56
Kudimaramath works for the year 2016-17 Sl.No 88 Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross masonry structures under the jurisdiction of the "U-1 Keel Bhavani Murai neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in sathyamangalam taluk of Erode District" Estimate Amount (Rs. In lakhs) 8.50 Date of commencement 22.03.2017 Expenditure w.r.t 90% of Estimate Amount (Rs. In lakhs) 7.65 Date of completion (If the work is in progress, mention the probable date of completion) 31.05.2017 Nature of work Clearing Jungle, Desilting, Sluice repair work, Drop,Shutter repair work and Bund strengthening. Progress of work (% Completed) Work completed Name of the Farmers Asssociation by which work has been executed U-1 Keel Bhavani Murai neer pasana vivasaigal sabai PHOTOS Before Execution After Execution

Kudimaramath works for the 2016-17 Sl.No 88

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Kudimaramath works for the

year

2016-17

Sl.No 88

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "U-1 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

sathyamangalam taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

8.50 Date of

commencement

22.03.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

7.65 Date of completion (If

the work is in progress,

mention the probable

date of completion)

31.05.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

U-1 Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 89

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "U-2 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

sathyamangalam taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

9.00 Date of

commencement

05.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

8.10 Date of completion (If

the work is in progress,

mention the probable

date of completion)

06.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

U-2 Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 90

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "U-3A Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

sathyamangalam taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

8.00 Date of

commencement

05.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

7.20 Date of completion (If

the work is in progress,

mention the probable

date of completion)

06.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

U-3A Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 91

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "U-3B Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation in

Gobichettipalayam taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

8.50 Date of

commencement

08.05.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

7.65 Date of completion (If

the work is in progress,

mention the probable

date of completion)

22.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

U-3B Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 92

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "U-4 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Gobichettipalayam taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

8.00 Date of

commencement

22.03.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

7.20 Date of completion (If

the work is in progress,

mention the probable

date of completion)

03.05.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

U-4 Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 93

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "U-5Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Gopichettipalayam taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

9.00 Date of

commencement

23.03.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

8.10 Date of completion (If

the work is in progress,

mention the probable

date of completion)

10.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

U-5 Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 94

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "U-6 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Gobichettipalayam taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

9.00 Date of

commencement

23.3.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

8.09 Date of completion (If

the work is in progress,

mention the probable

date of completion)

14.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

U-6 Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 95

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "U-7 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Gobichettipalayam taluk of Erode District

Estimate Amount (Rs. In

lakhs)

9.90 Date of

commencement

23.3.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

8.91 Date of completion (If

the work is in progress,

mention the probable

date of completion)

16.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

U-7 Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 96

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "U-8A Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Bhavani taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

9.00 Date of

commencement

23.3.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

8.10 Date of completion (If

the work is in progress,

mention the probable

date of completion)

19.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

U-8A Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 97

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "U-8B Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Bhavani and Perundurai taluks Erode District"

Estimate Amount (Rs. In

lakhs)

10.00 Date of

commencement

23.3.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

9.00 Date of completion (If

the work is in progress,

mention the probable

date of completion)

19.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

U-8B Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 98

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "U-9 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Bhavani and Perundurai taluks of Erode District"

Estimate Amount (Rs. In

lakhs)

9.50 Date of

commencement

23.3.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

8.55 Date of completion (If

the work is in progress,

mention the probable

date of completion)

19.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

U-9 Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 99

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "U-10 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system

inBhavani and Perundurai taluks of Erode District"

Estimate Amount (Rs. In

lakhs)

10.00 Date of

commencement

07.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

9.00 Date of completion (If

the work is in progress,

mention the probable

date of completion)

17.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

U-10 Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 100

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "M-1 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system Erode

and Perundurai taluks of Erode District"

Estimate Amount (Rs. In

lakhs)

9.00 Date of

commencement

07.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

8.10 Date of completion (If

the work is in progress,

mention the probable

date of completion)

17.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

M-1 Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 101

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "M-2A Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Perundurai and Bhavani taluks of Erode District"

Estimate Amount (Rs. In

lakhs)

8.50 Date of

commencement

12.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

7.65 Date of completion (If

the work is in progress,

mention the probable

date of completion)

30.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

M-2A Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 102

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "M-2B Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Bhavani and Erode taluks of Erode District"

Estimate Amount (Rs. In

lakhs)

8.00 Date of

commencement

22.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

7.20 Date of completion (If

the work is in progress,

mention the probable

date of completion)

30.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

M-2B Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 103

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "M-3 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Bhavani taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

8.50 Date of

commencement

2.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

7.65 Date of completion (If

the work is in progress,

mention the probable

date of completion)

30.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

M-3 Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 104

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "M-4 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Perundurai and Erode taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

8.00 Date of

commencement

7.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

7.20 Date of completion (If

the work is in progress,

mention the probable

date of completion)

17.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

M-4 Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 105

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "M-5 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in Erode

taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

9.00 Date of

commencement

20.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

8.10 Date of completion (If

the work is in progress,

mention the probable

date of completion)

15.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

M-5 Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 106

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "M-6 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in Erode

taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

8.00 Date of

commencement

20.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

7.20 Date of completion (If

the work is in progress,

mention the probable

date of completion)

21.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

M-6 Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 107

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "M-7 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Perundurai and Modakuruchi of Erode District"

Estimate Amount (Rs. In

lakhs)

1.00 Date of

commencement

10.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

0.90 Date of completion (If

the work is in progress,

mention the probable

date of completion)

19.05.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

M-7 Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 108

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "M-8A Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Modakuruchi and Erode taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

1.00 Date of

commencement

10.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

0.90 Date of completion (If

the work is in progress,

mention the probable

date of completion)

19.05.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

M-8A Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 109

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "M-8B Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Modakuruchi and Erode taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

7.00 Date of

commencement

10.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

6.30 Date of completion (If

the work is in progress,

mention the probable

date of completion)

19.05.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

M-8B Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 110

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "M-9 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Modakuruchi and Erode taluks of Erode District"

Estimate Amount (Rs. In

lakhs)

9.00 Date of

commencement

03.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

8.10 Date of completion (If

the work is in progress,

mention the probable

date of completion)

29.05.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

M-9 Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 111

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "M-10 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Modakuruchi taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

9.90 Date of

commencement

03.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

8.91 Date of completion (If

the work is in progress,

mention the probable

date of completion)

29.05.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

M-10 Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 112

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "M-10A Keel Bhavani

Kuranganpallam Murai neer pasana vivasaigal sabai" in Lower Bhavani

Irrigation system in Erode and Modakuruchi taluks of Erode District"

Estimate Amount (Rs. In

lakhs)

10.00 Date of

commencement

31.03.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

9.00 Date of completion (If

the work is in progress,

mention the probable

date of completion)

29.05.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

M-10A Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 113

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "M-11A Keel Bhavani

Murai neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Modakuruchi and Kodumudi taluks of Erode District"

Estimate Amount (Rs. In

lakhs)

7.00 Date of

commencement

29.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

6.30 Date of completion (If

the work is in progress,

mention the probable

date of completion)

20.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

M-11A Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 114

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "M-11B Keel Bhavani

Murai neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Modakuruchi and Kodumudi taluks of Erode District"

Estimate Amount (Rs. In

lakhs)

8.00 Date of

commencement

29.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

7.13 Date of completion (If

the work is in progress,

mention the probable

date of completion)

20.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

M-11B Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 115

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "M-12 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system

Perundurai and Modakuruchi taluks of Erode District

Estimate Amount (Rs. In

lakhs)

9.00 Date of

commencement

29.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

8.10 Date of completion (If

the work is in progress,

mention the probable

date of completion)

20.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

M-12 Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 116

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "M-13 Keel Bhavani Murai

neer pasana vivasaigal sabai" Lower Bhavani Irrigation system in

Modakuruchi taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

7.00 Date of

commencement

26.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

6.30 Date of completion (If

the work is in progress,

mention the probable

date of completion)

07.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

M-13 Keel Bhavani Murai neer pasana vivasaigal sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 117

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the " L-1 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Modakuruchi and Kodumudi taluks of Erode District"

Estimate Amount (Rs. In

lakhs)

7.00 Date of

commencement

03.05.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

6.30 Date of completion (If

the work is in progress,

mention the probable

date of completion)

07.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

L-1 Keel Bhavani Murai neer pasana vivasaigal sabai"

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 118

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "L-2 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Modakuruchi taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

9.00 Date of

commencement

16.05.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

8.10 Date of completion (If

the work is in progress,

mention the probable

date of completion)

16.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

L-2 Keel Bhavani Murai neer pasana vivasaigal sabai"

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 119

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "L-3 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Modakuruchi taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

9.00 Date of

commencement

27.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

8.10 Date of completion (If

the work is in progress,

mention the probable

date of completion)

03.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

L-3 Keel Bhavani Murai neer pasana vivasaigal sabai"

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 120

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "L-4 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation systemin

Modakuruchi and Kodumudi taluks of Erode District"

Estimate Amount (Rs. In

lakhs)

7.00 Date of

commencement

09.05.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

6.30 Date of completion (If

the work is in progress,

mention the probable

date of completion)

24.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

L-4 Keel Bhavani Murai neer pasana vivasaigal sabai"

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 121

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "L-5 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Kodumudi taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

9.00 Date of

commencement

28.03.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

8.10 Date of completion (If

the work is in progress,

mention the probable

date of completion)

06.05.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

L-5 Keel Bhavani Murai neer pasana vivasaigal sabai"

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 122

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "L-6 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Kodumudi taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

10.00 Date of

commencement

28.03.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

9.00 Date of completion (If

the work is in progress,

mention the probable

date of completion)

06.05.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

L-6 Keel Bhavani Murai neer pasana vivasaigal sabai"

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 123

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "L-7 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Kodumudi taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

8.50 Date of

commencement

15.05.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

7.65 Date of completion (If

the work is in progress,

mention the probable

date of completion)

24.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

L-7 Keel Bhavani Murai neer pasana vivasaigal sabai"

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 124

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "L-8 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Kodumudi taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

8.00 Date of

commencement

09.05.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

7.20 Date of completion (If

the work is in progress,

mention the probable

date of completion)

20.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

L-8 Keel Bhavani Murai neer pasana vivasaigal sabai"

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 125

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "L-9 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system

Modakuruchi and Perundurai taluks of Erode District"

Estimate Amount (Rs. In

lakhs)

9.00 Date of

commencement

04.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

8.10 Date of completion (If

the work is in progress,

mention the probable

date of completion)

26.05.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

L-9 Keel Bhavani Murai neer pasana vivasaigal sabai"

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 126

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "Kalingarayan Vaikkal

Pasana Vivasaigal sangam in Modakuruchi taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

9.50 Date of

commencement

04.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

8.55 Date of completion (If

the work is in progress,

mention the probable

date of completion)

26.05.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

Kalingarayan Vaikkal Pasana Vivasaigal sangam

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 127

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "Kalingarayan Pasana

Sabai in Kodumudi taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

9.50 Date of

commencement

18.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

8.55 Date of completion (If

the work is in progress,

mention the probable

date of completion)

08.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

Kalingarayan Pasana Sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 128

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "Kalingarayan Pasana

Sabai in Kodumudi taluk of Erode District"

Estimate Amount (Rs. In

lakhs)

9.00 Date of

commencement

18.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

8.10 Date of completion (If

the work is in progress,

mention the probable

date of completion)

08.06.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

Kalingarayan Pasana Sabai

PHOTOS

Before Execution After Execution

Kudimaramath works for

the year 2016-17

Sl.No 129

Name of work Clearing scrub jungle, removal of fallan earth & debris in canal & filling

gullies in the channel bund in Thadapalli channel jurisdiction of the

Thadapalli vaikal pasana sabai T1, Kasipalayam village of Gobi Taluk

of Erode District.

Estimate Amount (Rs. In

lakhs)

1.71 Date of

commencement

14.03.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

1.54 Date of completion (If

the work is in

progress, mention the probable date of

completion)

20.11.2017

Nature of work Jungle Clearance,

Bund Strengnthening

Progress of work (%

Completed)

100%Completed

Name of the Farmers

Asssociation by which work

has been executed

Thadapalli vaikal pasana sabai T1,

Kasipalayam,

Gobi.

PHOTOS

Before Execution After Execution

Kudimaramath works for

the year

2016-17

Sl.No 130

Name of work Clearing scrub jungle, removal of fallan earth & debris in canal & filling

gullies in the channel bund in Thadapalli channel jurisdiction of the

Thadapalli vaikal pasana sabai T2, Podichinnampalayam village of Gobi

Taluk of Erode District.

Estimate Amount (Rs. In

lakhs)

2.52 Date of

commencement

16.03.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

2.27 Date of completion (If

the work is in

progress, mention the probable date of

completion)

20.11.2017

Nature of work Jungle Clearance,

Bund Strengnthening

Progress of work (%

Completed)

100%Completed

Name of the Farmers

Asssociation by which work

has been executed

Thadapalli vaikal pasana sabai T2,

Podichinnampalayam,

Gobi.

PHOTOS

Before Execution After Execution

Kudimaramath works for

the year

2016-17

Sl.No 131

Name of work Clearing scrub jungle, removal of fallan earth & debris in canal & filling

gullies in the channel bund in Thadapalli channel jurisdiction of the

Thadapalli vaikal muraineer pasana vivasayigal sangam T3, Sengalarai

village of Gobi Taluk of Erode district.

Estimate Amount (Rs. In

lakhs)

2.25 Date of

commencement

16.03.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

2.03 Date of completion (If

the work is in

progress, mention the probable date of

completion)

20.11.2017

Nature of work Jungle Clearance &

RR wall

Progress of work (%

Completed)

100%Completed

Name of the Farmers

Asssociation by which work

has been executed

Thadapalli vaikal muraineer pasana vivasayigal sangam T3,

Sengalarai,

Gobi.

PHOTOS

Before Execution After Execution

Kudimaramath works for

the year

2016-17

Sl.No 132

Name of work Clearing scrub jungle, removal of fallan earth & debris in canal & filling

gullies in the channel bund in Thadapalli channel jurisdiction of the

Thadapalli vaikal pasana sabai T4, Seyyampalayam village of Gobi

Taluk of Erode District.

Estimate Amount (Rs. In

lakhs)

1.07 Date of

commencement

14.03.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

0.96 Date of completion (If

the work is in

progress, mention the probable date of

completion)

20.11.2017

Nature of work Jungle Clearance &

Removal of silt

Progress of work (%

Completed)

100%Completed

Name of the Farmers

Asssociation by which work

has been executed

Thadapalli vaikal pasana sabai T4,

Seyyampalayam,

Gobi.

PHOTOS

Before Execution After Execution

Kudimaramath works for

the year

2016-17

Sl.No 133

Name of work Clearing scrub jungle, removal of fallan earth & debris in canal & filling

gullies in the channel bund in Thadapalli channel jurisdiction of the

Thadapalli vaikal pasana sabai T5, Nanjagoundenpalayam village of

Gobi Taluk of Erode District.

Estimate Amount (Rs. In

lakhs)

1.57 Date of

commencement

16.03.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

1.41 Date of completion (If

the work is in

progress, mention the probable date of

completion)

20.11.2017

Nature of work Jungle Clearance &

Removal of silt

Progress of work (%

Completed)

100%Completed

Name of the Farmers

Asssociation by which work

has been executed

Thadapalli vaikal pasana sabai T5,

Nanjagoundenpalayam,

Gobi.

PHOTOS

Before Execution After Execution

Kudimaramath works for

the year

2016-17

Sl.No 134

Name of work Clearing scrub jungle, removal of fallan earth & debris in canal & filling

gullies in the channel bund in Thadapalli channel jurisdiction of the

Thadapalli vaikal pasana sabai T6, Nanjagoundenpalayam village of

Gobi Taluk of Erode District.

Estimate Amount (Rs. In

lakhs)

6.30 Date of

commencement

15.03.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

5.67 Date of completion (If

the work is in

progress, mention the probable date of

completion)

20.11.2017

Nature of work

Jungle Clearance,

Bund Strengnthening

& RR wall

Progress of work (%

Completed)

100%Completed

Name of the Farmers

Asssociation by which work

has been executed

Thadapalli vaikal pasana sabai T6,

Nanjagoundenpalayam,

Gobi.

PHOTOS

Before Execution After Execution

Kudimaramath works for

the year

2016-17

Sl.No 135

Name of work Clearing scrub jungle, removal of fallan earth & debris in canal & filling

gullies in the channel bund in Thadapalli channel jurisdiction of the

Thadapalli vaikal murai neer pasana vivasaigal sangam, Perunthalaiyur

village of Gobi Taluk of Erode district.

Estimate Amount (Rs. In

lakhs)

4.50 Date of

commencement

06.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

4.05 Date of completion (If

the work is in

progress, mention the probable date of

completion)

20.11.2017

Nature of work Jungle Clearance &

Removal silt

Progress of work (%

Completed)

100%Completed

Name of the Farmers

Asssociation by which work

has been executed

Thadapalli vaikal murai neer pasana vivasaigal sangam,

Perunthalaiyur,

Gobi.

PHOTOS

Before Execution After Execution

Kudimaramath works for

the year

2016-17

Sl.No 136

Name of work Clearing scrub jungle, removal of fallan earth & debris in canal & filling

gullies in the channel bund in Thadapalli canal jurisdiction of the

Thadapalli vaikal pasana sabai T10, Mevani village of Gobi Taluk of

Erode district.

Estimate Amount (Rs. In

lakhs)

6.27 Date of

commencement

06.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

5.64 Date of completion (If

the work is in

progress, mention the probable date of

completion)

20.11.2017

Nature of work

Jungle Clearance,

Bund Strengnthening

& RR wall

Progress of work (%

Completed)

100%Completed

Name of the Farmers

Asssociation by which work

has been executed

Thadapalli vaikal pasana sabai T10,

Mevani,

Gobi.

PHOTOS

Before Execution After Execution

Kudimaramath works for

the year

2016-17

Sl.No 137

Name of work Clearing scrub jungle, removal of fallan earth & debris in canal & filling

gullies in the channel bund in Kugalur branch canal jurisdiction of the

Thadapalli vaikal pasana sabai T8, Nanjagoundenpalayam village of

Gobi Taluk of Erode district.

Estimate Amount (Rs. In

lakhs)

5.57 Date of

commencement

20.03.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

5.01 Date of completion (If

the work is in

progress, mention the probable date of

completion)

20.11.2017

Nature of work Jungle Clearance &

RR Wall

Progress of work (%

Completed)

100%Completed

Name of the Farmers

Asssociation by which work

has been executed

Thadapalli vaikal pasana sabai T8,

Nanjagoundenpalayam,

Gobi.

PHOTOS

Before Execution After Execution

Kudimaramath works for

the year 2016 -17

Sl.No 138

Name of work

Clearing scrub jungle, Removal of fallen earth, clearing out the Debris’s

in canal & filling gullies in the Channel bund and Cross masonry

structures in Arakkankottai channel Under the Jurisdiction of the

Arakkankottai Channel Water Users Sabi No.1 of Gobi Taluk of Erode

district.

Estimate Amount (Rs. In

lakhs) 1.80 Lakhs

Date of

commencement 07.03.2017

Expenditure w.r.t 90% of Estimate Amount (Rs. In

lakhs)

1.62 Lakhs

Date of completion (If

the work is in progress, mention the

probable date of

completion)

02.05.2018

Nature of work

Jungle Clearance,

Special Repairs to

Sluice, Bund

Strengthening.

Progress of work (%

Completed) 100%Completed

Name of the Farmers Asssociation by which work

has been executed

The president,

Arakkankottai Channel Water Users Sabai No.1 79, Sathy - K.N.palayam Road,

Periyakodiveri (PO),Dhasappagoundenpudur,

Gobi taluk,Erode District.Pin.638503.

PHOTOS

Before Execution After Execution

Kudimaramath works for

the year 2016 -17

Sl.No 139

Name of work Clearing scrub jungle, Removal of fallen earth, clearing out the Debris’s

in canal & filling gullies in the Channel bund and Cross masonry

structures in Arakkankottai channel Under the Jurisdiction of the

Arakkankottai Channel Water Users Sabi No.2 of Gobi Taluk of Erode

district.

Estimate Amount (Rs. In

lakhs) 2.52 Lakhs

Date of

commencement

10.03.2017

Expenditure w.r.t 90% of Estimate Amount (Rs. In

lakhs) 2.27 Lakhs

Date of completion (If the work is in

progress, mention the

probable date of

completion)

02.05.2018

Nature of work

Jungle Clearance,

Special Repairs to

Sluice, Bund

Strengthening.

Progress of work (%

Completed)

100%Completed

Name of the Farmers

Asssociation by which work

has been executed

The president, Arakkankottai and Vaniputhur Branch Channel Water Users Sabai No.2

36, Elango street,

Thukanaickenpalayam(PO),Gobi taluk,

Erode District. Pin.638506.

PHOTOS

Before Execution After Execution

Kudimaramath works for

the year 2016 -17

Sl.No 140

Name of work Clearing scrub jungle, Removal of fallen earth, clearing out the Debris’s

in canal & filling gullies in the Channel bund and Cross masonry

structures in Arakkankottai channel- Vaniputhur Branch channel Under the Jurisdiction of the Arakkankottai Channel Water Users Sabai No.3

of Gobi Taluk of Erode district.

Estimate Amount (Rs. In

lakhs) 2.09 Lakhs

Date of

commencement

10.03.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs) 1.88 Lakhs

Date of completion (If

the work is in

progress, mention the

probable date of

completion)

02.05.2018

Nature of work

Jungle Clearance,

Special Repairs to Sluice, Bund

Strengthening.

Progress of work (%

Completed)

100%Completed

Name of the Farmers

Asssociation by which work

has been executed

The president,

Arakkankottai Channel Water Users Sabai No.3

26, Ramamanthiram,south street,

Kallipatti (PO), Gobi taluk,

Erode District.Pin.638505

PHOTOS

Before Execution After Execution

Kudimaramath works for

the year 2016 -17

Sl.No 141

Name of work Clearing scrub jungle, Removal of fallen earth, clearing out the Debris’s

in canal & filling gullies in the Channel bund and Cross masonry

structures in Arakkankottai channel Under the Jurisdiction of the Arakkankottai Channel Water Users Sabi No.4 of Gobi Taluk of Erode

district.

Estimate Amount (Rs. In

lakhs) 2.13 Lakhs

Date of

commencement

07.03.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

1.92 Lakhs

Date of completion (If

the work is in

progress, mention the

probable date of

completion)

02.05.2018

Nature of work

Jungle Clearance, Special Repairs to

Sluice, Bund

Strengthening.

Progress of work (% Completed)

100%Completed

Name of the Farmers

Asssociation by which work

has been executed

The president,

Arakkankottai Channel Water Users Sabai No.4

26, Ramamanthiram,south street,

Kallipatti (PO),Gobi taluk,Erode District.

Pin.638505

PHOTOS

Before Execution After Execution

Kudimaramath works for

the year 2016 -17

Sl.No 142

Name of work Clearing scrub jungle, Removal of fallen earth, clearing out the Debris’s

in canal & filling gullies in the Channel bund and Cross masonry

structures in Arakkankottai channel – Perumugai Athani Branch channel Under the Jurisdiction of the Arakkankottai Channel Water Users Sabai

No.5 of Gobi Taluk of Erode district.

Estimate Amount (Rs. In

lakhs) 3.79 Lakhs

Date of

commencement

07.03.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs) 3.41 Lakhs

Date of completion (If

the work is in

progress, mention the

probable date of

completion)

02.05.2018

Nature of work

Jungle Clearance, Special Repairs to

Sluice, Bund

Strengthening.

Progress of work (% Completed)

100%Completed

Name of the Farmers

Asssociation by which work

has been executed

The president,

PerumugaiAthani Branch Channel Water Users Sabai No.5

Perumugai (PO),

Kallipatti, Gobi taluk,

Erode District. Pin.638505

PHOTOS

Before Execution After Execution

Kudimaramath works for the

year

2016-17

Sl.No 143

Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross

masonry structures under the jurisdiction of the "L-10 Keel Bhavani Murai

neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in

Kangayam and Perundurai taluks of Erode and Tirupur Districts"

Estimate Amount (Rs. In

lakhs)

8.40 Date of

commencement

04.04.2017

Expenditure w.r.t 90% of

Estimate Amount (Rs. In

lakhs)

7.56 Date of completion (If

the work is in progress,

mention the probable

date of completion)

25.05.2017

Nature of work

Clearing Jungle,

Desilting, Sluice repair

work, Drop,Shutter

repair work and Bund

strengthening.

Progress of work (%

Completed)

Work completed

Name of the Farmers

Asssociation by which work

has been executed

L-10 Keel Bhavani Murai neer pasana vivasaigal sabai"

PHOTOS

Before Execution After Execution