015 ·

Project Name Description of Project

LMD REPAIRS VARIOUS GENERAL CONSTRUCTION: BLOCK WALL, WROUGHT IRON,

CONCRETE DEVIATION REPAIRS-VARIOUS LMD ZONES

CC LIBRARY EMERGENCY REPAIRS EMERGENCY REPAIRS TO CANYON COUNTRY/JOANNE DARCY

LIBRARY

LMD GENERAL REPAIRS GENERAL CONSTRUCTION: PROPOSAL 350 {$716.59) LMD T46

CITY HALL KITCHEN MAINTENANCE CITY HALL THIRD FLOOR KITCHENS; PROPOSAL 348

PARKS REPAIRS REPAIRS AT VALENCIA GLEN PARK AND SANTA CLARITA PARK, AN-

13-14-34 PER PROPOSAL #358

LMD CONCRETE REPAIRS GENERAL CONSTRUCTION: CONCRETE FENCE POSTS & RAILS LMD

T8-VALENCIA SUMMIT

VIA CENTER SIGN GENERAL CONSTRUCTION: FRAMING/FOUNDATION VALENCIA

INDUSTRIAL CTR SIGN

MCBEAN PARKWAY CONCRETE REPAIR GENERAL CONSTRUCTION: CONCRETE IN MEDIAN ON MCBEAN

PKWY

PARK CABINETS REPLACEMENT REPLACEMENT OF CABINETS AT PARK DUE TO MOLD PER

PROPOSAL #335

BRIDGE PAINTING MAINTENANCE BRIDGE PAINTING PER PROPOSAL #347

CENTRAL PARK SIGN REPLACEMENT REMOVE 4 OLD SIGNS/INSTALL 5 NEW WAYFINDING SIGNS@

CENTRAL PARK. PART OF P4012, SPORTS FIELDS.

FENCE POST REPAIR GENERAL CONSTRUCTION: DEVIATIONS AND FENCE POSTS

PROPOSALS: 355,356,357,359,370

lMD GENERAL REPAIRS GENERAL CONSTRUCTION: PROPOSAL: 360 {ZONE 6 $590.26),AND

361 (ZONE T46791.29)

LMD LIGHT POLES GENERAL CONSTRUCTION CONCRETE WORK AT LIGHT POLES LMD

ZONE T7 {PROPOSAL 375)

GENERAL REPAIRS GENERAL CONSTRUCTION: MANAGEMENT DEVIATION REPAIRS

PROPOSALS 378 {$2450.09) & 381 {612.00}

MCBEAN TRANSFER CONCRETE SAW CUT, DEMO, REMOVE, AND INSTALL CONCRETE AT THE

MCBEAN TRANSFER STATION.

MOLD REMEDIATION MOLD REMEDIATION EOR PROPOSAL#398

ZONE 18 (PROP. 397 $2,997.34)

LMD GENERAL REPAIRS ZONE T4 {PROP. 396 $1,915.39}

ZONE T2 (PROP. 395 $693.00}

PASEO REPAIRS SIDEWALKS/PASEO, REMOVAL AND/OR REPLACEMENT OF

EXISTING. LMD T46- PROPOSAL #400

PAMPLICO PARK CONCRETE PAMPLICO PARK CONCRETE REPAIRS, AS NEEDED CONTRACT.

MOLD REMEDIATION MOLD REMEDIATION AT CITY HALL; PROPOSAL401

LMD CONCRETE REPAIRS GENERAL CONSTRUCTION: SIDEWALK CONCRETE REPAIR-LMD T7

PROPOSAL 404

Contract

Amount

$2,380

$13,521

$1,419

$18,203

$5,574

$1,476

$14,220

$1,966

$6,320

$14,920

$1,692

$5,989

$1,381

$3,441

$3,062

$1,098

$9,144

$5,605

$4,426

$5,930

$2,421

$2,857

2

Page 19: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that

City of Santa Clarita Labor Compliance Report

Exempt Listing 7/1/2014 through 6/30/2015

Project Name Description of Project

CITY HALL WATER DAMAGE WATER DAMAGE REPLACEMENT OF CITYHALL CABINETS PER

PROPOSAL #423, DATED 11/6/14

HELMERS CONCRETE REPAIR GENERAL CONSTRUCTION SERVICES CONCRETE BEHIND HELMERS

ELEMENTARY PROPOSAL 439

GENERAL REPAIRS CONSTRUCTION WORK AS PER PROPOSAL #376, DATES 9/17/14

CENTERAL PARK CONCRETE REMOVE AND REPLACE CONCRETE AT CENTRAL PARK PER

PROPOSAL #441.

CC LIBRARY WATER HEATER WATER HEATER INSTALLATION AT CANYON COUNTRY LIBRARY;

PROPOSAL400

NORTH OAKS CONCRETE NORTH OAKS CONCRETE REPAIR PER PROPOSAL #450, DATED

12.17.14

CENTERL PARK FENCE INSTALL CENTRAL PARK RAIL FENCE

LMD IRON RAIL GENERAL CONSTRUCTION IRON RAIL (PROP 407 $605.34)-LMD T8

SLUMPSTONE (PROP 408 $402.86}-LMD T8

CITY HALL DRAIN PIPE PROPOSAL 453; INSTALLATION OF DRAIN PIPE AND RAIN GUTTER

AT CITY HALL

CITY HALL EM ERG DOOR INSTALL PURCHASE AND INSTALL OF EMERGENCY DOOR FOR SUITE 110.

PROPOSAL 467. ..

LMD BRICK SEAT GENERAL CONSTRUCTION PROP 469 ($2700} LMD T3 BRICK SEAT

PROP 466 ($5818) LMD T5 MON.SIGN

FACILITY SEWER PIPE EMERGENCY REPAIR TO CLOGGED SEWER PIPE (WATER

OVERFLOW). DEMO AND REPAIR

VAL MEADOWS DOORS REPLACE DOORS FOR VALENCIA MEADOWS PARK PER PROPOSAL

#472

CORP YARD DOOR LABOR AND MATERIAL TO INSTALL DOOR AT CORPORATE YARD

HOMELESS ENCAMPMENT CLEAN UP PROPOSAL #481: PROVIDE CLEAN UP SERVICES FOR HOM LESS

ENCAMPMENT PER JOB WALK ON 1/29/15

LMD GENERAL REPAIRS GENERAL CONSTRUCTION PROPOSAL 474 DEVIATIONS LMD T8

PASEO CONCRETE PASEO CONCRETE REPAIR PER PROPOSAL #483, DATED 2/11/15,

APPROVED BY

CITY HALL NEW CABINETS INSTALL LABOR AND MATERIALS FOR NEW KITCHEN CABINETS

INSTALLATION AT CITY HALL

LMD WROUGHT IRON GENERAL CONSTRUCTION WROUGHT IRON REPAIRS ZONE 27

PROPOSAL 485

LMD CONCRETE REPAIRS GENERAL CONSTRUCTION SVCS CONCRETE PROPOSAL 478 LMD

ZONET6

HOMELESS ENCAMPMENT CLEAN UP HOMELESS ENCAMPMENT CLEAN UP 3-23-15

HOMELESS ENCAMPMENT CLEAN UP HOMELESS ENCAMPMENT CLEAN UP 3-26-15

Contract Amount

$4,123

$1,800

$6,534

$8,310

$2,198

$14,690

$15,690

$1,008

$1,475

$3,892

$8,518

$5,500

$9,144

$7,560

$9,310

$1,271

$3,594

$22,844

$1,355

$5,388

$4,868

$7,562

3

Page 20: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that

. City of Santa Clarita Labor Compliance Report Exempt Listing 7/1/2014 through 6/30/2015

Project Name Description of Project

CONCRETE/FENCE INSTALL BREAKOUT AND REMOVE EXISTING CURBS AND BLOCKS AND ADD

CONCRETE RAMPES, POLES, AND CHAINS.

EMERGENCY FENCE INSTALL GENERAL CONSTRUCTION EM ERG-VINYL FENCING ALONG 1-5

PROPOSAL491

HOMELESS ENCAMPMENT CLEAN UP HOMELESS ENCAMPMENT CLEAN UP 4-27-15

LMD CONCRETE REPAIRS GENERAL CONSTRUCTION SERVICES CONCRETE REPAIR. LMD T6

PROPOSAL516

GENERAL PAINTING PAINTING AND EXTERIOR WORK AT 28111 SAND CANYON PER

PROPOSAL 518.

CHICANE IMPROVEMENTS CHICANE IMPROVEMENTS PER PROPOSAL #524

HOMELESS ENCAMPMENT CLEAN UP HOMELESS ENCAMPMENT CLEAN UP 5/18/15

HOMELESS ENCAMPMENT CLEAN UP HOMELESS ENCAMPMENT CLEAN UP 5/26/15

DEMOLISH EXISTING SHADE STRUCTURE AND DESIGN AND

VAL MEADOWS SHADE STRUCTURE CONSTRUCT NEW SHADE STRUCTURE AT VALENCIA MEADOWS

PARK.PROPOSAL#527

ALMENDRA PARK CONCRETE CONCRETE WORK AT ALMENDRA PARK PER PROPOSAL #515

NORTH OAKS POOL CONCRETE NORTH OAKS POOL CONCRETE PROPOSAL #533

CENTRALPARK DOORS R.EPLACE CF,NTRAL PARK DOORS PROPOSAL #5.07

BRIDGEPORT PARK DOOR DOOR REPLACEMENT AT BRIDGEPORT PARK PROPOSAL #504 ·

GENERAL WROUGHT IRON REPAIRS GENERAL CONSTRUCTION PROPOSAL #543, WROUGHT IRON

HOMELESS ENCAMPMENT CLEAN UP HOMELESS ENCAMPMENT CLEAN UP 6/29/15

ACTIVITIES CENTER KITCHEN REPLACEMENT/REFACING COUNTERS IN KITCHEN AND RESTROOMS

AT THE ACTIVITIES CENTER

CHESEBROUGH PARK BRIDGE LIGHTS ELECTRICAL MAINTENANCE AND REPAIR SERVICES LMD ZONE T47-

BRIDGE LIGHTS AT CHESEBROUGH PARK & MCBEAN

NORTHPARK BALLASTS/BULBS. ELECTRICAL MAINTENANCE AND REPAIR SERVICES RGPLACE

BALLASTS AND BULBS LMD ZONE T47 NORTH PARK

LMD LIGHT FIXTURES ELECTRICAL MAINTENANCE AND REPAIR SERVICES LMD LIGHT

FIXTURE REPAIRS ZONES T5 {PROPOSAL 008) & T6 {PROPOSAL 007)

LMD PAINTING VARIOUS PAINTING, MAINTENANCE AND REPAIR SERVICES FENCE PAINTING

VARIOUS LMD AREAS

NEWHALL INCUBATOR PAINTING PAINTING, MAINTENANCE AND REPAIR SERVICES NEWHALL

INCUBATOR

SC AQUATICS CENTER PAINTING PAINTING OF EXTERIOR TRIMS, DOORS, WINDOWS, AND WAVE

COVER ATSCAQUATICS CENTER.

LMD PAINTING CIRCLE J PAINTING, MAINTENANCE AND REPAIR SERVICES LMD ZONE 27

CIRCLE J WROUGHT IRON

PAINTING, MAINTENANCE AND REPAIR SERVICES WO #2015-005

LMD PAINTING VARIOUS {670.00) LMD ZONE T8 WO #2015-006 {400.00) LMD ZONE T8 WO

#2015-007 {120.00) LMD ZONE T8

Contract

Amount

$7,848

$1,200

$5,910

$3,845

$6,775

$5,516

$6,740

$2,911

$14,820

$14,386

$13,506

$6,745

$8,754

$1,150

$6,326

$6,950

$6,562

$6,562

$1,184

$13,920

$6,480

$14,980

$12,970

$1,190

4

Page 21: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that

City of Santa Clarita Labor Compliance Report

Exempt Listing 7/1/2014 through 6/30/2015

Project Name Description of Project PAINTING THE 5 SHUTIER DOOR, STORAGE PUMP ROOM DOOR,

SC AQUATICS CENTER PAINTING AND OVERHANG WEST OF THE EXIT DOOR AT THE AQUATIC

CENTER.

LMD PAINTING VARIOUS PAINTING, MAINTENANCE & REPAIR SERVICES ALL LMD T46

LMD WROUGHT IRON CIRCLE J PAINTING, MAINTENANCE AND REPAIR SERVICES WROUGHT IRON

REPAIR LMD ZONE 27-CIRCLE J

VAL HERITAGE PARK PAINTING PAINTING SERVICES AT VALENCIA HERITAGE PARK.

LMD PAINTING ZONE T2 PAINTING, MAINTENANCE AND REPAIR SERVICES WROUGHT IRON

LMD ZONE T2

NORTHPARK PAINTING MAINTENANCE PAINTING, MAINTENANCE AND REPAIR SERVICES LMD ZONE T47-

NORTH PARK

VALENCIA BLVD PASEO BRIDGE PAINTING, MAINTENANCE AND REPAIR SERVICES PASEO BRIDGE

NEAR CITY HALL

SUMMIT PARK PAINTING REPAIRS PAINTING, MAINTENANCE AND REPAIR SERVICES PAINTING OF

SUMMIT PARK PLAYGROUND EQUIPMENT, LMD ZONE T8

VAL CENTRAL VALLEY PARK PAINTING PAINTING, MAINTENANCE AND REPAIR SERVICES PAINTING OF

PLAYGROUND EQUIPMENT VALENCIA CENTRAL VALLEY PARK '·

CENTRAL PARK ELECTRIC INSTALL ,.

CENTRAL PARK POWER INSTALLATION FOR SCOREBOARDS

CENTRAL PARK SCOREBOARDS INSTALLATION OF CENTRAL PARK SCOREBOARDS

LMD ELECTRICAL MAINTENANCE· ELECTRICAL MAINTENANCE AND REPAIR SERVICES PROP.10364-

LMD ZONE T20 PROP.10365-LMD ZONE T44

ROCKWELL/SUMMIT PLACE ELEC REPAIR ELECTRICAL MAINTENANCE AND REPAIR SERVICES LMD T8-

ROCKWELL/SUMMIT PL BID 10371

PASEO LIGHT REPAIR ELECTRICAL MAINTENANCE AND REPAIR SERVICES PASEO LIGHT

REPAIR: LMD ZONE T2

PUBLIC LIBRARY SIGN MAINTENANCE ELECTRICAL MAINTENANCE AND REPAIR SERVICES POWER TO THE

NEW CIVIC CENTER MONUMENT/SC PUBLIC LIBRARY SIGN

LMD ELECTRICAL MAINTENANCE ELECTRICAL MAINTENANCE AND REPAIR SERVICES PROP 10384

(LMD T47), PROP 10385 (LMD·T47) PROP 10374 (LMDZONE4)

LMD LIGHT REPAIR LIGHT REPAIR PER RPOPOSAL #10408 FOR ZONE T-7

SPORT COMPLEX BALLASTS REPLACE 6 BALLASTS AT THE GYM, SPORTS COMPLEX.

BID #10410

PASEO LIGHT POLES PASEO LIGHT POLES AND STANDARDS LMD ZONE T8

SCSC GYM LIGHTING CONTROLLER REMOVAL AND INSTALLATION OF THE EMERGENCY LIGHTING

CONTROLLER AT THE SCSC GYM.

PACIFIC CREST PARK RESTROOM ELECTRICAL INSTALLATION FOR RESTROOM BUILDING AT PACIFIC

CREST PARK BID 10424

Contract

Amount

$1,550

$2,980

$1,430

$5,000

$2,850

$12,350

$6,171

$8,900

$8,821

$14,630

$18,117

$1,333

$1,174

$2,301

$10,968

$4,034

$1,000

$2,150

$2,943

$8,996

$3,975

5

Page 22: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that

City of Santa Clarita Labor Compliance Report

Exempt Listing 7/1/2014 through 6/30/2015

Project Name Description of Project

PASEO LIGHTS REPAIR ELECTRICAL MAINTENANCE AND REPAIR SERVICES BID #10422, LMD

T7 PASEO LIGHTS

LMD LIGHT REPAIR ELECTRICAL MAINTENANCE AND REPAIR SERVICES LIGHT REPAIRS

LMD ZONE T47 BID# 10425

PASEO LED LIGHTING ELECTRICAL MAINTENANCE AND REPAIR SERVICES BID #10430

PASEO LED LIGHTING

MCBEAN TRANSIT CTR VERTICUS INSTALLATION OF OVERRIDE VERTICUS SYSTEM FOR MCBEAN

TRANSIT CENTER

AVE ROTELLA ELEC REPAIR ELECTRICAL MAINTENANCE AND REPAIR SERVICES 25172 AVENIDA

ROTELLA BID #10440

ELECTRICAL MAINTENANCE AND REPAIR SERVICES PASEO LIGHTS,

PASEOS/TUNNEL LIGHT REPAIRS BID 10451 VIA GAVOLA/TUNNEL, LMD T5 ELECTRICAL

MAINTENANCE AND REPAIR SERVICES BID #10450, REPAIR LIGHTS

LMD ZONE 18

LMD ELECTRICAL MAINTENANCE ELECTRICAL MAINTENANCE AND REPAIR SERVICES BIDS

#10454,10455,10456 LIGHT REPAIRS LMD ZONE T46

LMD PEDESTAL REPLACEMENT ELECTRICAL MAINTENANCE AND REPAIR SERVICES BID #10463, LMD

ZONE T231'y1ETER PEDESTAL REPLACEMENT

PACIFIC CREST PARK POWER PROVIDE POWER TO RESTRM BLDG- PACIFIC CREST Pk IMPROV,

PROJ P4014

LMD VANDALIZED LIGHTS REPAIR ELECTRICAL MAINTENANCE AND REPAIR SERVICES BID 10471

REPAIR VANDALIZED LIGHTS LMD ZONE T46

Flo Services Preventative maintenance, pump repairs & calibration

14-00414 LMD Zones Electrical Maintenance and repair for various LMD Zones

15-LMD-07 LMD Zones Electrical Maintenance and repair for various LMD Zones

15-00021 Summit Park Equipment Replacement of playground equipment in LMD park

14-00400 VIC Monument Sign Monument sign foundation repairs

15-LMD"05 Summit Park Surface Installation of playground surface

14-00395 Villa Metro Landscape Landscape Maintenance for Villa Metro

14-00309 LMD Zones Electrical Maintenance and repair for various LMD Zones

13-00450 Disney Berm Install landscape at Disney Berm

Drain Grate Replacement Pool drain grate replacement @ Aquatic Center

Santa Clarita Pump Repair Pool pump reinstallation@ Santa Clarita Pool

Fair Oaks Pump Repair Backflow and Pump repairs

Northpark Fence Project Fence Installation

Concrete Work in Various LMD Zones Concrete Walkway deviation repairs

Mulch installation Project at Lost Canyon Installation of mulched median

Lyons Avenue Refurbishment Project Landscape refurbishment

McBean Median Repair Remove and replace concrete

Contract

Amount

$2,301

$1,140

$10,000

$2,549

$1,179

$6,600

$1,943

$1,750

$18,302

$1,000

$13,798

$15,000

$15,000

$2,999

$15,000

$21,336

$3,924

$15,000

$13,686

$4,470

$1,952

$6,840

$13,118

$15,000

$19,198

$2,962

$11,397

6

Page 23: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that

City of Santa Clarita labor Compliance Report Exempt listing 7/1/2014 through 6/30/2015

Project Name Description of Project McBean Transfer Station Raised Planter Install new landscape and irrigation in planters areas at the McBean

Project Transfer Station

Landscape Correction Project Landscape repair

HMNMH SlOPE! Forestation Project Installation of trees on slope behind HMNMH

Community Center Painting Painting of Hallway and Kitchen @ Newhall Community Center

Aquatic Center Painting Painting of exterior of Aquatic Center

Valencia Meadows Pool Pipe Replacement of leaking pool pipe fitting@ Valencia Meadows Pool

Aquatic Center Pipe Repairs Repair of leaking pipe fitting on SOm pool @the Aquatic Center

Raypak Heat Exchanger Replacement of SOm pool heater heat exchanger@ Aquatic Center

SOm Paco Pump Repair Rebuild of SOm pool pump @Aquatic Center

SOm Paco Pump Repair Rebuild of SOm pool pump @Aquatic Center

Aquatic Center Painting Painting of Roll-up doors @Aquatic Center

Aquatic Center Shade Repair Patch and resew shade canopies @Aquatic Center

Valencia Glen Leak Test Test pool piping for leaks @ Valencia Glen Pool,

Santa Clarita Pool Heater Repair pool Heater@ Santa Clarita Pool

25m Paco Pump Rebuild Install new rotating element on 25m pool @ Aquatic Center

Santa Clarita Pump Repair Offsite pump rebuild for Santa Clarita Pool

Fire Alarm Panel Service Repair Of Newhall Community Center Fire Alarm panel

Aquatic Stadium Light Replacement Replace 34 stadium lights @Aquatic Center

North Oaks Alarm Install conduit for North Oaks· alarm installation

Activity Center Relamp Install new light bulbs in all fixtures at Activity Center

Fire Alarm Repair Replace faulty smoke detector on fire alarm system @ Newhall

Community Center

Newhall Community Center Re-lamp Install new bulbs in all fixtures @ Newhall Community Center

Gym Light Fixture Upgrade Replace light ballast w/ upgrade@ Gym

Gym Emergency Lighting Repair Remove and install new emergency battery backup system @ Gym

Newhall Community Center Lighting Repair light fixtures and replace ballast @ Newhall Community

Repairs Center

Drain Grate Replacement Prepare & design plans for SOm pool drain grate replacement @

Aquatic Center

BRIVO @ Canyon Country Library Install Library Card readers on Men's & Women's restroom doors

Rest rooms

Floor Sealing Apply Nano Sealer to Activities Center Floors

Newhall Park Replacement of Main Replace 3" and 4" Gate Valves in vault

Water Valves

(SCAC Sound System) Upgrade the Sound System Controller in the Aquatics Center

Contract

Amount

$12,000

$3,000

$4,900

$2,150

$14,980

$1,238

$1,524

$2,000

$6,312

$5,387

$1,550

$1,500

$1,219

$1,136

$2,495

$10,730

$1,029

$1,958

$1,100

$1,462

$1,285

$1,662

$2,150

$8,996

$1,630

$3,086

$6,967

$6,950

$5,000

$2,850

7

Page 24: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that

City of Santa Clarita Labor Compliance Report Exempt Listing 7/1/2014 through 6/30/2015

Project Name Description of Project Golden Valley Ranch Open Space Access Trail improvements, signage, restoration of areas damaged by

Improvements erosion.

SCSC Aquatic Center Pool Deck Grinding Grinding concrete pool deck to meet LAC Health Department

regulations

Pacific Crest Storm Drain Install storm drains in turf area of park

Signal Modifications Signal Modification at Valencia Boulevard & Citrus Street and

Newhall Ranch Road & West Rye Canyon Road

Signal Re-wiring Install new wiring on signals at Bouquet Canyon Road and Seco

Canyon Road

Fiber Optic Installation Sheriff's ALPR Camera System Fiber Optic Connection Project

Signal Modifications Signal Modification at Copper Hill Drive & San Francisquito Canyon

Road

B3013 Lost Canyon Median Concept design project- CF Engineering did pot holing for irrigation

Refurbishment sleeve locations

Heritage Park Painting Re-paint gazebo and restroom

Parks Lock Repairs Repair broken door locks at various park locations

TMF Bldg B HVAC Replace ductless air conditioner in parts manager office.

TMF Bldg. B Eurovac System Repair bus vacuum system at fuel island~

TMF Bldg. D lighting contactor Replace lighting contactor that controls parking lot lights.

TMF Bldg A dispatch window covering Install new window blinds in dispatch.

TMF clarifier Preparation of sanitation monitoring 6 months

TMF clarifier Preparation of sanitation monitoring 6 months

Total

Contract Amount

$14,917

$14,500

$7,921

$5,000

$21,584

$11,496

$6,015

$2,422

$5,100

$1,037

$4,090

$1,602

$2,840

$4,502

$1,797

$1,997

$1,123,407

8

Page 25: LABOR COMPLIANCE PROGRAM ANNUAL REPORT 2 … Reports FY 2014-15/City of Santa... · LCP-AR2 LABOR COMPLIANCE PROGRAM ANNUAL REPORT RECEIVED AUG 2 4 2015 Format for Awarding Body that

City of

SANTA CLARITA 23920 Valencia Boulevard • Suite 300 • Santa Clarita, California 91355-2196

Phone: (661) 259-2489 • FAX: (661) 259-8125

www.santa-clarita. com

August 18, 2015 VIA CERTIFIED MAIL: 7013 1710 0000 9704 7292

Department oflndustrial Relations Office of the Director Attn: LCP Special Assistant 455 Golden Gate Avenl!e, lOth Floor San Francisco, CA 94102

Dear Sir/Madam:

Re:. Labor Compliance Program Annual Report Submission (per 8 CCR § 16431 (a)) Reporting Period: July 1, 2014, to June 30,2015 Labor Compliance Program Approval Date: November 20, 2003

The City of Santa Clarita ("City") is pleased to submit its Labor Compliance Program (LCP) Annual Report prepared in accordance with 8 CCR § 16431 (a). The LCP Annual Report covers the period of July I, 2014, to June 30,2015, as requested.

The LCP Annual Report enclosed provides detailed responses to all required questions. The City is confident that it meets all requirements of its LCP and is prepared to respond to questions in the event any arise.

Should you have any questions regarding the City's LCP Annual Report submittal, please contact me at (661) 286-4025 or [email protected].

Sincerely,~ . ··:·,-·· ... :

/~· ~~ Ha~er ·. Labor Compliance Officer

HC:mab ·

' '. ~

S:\PW\Labor Compliance-access\Labor Compliance Program_ DIR\Annual Reports\20 IS Annual Report to DIR\Transmillal Leller for 20 IS Annual Report lo DIR.doc

Enclosure

cc: Robe1i G. Newman, Director of Public Works Rick Gould, Director of Parks, Recreation, and Community Services Darren Hernandez, Deputy City Manager Damon Letz, Assistant City Engineer Andrew Yi, City Traffic Engineer Cruz Caldera, General Services Manager Travis Lange, Environmental Services Manager Dennis Luppens, Special Districts Administrator.