2
NAMING OPPORTUNITIES: Patio (4,050 sq ft): $500,000 Green Roof and Rain Garden (14,524 sq ft): $500,000 Open Office Space (2,180 sq ft): $400,000 Multi-Purpose Room (2) (1,215 sq ft): $300,000 each Lobby (576 sq ft): $200,000 Demonstration Kitchen (552 sq ft): $100,000 Gardener’s Lab (227 sq ft): $75,000 Conference Room (280 sq ft): $75,000 Program Fulfillment (528 sq ft): $50,000 Large Office (144 sq ft): $35,000 Office (8) (98 sq ft each): $25,000 each OUR VISION Located within the Waterman living-learning laboratory, the Kunz-Brundige Franklin County Extension Building will position OSU Extension to expand its reach through myriad educational opportunities benefiting Franklin County adults and children alike. This building is the beginning of an exciting time for Waterman. In the years to come, we will add traditional, hydroponic, aquaponic, and high tunnel greenhouses, plant and animal laboratories, and more to make this a dynamic home for vibrant educational initiatives — and your support will make it all possible! LEARN MORE For more details or to support the Kunz-Brundige Franklin County Extension Building Fund (#316284), please contact Emily Winnenberg at [email protected] or (614) 247-7606. KUNZ-BRUNDIGE FRANKLIN COUNTY EXTENSION BUILDING Explore How You Can Support the Future of Franklin County Extension

KUNZ-BRUNDIGE FRANKLIN COUNTY EXTENSION BUILDING · Patio $500,000 Program Fulfillmen t $ 5 0,000 Lobby $200,000 Demo nstration Kitchen $100,000 G a rden er's Lab $ 7 5,000 Conference

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: KUNZ-BRUNDIGE FRANKLIN COUNTY EXTENSION BUILDING · Patio $500,000 Program Fulfillmen t $ 5 0,000 Lobby $200,000 Demo nstration Kitchen $100,000 G a rden er's Lab $ 7 5,000 Conference

NAMING OPPORTUNITIES:

• Patio (4,050 sq ft): $500,000

• Green Roof and Rain Garden (14,524 sq ft):$500,000

• Open Office Space (2,180 sq ft): $400,000

• Multi-Purpose Room (2) (1,215 sq ft):$300,000 each

• Lobby (576 sq ft): $200,000

• Demonstration Kitchen (552 sq ft):$100,000

• Gardener’s Lab (227 sq ft): $75,000

• Conference Room (280 sq ft): $75,000

• Program Fulfillment (528 sq ft): $50,000

• Large Office (144 sq ft): $35,000

• Office (8) (98 sq ft each): $25,000 each

OUR VISION

Located within the Waterman living-learning laboratory, the Kunz-Brundige Franklin County Extension Building will position OSU Extension to expand its reach through myriad educational opportunities benefiting Franklin County adults and children alike.

This building is the beginning of an exciting time for Waterman. In the years to come, we will add traditional, hydroponic, aquaponic, and high tunnel greenhouses, plant and animal laboratories, and more to make this a dynamic home for vibrant educational initiatives — and your support will make it all possible!

LEARN MORE

For more details or to support the Kunz-Brundige

Franklin County Extension Building Fund (#316284), please contact Emily Winnenberg at [email protected] or (614) 247-7606.

KUNZ-BRUNDIGE FRANKLIN COUNTY EXTENSION BUILDINGExplore How You Can Support the Future of Franklin County Extension

Page 2: KUNZ-BRUNDIGE FRANKLIN COUNTY EXTENSION BUILDING · Patio $500,000 Program Fulfillmen t $ 5 0,000 Lobby $200,000 Demo nstration Kitchen $100,000 G a rden er's Lab $ 7 5,000 Conference

REF.

REF.

OCCUPANCYAREALOAD FACTOROCCUPANT LOAD 528 SF B6

100 SF

PROGRAM FULFILLMENT

OCCUPANCYAREALOAD FACTOROCCUPANT LOAD 81 SF B1

100 SF

ELECTRIC RMOCCUPANCYAREALOAD FACTOROCCUPANT LOAD 89 SF B1

100 SF

WATER RM

OCCUPANCYAREALOAD FACTOROCCUPANT LOAD 78 SF B1

100 SF

TELE/DATA RM

OCCUPANCYAREALOAD FACTOROCCUPANT LOAD 356 SF B4

100 SF

WORK RM

OCCUPANCYAREALOAD FACTOR

OCCUPANT LOAD 144 SF B2

100 SF

OFFICEOCCUPANCYAREALOAD FACTOROCCUPANT LOAD 98 SF B1

100 SF

OFFICE

OCCUPANCYAREALOAD FACTOROCCUPANT LOAD 98 SF B1

100 SF

OFFICEOCCUPANCYAREALOAD FACTOROCCUPANT LOAD 98 SF B1

100 SF

OFFICEOCCUPANCYAREALOAD FACTOROCCUPANT LOAD 98 SF B1

100 SF

OFFICEOCCUPANCYAREALOAD FACTOROCCUPANT LOAD 98 SF B1

100 SF

OFFICEOCCUPANCYAREALOAD FACTOROCCUPANT LOAD 98 SF B1

OFFICEOCCUPANCYAREALOAD FACTOROCCUPANT LOAD 98 SF B1

100 SF

OFFICEOCCUPANCYAREALOAD FACTOROCCUPANT LOAD 100 SF B1

100 SF

OFFICE

OCCUPANCYAREA

203 SF BMEN'S RR

OCCUPANCYAREA

169 SF BW

OMEN'S RR

OCCUPANCYAREALOAD FACTOR

149 SF B100 SF

ENTRANCE VESTIBULE

OCCUPANCYAREALOAD FACTOROCCUPANT LOAD

B292 SF1300 SF

MECHANICAL RM

OCCUPANCYAREALOAD FACTOROCCUPANT LOAD 2,180 SF B22

100 SF

OPEN OFFICES (26)

OCCUPANCYAREALOAD FACTOROCCUPANT LOAD 578 SF B6

100 SF

LOBBY

OCCUPANCYAREALOAD FACTOROCCUPANT LOAD 303 SF B4

100 SF

STAFF KITCHEN

OCCUPANCY

AREALOAD FACTOROCCUPANT LOAD 227 SF

B3

100 SF

GARDENER'S LAB

OCCUPANCYAREALOAD FACTOROCCUPANT LOAD 134 SF B2

100 SF

PANTRY

OCCUPANCYAREALOAD FACTOROCCUPANT LOAD 552 SF B39

15 SF

DEMONSTRATION KITCHEN

OCCUPANCYAREALOAD FACTOROCCUPANT LOAD 1,241 SF

A-31507 SF

MULTI-PURPOSE RM A

ROOF ABOVE

ROOF ABOVE

RO

OF AB

OVE

RO

OF AB

OVE

OC

CUPA

NCY C

LASSIFICATIO

N

A-3

B

EXIT

EXIT

EXIT

EXIT

EXIT

82 ft79 ft

OCCUPANCYAREALOAD FACTOROCCUPANT LOAD 1,008 SF

A-31437 SF

MULTI-PURPOSE RM B

OCCUPANCYAREALOAD FACTOR

OCCUPANT LOAD

280 SF B3 100 SF

CONFERENCE

88 ftOCCUPANCYAREALOAD FACTOROCCUPANT LOAD 201 SF B2

100 SF

WORK RM/FUTURE OFFICES

W/D

OCCUPANCYAREALOAD FACTOROCCUPANT LOAD 49 SF B1

100 SF

WELLNESS

OCCUPANCYAREA

13 SF BJAN CL

86 ft

OCCUPANCYAREA

49 SF BCLOSET

CARMACK ROAD

OCCUPANCYAREA

B19 SF

CLOS.

1

5

2

4

ACTUAL26

3

75 OC

C.

105 OCC.

75 OC

C.

71OCC.

105OCC.

108OCC.

72OC

C.

40 OCC.

ACTUAL4

13 OC

C.

CO

DE

RE

VIE

WS

UM

MA

RY

APPLICAB

LE CO

DES:

2017 Ohio B

uilding Code

Ohio P

lumbing

Code (2017

Edition)

Ohio M

echanicalCode (2017

Edition)

National E

lectrical Code (2017

Edition)

International Energy C

onservationC

ode (Iecc-12)IC

C/A

NSIA117.1 -2009

AS

HR

AE 90.1 -2010

InternationalFuelGas

Code

(2009E

dition)O

hioFire C

ode(2011 Edition)

NFPA 13

Fire Suppression(2016 Edition)

NFP

A 72 Fire A

larm S

ystem(2016

Edition)

APPLICAB

LE STAND

ARD

S:

NFP

A13 –

InstallationofSprinklerSystem

sN

FPA

70– N

ational Electrical Code

NFP

A72 – N

ationalFire Alarm

Code

ASHR

AE 90.1 2007

2 HR

FIRE BAR

RIER

1 HR

FIRE BAR

RIER

0.5 HR

FIRE BAR

RIER

LEGEN

D:

xxx 'M

AX TRAV

EL INFE

ET

EXIT LOC

ATION

EXIT

PRO

JECT

LOC

ATION

:2548 C

armack R

oadC

olumbus,O

H43221

OC

CU

PANC

YC

LASSIFICATIO

NS:

§ 303, 304

BU

SINESS G

RO

UP

B (Educationaloccupancies

above the 12th grade.)

ASSEMB

LY GR

OU

PA

-3(Lecture H

alls)

BU

ILDIN

G H

EIGH

T &AR

EA LIMITATIO

NS:

§ 503, 504, 506, 508

HEIG

HT

STOR

IESAR

EAAssem

bly A-3

75'-0"3

38,000 sfBusiness B

75'-0"4

76,000sf

FIRE-R

ESISTANC

E R

ATING

REQ

UIR

EMEN

TS:§

508,Table 601, 602, 709,713, 1018

PR

IMA

RY

STR

UC

TUR

AL

FRA

ME

0H

rsBEA

RIN

GW

ALLS EXTERIO

R2

Hrs

BEAR

ING

WALLS IN

TERIO

R0

Hrs

NO

N-BE

ARIN

GW

ALLS EXTERIO

R0

Hrs

NO

N-BE

ARIN

GW

ALLS INTER

IOR

0H

rsFLO

OR

CO

NS

TRU

CTIO

N0

Hrs

RO

OF

CO

NSTR

UC

TION

0H

rs

EXIT ACC

ESS TRAVEL

DISTAN

CE:

§ 1017.2

MA

XEXIT AC

CESS TR

AVEL DIS

TAN

CE

250ft

CO

RR

IDO

RS:

§ 1020C

OR

RID

OR

WA

LLR

ATIN

G0

HR

MIN

IMU

M W

IDTH

44

inM

AXIM

UM

DE

AD

EN

D20

ft

NU

MB

ER O

F EXITS:§ 1006,1021

1-49 OC

CU

PANTS

1 Exit

49-500O

CC

UP

AN

TS2 E

xits501-1000 O

CC

UP

ANTS

3 Exits

CO

NSTR

UC

TION

C

LASSIFICATIO

N:

§ 602.3

CO

MM

ON

PATH O

FEG

RESS TR

AVEL:§ 1006.2.1

MAX

CO

MM

ON

PATH

OF

TRA

VELD

ISTANC

E75

ft

BU

ILDIN

G H

EIGH

T:§ 502.1

BU

ILDIN

GH

EIGH

T: +/-23’-0”

Theverticaldistance from

gradeplane

tothe average

heightofthehighest roofsurface.

AUTO

MATIC

SPRIN

KLER

SYSTEM

S:§

903.2.1.3

Group A

-3.An

automatic

sprinklersystem shallbe provided

for A-3 occupancies

were

oneof the follow

ingconditions

exist:2.The fire area

hasan

occupant loadof300 or m

ore

NO

NSEPAR

ATEDO

CC

UPAN

CIES:

§508.3.3

No separation

isrequired betw

een nonseparated occupancies.

TYPE IIIB

Building is equipped throughout w

ith anapproved autom

aticsprinklersystem

inaccordance

with S

ection903.3.1.1 and

isone story

abovegrade plane (S

1,Table 506.2).

AREA

OF EXTER

IOR

ENC

LOSU

RE 10,475 G

SF

ZON

ING

CLASSIFIC

ATION

:L-U

CR

PD

(Limited

University

College

Research

Park

District)

BU

ILDIN

GH

EIGH

T:

FIRE SEPAR

ATION

DISTAN

CE:

§602, Table 602

X ≥30'

0 H

rs

Fire-Resistance

Rating R

equirements

forExteriorW

allsB

asedon

Fire Separation

Distance

TOTA

LO

CC

UP

IED

LOA

D:

409O

CC

UPAN

TLO

AD:

§ 1004

PLUM

BIN

G FIXTU

RES:

§2902.1, Table

2902.1W

ATER

CLO

SE

T (M)

2 (2U

R)

WATE

RC

LOS

ET (F)

3LA

VATOR

IES 6

DR

INKIN

GFO

UN

TAIN1

EX

ITE

GR

ES

SW

IDT

H

EXIT 1

CLEAR

WID

THLO

AD FAC

TOR

CAPAC

ITYR

EQU

IRED

CAPAC

ITYPR

OVID

ED

0.2"108 O

CC

.

EXIT 2

0.2"105 O

CC

.

EXIT 3

0.2"75

OC

C.

EXIT 40.2"

72 OC

C.

EXIT 5

0.2"40 O

CC

.

68"

68"

34"

34"

34"

340 OC

C.

340 OC

C.

170 OC

C.

170 OC

C.

170 OC

C.

EXIT

Plotted:

DATE:

THE

OH

IO S

TATE

UN

IVE

RS

ITYFA

CILITIE

S O

PE

RA

TION

S A

ND

DE

VE

LOP

ME

NT

CO

LUM

BU

S, O

HIO

OSUPROJECT NUMBER

PREPAREDBY

NO.DATE

DESCRIPTION

REVISIONS

PREPAREDFOR

Archive DrawingNumberDRAW

N BYOF

SHEET NUMBER

Erdy McHenry Architecture, LLCSTREET

ADDRESS915 North Orianna Street

Philadelphia,PA 19123

2/28/2018 1:08:37 PM

02/16/18

Code & Life Safety Plans

OSU - 160920

Kunz-Brundige Franklin County Extension Building

100EM

A1.00

Open O

ffice Space $400,000

Offices (8) $25,000 each

Multi-Purpose

Room

s (2)$300,000 each

Patio $500,000

Program Fulfillm

ent $50,000

Lobby$200,000

Dem

onstration K

itchen$100,000

Gardener's

Lab $75,000

Conference

Room

$75,000

Large Office

$35,000

Rain G

arden(w

ith Green

Roof)$500,000

Nam

ing Opportunities

Kunz-B

rundige Franklin County Extension B

uilding