Kudimaramath works for the
year
2016-17
Sl.No 88
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "U-1 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
sathyamangalam taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
8.50 Date of
commencement
22.03.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
7.65 Date of completion (If
the work is in progress,
mention the probable
date of completion)
31.05.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
U-1 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 89
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "U-2 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
sathyamangalam taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
9.00 Date of
commencement
05.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
8.10 Date of completion (If
the work is in progress,
mention the probable
date of completion)
06.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
U-2 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 90
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "U-3A Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
sathyamangalam taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
8.00 Date of
commencement
05.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
7.20 Date of completion (If
the work is in progress,
mention the probable
date of completion)
06.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
U-3A Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 91
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "U-3B Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation in
Gobichettipalayam taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
8.50 Date of
commencement
08.05.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
7.65 Date of completion (If
the work is in progress,
mention the probable
date of completion)
22.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
U-3B Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 92
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "U-4 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Gobichettipalayam taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
8.00 Date of
commencement
22.03.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
7.20 Date of completion (If
the work is in progress,
mention the probable
date of completion)
03.05.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
U-4 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 93
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "U-5Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Gopichettipalayam taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
9.00 Date of
commencement
23.03.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
8.10 Date of completion (If
the work is in progress,
mention the probable
date of completion)
10.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
U-5 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 94
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "U-6 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Gobichettipalayam taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
9.00 Date of
commencement
23.3.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
8.09 Date of completion (If
the work is in progress,
mention the probable
date of completion)
14.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
U-6 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 95
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "U-7 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Gobichettipalayam taluk of Erode District
Estimate Amount (Rs. In
lakhs)
9.90 Date of
commencement
23.3.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
8.91 Date of completion (If
the work is in progress,
mention the probable
date of completion)
16.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
U-7 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 96
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "U-8A Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Bhavani taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
9.00 Date of
commencement
23.3.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
8.10 Date of completion (If
the work is in progress,
mention the probable
date of completion)
19.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
U-8A Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 97
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "U-8B Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Bhavani and Perundurai taluks Erode District"
Estimate Amount (Rs. In
lakhs)
10.00 Date of
commencement
23.3.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
9.00 Date of completion (If
the work is in progress,
mention the probable
date of completion)
19.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
U-8B Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 98
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "U-9 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Bhavani and Perundurai taluks of Erode District"
Estimate Amount (Rs. In
lakhs)
9.50 Date of
commencement
23.3.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
8.55 Date of completion (If
the work is in progress,
mention the probable
date of completion)
19.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
U-9 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 99
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "U-10 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system
inBhavani and Perundurai taluks of Erode District"
Estimate Amount (Rs. In
lakhs)
10.00 Date of
commencement
07.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
9.00 Date of completion (If
the work is in progress,
mention the probable
date of completion)
17.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
U-10 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 100
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "M-1 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system Erode
and Perundurai taluks of Erode District"
Estimate Amount (Rs. In
lakhs)
9.00 Date of
commencement
07.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
8.10 Date of completion (If
the work is in progress,
mention the probable
date of completion)
17.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
M-1 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 101
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "M-2A Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Perundurai and Bhavani taluks of Erode District"
Estimate Amount (Rs. In
lakhs)
8.50 Date of
commencement
12.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
7.65 Date of completion (If
the work is in progress,
mention the probable
date of completion)
30.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
M-2A Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 102
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "M-2B Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Bhavani and Erode taluks of Erode District"
Estimate Amount (Rs. In
lakhs)
8.00 Date of
commencement
22.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
7.20 Date of completion (If
the work is in progress,
mention the probable
date of completion)
30.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
M-2B Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 103
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "M-3 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Bhavani taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
8.50 Date of
commencement
2.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
7.65 Date of completion (If
the work is in progress,
mention the probable
date of completion)
30.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
M-3 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 104
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "M-4 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Perundurai and Erode taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
8.00 Date of
commencement
7.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
7.20 Date of completion (If
the work is in progress,
mention the probable
date of completion)
17.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
M-4 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 105
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "M-5 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in Erode
taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
9.00 Date of
commencement
20.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
8.10 Date of completion (If
the work is in progress,
mention the probable
date of completion)
15.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
M-5 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 106
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "M-6 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in Erode
taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
8.00 Date of
commencement
20.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
7.20 Date of completion (If
the work is in progress,
mention the probable
date of completion)
21.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
M-6 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 107
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "M-7 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Perundurai and Modakuruchi of Erode District"
Estimate Amount (Rs. In
lakhs)
1.00 Date of
commencement
10.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
0.90 Date of completion (If
the work is in progress,
mention the probable
date of completion)
19.05.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
M-7 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 108
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "M-8A Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Modakuruchi and Erode taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
1.00 Date of
commencement
10.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
0.90 Date of completion (If
the work is in progress,
mention the probable
date of completion)
19.05.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
M-8A Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 109
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "M-8B Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Modakuruchi and Erode taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
7.00 Date of
commencement
10.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
6.30 Date of completion (If
the work is in progress,
mention the probable
date of completion)
19.05.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
M-8B Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 110
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "M-9 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Modakuruchi and Erode taluks of Erode District"
Estimate Amount (Rs. In
lakhs)
9.00 Date of
commencement
03.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
8.10 Date of completion (If
the work is in progress,
mention the probable
date of completion)
29.05.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
M-9 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 111
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "M-10 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Modakuruchi taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
9.90 Date of
commencement
03.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
8.91 Date of completion (If
the work is in progress,
mention the probable
date of completion)
29.05.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
M-10 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 112
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "M-10A Keel Bhavani
Kuranganpallam Murai neer pasana vivasaigal sabai" in Lower Bhavani
Irrigation system in Erode and Modakuruchi taluks of Erode District"
Estimate Amount (Rs. In
lakhs)
10.00 Date of
commencement
31.03.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
9.00 Date of completion (If
the work is in progress,
mention the probable
date of completion)
29.05.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
M-10A Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 113
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "M-11A Keel Bhavani
Murai neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Modakuruchi and Kodumudi taluks of Erode District"
Estimate Amount (Rs. In
lakhs)
7.00 Date of
commencement
29.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
6.30 Date of completion (If
the work is in progress,
mention the probable
date of completion)
20.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
M-11A Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 114
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "M-11B Keel Bhavani
Murai neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Modakuruchi and Kodumudi taluks of Erode District"
Estimate Amount (Rs. In
lakhs)
8.00 Date of
commencement
29.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
7.13 Date of completion (If
the work is in progress,
mention the probable
date of completion)
20.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
M-11B Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 115
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "M-12 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system
Perundurai and Modakuruchi taluks of Erode District
Estimate Amount (Rs. In
lakhs)
9.00 Date of
commencement
29.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
8.10 Date of completion (If
the work is in progress,
mention the probable
date of completion)
20.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
M-12 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 116
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "M-13 Keel Bhavani Murai
neer pasana vivasaigal sabai" Lower Bhavani Irrigation system in
Modakuruchi taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
7.00 Date of
commencement
26.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
6.30 Date of completion (If
the work is in progress,
mention the probable
date of completion)
07.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
M-13 Keel Bhavani Murai neer pasana vivasaigal sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 117
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the " L-1 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Modakuruchi and Kodumudi taluks of Erode District"
Estimate Amount (Rs. In
lakhs)
7.00 Date of
commencement
03.05.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
6.30 Date of completion (If
the work is in progress,
mention the probable
date of completion)
07.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
L-1 Keel Bhavani Murai neer pasana vivasaigal sabai"
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 118
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "L-2 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Modakuruchi taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
9.00 Date of
commencement
16.05.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
8.10 Date of completion (If
the work is in progress,
mention the probable
date of completion)
16.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
L-2 Keel Bhavani Murai neer pasana vivasaigal sabai"
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 119
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "L-3 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Modakuruchi taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
9.00 Date of
commencement
27.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
8.10 Date of completion (If
the work is in progress,
mention the probable
date of completion)
03.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
L-3 Keel Bhavani Murai neer pasana vivasaigal sabai"
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 120
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "L-4 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation systemin
Modakuruchi and Kodumudi taluks of Erode District"
Estimate Amount (Rs. In
lakhs)
7.00 Date of
commencement
09.05.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
6.30 Date of completion (If
the work is in progress,
mention the probable
date of completion)
24.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
L-4 Keel Bhavani Murai neer pasana vivasaigal sabai"
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 121
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "L-5 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Kodumudi taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
9.00 Date of
commencement
28.03.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
8.10 Date of completion (If
the work is in progress,
mention the probable
date of completion)
06.05.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
L-5 Keel Bhavani Murai neer pasana vivasaigal sabai"
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 122
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "L-6 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Kodumudi taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
10.00 Date of
commencement
28.03.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
9.00 Date of completion (If
the work is in progress,
mention the probable
date of completion)
06.05.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
L-6 Keel Bhavani Murai neer pasana vivasaigal sabai"
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 123
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "L-7 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Kodumudi taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
8.50 Date of
commencement
15.05.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
7.65 Date of completion (If
the work is in progress,
mention the probable
date of completion)
24.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
L-7 Keel Bhavani Murai neer pasana vivasaigal sabai"
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 124
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "L-8 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Kodumudi taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
8.00 Date of
commencement
09.05.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
7.20 Date of completion (If
the work is in progress,
mention the probable
date of completion)
20.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
L-8 Keel Bhavani Murai neer pasana vivasaigal sabai"
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 125
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "L-9 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system
Modakuruchi and Perundurai taluks of Erode District"
Estimate Amount (Rs. In
lakhs)
9.00 Date of
commencement
04.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
8.10 Date of completion (If
the work is in progress,
mention the probable
date of completion)
26.05.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
L-9 Keel Bhavani Murai neer pasana vivasaigal sabai"
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 126
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "Kalingarayan Vaikkal
Pasana Vivasaigal sangam in Modakuruchi taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
9.50 Date of
commencement
04.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
8.55 Date of completion (If
the work is in progress,
mention the probable
date of completion)
26.05.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
Kalingarayan Vaikkal Pasana Vivasaigal sangam
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 127
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "Kalingarayan Pasana
Sabai in Kodumudi taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
9.50 Date of
commencement
18.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
8.55 Date of completion (If
the work is in progress,
mention the probable
date of completion)
08.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
Kalingarayan Pasana Sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 128
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "Kalingarayan Pasana
Sabai in Kodumudi taluk of Erode District"
Estimate Amount (Rs. In
lakhs)
9.00 Date of
commencement
18.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
8.10 Date of completion (If
the work is in progress,
mention the probable
date of completion)
08.06.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
Kalingarayan Pasana Sabai
PHOTOS
Before Execution After Execution
Kudimaramath works for
the year 2016-17
Sl.No 129
Name of work Clearing scrub jungle, removal of fallan earth & debris in canal & filling
gullies in the channel bund in Thadapalli channel jurisdiction of the
Thadapalli vaikal pasana sabai T1, Kasipalayam village of Gobi Taluk
of Erode District.
Estimate Amount (Rs. In
lakhs)
1.71 Date of
commencement
14.03.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
1.54 Date of completion (If
the work is in
progress, mention the probable date of
completion)
20.11.2017
Nature of work Jungle Clearance,
Bund Strengnthening
Progress of work (%
Completed)
100%Completed
Name of the Farmers
Asssociation by which work
has been executed
Thadapalli vaikal pasana sabai T1,
Kasipalayam,
Gobi.
PHOTOS
Before Execution After Execution
Kudimaramath works for
the year
2016-17
Sl.No 130
Name of work Clearing scrub jungle, removal of fallan earth & debris in canal & filling
gullies in the channel bund in Thadapalli channel jurisdiction of the
Thadapalli vaikal pasana sabai T2, Podichinnampalayam village of Gobi
Taluk of Erode District.
Estimate Amount (Rs. In
lakhs)
2.52 Date of
commencement
16.03.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
2.27 Date of completion (If
the work is in
progress, mention the probable date of
completion)
20.11.2017
Nature of work Jungle Clearance,
Bund Strengnthening
Progress of work (%
Completed)
100%Completed
Name of the Farmers
Asssociation by which work
has been executed
Thadapalli vaikal pasana sabai T2,
Podichinnampalayam,
Gobi.
PHOTOS
Before Execution After Execution
Kudimaramath works for
the year
2016-17
Sl.No 131
Name of work Clearing scrub jungle, removal of fallan earth & debris in canal & filling
gullies in the channel bund in Thadapalli channel jurisdiction of the
Thadapalli vaikal muraineer pasana vivasayigal sangam T3, Sengalarai
village of Gobi Taluk of Erode district.
Estimate Amount (Rs. In
lakhs)
2.25 Date of
commencement
16.03.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
2.03 Date of completion (If
the work is in
progress, mention the probable date of
completion)
20.11.2017
Nature of work Jungle Clearance &
RR wall
Progress of work (%
Completed)
100%Completed
Name of the Farmers
Asssociation by which work
has been executed
Thadapalli vaikal muraineer pasana vivasayigal sangam T3,
Sengalarai,
Gobi.
PHOTOS
Before Execution After Execution
Kudimaramath works for
the year
2016-17
Sl.No 132
Name of work Clearing scrub jungle, removal of fallan earth & debris in canal & filling
gullies in the channel bund in Thadapalli channel jurisdiction of the
Thadapalli vaikal pasana sabai T4, Seyyampalayam village of Gobi
Taluk of Erode District.
Estimate Amount (Rs. In
lakhs)
1.07 Date of
commencement
14.03.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
0.96 Date of completion (If
the work is in
progress, mention the probable date of
completion)
20.11.2017
Nature of work Jungle Clearance &
Removal of silt
Progress of work (%
Completed)
100%Completed
Name of the Farmers
Asssociation by which work
has been executed
Thadapalli vaikal pasana sabai T4,
Seyyampalayam,
Gobi.
PHOTOS
Before Execution After Execution
Kudimaramath works for
the year
2016-17
Sl.No 133
Name of work Clearing scrub jungle, removal of fallan earth & debris in canal & filling
gullies in the channel bund in Thadapalli channel jurisdiction of the
Thadapalli vaikal pasana sabai T5, Nanjagoundenpalayam village of
Gobi Taluk of Erode District.
Estimate Amount (Rs. In
lakhs)
1.57 Date of
commencement
16.03.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
1.41 Date of completion (If
the work is in
progress, mention the probable date of
completion)
20.11.2017
Nature of work Jungle Clearance &
Removal of silt
Progress of work (%
Completed)
100%Completed
Name of the Farmers
Asssociation by which work
has been executed
Thadapalli vaikal pasana sabai T5,
Nanjagoundenpalayam,
Gobi.
PHOTOS
Before Execution After Execution
Kudimaramath works for
the year
2016-17
Sl.No 134
Name of work Clearing scrub jungle, removal of fallan earth & debris in canal & filling
gullies in the channel bund in Thadapalli channel jurisdiction of the
Thadapalli vaikal pasana sabai T6, Nanjagoundenpalayam village of
Gobi Taluk of Erode District.
Estimate Amount (Rs. In
lakhs)
6.30 Date of
commencement
15.03.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
5.67 Date of completion (If
the work is in
progress, mention the probable date of
completion)
20.11.2017
Nature of work
Jungle Clearance,
Bund Strengnthening
& RR wall
Progress of work (%
Completed)
100%Completed
Name of the Farmers
Asssociation by which work
has been executed
Thadapalli vaikal pasana sabai T6,
Nanjagoundenpalayam,
Gobi.
PHOTOS
Before Execution After Execution
Kudimaramath works for
the year
2016-17
Sl.No 135
Name of work Clearing scrub jungle, removal of fallan earth & debris in canal & filling
gullies in the channel bund in Thadapalli channel jurisdiction of the
Thadapalli vaikal murai neer pasana vivasaigal sangam, Perunthalaiyur
village of Gobi Taluk of Erode district.
Estimate Amount (Rs. In
lakhs)
4.50 Date of
commencement
06.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
4.05 Date of completion (If
the work is in
progress, mention the probable date of
completion)
20.11.2017
Nature of work Jungle Clearance &
Removal silt
Progress of work (%
Completed)
100%Completed
Name of the Farmers
Asssociation by which work
has been executed
Thadapalli vaikal murai neer pasana vivasaigal sangam,
Perunthalaiyur,
Gobi.
PHOTOS
Before Execution After Execution
Kudimaramath works for
the year
2016-17
Sl.No 136
Name of work Clearing scrub jungle, removal of fallan earth & debris in canal & filling
gullies in the channel bund in Thadapalli canal jurisdiction of the
Thadapalli vaikal pasana sabai T10, Mevani village of Gobi Taluk of
Erode district.
Estimate Amount (Rs. In
lakhs)
6.27 Date of
commencement
06.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
5.64 Date of completion (If
the work is in
progress, mention the probable date of
completion)
20.11.2017
Nature of work
Jungle Clearance,
Bund Strengnthening
& RR wall
Progress of work (%
Completed)
100%Completed
Name of the Farmers
Asssociation by which work
has been executed
Thadapalli vaikal pasana sabai T10,
Mevani,
Gobi.
PHOTOS
Before Execution After Execution
Kudimaramath works for
the year
2016-17
Sl.No 137
Name of work Clearing scrub jungle, removal of fallan earth & debris in canal & filling
gullies in the channel bund in Kugalur branch canal jurisdiction of the
Thadapalli vaikal pasana sabai T8, Nanjagoundenpalayam village of
Gobi Taluk of Erode district.
Estimate Amount (Rs. In
lakhs)
5.57 Date of
commencement
20.03.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
5.01 Date of completion (If
the work is in
progress, mention the probable date of
completion)
20.11.2017
Nature of work Jungle Clearance &
RR Wall
Progress of work (%
Completed)
100%Completed
Name of the Farmers
Asssociation by which work
has been executed
Thadapalli vaikal pasana sabai T8,
Nanjagoundenpalayam,
Gobi.
PHOTOS
Before Execution After Execution
Kudimaramath works for
the year 2016 -17
Sl.No 138
Name of work
Clearing scrub jungle, Removal of fallen earth, clearing out the Debris’s
in canal & filling gullies in the Channel bund and Cross masonry
structures in Arakkankottai channel Under the Jurisdiction of the
Arakkankottai Channel Water Users Sabi No.1 of Gobi Taluk of Erode
district.
Estimate Amount (Rs. In
lakhs) 1.80 Lakhs
Date of
commencement 07.03.2017
Expenditure w.r.t 90% of Estimate Amount (Rs. In
lakhs)
1.62 Lakhs
Date of completion (If
the work is in progress, mention the
probable date of
completion)
02.05.2018
Nature of work
Jungle Clearance,
Special Repairs to
Sluice, Bund
Strengthening.
Progress of work (%
Completed) 100%Completed
Name of the Farmers Asssociation by which work
has been executed
The president,
Arakkankottai Channel Water Users Sabai No.1 79, Sathy - K.N.palayam Road,
Periyakodiveri (PO),Dhasappagoundenpudur,
Gobi taluk,Erode District.Pin.638503.
PHOTOS
Before Execution After Execution
Kudimaramath works for
the year 2016 -17
Sl.No 139
Name of work Clearing scrub jungle, Removal of fallen earth, clearing out the Debris’s
in canal & filling gullies in the Channel bund and Cross masonry
structures in Arakkankottai channel Under the Jurisdiction of the
Arakkankottai Channel Water Users Sabi No.2 of Gobi Taluk of Erode
district.
Estimate Amount (Rs. In
lakhs) 2.52 Lakhs
Date of
commencement
10.03.2017
Expenditure w.r.t 90% of Estimate Amount (Rs. In
lakhs) 2.27 Lakhs
Date of completion (If the work is in
progress, mention the
probable date of
completion)
02.05.2018
Nature of work
Jungle Clearance,
Special Repairs to
Sluice, Bund
Strengthening.
Progress of work (%
Completed)
100%Completed
Name of the Farmers
Asssociation by which work
has been executed
The president, Arakkankottai and Vaniputhur Branch Channel Water Users Sabai No.2
36, Elango street,
Thukanaickenpalayam(PO),Gobi taluk,
Erode District. Pin.638506.
PHOTOS
Before Execution After Execution
Kudimaramath works for
the year 2016 -17
Sl.No 140
Name of work Clearing scrub jungle, Removal of fallen earth, clearing out the Debris’s
in canal & filling gullies in the Channel bund and Cross masonry
structures in Arakkankottai channel- Vaniputhur Branch channel Under the Jurisdiction of the Arakkankottai Channel Water Users Sabai No.3
of Gobi Taluk of Erode district.
Estimate Amount (Rs. In
lakhs) 2.09 Lakhs
Date of
commencement
10.03.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs) 1.88 Lakhs
Date of completion (If
the work is in
progress, mention the
probable date of
completion)
02.05.2018
Nature of work
Jungle Clearance,
Special Repairs to Sluice, Bund
Strengthening.
Progress of work (%
Completed)
100%Completed
Name of the Farmers
Asssociation by which work
has been executed
The president,
Arakkankottai Channel Water Users Sabai No.3
26, Ramamanthiram,south street,
Kallipatti (PO), Gobi taluk,
Erode District.Pin.638505
PHOTOS
Before Execution After Execution
Kudimaramath works for
the year 2016 -17
Sl.No 141
Name of work Clearing scrub jungle, Removal of fallen earth, clearing out the Debris’s
in canal & filling gullies in the Channel bund and Cross masonry
structures in Arakkankottai channel Under the Jurisdiction of the Arakkankottai Channel Water Users Sabi No.4 of Gobi Taluk of Erode
district.
Estimate Amount (Rs. In
lakhs) 2.13 Lakhs
Date of
commencement
07.03.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
1.92 Lakhs
Date of completion (If
the work is in
progress, mention the
probable date of
completion)
02.05.2018
Nature of work
Jungle Clearance, Special Repairs to
Sluice, Bund
Strengthening.
Progress of work (% Completed)
100%Completed
Name of the Farmers
Asssociation by which work
has been executed
The president,
Arakkankottai Channel Water Users Sabai No.4
26, Ramamanthiram,south street,
Kallipatti (PO),Gobi taluk,Erode District.
Pin.638505
PHOTOS
Before Execution After Execution
Kudimaramath works for
the year 2016 -17
Sl.No 142
Name of work Clearing scrub jungle, Removal of fallen earth, clearing out the Debris’s
in canal & filling gullies in the Channel bund and Cross masonry
structures in Arakkankottai channel – Perumugai Athani Branch channel Under the Jurisdiction of the Arakkankottai Channel Water Users Sabai
No.5 of Gobi Taluk of Erode district.
Estimate Amount (Rs. In
lakhs) 3.79 Lakhs
Date of
commencement
07.03.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs) 3.41 Lakhs
Date of completion (If
the work is in
progress, mention the
probable date of
completion)
02.05.2018
Nature of work
Jungle Clearance, Special Repairs to
Sluice, Bund
Strengthening.
Progress of work (% Completed)
100%Completed
Name of the Farmers
Asssociation by which work
has been executed
The president,
PerumugaiAthani Branch Channel Water Users Sabai No.5
Perumugai (PO),
Kallipatti, Gobi taluk,
Erode District. Pin.638505
PHOTOS
Before Execution After Execution
Kudimaramath works for the
year
2016-17
Sl.No 143
Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross
masonry structures under the jurisdiction of the "L-10 Keel Bhavani Murai
neer pasana vivasaigal sabai" in Lower Bhavani Irrigation system in
Kangayam and Perundurai taluks of Erode and Tirupur Districts"
Estimate Amount (Rs. In
lakhs)
8.40 Date of
commencement
04.04.2017
Expenditure w.r.t 90% of
Estimate Amount (Rs. In
lakhs)
7.56 Date of completion (If
the work is in progress,
mention the probable
date of completion)
25.05.2017
Nature of work
Clearing Jungle,
Desilting, Sluice repair
work, Drop,Shutter
repair work and Bund
strengthening.
Progress of work (%
Completed)
Work completed
Name of the Farmers
Asssociation by which work
has been executed
L-10 Keel Bhavani Murai neer pasana vivasaigal sabai"
PHOTOS
Before Execution After Execution