KUNZE LAKE TIMBER SALE
SPECIFIED ROAD SCHEDULE OF ITEMS
Item
Number Item Description & Milepost
C or
R1
Road
Std.
W,D,S 2
Unit &
M of
M3
Quantity
Unit
Allowance
Estimated
Allowance
South Sidnaw/Ponozzo Road DMP 0.71 Right
249 02Construct truck turnaround into PU
10 C
LS
LSQ 1 $600.00 $600.00
301 22
Haul and place 15 CY of crushed
aggregate for surfacing entrance. (20
CY loose material)
CY
DQ 15 $15.00 $225.00
MP 1.11 Left
249 02Construct truck turnaround into PU 7
and 8. C
LS
LSQ 1 $600.00 $600.00
301 22
Haul and place 15 CY of crushed
aggregate for surfacing entrance. (20
CY loose material)
CY
DQ 15 $15.00 $225.00
SOUTH SIDNAW ROAD TOTAL
SPECIFIED ROAD SCHEDULE OF
ITEMS $1,650.00
FR 2117 DMP 1.54 Left
249 02Construct truck turnaround C
LS
LSQ 1 $600.00 $600.00
FR 2117 TOTAL SPECIFIED ROAD
SCHEDULE OF ITEMS $600.00
FR 2117-C DMP 0.32 Left
249 02Construct truck turnaround C
LS
LSQ 1 $600.00 $600.00
FR 2117-C TOTAL SPECIFIED
ROAD SCHEDULE OF ITEMS $600.00
FR 2117-F DMP 0.14 Left
249 02Construct truck turnaround C
LS
LSQ 1 $600.00 $600.00
FR 2117-F TOTAL SPECIFIED
ROAD SCHEDULE OF ITEMS $600.00
FR 2119 DMP 0.39 Left
249 02Construct truck turnaround C
LS
LSQ 1 $600.00 $600.00
301 22
Haul and place 15 CY of crushed
aggregate for surfacing entrance. (20
CY loose material)
CY
DQ 15 $15.00 $225.00
FR 2119 TOTAL SPECIFIED ROAD
SCHEDULE OF ITEMS $825.00
FR 2125-B DMP 0.44 Right
1C = Construction, R = Reconstruction
2W = Winter, D = Dry Summer, S = Summer
3Method of Measure SR-1
Prepared By: Travis Kilpela 2/12/2020
Civil Engineering Technician
***Advertisement Copy***
KUNZE LAKE TIMBER SALE
SPECIFIED ROAD SCHEDULE OF ITEMS
Item
Number Item Description & Milepost
C or
R1
Road
Std.
W,D,S 2
Unit &
M of
M3
Quantity
Unit
Allowance
Estimated
Allowance
249 02Construct truck turnaround C
LS
LSQ 1 $600.00 $600.00
FR 2125-B TOTAL SPECIFIED
ROAD SCHEDULE OF ITEMS $600.00
$4,875.00
KUNZE LAKE TIMBER SALE TOTAL
SPECIFIED ROAD SCHEDULE OF ITEMS
1C = Construction, R = Reconstruction
2W = Winter, D = Dry Summer, S = Summer
3Method of Measure SR-2
Prepared By: Travis Kilpela 2/12/2020
Civil Engineering Technician
***Advertisement Copy***
SR-3
KUNZE LAKE TIMBER SALE SPECIFIED ROADWORK NOTES
NOTE: There may be underground utility lines in unknown locations on this project. Call MISS DIG THREE full working days before any work begins. Phone 1-800-482-7171.
NOTE: During gravel hauling operations, “safety” signs shall be placed as directed by the Forest Service. See Sale Area Map for specific sign locations and Traffic Control Plan for sign size and type.
NOTE: Clearing and grubbing shall be done in accordance with supplemental specifications 249.02 and 249.04.
NOTE: All finished roadbeds shall be as shown in the typical drawing with 1’ ditches or out slopes as applicable.
NOTE: 45 CY of crushed aggregate is required for specified roadwork, this volume plus the normal compaction factor of 130% computes to a loose volume of 59 CY. Material for this project may be taken from the Lake 13 Pit, located at T47N, R35W, Section 18. Some pit development may be required and is considered incidental to associated items. Compaction shall be method A.
***Advertisement Copy***
KUNZE LAKE TIMBER SALE
ROADWORK MAINTENANCE PLAN-APPRAISAL ALLOWANCE
Road
Number
Item Description &
Milepost
Season
of Use Unit Quantity
Unit
Allowance
Appraisal
Allowance
FR 2117 D
MP 0.00-1.59
Clear, grub and reshape
road to a crown or
outslope. Mile 1.59 $2,500.00 $3,975.00
Haul and place 15 CY of
crushed aggregate for
surfacing entrance. (20
CY loose material) CY 15 $15.00 $225.00
FR 2117 TOTAL
MAINTENANCE $4,200.00
FR 2117-C D
MP 0.00-0.35
Clear, grub and reshape
road to a crown or
outslope. Mile 0.35 $2,500.00 $875.00
Haul and place 15 CY of
crushed aggregate for
surfacing entrance. (20
CY loose material) CY 15 $15.00 $225.00
FR 2117-C TOTAL
MAINTENANCE $1,100.00
FR 2117-F D
MP 0.00-0.17
Clear, grub and reshape
road to a crown or
outslope. Mile 0.17 $2,500.00 $425.00
Haul and place 15 CY of
crushed aggregate for
surfacing entrance. (20
CY loose material) CY 15 $15.00 $225.00
FR 2117-F TOTAL
MAINTENANCE $650.00
FR 2117-K D
MP 0.00-0.03
Clear, grub and reshape
road to a crown or
outslope to be used as
truck turnaround. LS 1 $300.00 $300.00
S=Summer
D=Dry Summer
W=Winter
1 of 3
Prepared By: Travis Kilpela 2/12/2020
Civil Engineering Technician
***Advertisement Copy***
KUNZE LAKE TIMBER SALE
ROADWORK MAINTENANCE PLAN-APPRAISAL ALLOWANCE
Road
Number
Item Description &
Milepost
Season
of Use Unit Quantity
Unit
Allowance
Appraisal
Allowance
Haul and place 15 CY of
crushed aggregate for
surfacing entrance. (20
CY loose material) CY 15 $15.00 $225.00
FR 2117-K TOTAL
MAINTENANCE $525.00
FR 2119 D
MP 0.00-0.42
Clear, grub and reshape
road to a crown or
outslope. Mile 0.42 $2,500.00 $1,050.00
Haul and place 15 CY of
crushed aggregate for
surfacing entrance. (20
CY loose material) CY 15 $15.00 $225.00
MP 0.09
Haul and place 15 CY of
crushed aggregate for
surfacing. (20 CY loose
material) CY 15 $15.00 $225.00
MP 0.24
Haul and place 30 CY of
crushed aggregate for
surfacing. (39 CY loose
material) CY 30 $15.00 $450.00
FR 2119 TOTAL
MAINTENANCE $1,950.00
FR 2125 D
MP 0.00-0.39
Clear, grub and reshape
road to a crown or
outslope. Mile 0.39 $2,500.00 $975.00
Haul and place 15 CY of
crushed aggregate for
surfacing entrance. (20
CY loose material) CY 15 $15.00 $225.00
FR 2125 TOTAL
MAINTENANCE $1,200.00
FR 2125-B D
MP 0.00-0.47
Clear, grub and reshape
road to a crown or
outslope. Mile 0.47 $2,500.00 $1,175.00
S=Summer
D=Dry Summer
W=Winter
2 of 3
Prepared By: Travis Kilpela 2/12/2020
Civil Engineering Technician
***Advertisement Copy***
KUNZE LAKE TIMBER SALE
ROADWORK MAINTENANCE PLAN-APPRAISAL ALLOWANCE
Road
Number
Item Description &
Milepost
Season
of Use Unit Quantity
Unit
Allowance
Appraisal
Allowance
Haul and place 15 CY of
crushed aggregate for
surfacing entrance. (20
CY loose material) CY 15 $15.00 $225.00
FR 2125-B TOTAL
MAINTENANCE $1,400.00
D
Appraisal allowance for
during haul maintenance.
Haul and place 50 CY (65
CY loose material) of pit run
gravel to be spot placed as
needed in accordance with
Spec T-8130 CY 50 $15.00 $750.00
$11,775.00
Any maintenance road within the
sale area
Kunze Lake Timber Sale Total Maintenance
S=Summer
D=Dry Summer
W=Winter
3 of 3
Prepared By: Travis Kilpela 2/12/2020
Civil Engineering Technician
***Advertisement Copy***
KUNZE LAKE TIMBER SALE
ROAD MAINTENANCE APPRAISAL NOTES
NOTE: There may be underground utility lines in unknown locations on this
project. Call MISS DIG THREE full working days before any work begins. Phone 1-
800-482-7171.
NOTE: During gravel hauling operations, “safety” signs shall be placed as directed by the Forest
Service. See Sale Area Map for specific sign locations and Traffic Control Plan for sign
size and type.
NOTE: Blading and shaping requires filling in existing ruts and potholes, reestablishing a crown
to conform to the typical detail for a crown with no ditches, crown with 1’ ditches or out
sloped roads.
NOTE: Additional outlet or lead out ditches may be required at road segment locations to allow
for proper drainage needs. Locations for placement shall be determined by the Forest
Service.
NOTE: 150 CY of crushed aggregate material is required for road maintenance. This volume
plus the normal compaction factor of 130% for pit run computes to a loose volume of 195
CY. Material for this project may be taken from the Lake 13 Pit, located at T47N, R35W,
Section 18. Some pit development may be required and is considered incidental to
associated items. Compaction shall be method A.
NOTE: 50 CY of pit run material is allotted for during haul for road maintenance. This volume
plus the normal compaction factor of 130% for pit run computes to a loose volume of 65
CY. Material for this project may be taken from the Lake 13 Pit, located at T47N, R35W,
Section 18. Some pit development may be required and is considered incidental to
associated items. Compaction shall be method A.