KUNZE LAKE TIMBER SALE SPECIFIED ROAD SCHEDULE OF ITEMS Item Number Item Description & Milepost C or R 1 Road Std. W,D,S 2 Unit & M of M 3 Quantity Unit Allowance Estimated Allowance South Sidnaw/Ponozzo Road D MP 0.71 Right 249 02 Construct truck turnaround into PU 10 C LS LSQ 1 $600.00 $600.00 301 22 Haul and place 15 CY of crushed aggregate for surfacing entrance. (20 CY loose material) CY DQ 15 $15.00 $225.00 MP 1.11 Left 249 02 Construct truck turnaround into PU 7 and 8. C LS LSQ 1 $600.00 $600.00 301 22 Haul and place 15 CY of crushed aggregate for surfacing entrance. (20 CY loose material) CY DQ 15 $15.00 $225.00 SOUTH SIDNAW ROAD TOTAL SPECIFIED ROAD SCHEDULE OF ITEMS $1,650.00 FR 2117 D MP 1.54 Left 249 02 Construct truck turnaround C LS LSQ 1 $600.00 $600.00 FR 2117 TOTAL SPECIFIED ROAD SCHEDULE OF ITEMS $600.00 FR 2117-C D MP 0.32 Left 249 02 Construct truck turnaround C LS LSQ 1 $600.00 $600.00 FR 2117-C TOTAL SPECIFIED ROAD SCHEDULE OF ITEMS $600.00 FR 2117-F D MP 0.14 Left 249 02 Construct truck turnaround C LS LSQ 1 $600.00 $600.00 FR 2117-F TOTAL SPECIFIED ROAD SCHEDULE OF ITEMS $600.00 FR 2119 D MP 0.39 Left 249 02 Construct truck turnaround C LS LSQ 1 $600.00 $600.00 301 22 Haul and place 15 CY of crushed aggregate for surfacing entrance. (20 CY loose material) CY DQ 15 $15.00 $225.00 FR 2119 TOTAL SPECIFIED ROAD SCHEDULE OF ITEMS $825.00 FR 2125-B D MP 0.44 Right 1 C = Construction, R = Reconstruction 2 W = Winter, D = Dry Summer, S = Summer 3 Method of Measure SR-1 Prepared By: Travis Kilpela 2/12/2020 Civil Engineering Technician ***Advertisement Copy***

KUNZE LAKE TIMBER SALE SPECIFIED ROAD SCHEDULE OF ITEMS

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: KUNZE LAKE TIMBER SALE SPECIFIED ROAD SCHEDULE OF ITEMS

KUNZE LAKE TIMBER SALE

SPECIFIED ROAD SCHEDULE OF ITEMS

Item

Number Item Description & Milepost

C or

R1

Road

Std.

W,D,S 2

Unit &

M of

M3

Quantity

Unit

Allowance

Estimated

Allowance

South Sidnaw/Ponozzo Road DMP 0.71 Right

249 02Construct truck turnaround into PU

10 C

LS

LSQ 1 $600.00 $600.00

301 22

Haul and place 15 CY of crushed

aggregate for surfacing entrance. (20

CY loose material)

CY

DQ 15 $15.00 $225.00

MP 1.11 Left

249 02Construct truck turnaround into PU 7

and 8. C

LS

LSQ 1 $600.00 $600.00

301 22

Haul and place 15 CY of crushed

aggregate for surfacing entrance. (20

CY loose material)

CY

DQ 15 $15.00 $225.00

SOUTH SIDNAW ROAD TOTAL

SPECIFIED ROAD SCHEDULE OF

ITEMS $1,650.00

FR 2117 DMP 1.54 Left

249 02Construct truck turnaround C

LS

LSQ 1 $600.00 $600.00

FR 2117 TOTAL SPECIFIED ROAD

SCHEDULE OF ITEMS $600.00

FR 2117-C DMP 0.32 Left

249 02Construct truck turnaround C

LS

LSQ 1 $600.00 $600.00

FR 2117-C TOTAL SPECIFIED

ROAD SCHEDULE OF ITEMS $600.00

FR 2117-F DMP 0.14 Left

249 02Construct truck turnaround C

LS

LSQ 1 $600.00 $600.00

FR 2117-F TOTAL SPECIFIED

ROAD SCHEDULE OF ITEMS $600.00

FR 2119 DMP 0.39 Left

249 02Construct truck turnaround C

LS

LSQ 1 $600.00 $600.00

301 22

Haul and place 15 CY of crushed

aggregate for surfacing entrance. (20

CY loose material)

CY

DQ 15 $15.00 $225.00

FR 2119 TOTAL SPECIFIED ROAD

SCHEDULE OF ITEMS $825.00

FR 2125-B DMP 0.44 Right

1C = Construction, R = Reconstruction

2W = Winter, D = Dry Summer, S = Summer

3Method of Measure SR-1

Prepared By: Travis Kilpela 2/12/2020

Civil Engineering Technician

***Advertisement Copy***

Page 2: KUNZE LAKE TIMBER SALE SPECIFIED ROAD SCHEDULE OF ITEMS

KUNZE LAKE TIMBER SALE

SPECIFIED ROAD SCHEDULE OF ITEMS

Item

Number Item Description & Milepost

C or

R1

Road

Std.

W,D,S 2

Unit &

M of

M3

Quantity

Unit

Allowance

Estimated

Allowance

249 02Construct truck turnaround C

LS

LSQ 1 $600.00 $600.00

FR 2125-B TOTAL SPECIFIED

ROAD SCHEDULE OF ITEMS $600.00

$4,875.00

KUNZE LAKE TIMBER SALE TOTAL

SPECIFIED ROAD SCHEDULE OF ITEMS

1C = Construction, R = Reconstruction

2W = Winter, D = Dry Summer, S = Summer

3Method of Measure SR-2

Prepared By: Travis Kilpela 2/12/2020

Civil Engineering Technician

***Advertisement Copy***

Page 3: KUNZE LAKE TIMBER SALE SPECIFIED ROAD SCHEDULE OF ITEMS

SR-3

KUNZE LAKE TIMBER SALE SPECIFIED ROADWORK NOTES

NOTE: There may be underground utility lines in unknown locations on this project. Call MISS DIG THREE full working days before any work begins. Phone 1-800-482-7171.

NOTE: During gravel hauling operations, “safety” signs shall be placed as directed by the Forest Service. See Sale Area Map for specific sign locations and Traffic Control Plan for sign size and type.

NOTE: Clearing and grubbing shall be done in accordance with supplemental specifications 249.02 and 249.04.

NOTE: All finished roadbeds shall be as shown in the typical drawing with 1’ ditches or out slopes as applicable.

NOTE: 45 CY of crushed aggregate is required for specified roadwork, this volume plus the normal compaction factor of 130% computes to a loose volume of 59 CY. Material for this project may be taken from the Lake 13 Pit, located at T47N, R35W, Section 18. Some pit development may be required and is considered incidental to associated items. Compaction shall be method A.

***Advertisement Copy***

Page 4: KUNZE LAKE TIMBER SALE SPECIFIED ROAD SCHEDULE OF ITEMS

KUNZE LAKE TIMBER SALE

ROADWORK MAINTENANCE PLAN-APPRAISAL ALLOWANCE

Road

Number

Item Description &

Milepost

Season

of Use Unit Quantity

Unit

Allowance

Appraisal

Allowance

FR 2117 D

MP 0.00-1.59

Clear, grub and reshape

road to a crown or

outslope. Mile 1.59 $2,500.00 $3,975.00

Haul and place 15 CY of

crushed aggregate for

surfacing entrance. (20

CY loose material) CY 15 $15.00 $225.00

FR 2117 TOTAL

MAINTENANCE $4,200.00

FR 2117-C D

MP 0.00-0.35

Clear, grub and reshape

road to a crown or

outslope. Mile 0.35 $2,500.00 $875.00

Haul and place 15 CY of

crushed aggregate for

surfacing entrance. (20

CY loose material) CY 15 $15.00 $225.00

FR 2117-C TOTAL

MAINTENANCE $1,100.00

FR 2117-F D

MP 0.00-0.17

Clear, grub and reshape

road to a crown or

outslope. Mile 0.17 $2,500.00 $425.00

Haul and place 15 CY of

crushed aggregate for

surfacing entrance. (20

CY loose material) CY 15 $15.00 $225.00

FR 2117-F TOTAL

MAINTENANCE $650.00

FR 2117-K D

MP 0.00-0.03

Clear, grub and reshape

road to a crown or

outslope to be used as

truck turnaround. LS 1 $300.00 $300.00

S=Summer

D=Dry Summer

W=Winter

1 of 3

Prepared By: Travis Kilpela 2/12/2020

Civil Engineering Technician

***Advertisement Copy***

Page 5: KUNZE LAKE TIMBER SALE SPECIFIED ROAD SCHEDULE OF ITEMS

KUNZE LAKE TIMBER SALE

ROADWORK MAINTENANCE PLAN-APPRAISAL ALLOWANCE

Road

Number

Item Description &

Milepost

Season

of Use Unit Quantity

Unit

Allowance

Appraisal

Allowance

Haul and place 15 CY of

crushed aggregate for

surfacing entrance. (20

CY loose material) CY 15 $15.00 $225.00

FR 2117-K TOTAL

MAINTENANCE $525.00

FR 2119 D

MP 0.00-0.42

Clear, grub and reshape

road to a crown or

outslope. Mile 0.42 $2,500.00 $1,050.00

Haul and place 15 CY of

crushed aggregate for

surfacing entrance. (20

CY loose material) CY 15 $15.00 $225.00

MP 0.09

Haul and place 15 CY of

crushed aggregate for

surfacing. (20 CY loose

material) CY 15 $15.00 $225.00

MP 0.24

Haul and place 30 CY of

crushed aggregate for

surfacing. (39 CY loose

material) CY 30 $15.00 $450.00

FR 2119 TOTAL

MAINTENANCE $1,950.00

FR 2125 D

MP 0.00-0.39

Clear, grub and reshape

road to a crown or

outslope. Mile 0.39 $2,500.00 $975.00

Haul and place 15 CY of

crushed aggregate for

surfacing entrance. (20

CY loose material) CY 15 $15.00 $225.00

FR 2125 TOTAL

MAINTENANCE $1,200.00

FR 2125-B D

MP 0.00-0.47

Clear, grub and reshape

road to a crown or

outslope. Mile 0.47 $2,500.00 $1,175.00

S=Summer

D=Dry Summer

W=Winter

2 of 3

Prepared By: Travis Kilpela 2/12/2020

Civil Engineering Technician

***Advertisement Copy***

Page 6: KUNZE LAKE TIMBER SALE SPECIFIED ROAD SCHEDULE OF ITEMS

KUNZE LAKE TIMBER SALE

ROADWORK MAINTENANCE PLAN-APPRAISAL ALLOWANCE

Road

Number

Item Description &

Milepost

Season

of Use Unit Quantity

Unit

Allowance

Appraisal

Allowance

Haul and place 15 CY of

crushed aggregate for

surfacing entrance. (20

CY loose material) CY 15 $15.00 $225.00

FR 2125-B TOTAL

MAINTENANCE $1,400.00

D

Appraisal allowance for

during haul maintenance.

Haul and place 50 CY (65

CY loose material) of pit run

gravel to be spot placed as

needed in accordance with

Spec T-8130 CY 50 $15.00 $750.00

$11,775.00

Any maintenance road within the

sale area

Kunze Lake Timber Sale Total Maintenance

S=Summer

D=Dry Summer

W=Winter

3 of 3

Prepared By: Travis Kilpela 2/12/2020

Civil Engineering Technician

***Advertisement Copy***

Page 7: KUNZE LAKE TIMBER SALE SPECIFIED ROAD SCHEDULE OF ITEMS

KUNZE LAKE TIMBER SALE

ROAD MAINTENANCE APPRAISAL NOTES

NOTE: There may be underground utility lines in unknown locations on this

project. Call MISS DIG THREE full working days before any work begins. Phone 1-

800-482-7171.

NOTE: During gravel hauling operations, “safety” signs shall be placed as directed by the Forest

Service. See Sale Area Map for specific sign locations and Traffic Control Plan for sign

size and type.

NOTE: Blading and shaping requires filling in existing ruts and potholes, reestablishing a crown

to conform to the typical detail for a crown with no ditches, crown with 1’ ditches or out

sloped roads.

NOTE: Additional outlet or lead out ditches may be required at road segment locations to allow

for proper drainage needs. Locations for placement shall be determined by the Forest

Service.

NOTE: 150 CY of crushed aggregate material is required for road maintenance. This volume

plus the normal compaction factor of 130% for pit run computes to a loose volume of 195

CY. Material for this project may be taken from the Lake 13 Pit, located at T47N, R35W,

Section 18. Some pit development may be required and is considered incidental to

associated items. Compaction shall be method A.

NOTE: 50 CY of pit run material is allotted for during haul for road maintenance. This volume

plus the normal compaction factor of 130% for pit run computes to a loose volume of 65

CY. Material for this project may be taken from the Lake 13 Pit, located at T47N, R35W,

Section 18. Some pit development may be required and is considered incidental to

associated items. Compaction shall be method A.