Front sheet : ……. of …….. F-PHEONWJ-Q-PRC-0241-001
LOCATION:
TRA REF No :
RISK ASSESSMENT TEAM (FIRST NAMED - TRA TEAM LEADER)
NAME POSITION SIGNATURE
REASON FOR L2RA: TRA Team Leader
NO OF PERSONS INCLUDED IN TASK:
EXPECTED DURATION OF THE TASK:
NAME
SIGNATURE:
DATE:
SC Sr. Manager
NAME :
SIGNATURE:
DATE:
DATE:
RISK ASSESSMENT TYPE:
TASK RISK ASSESMENT (NORMAL) OPERATING RISK ASSESMENT (ORA)
ISOLATION RISK ASSESMENT (IRA)
TASK DESCRIPTION: ensure enough level of detail is provided - list all major/critical tasks.
TRA Team Leader confirm that the risks for the task described have been reviewed and the controls which are recommended reduce the risk to ALARP and I consider it is safe so the task can proceed.
I am satisfied that the controls identified when put into place will reduce the risk level to ALARP. The task/action/change is permitted to proceed.
REFERENCE AND OTHER RELEVANT INFORMATION:(e.g. Emergency Provision Required, Competency requirements, Tools & Equipment, additional PPE, P&IDs, Drawings, PTW, Procedures, Certificates, other Risk Assessments)
Respective Technical Authority
Manager (Tier 1)
Task Risk Assessment Worksheet
TASK DESCRIPTION SUMMARY: TRA REF No.:
6. INITIAL RISK
S L R S L R
7
1. No.
2. SUB TASK ACTIVITY /
DESCRIPTION
3. HAZARD DESCRIPTION
4. HAZARD EFFECT
5. EXISTING CONTROL MEASURES
7. LIST ALL CONTROL MEASURES REQUIRED (RECOMMENDATION)
8. PE
RS
ON
OR
R
OL
E
RE
PS
ON
SIB
LE
9. RESIDUAL RISK
Integrated Risk Matrix
Health and Safety
A
Severity Level
Catastrophic
≥ 3 Fatalities- Accident / illness resulting more than 3 fatalities - Outbreak to neighbourhood- Agents with the potential to cause multiple fatalities eg. chemicals with acute toxic effects
B Major
C Serious
1-2 Fatalities- Accident/ illness resulting up to 3 fatalities - Outbreak within facility leading to potential shutdown of facility- Agents capable of irreversible effects leading to death
Permanent Disability- Accident/ illness resulting permanent disability- Agents capable of irreversible effects without loss of life but with serious disability and prolonged hospitalization
D Moderate
E Minor
Major Injury or Health Effect- Prolonged LTI- Agents capable of moderate health effects which are reversible but with hospitalization
Minor Injury or Health Effect- Medical treatment case- Restricted Work Case- LTI (a few days)- Agents capable of minor health effects which are reversible (no hospitalization)
Integrated Risk Matrix
Environmental
Extensive/ Massive Damage- Uncontrolled release of oil spills > 500 bbls (exceed statutory limit)- Persistent severe environmental damage extending well beyond site boundary- Recovery/ rehabilitation may require external assistance (Tier 3 Oil Spill Response)- Receptor experiences very long term difficulties in absorbing/ adapting and recovering from impact, potential permanent damage - Sensitive receptors (ie. turtles nesting grounds, fish spawning areas, birds, marine parks, corals, etc.) are affected- Potential compensation by the company to the affected community
Major Damage- Uncontrolled release of oil spill > 250 to 500 bbls (exceed statutory limit)- Severe environmental damage beyond site boundary- Company is required to take extensive measures to restore contaminated environment to original conditions - Recovery/ rehabilitation may require external assistance (Tier 2 Oil Spill Response)- Receptor experiences considerable, long term difficulties in absorbing/ adapting and recovering from impact - Sensitive receptors (ie. turtles nesting grounds, fish spawning areas, birds, marine parks, corals, etc.) are affected
Serious Damage- Oil spill > 100 to 250 bbls (exceed statutory limit)- Severe environmental damage, potentially beyond site boundary- Company potentially required to take extensive measures to restore contaminated environment to original conditions (Tier 1 Oil Spill Response) - Receptor experiences considerable, medium to long term difficulties in absorbing/ adapting and recovering from impact - Sensitive receptors (ie. turtles nesting grounds, fish spawning areas, birds, marine parks, corals, etc.) potentially affected
Moderate Damage- Oil spill >15 to 100 bbls (exceed statutory limit)- Contained by PHE Oil Spill Response Team (OSRT)- Moderate environmental damage that require cleaning up/ removal and disposal from the company- Receptors experience short term difficulties in absorbing/ adapting and recovering from impact - No sensitive receptors (ie. turtles nesting grounds, fish spawning areas, birds, marine parks, corals, etc.) are affected
Minor Damage- Oil spill 1-15 bbls (within statutory limit)- Contained within the site boundary/ localised- Able to be controlled/ recovered on site- Immediate slight impact/ damage to a non-sensitive environment and can be remediated to original conditions
Integrated Risk Matrix
Business ReputationEquipment Damage and Business Value
Extensive/ Massive Effect- Cost > USD 200 M- Production loss > 75% of PHE ONWJ Production- Production loss total shutdown for > 1 month
Extensive/ Massive Impact- Potential international media coverage affecting the company & parent company (Pertamina Persero)- Potential legal suit by regulator & affected community- Public outcry to cease operation- Potential environmental remediation demanded by regulator
Major Effect- Cost > USD 100 M to USD 200 M- Production loss > 50% to 75% of PHE ONWJ Production- Production loss total shutdown for > 0.5 up to 1 month
Major Impact- Potential regional and/or international media coverage to the company and parent company (Pertamina Persero)- Potential legal suit by regulator & affected community- Potential environmental remediation demanded by regulator
Serious Effect- Cost > USD 50 M to USD 100 M- Production loss > 25% to 50% of PHE ONWJ Production- Production loss total shutdown for > 1 week up to 0.5 month
Serious Impact- Potential national and/or regional media coverage- Potential legal suit by regulator & affected victims- Potential environmental remediation demanded by regulator
Moderate Effect- Cost > USD 10 M to USD 50 M- Production loss > 10% to 25% of PHE ONWJ Production - Production loss total shutdown for > 1 day up to 1 week
Moderate Impact- Potential local press exposures- Potential legal claim by affected victims- Potential environmental remediation needed
Minor Effect- Cost > USD 1 M to USD 10 M- Production loss > 5% to 10% of PHE ONWJ Production- Production loss total shutdown for < 1 day
Minor Impact- Potential press exposures- Query by regulator
Slight Effect- Cost ≤ 1M- Production loss ≤ 5% of PHE ONWJ Production - Partial shutdown < 1 day
Slight Impact- No media concern
LikelihoodMedium (M)
9
Has occurred on PHE ONWJ during its lifetime up to once per year OR conditions may allow the event to occur on PHE ONWJ during its lifetime up to once per year
10-2 to 1 per year
LikelihoodHigh (H)
>1 per year
10
Has occurred more than once per year on PHE ONWJ OR event can reasonably be expected to occur more than once per year on PHE ONWJ