39
Front sheet : ……. of …….. F-PHEONWJ-Q-PRC-0241-001 LOCATION: TRA REF No : RISK ASSESSMENT TEAM (FIRST NAMED - TRA TEAM LEADER) NAME POSITION SIGNATURE REASON FOR L2RA: TRA Team Leader NO OF PERSONS INCLUDED IN TASK: EXPECTED DURATION OF THE TASK: NAME SIGNATURE: DATE: SC NAME : SIGNATURE: DATE: DATE: RISK ASSESSMENT TYPE: TASK RISK ASSESMENT (NORMAL) OPERATING RISK ASSESMENT (ORA) ISOLATION RISK ASSESMENT (IRA) TASK DESCRIPTION: ensure enough level of detail is provided - list all major/critical tasks. TRA Team Leader confirm that the risks for the task described have been reviewed and the controls which are recommended reduce the risk to ALARP and I consider it is safe so the task can proceed. I am satisfied that the controls identified when put into place will reduce the risk level to ALARP. The task/action/change is permitted to proceed. REFERENCE AND OTHER RELEVANT INFORMATION: (e.g. Emergency Provision Required, Competency requirements, Tools & Equipment, additional PPE, P&IDs, Drawings, PTW, Procedures, Certificates, other Risk Assessments) Respective Technical Authority Manager (Tier 1) Sr. Manager

L2RA Blank Form_New (2)

Embed Size (px)

DESCRIPTION

L2RA Blank Form

Citation preview

Front sheet : ……. of …….. F-PHEONWJ-Q-PRC-0241-001

LOCATION:

TRA REF No :

RISK ASSESSMENT TEAM (FIRST NAMED - TRA TEAM LEADER)

NAME POSITION SIGNATURE

REASON FOR L2RA: TRA Team Leader

NO OF PERSONS INCLUDED IN TASK:

EXPECTED DURATION OF THE TASK:

NAME

SIGNATURE:

DATE:

SC Sr. Manager

NAME :

SIGNATURE:

DATE:

DATE:

RISK ASSESSMENT TYPE:

TASK RISK ASSESMENT (NORMAL) OPERATING RISK ASSESMENT (ORA)

ISOLATION RISK ASSESMENT (IRA)

TASK DESCRIPTION: ensure enough level of detail is provided - list all major/critical tasks.

TRA Team Leader confirm that the risks for the task described have been reviewed and the controls which are recommended reduce the risk to ALARP and I consider it is safe so the task can proceed.

I am satisfied that the controls identified when put into place will reduce the risk level to ALARP. The task/action/change is permitted to proceed.

REFERENCE AND OTHER RELEVANT INFORMATION:(e.g. Emergency Provision Required, Competency requirements, Tools & Equipment, additional PPE, P&IDs, Drawings, PTW, Procedures, Certificates, other Risk Assessments)

Respective Technical Authority

Manager (Tier 1)

Task Risk Assessment Worksheet

TASK DESCRIPTION SUMMARY: TRA REF No.:

6. INITIAL RISK

S L R S L R

7

1. No.

2. SUB TASK ACTIVITY /

DESCRIPTION

3. HAZARD DESCRIPTION

4. HAZARD EFFECT

5. EXISTING CONTROL MEASURES

7. LIST ALL CONTROL MEASURES REQUIRED (RECOMMENDATION)

8. PE

RS

ON

OR

R

OL

E

RE

PS

ON

SIB

LE

9. RESIDUAL RISK

TRA REF No.:

10. ALA

RP

11.

AC

TIO

NS

C

LO

SE

D?

Integrated Risk Matrix

Health and Safety

A

Severity Level

Catastrophic

≥ 3 Fatalities- Accident / illness resulting more than 3 fatalities - Outbreak to neighbourhood- Agents with the potential to cause multiple fatalities eg. chemicals with acute toxic effects

B Major

C Serious

1-2 Fatalities- Accident/ illness resulting up to 3 fatalities - Outbreak within facility leading to potential shutdown of facility- Agents capable of irreversible effects leading to death

Permanent Disability- Accident/ illness resulting permanent disability- Agents capable of irreversible effects without loss of life but with serious disability and prolonged hospitalization

D Moderate

E Minor

Major Injury or Health Effect- Prolonged LTI- Agents capable of moderate health effects which are reversible but with hospitalization

Minor Injury or Health Effect- Medical treatment case- Restricted Work Case- LTI (a few days)- Agents capable of minor health effects which are reversible (no hospitalization)

F Slight Slight Injury or Health Effect- First aid- No effect on work performance

Integrated Risk Matrix

Environmental

Extensive/ Massive Damage- Uncontrolled release of oil spills > 500 bbls (exceed statutory limit)- Persistent severe environmental damage extending well beyond site boundary- Recovery/ rehabilitation may require external assistance (Tier 3 Oil Spill Response)- Receptor experiences very long term difficulties in absorbing/ adapting and recovering from impact, potential permanent damage - Sensitive receptors (ie. turtles nesting grounds, fish spawning areas, birds, marine parks, corals, etc.) are affected- Potential compensation by the company to the affected community

Major Damage- Uncontrolled release of oil spill > 250 to 500 bbls (exceed statutory limit)- Severe environmental damage beyond site boundary- Company is required to take extensive measures to restore contaminated environment to original conditions - Recovery/ rehabilitation may require external assistance (Tier 2 Oil Spill Response)- Receptor experiences considerable, long term difficulties in absorbing/ adapting and recovering from impact - Sensitive receptors (ie. turtles nesting grounds, fish spawning areas, birds, marine parks, corals, etc.) are affected

Serious Damage- Oil spill > 100 to 250 bbls (exceed statutory limit)- Severe environmental damage, potentially beyond site boundary- Company potentially required to take extensive measures to restore contaminated environment to original conditions (Tier 1 Oil Spill Response) - Receptor experiences considerable, medium to long term difficulties in absorbing/ adapting and recovering from impact - Sensitive receptors (ie. turtles nesting grounds, fish spawning areas, birds, marine parks, corals, etc.) potentially affected

Moderate Damage- Oil spill >15 to 100 bbls (exceed statutory limit)- Contained by PHE Oil Spill Response Team (OSRT)- Moderate environmental damage that require cleaning up/ removal and disposal from the company- Receptors experience short term difficulties in absorbing/ adapting and recovering from impact - No sensitive receptors (ie. turtles nesting grounds, fish spawning areas, birds, marine parks, corals, etc.) are affected

Minor Damage- Oil spill 1-15 bbls (within statutory limit)- Contained within the site boundary/ localised- Able to be controlled/ recovered on site- Immediate slight impact/ damage to a non-sensitive environment and can be remediated to original conditions

Slight Damage- Oil spill <1 bbls of oil (within statutory limit)- Natural dispersion

Integrated Risk Matrix

Business ReputationEquipment Damage and Business Value

Extensive/ Massive Effect- Cost > USD 200 M- Production loss > 75% of PHE ONWJ Production- Production loss total shutdown for > 1 month

Extensive/ Massive Impact- Potential international media coverage affecting the company & parent company (Pertamina Persero)- Potential legal suit by regulator & affected community- Public outcry to cease operation- Potential environmental remediation demanded by regulator

F5
Dian: Assumed for half of flowstation loss

Major Effect- Cost > USD 100 M to USD 200 M- Production loss > 50% to 75% of PHE ONWJ Production- Production loss total shutdown for > 0.5 up to 1 month

Major Impact- Potential regional and/or international media coverage to the company and parent company (Pertamina Persero)- Potential legal suit by regulator & affected community- Potential environmental remediation demanded by regulator

Serious Effect- Cost > USD 50 M to USD 100 M- Production loss > 25% to 50% of PHE ONWJ Production- Production loss total shutdown for > 1 week up to 0.5 month

Serious Impact- Potential national and/or regional media coverage- Potential legal suit by regulator & affected victims- Potential environmental remediation demanded by regulator

F6
Dian: Assumed for loss of a remote junction
F7
Dian: Assumed for loss of a remote with high production or high asset value

Moderate Effect- Cost > USD 10 M to USD 50 M- Production loss > 10% to 25% of PHE ONWJ Production - Production loss total shutdown for > 1 day up to 1 week

Moderate Impact- Potential local press exposures- Potential legal claim by affected victims- Potential environmental remediation needed

Minor Effect- Cost > USD 1 M to USD 10 M- Production loss > 5% to 10% of PHE ONWJ Production- Production loss total shutdown for < 1 day

Minor Impact- Potential press exposures- Query by regulator

F8
Dian: Assumed for loss of a remote with medium production and medium asset value
F9
Dian: Assumed for loss of significant equipment process

Slight Effect- Cost ≤ 1M- Production loss ≤ 5% of PHE ONWJ Production - Partial shutdown < 1 day

Slight Impact- No media concern

F10
Dian: Assumed for loss of minor part of equipment

LikelihoodAlmost Impossible (AI)

6

Rare or never heard of in the industry

<10-6per year

5

4

3

2

1

LikelihoodVery Low (VL)Heard of in the industry

7

10-6 to 10-4 per year

6

5

4

3

2

LikelihoodLow (L)

8

Has occurred on PHE ONWJ up to once in 100 years

10-4 to 10-2 per year

7

6

5

4

3

LikelihoodMedium (M)

9

Has occurred on PHE ONWJ during its lifetime up to once per year OR conditions may allow the event to occur on PHE ONWJ during its lifetime up to once per year

10-2 to 1 per year

8

7

6

5

4

LikelihoodHigh (H)

>1 per year

10

Has occurred more than once per year on PHE ONWJ OR event can reasonably be expected to occur more than once per year on PHE ONWJ

9

8

7

6

5