Member of

Participated in the preparation of a report on the international tender to erect and

install two Post Panamax Winch for the container terminal at the Dekhila Port,

Alexandria Container Company, Alexandria 1993.

Participated in the hydrostatic, trim and stability calculations of the 32 m Reception

Vessel “Sabora2”. Alexandria, Egypt. 1993.

Participated in the hydrostatic, trim and stability calculations of the 18 m Pilot Boat

for the Egyptian Company for Ship Building and Repair, June 1993.

Participated in conducting the inclining experiment on the 71 meter passenger ship

“Glory” and in the preparation of the hydrostatic, trim and stability calculations..

Alexandria, Egypt. Sept. 1994

Participated in the hydrostatic, trim and stability calculations of the 24.5 m Anti

Pollution Reception Vessel. “Shalila”, June 1994

Participated in the Faculty of Engineering Committee in the preparation of the

Technical Evaluation and Price Estimate of two passenger ships “Gaya” and “Sybell”

owned by Horizon Egypt Company and partially financed by el Ahly National Bank,

Cairo, Egypt, (September 2003).

Participated in preparing complete design package for a 70 m Launch/material

barge for Arab Shipbuilding and Repair Company ASRY, Kingdom of Bahrain (2003)

Participated in preparing technical proposal to supply a marine floating platform

made of metal construction for Lake Nasser. (Dec 2003)

Participated in preparing technical specifications and heat gain calculations for a 35

m service boat for the state of Kuwait, Tender No. 40073 (March 2004).

Participated in writing the technical specifications for a 20 m fishing boat (July

2004)

Participated in preparing a proposal for technical specifications for Conventional

and Reefer Container ships to operate in the High Dam Lake between Aswan and

Wadi Halfa (Oct. 2004).

Prof. Dr. Mohamed A. Kotb

Marine Eng, & Naval Arch. Consultant

Page 4 /25

Member of

Participated in preparing technical and financial assessment of bulk carriers "Edco"

and "Edcostar' owned by Edco Misr Company, Alexandria, Egypt (Nov 2004).

Participated in the Faculty of Engineering Committee Case No. 7687/2000.

Investigate on the dispute between Samatours Company and Alexandria Shipyard

over "Salem" Bulk Carrier . (June 2004)

Participated in preparing a study proposal to modify deck arrangement for a 14000

ton RoRo passenger Vessel (Jan 2005)

Participated in a design, construction, hydrostatics and stability particulars of a 20

m excavation barge for Sehmawy Contracting Company, Alexandria Egypt (Feb

2005).

Participated in preparing technical specification for a 65 m catamaran floating

restaurant for Al-Elman International Real State Co. (Hussain Al-Saeed) to work at

the Coast of Kuwait. (March 2005)

Participated in reviewing of a proposal submitted by the Ministry of Defense,

Marine industries &services organization, Egyptian Ship Repair and Building

Company for design construct , launch, equip, deliver and commission of a 4000 kw

marine multi purpose oil recovery / FIFI Tug for King Fahd industrial Harbor,

Kingdom of Saudi Arabia. (2005).

Participated in reviewing of a proposal submitted by the Ministry of Defense,

Marine industries &services organization, Egyptian Ship Repair and Building

Company for design and construct , of a 90 m Material deck barge. (April 2005).

Participated in revising Fire Control Plan for a 67.9 m "Lady F" vessel in

accordance with IMO symbol notations. ( April 2005).

Participated in preparing the technical specifications for a 34 m Fishing vessel (Aug.

2005)

Participated in preparing the technical specifications for a 26 m Fishing vessel (Aug.

2005)

Participated in Structural Modification of a 71 m , 96 passenger Vessel "Le-Scribe'

(Aug. 2005)

Participated in revising Fire and Safety Plans for a 71 m "Captain Joe" Vessel in

accordance with IMO symbols. ( Nov 2005)

Participated in revising life saving equipment and escape way for "Shahrzade"

passenger Ro-Ro ship (Nov 2005)

Participated in preparing technical specifications and layout for a shipyard for Iraq

Page 5 /25

Member of

(Nov 2005)

Participated in preparing technical specifications for a 100 guest floating hotel for

the Kingdom of Bahrain (Nov 2005)

Participated in preparing a study on Safe Berthing and Mooring Analysis Study for

Egypt LNG jetty, Edco, Alexandria, (Dec 2005).

Participated in reviewing technical specifications offer submitted by the Egyptian

Ship Building and Repair Company for building a 300 guest water bus for the

Governorate of Assiut bus (Dec 2005).

Participated in preparing technical and financial assessment of Naggar Group

floating hotels in Luxor (Jan 2006)

Participated in preparing Main Engine Foundation design and replacement for

Petrojet Marine Services PMS 32 anchor handling tug and supply vessel (Feb 2006)

Prepared technical specifications for research boat for Marine Science Department,

Faculty of science, Alexandria university (Feb 2006)

Participated in preparing a report on technical and financial assessment of

"ADMARINE-II" Jack up offshore platform for Advance Energy Systems, ADES, at

Altor, Sinai, (March) 2006

Participated in design and construction of a 100 guest floating hotel "Abreen 1" for

Al Rased International Trade, Sudan (May 2006)

Participated in design and construction of a 50 guest floating hotel " Abreen 2" for

Al Rased International Trade, Sudan (May 2006).

Participated in revising Fire and Safety Plans for 69.m "MJ2" general cargo vessel in

accordance with IMO symbols. ( June 2006)

Participated in technical assessment of offers submitted to build a research boat for

Marine Science Department, Faculty of science, Alexandria university (June 2006)

Participated in preparing trim and stability booklet for the RoRo Passenger Vessel

M/V "Farah" for increased passenger capacity for Arab Ship Management Ltd,

Aqaba, Jordan. (Oct 2006).

Participated in preparing a Report " Safe Berthing and Mooring Analysis Study for

Egypt LNG Jetty, Idku, Alexandria," (Dec 2005-October 2006).

Participated in submitting a proposal to design two floating barges one for fresh

water and one for diesel oil (15 m3) capacity to operate in dead sea for Arab Potash

Company, Aqaba, Jordan (Oct 2006).

Page 6 /25

Member of

Prepared the Technical Specifications for a 10 m research boat for Marine Science

Department, Faculty of Science, Alexandria University (Dec 2006)

Participated in preparing the Technical Specifications for 82 m cross river ferry to

operate across the High Dam Lake (Qastal-Abu simple) for the Trans Export – Great

Nile Group (Dec 2006).

Participated in the design of a ballast system and pump room installations for a 91

m material barge PMS 42 for Petroleum Marine Services Feb 2007.

Prepared a Technical Report " Options for Enhancing the Maneuvering Capabilities

of Maridive AHTS Vessel ", for Maridive & Oil Services S. A. E. Egypt, (Feb 2007).

Participated in preparing the design and technical specifications for 64 m

"Evergreen" floating luxury hotel to operate in the river Nile (May 2007).

Participated in preparing the design and technical specifications for 40 m

"Dahabeya" floating boat to operate in the river Nile (May 2007).

Participated in preparing the design and Technical Specifications for a 17 m

diameter helideck to fit to a 70 m Barge for Maridive Oil Services MOS (July 2007).

Participated in conducting inclining experiment for a 63 m floating hotel "Reve-de-

Nil-Cleopatra" in Luxor, Jan 2008.

Participated in preparing the stability booklet on severe wind and rolling criterion

(weather criterion) in accordance to Resolution A.749(18) for a 61.30 m cargo ship

M/V "Lama-M", Feb. 2008

Participated in preparing the stability booklet on severe wind and rolling criterion

(weather criterion) in accordance to Resolution A.749(18) for a 64.52 m cargo ship

M/V "Fatema-M", Feb. 2008

Participated in the design of a replacement of a propulsion and steering system for a

55.5 m floating hotel "Atlas", March 2008.

Participated in preparing a report on technical assessment for cutter suction

dredgers offers submitted to Orascom construction industries, Cairo, Egypt., March

2008.

Participated in preparing a report on the , Stability Assessment of the jack-up

platform "ZAHRAA" According to Code of Intact Stability for Mobile Offshore Drilling

Units (MODUs) Resolution A.749(18), May 2008

Participated in preparing a report on the , tonnage calculations of the jack-up

platform "ZAHRAA" According to Code of Intact Stability for Mobile Offshore Drilling

Units (MODUs) Resolution A.749(18), May 2008

Page 7 /25

Member of

Participated in the inclining experiment for a 55.5 m floating hotel "Atlas", Cairo,

June 2008.

Participated in preparing the National Academic Reference Standards (NARS) for

Engineering- Marine Engineering and Naval Architecture Program, June 2008

Participated in the design and modification of the general arrangement of a 63.3 m

floating hotel "Flash2", (June 2008)

Structural modification, inclining experiment, and stability booklet of the 63.3 m

Nile Cruiser M/V "Flash II" (Jan 2009)

Design and supervising the construction of 4 x 23 m self propelled Excavator barge

(Jan 2009)

Stability and Design and supervising the construction of 2 x 10 m inspection boats

(April 2009).

Participated in a study regarding the ability of Misr Gulf XII supply boat to transport

a 160 ton rubber tyre gantry crane RTG between Alexandria and Dekhela Ports

MisrGulf, June 2009

Participated in providing a technical opinion regarding propeller repair work on a

144 m M/V "Nadeen", August 2009.

Participated in tank sounding calculations, inclining experiment, and stability

booklet on the M/V "Subsea99" supply boat, December 2009.

Reviewing the towing calculations "ESTUDIO DE REMOLQUE R,07,44 Draga

"HONDIUS" by Grupo Boluda, Corporacion Maritime ", Naval Tek Marine, Feb.28th,

2010

Participated in tank sounding calculations, inclining experiment, and stability

booklet on the M/V "WesternShore" seismic boat, March 2010

Reviewed the trim and stability booklet for the M/V “Taiba” livestock carrier, July

2010 .

Reviewed the trim and stability booklet for the M/V “Malak1” livestock carrier, July

2010 .

inspection of the S/S ”ALDEEBEL” 283 m LNG carrier during the crossing of the

Suez Canal from Port Said to Suez on 31st March 2010

Prepared trim and stability booklet for the M/V “Malak1” livestock carrier Feb

2011

Reviewed longitudinal and transverse strength of the M/V “Malak1” liveock stock

Feb 2011

Page 8 /25

Member of

Participated in a study of converting the M/V “Gracia del-Mar” Container vessel into

a livestock carrier. Tartous Syria Xx 2011

Prepared a draft survey report on the M/V supply boat “MisrGulf 12”, Suez, Egypt ,

xx2011

Reviewed the trim and stability booklet of the M/V livestock “Taiba” May 2011

Prepared a technical study on de-rating of Power of the M/V “MisrGulfXIII” due to

propeller shaft diameter wearing –April 2011

Reviewed the tonnage calculations of the M/V “Delmar1” xx 2011

Reviewed the tonnage calculations of the M/V “Echoflumiccino” xx2011

Reviewed the tonnage calculations of the M/V “Sea Clean” xx 2011

Reviewed the conversion drawings, tonnage and Freeboard of the M/V "Chance "

General Cargo Ship to a livestock carrier June 2011

Conducted the inclining experiment of the M/V supply vessel “Subsea5” and

prepared her trim and stability booklet

Reviewed the conversion drawings, of the M/V "Goldstone " Container ship to a dry

bulk carrier – in progress

Page 9 /25

Member of

Taking part in designing many small boats for different shipbuilding companies

such as:

A number of tug boats and service boats

Nile floating hotels ( e.g. Nephtis)

Floating restaurants (e.g. Onyx & Topaz)

Research vessel for high dam lake

Floating jetty for high dam lake

Preparing stability calculations for several units.

Review the design of pipeline marker buoys and mooring buoys for Geisum Oil

Company in Suez Gulf, Red Sea, May 1998.

Working with the technical department of the Alexandria shipyard as a technical

advisor from April 1996 to February 1997.

Preparing a techno-economical evaluation of a number of marine units.

Preparing a number of technical specifications for a number of maritime

tenders.

Participating as a member in technical evaluation committees for offers of a

number of marine unit tenders.

Participating as a member in expert committees in a number of disputes and

court cases.

Participating in a training course in a shipbuilding company in Netherlands

1980.

Post-doctoral fellowship in Fisheries and Marine Institute, memorial University,

Newfoundland, Canada from February 1997 to February 1998.

Supervising a number of M.Sc. and Ph.D. students in the field of ship

hydrodynamics and ship design.

Prof. Dr. Adel Banawan

Marine Eng, & Naval Arch. Consultant

Page 10 /25

Member of

Participations in Projects and Applied Researches:

Suez Canal University Project, Faculty of Engineering, Design and fabrication

of fire fighting system on shipboard"

Suez Canal University Project, Faculty of Engineering, "Wind assisted cruise

for clean environments and energy conservation"

Design and installation of the Sanitary and sewage pumping station for the

academic hospital, Suez Canal University.

Participated and chaired in more than 100 projects and field problems

related to Mechanical and Marine engineering- Application of new and

renewable energy in Egypt- Pipeline laying- Marine power plants- Design of

piping systems and installations- Design and construction of marine units-

Natural Gas application in marine fields- NG transportations- Pumps and

pumping systems- Offshore operation and installation.

General Experiences:

Visitor professor in Marine Engineering Department, Faculty of Engineering,

Alexandria University, Egypt.

Visitor professor in Marine Engineering Department, Arab Academy for

Science and Technology and Maritime Transport, Egypt.

Consultant in many ship building and construction projects, Egypt.

Visitor professor in Steam and Gas Turbines Institute, University of Aachen,

Germany.

Member of Indian Institute group for Heat Transfer studies, India.

Visitor professor in Maritime Transport Department, Arab Academy for

Science and Technology and Maritime Transport, Egypt.

Prof. Dr. Adel A. Tawfik

Marine Eng, & Naval Arch. Consultant

Page 11 /25

Member of

Page 12 /25

Member of

The consultant participated in the following projects:

Client Project Project Budget Million EP

Role Affiliation

ACPA Infrastructure work 35 Design-Supervision FACB

Airliquide Oxygen/Nitrogen facility, Dekhela, Alexandria, Egypt

20 Design-Supervision AHK

Airliquide Hydrogen/Nitrogen facility, Alein Alsokhna

25 Design-Supervision AHK

Alexandria LNG Control room explosion resistance design

15 Review Alexandria University

Ameryia petroleum refinery company

Penex process unit 3 Design FACB

Ameryia petroleum refinery company

grease manufacturing plant 3 Design FACB

Ameryia petroleum refinery company

Medical oil unit 6 Design FACB

Ameryia petroleum refinery company

Biological Treatment plant , Ameryia Petroleum refinery co.

1 Design FACB

Ameryia petroleum refinery company

Reactors, Compressors 3 Design FACB

Ameryia petroleum refinery company

pipe racks and pipelines from Ameryia Company to Alexandria Harbor

16 Design-Supervision FACB

Ameryia petroleum refinery company

pipe racks and pipelines from Rashpetco to EL-madia

8 Design-Supervision FACB

Ameryia petroleum refinery company

Cooling tower 3 Design FACB

AMOC foundations for process plants and buildings

12 Design FACB

APC Polyethylen plant 4 Design FACB

APC ethylene plant 5 Design FACB

APC Foundation piling debate 650 Court report Alexandria University

APC Rashpetco Diaphram walls for pits and sumps

10 Design FACB

Burullus gas company Infrastructure work 20 Design-Supervision FACB

PROJECTS RELATED TO PETROLEUM AND GAS INDUSTRIES

Prof. Dr. Hassan M. Abouseeda

Structural Design Consultant

Page 13 /25

Member of

EPCO Cooling towers 5 Design FACB

GASCO pipeline 7 Design FACB

LPG- Alexandria processing, Sumps, Substations, Flare

10 Design FACB

Midor Refinery Oil tanks 6 Design FACB

Midor Refinery water supply network and pumping station

9 Design FACB

Midor Refinery fence pipe lines 3 Design FACB

Midor Refinery water treatment plant 5 Design FACB

Midor Refinery back fill quality control 100 Design-Supervision FACB

Midor Refinery Infrastructure work 30 Design-Supervision FACB

Misr for oil electrical pump station, compressors, heat exchanger, pipe racks

3 Design FACB

Petrobel API Separator 2 Design FACB

Petrogas administration building , spherical tanks, work shop, processing plant

20 Design FACB

Petrojet testing for subsidence and monitoring, Ethanex plant, Damietta

30 Design-Supervision MACO

Sumid Precast Concrete sumps 1 Design FACB

Zafco Rosetta feild development- infrastructure work

70 Design-Supervision FACB

Client Project Project Budget Million EP

Role Affiliation

Alkan factories, admin and utility buildings - Alexandria free zone

30 Design-Supervision AHK

Alkan factories, admin and utility buildings - Sadat city

45 Design-Supervision AHK

Citcor factories, admin and utility buildings - Borg Elarab city

80 Design-Supervision AHK

Eshratex factories, admin and utility buildings - Borg Elarab city

150 Design-Supervision AHK

Mediteranian factories, admin and utility buildings - Borg Elarab city

170 Design-Supervision AHK

CSA factories, admin and utility buildings - Borg Elarab city

60 Design-Supervision AHK

Nile Suez factories, admin and utility buildings - Sadat city

70 Design-Supervision AHK

PROJECTS RELATED TO TEXTILE INDUSTRIES

Page 14 /25

Member of

Filmar factories, admin and utility buildings - Borg Elarab city

130 Design-Supervision AHK

Puttman factories, admin and utility buildings - Borg Elarab city

120 Design-Supervision AHK

Client Project Project Budget Million EP

Role Affiliation

Yemen Naval Forces Al Katheeb Harbor - quay wall and break waters

500 Design-Supervision FACB

Yemen Coast Guard Adan harbor 30 Design-Supervision FACB

Yemen Engineering Corps

Adan harbor retrofitting 15 Design-Supervision Geotechnics

Yemen Engineering Corps

Algabbana harbor 120 Design-Supervision Geotechnics

Alwadei Group Meedi Harbor - quay wall and break waters- Yemen

250 Design-Supervision Geotechnics

Alwadei Group Alkhawba Harbor retrofitting- Yemen 20 Design-Supervision Geotechnics

Alwadei Group Allsaleef quay wall retrofitting- Yemen 12 Design-Supervision Geotechnics

Egyptian Naval Forces Damietta harbor 30 Design Dr. Hamdi Alqamhawy

Petrojet-PMS Almeadeia quay wall 25 Design FACB

Chevron Benguila-Beleiz Complaint Tower - Angola

6000 Design Mustang Engineering

BP Mad Dog Spar and topside 1500 Design Mustang Engineering

OFFSHORE AND HARBOR DESIGN

Page 15 /25

Member of

Demonstrator in Naval Architecture and Marine Engineering Department,

Faculty of Engineering, Alexandria University, Alexandria, Egypt.

Assistant Lecture in Naval Architecture and Marine Engineering Department,

Faculty of Engineering, Alexandria University, Alexandria, Egypt.

Assistant professor in Naval Architecture and Marine Engineering Department,

Faculty of Engineering, Alexandria University, Alexandria, Egypt.

Prof. Dr. Ahmed M. Elhewy

Structural Design Consultant

Page 16 /25

Member of

Page 17 /25

Member of

Workshop Extension , GASCO Company, Egypt

VIP Hall , Arab Academy, Alexandria

EgyTec Company for Developed Industries, Alexandria.

Electronic Gates, Arab Academy, Alexandria.

Techno Valley, Riyadh, Saudi Arabia.

California Compound, Riyadh, Saudi Arabia.

Academy Scientific School, Alexandria, Egypt.

Tube Bundle Erection, Alex. National Refining and Petrochemicals Company

(ANRPC), Alexandria, Egypt

Egypt Sat Administration Building, Ismailia, Egypt

Service Building, Arab Academy, Alexandria, Egypt.

Steam Laboratory frame, Arab Academy, Alexandria, Egypt.

Eco Tower Building, Smouha, Alexandria, Egypt.

High Mast for Lighting Football Stadium, , Arab Academy.

Sabha City Government Building, Libya.

New Passenger Hall, El-Madina Airport, Saudi Arabia.

AL-SABAASONS Faculty the Holy Quran, Lybia.

Administration Building of Alexandria Fertilization Company, Behera, Egypt.

Administration Building of Egyptian Liquefied Natural Gas Company, ELNG, Idku,

Behera, Egypt.

Gangway for Egyptian Liquefied Natural Gas Company, ELNG, Idku, Behera,

Egypt.

Permeate Compressor Shelter for Khalda Petroleum Company, Matrouh, Egypt.

Recycle Compressor Shelter for Khalda Petroleum Company, Matrouh, Egypt.

New Middle School Athletic Building and Elementary Gymnasium, Cairo

Kassas-Prof. Dr. Ehab M. El

Civil Eng. Consultant

Page 18 /25

Member of

American College, Maadi, Cairo, Egypt.

EI Manarat Schools Group, Skeleton R. C. Structure, El-Madina Al-Monoura, Saudi

Arabia.

Closed Sports hall, Shebeen El-Koom Stadium, Shebeen El-Koom, Minofia, Egypt.

Washing Machine Industrial Building, Alexandria Metal Products Company,

Alexandria, Egypt.

Compressor Sheds and Compressor Foundations, Alexandria Petroleum

Company, Steel Frames & R. C. Foundation for compressors, Alexandria, Egypt.

Design of steel shed, Elmahrosa Hotel, Sidi beshr, Alexandria, Egypt.

Rasher office Building, Borg El-Arab, Alexandria, Egypt.

El-Farsi Plaza Building, Gleem, Alexandria, Egypt.

Ragab Mall, Damanhour, Behera, Egypt.

Dream Tower Building, Sporting, Alexandria, Egypt.

Elyasmeen Building, Bolkely, Alexandria, Egypt.

Ben Haleem Villa with a swimming pool, New Cairo, Egypt.

Tarek Barakat Villa with a swimming pool, King Mariout, Alexandria, Egypt.

Magdy El-Wellely Villa with a swimming pool, King Mariout, Alexandria, Egypt.

Aly Elaraby Villa with a swimming pool, King Mariout, Alexandria, Egypt.

Atef Abu AI-Naser & Sons Villas, Five different villas with a swimming pool, Abu

Talal, Alexandria, Egypt.

Eagar & Sons Villas, three different Villas with a swimming pool, New Cairo,

Egypt.

Daifalla Villa, King Mariout, Alexandria, Egypt.

Page 19 /25

Member of

Page 20 /25

Member of

Junior Lecturer, Mechanical and Marine Engineering Department, Arab

Academy for Science, Technology & Maritime transport, Alexandria, Egypt.

Lecturing undergraduate courses of: Thermodynamics, Engineering drawings,

AutoCAD and Heat Transfer in Mechanical and Marine Engineering Department

Teaching Assistant, Mechanical and Marine Engineering Department, Arab

Academy for Science, Technology & Maritime transport, Alexandria, Egypt.

Lecturing undergraduate courses of: Thermodynamics, Heat Transfer.

AutoCAD, Refrigeration and Air Conditioning in Mechanical and Marine

Engineering Department

Registered for PhD in the University of Nottingham, School of Mechanical,

Materials, Manufacturing and Management. A thorough investigation

characterising and describing the vehicle defrosting and demisting

mechanisms on the front vehicle windshield have been carried out. The

investigation used CFD (Fluent 5) with experiments to validate the numerical

results. The present study has shown how Computational Fluid Dynamics can

be applied successfully to the evaluation of the defrosting and demisting of the

windshield. Also, CFD gives vital details on the fluid flow and heat transfer in

the vicinity of the windshield and within the passenger compartment.

Part time Demonstrator, Mechanical Engineering Department, University of

Nottingham, UK. - Laboratory demonstrator/supervisor of undergraduate

course of: Fluid Mechanics, Thermodynamics

Associate Professor, Marine Engineering Department, Arab Academy for

Science, Technology & Maritime transport, Alexandria, Egypt. Lecturing

undergraduate courses of: Thermodynamics, Refrigeration and Air

Conditioning in Mechanical and Marine Engineering Department

Prof. Dr. Amr Ali

Mechanical Engineering Consultant

Page 21 /25

Member of

Head of Marine Engineering Department, College of Engineering, Arab Academy

for Science and Technology and Maritime transport.

Marine Surveyor in Marine Surveyors Office (Marisurv)at Alexandria

N.D.T Inspector (UT welding inspection, UT thickness gauge, Visual Inspection,

Dye Penetrate Inspection and magnetic Particle Inspection)

Quality representative for college Engineering & Technology at Arab Academy

for Science and Technology and Maritime Transport

Involved in several engineering consultancies in the field of mechanical and

marine engineering

Prof. Dr. Ashraf Sharara

Mechanical Engineering Consultant

Page 22 /25

Member of

Page 23 /25

Member of

Five years at “Marine Surveyors” Establishment on a Capacity of a Marine

Surveyor.

Approved “Marine Surveyor (Ships Hull & Machinery / Cargo)” by the EGYPTIAN

INSURANCE SUPERVISORY AUTHRITY under Reg.No.1100.

Approved Surveyor for DNV PETROLEUM SERVICE since March 2001.

Superintendent Engineer for Zakher Marine Oil Services International.

Port Supervisor/Loading Master and dredging Coordinator at ELNG, Idku LNG

Port Egypt.

Ch. Eng. Mahmoud Ibrahim

Marine Engineering Consultant

Page 24 /25

Member of

Qualified machinery consultant by the International Council for Machinery

Lubrication at the United States of America with Six years at ExxonMobil Marine

Lubricants as Middle East Manager running technical and commercial activities.

Invented and implemented the optimization of cylinder lubrication on two

stroke diesel engines for various types of vessels.

Two years at Germanischer Lloyd at the capacity of country manager establishing

and managing all GL activities in Kuwait.

Two years as a fleet technical manager for Kuwaiti Saudi Livestock running a

fleet of 4 livestock carriers rated as the biggest livestock carriers globally.

During the service a huge repair of 900 tons of steel renewal and modification to

AMSA requirement has been successfully conducted on the biggest livestock

vessel.

TWI Qualified Welding inspector with NDT & CSWEP qualification and a member

of the UK welding institute with two years experience as marine surveyor and

industrial inspector for Lloyds Register.

Qualified negotiator and project manager in a capacity of Ship Repair Manager

for Kuwait Shipyard conducting vessels modifications and repair projects.

Chief Engineer Qualification with eleven years total sailing experience on board

various types of vessels (mainly VLCC’s and LPG’s for Kuwait Oil Tanker Co.)

from the starting point to the Chief Engineering position.

Ch. Eng. Khaled Matar

Marine Engineering Consultant

Page 25 /25

Member of

Page 26 /25

Member of

As a Mate on board, General Cargo, Multiple Purpose, RO RO, Bulk, Passengers,

Timber, Tanker and Container ships for more than ten years 1991 / 2001.

As a Master on board high speed Catamaran (266 passengers) in the former

Jordan International Shipping Management Co. (JISM).

As a lecturer in the A.A.S.T & M.T. Maritime Safety Studies since 15 June 2001

until date. Teaching all Safety and Security courses in the Academy's Egyptian,

Lebanese and Syrian Branches and plenty other teaching projects in foreign and

national petroleum companies in Egypt.

Compiled and Teaching Voluntary IMO Member State Audit Scheme (VIMSAS)

course for the Egyptian Maritime Administration.

Capt. Mohamed A. Essallamy

Marine Consultant