L. Mansani [email protected]. Progress on EFIT Design. EFIT: Reactor Block. EFIT SG & Pump Group. EFIT Purification Unit. Target Outside Diameter as a function of main Target Parameters. EFIT Windowless Target Heat Exchanger. 800 MeV 20 mA Proton Beam - PowerPoint PPT Presentation
Citation preview
AnsaldoNucleare A Company of Ansaldo Energia
DM1: WP1.5 Meeting Brussels 17-03-2006
L. Mansani
Progress on EFIT DesignProgress on EFIT Design
AnsaldoNucleare A Company of Ansaldo Energia
DM1: WP1.5 Meeting Brussels 17-03-2006
EFIT: Reactor Block
AnsaldoNucleare A Company of Ansaldo Energia
DM1: WP1.5 Meeting Brussels 17-03-2006
EFITSG & Pump Group
EFITPurification Unit
AnsaldoNucleare A Company of Ansaldo Energia
DM1: WP1.5 Meeting Brussels 17-03-2006
Run Target Power[MW]
Target HX OD
[mm]
N° HX Tubes
HX Tubes radial pitch[mm]
Flow Rate[kg/s]
Primary Coolant Temp. (in/out)
[°C]
Target Coolant Temp. (in/out)
[°C]
Pump Tube Speed[m/s]
HX Tube Speed[m/s]
HX Shell Speed[m/s]
1 11.2 861 1274 19 780 400/450 422/524 1 0.54 0.55
2 11.2 861 1274 19 850 400/450 424/518 1.13 0.58 0.55
3 11.2 899 1410 19 780 400/450 419/522 1 0.48 0.49
4 11.2 899 1410 19 850 400/450 421/515 1.13 0.53 0.49
5 11.2 871 1410 18 780 400/450 418/521 1 0.48 0.56
6 11.2 871 1410 18 850 400/450 420/514 1.13 0.53 0.56
7 8.4 747 902 19 700 400/450 428/514 0.93 0.68 0.58
Target Outside Diameter as a function of main Target Parameters
AnsaldoNucleare A Company of Ansaldo Energia
DM1: WP1.5 Meeting Brussels 17-03-2006
800 MeV 20 mA Proton Beam
Deposited Power in the Target 11.2 MW
EFIT Windowless Target Heat Exchanger
600 MeV 20 mA Proton Beam
Deposited Power in the Target 8.4 MW