41
Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Embed Size (px)

Citation preview

Page 1: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Kuali Budget Construction Training

Catherine MaddafordKBC Administrator

Page 2: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

SALARY SETTINGSKuali Budget Construction

Page 3: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Where to Start

This one link takes you to the starting page for all of the KBC processes.

Page 4: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Budget Construction Selection

• All of the data entry screens, views, and searches, as well as the imports and exports needed for KBC start from this one page.

• Each separate process starts when you click on a button.

Page 5: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Closing Session• The following may cause this message:

– If you close the Budget Construction Selection screen while an account edoc is loaded

– Timing out while account edoc is loaded• Click YES when you see this message, so that

you can restart with a fresh session.• Be sure to frequently save your updates as you

work.

Click refresh before close to clear the loaded data

Page 6: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Comp Data Entry• Method One: Data Entry into the salary setting screen

from one of the following– Org Salary Settings (preferred direct entry method)– Quick Salary Settings from within an Account edoc

• Method Two: Salary import using the salary worksheet– Use the salary export to download the worksheet from

KBC– Enter changes in the worksheet– Use the salary import to upload it back into KBC– Requires careful attention to detail to avoid errors.

Page 7: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Org Salary SettingsUsing the org salary settings button is the most direct and comprehensive approach to updating positions and/or incumbents, one at a time.

Page 8: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Select Point of View

First – Find and select the org code you want under “point of view” and then select it by clicking on the box under Selected in the Organization sub tree tab.

Page 9: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Choose Pick List

Second – Select which pick list you want, sorted by position number, which includes names, or sorted alphabetically by the incumbent’s name. Click on the View button for the one you have selected.

Page 10: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Position Search/Select

You can click search to get all positions, or you can refine your search. Then select the position you want to open by clicking on Posn Salset.

Page 11: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Search Criteria• Position Number – This is the position number from Workday or a

pooled position number created in KBC.• FLSA- (Fair Labor Standards Act) Exempt or non-exempt• Employee Type –ie. staff, faculty, student, etc.• Position Description –similar to job title, use *title*.• Department ID – Region code (i.e. home dept code) in WD, can

use wildcards.• Object Code – object code used in the funding.• Person Name – the name of the employee who fills the position.

Use *name*.• Fully Budgeted – a position is fully budgeted if all cost allocation

adds to 100% for all comp plans included.

Page 12: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Salary Setting Screen

First tab - Position information imported from Workday, for information only.

Page 13: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Position tab – col 1• Year – Fiscal year being updated• Base/Core Rate – WD current total monthly or hourly

rate for base pay only, all funding together• Job Code – WD job code• Work Months – for faculty, AWP, Annual Work Period• FTE – Full-time equivalent, with 100% represented as

1.00

Page 14: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Position tab – col 2

• Position – Position number, either from Workday or a pooled position created in KBC

• Department Identifier – Region code from Workday

• FLSA – Exempt or non-exempt• Pay Months - for faculty, DPP, Disbursement

Pay Period• Position Eff Date – the start date of the

position, from Workday

Page 15: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Position tab – col 3• Position Desc – WD Title related to the position• Union Code – applies only to union members• Scheduled weekly hours – how many hours an

employee in this position works in one week• Standard hours – how many hours a full-time

employee works a week in this position• Job Family Code – WD code that represents a

group of job codes

Page 16: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Position Funding

Accounts and comp plans loaded from

current cost allocation

Add new cost allocation

Each added line requires empl ID and comp plan

Page 17: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Intended Incumbent• When you use the search icon for empl ID within a position, this is the lookup

you receive.• Note that you may get all incumbents for this search, since you can add funding

for any incumbent if the account is yours.• This is different from the incumbent pick list from org salary setting.

Page 18: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

What do I update?• Position Funding changes– Click on Delete to remove funding lines for accounts or

comp plans you do not wish to fund.– If you are using the same account, add the new pay rate,

divided according to the distribution percent.– Adjust default cost allocation dates, if needed.– Add new lines for new accounts used for cost allocation,

remembering to add the employee and comp plan for each new line and click on Add.

• When all lines have been entered the distribution percent should be 100% for each comp plan.

Page 19: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Cost Allocation

Cost Allocation - KBCCosting Allocation - WD

Page 20: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Comp Plan

Compensation Plan – WDKBC Position funding w/comp plan information included

Page 21: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Distribution Percent• Cost allocation is updated in the position funding tab on the

salary setting screen.• Each line represents the cost allocation as associated with a

comp plan, and lines with the same comp plan are added together.

• Split the amount you enter in the rate of pay according to your desired distribution percent.– Example: A monthly pay rate of $1,000 would be split into two lines

of 50% each by entering $500 in each line for the rate of pay.– Example: An hourly rate of $30 would be split into two lines of 50%

each by entering $15 in each line for the rate of pay.• Cost allocation dates are important when entering multiple

cost allocation lines.

Page 22: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Entering Rate of Pay

• Each row represents the cost allocation distribution for the account and comp plan shown, with the cost allocation dates shown.

• Divide the Rate of Pay into the portions that you want to pay on each cost allocation line.

• The rate of pay plus the cost allocation dates determines the distribution percent.

• Each row that splits the cost allocation for one comp plan must add up to 100% for the distribution percent for that comp plan to be fully funded.

Page 23: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Cost allocation- Dates

• Cost Alloc Start – the start date for the cost allocation row must work with DPP for faculty, and must work with the rate type. (Default start date for non-exempt is 6/19/2014.)

• Cost Alloc End – the end date for the cost allocation row must work with DPP for faculty, and must work with the rate type. (Default end date for non-exempt is 6/17/2015.)

• You can reset to default dates by clearing the date fields and then clicking on the add button.

• Cost allocation dates cannot overlap within a position for the same comp plan. You may need to add additional lines or the dist pct will not be correct.

Page 24: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Dates – split funding• To ensure the correct distribution percent for one

comp plan, you cannot overlap the cost allocation dates on separate lines.

• Each time period needs its own set of lines adding to 100% for one comp plan.

• Note that some core pay for faculty may appear with the same object code, but actually be different comp plans. Check earning codes.

• Watch the totals and distribution percent when you add lines with different dates. You can check your calculations on the salary setting screens.

Page 25: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

AWP and DPP Dates

• There are start and end dates for the COMP PLAN and another set of start and end dates for the COST ALLOCATION.

• The example below is for a faculty member who has a nine-month contract (which matches the comp plan dates) but has elected to be paid over 12 months.

• If you are paying this faculty member for the first semester on one account and the second semester on another account, you would not change the comp plan, but you would have different dates on your cost allocation lines.

Page 26: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Position Funding lineChart – Always SCAccount – the GL account used for cost allocationObject – Object code, must match to comp plan and earningEmplid – the incumbent emplid must be repeated in each cost allocation rowMemo – if you enter a restricted account in the cost allocation, the memo box will automatically be checkedCost allocation start and end dates – the dates that align with how pay is distributed

Page 27: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Funding line - moreComp Plan – Loaded with the imported data or added for a new line. Some must be selected even for a loaded line.Earning – This is the earning type that goes with the comp plan. It may change if you change the comp plan.Comp plan start and end dates – May be the same as or different from cost allocation dates as determined by the type of pay and the employee type.Rate of pay – the portion of the hourly or monthly pay for that lineRate type – monthly or hourly or bi-weeklyReason select – reasons for the change in pay rate as provided from the selection list. Default is merit.Dist pct – the distribution percent for the rate of pay for that cost allocation, calculated by KBC based on rate of pay and cost allocation dates.

Page 28: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Comp Plan Select

• Some object codes work with more than one comp plan, so you must select one from the list.

• The choices for this example are core pay and core pay sponsored funds

Page 29: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Salary Setting totals• The bottom of the screen sums up each row of cost allocation.• CSF Totals – The sum of CSF amounts for each line.• Allocate is the sum of the lines you are entering.• Totals less memo amounts is the total after the memo funding lines have

been subtracted. This would represent the total that is counted against the control total.

Page 30: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

CSF – ExplanationCSF (Calculated Salary Foundation) – used in KBC only• Estimated annualized total based on the current rate and what was

actually paid in Workday as reflected in the KFS labor ledger for each account/object code.

• Use this only as a reference tool, this number is NOT collected and sent to Workday, NOR does it update anything in the GL budget.

• If there is no CSF then nothing was imported into KBC from the KFS labor ledger, meaning they were not paid from Workday.

• CSF amounts for supplemental pay will appear very different from regular monthly or biweekly pay, since the same calculation is used for all comp plans.

• CSF is helpful for simple cost allocation but can be confusing for multiple line cost allocations with different dates.

Page 31: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Delete, Undelete, PurgeDelete marks the funding line for deletion from the position. Undelete recovers a line you previously deleted and now wish to retrieve.Purge marks a line for deletion that you added.Delete lines not needed – It is good practice to delete unwanted lines to avoid confusion with cost allocation.

Page 32: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Incumbents• Current employees are called “incumbents” because they are actively

assigned to positions.• The changes to incumbents who are in the same positions are minimal in

most cases:– Change pay rate– Change cost allocation, if needed

• In February incumbent data was imported into KBC from Workday, and included labor ledger data from December through February.

• Once KBC is in final status, with everything closed and balanced, KBC will send back the updated incumbent data to Workday.

• KBC is considered the approval, so Workday does not generate an approval request unless the change is outside the standards set by Workday HR for KBC.

• After the load compensation plan and cost allocation with new pay rates will be ready in WD for the new fiscal year.

Page 33: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Incumbent Salary

When you use the incumbent pick list to access the salary setting screen, the layout of the fields is slightly different from the position salary setting screen.

Page 34: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Incumbent Pick List

Incumbent is defined as the employee who currently fills the position. The following fields are included in the incumbent pick list.

• Emplid – Employee ID from Workday• Financial Object Code – the Object code associated with the comp plans• Person Name – The name of the incumbent/employee• Employee type – Worker type, i.e. staff, faculty, student, etc.

Page 35: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Removing Incumbent

• If you have an incumbent that will not be associated with your position next year and has not been removed in Workday already, you can end the incumbent funding by VACATING the position.

• You can add funding to that same position with the empl ID showing as Vacant.

• Or you can add funding to a pooled position.

Page 36: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Incumbent Screen

• The position demographics that you saw in the first tab of the position salary setting layout is now gone, because you are viewing everything from the view of the incumbent rather than the position.

• You will see only the employee ID and name on the incumbent tab.• Incumbent Funding tab:

– All of the funding lines are the same, with the exception that you add the POSITION to the incumbent funding line.

– Each funding line will contain the position information that you saw on the first tab in the position salary setting screen, such as base rate, hours, job code, FTE, etc.

– From this view you would be able to see if the incumbent is assigned to more than one position, which is rare.

Page 37: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Adding funding lines• You can add a new funding line to a position or an

incumbent, as long as you are looking at the “whole” position (not Quick Salary Setting view.)

• Fill in the object code and the comp plan select list will populate based on that object code.

• Add the empl ID to the position, or the position to the incumbent, depending upon which view you are using.

• Be sure to delete funding lines that are involved in your cost allocation before adding new ones.

• Default dates will populate added lines, so change them if needed.

Page 38: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Quick Salary Setting

• You can only connect to quick salary setting from the account edoc by entering a “0” in the allocated field and then clicking on the salary setting button next to the object code.

• Use this only when you are troubleshooting or balancing an account with compensation and you are looking from the account/object view rather than from the position view.

• You will see only funding lines for that account and that object code, but for all associated positions.

Page 39: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Example Quick Salary

Page 40: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Link from Quick view

• You can update funding here or you can link to the position or the incumbent view.

• Linking to the other views allows you to all funding for the incumbent or position.

Page 41: Kuali Budget Construction Training Catherine Maddaford KBC Administrator

Memo Entries

• Those accounts that are not budgeted in KBC will still collect the data for reference and for updating to Workday. They are referred to as “memo” on the funding lines.– Sponsored project accounts.– Restricted accounts.

• Memo entries are not included when balancing the allocated to the control budgets in KBC, but you enter them to fully budget your positions.