. K.U. CO. 8 E.K.R.E.C.C. EXISTING & PROPOSED TRANSMISSION LINES IN THE AREA OF THE INTERCONNECTED TRANSMISSION SYSTEM t LEGEND-t @ ELECTRlC GENERATING STATION - K. u. co. 6% ELECTRIC GENERATING STATION - E. K.R. E.C.C. B EXISTING K.” CO. TRANSMISSION LINES - 136 KY B OVER - EXISTING K. “. CO. TRANSMISSION LINES - 69 K Y TO 136 K” - EXISTING K U. CO. TRANSMISSION LlNES - 22 K TO 69 K Y -. ^_. +wyyc PROPOSED K.“. CO. TRANSMISSION LINES - 69 K” TO 156 K -4 y*wcIc PROPOSED K.“. CO. WIRE REPLACEMENT SO,, CONVERSION TO HIGHER VOLTAGE - COMPLETED K.“. CO. TRANSMISSION LINES - EXISTING E K.R.E.C.C. B MEMBER CO-OP OWNED TRANS. LINES-MS 6 m PROPOSED E.K.R.E.C.C. TRANSMISSION LINES - 69 KV A E.K.R.E.C.C. MEMBER CO-OP LOAD CENTERS ON K.“. CO. SYSTEM A E.K.R.E.C.C. MEMBER CO-OP LOAD CENTERS ON E.K.R.E.C.C. SYSTEM 0 K. “. CO. LOAD CENTERS ON E.K.R.E.C.C. SYSTEM n POINTS OF INTERCONNECTlON BETWEEN K. “. CO. B E. K. R.E.C.C. SYSTEH 4so,r of Ml,99 - - 10 5 0 80 20 March 5.1956 69 K.V. m OOWENTON ELIZAGETHTC HODGENVILLE’ BEATTYVILL MPBELLSVILLE _ - ?Y HORSE CAVE;r ^.. /- EAST BERNSTA b-- Goose ROCK r---T CUMEIERLAND-

K.U. CO. 8 E.K.R.E.C.C. EXISTING & PROPOSED …psc.ky.gov/tariffs/Electric/East Kentucky Power Cooperative, Inc...in the area of the interconnected transmission system ... list of

Embed Size (px)

Citation preview

.

K.U. CO. 8 E.K.R.E.C.C. EXISTING & PROPOSED TRANSMISSION LINES

IN THE AREA OF THE INTERCONNECTED TRANSMISSION SYSTEM

t LEGEND-t

@ ELECTRlC GENERATING STATION - K. u. co.

6% ELECTRIC GENERATING STATION - E. K.R. E.C.C.

B EXISTING K.” CO. TRANSMISSION LINES - 136 KY B OVER

- EXISTING K. “. CO. TRANSMISSION LINES - 69 K Y TO 136 K”

- EXISTING K U. CO. TRANSMISSION LlNES - 22 K ” TO 69 K Y -. ^_.

+wyyc PROPOSED K.“. CO. TRANSMISSION LINES - 69 K” TO 156 K ” -4

y*wcIc PROPOSED K.“. CO. WIRE REPLACEMENT SO,, CONVERSION TO HIGHER VOLTAGE

- COMPLETED K.“. CO. TRANSMISSION LINES

- EXISTING E K.R.E.C.C. B MEMBER CO-OP OWNED TRANS. LINES-MS 6

m PROPOSED E.K.R.E.C.C. TRANSMISSION LINES - 69 KV

A E.K.R.E.C.C. MEMBER CO-OP LOAD CENTERS ON K.“. CO. SYSTEM

A E.K.R.E.C.C. MEMBER CO-OP LOAD CENTERS ON E.K.R.E.C.C. SYSTEM

0 K. “. CO. LOAD CENTERS ON E.K.R.E.C.C. SYSTEM

n POINTS OF INTERCONNECTlON BETWEEN K. “. CO. B E. K. R.E.C.C. SYSTEH

4so,r of Ml,99 - -

10 5 0 80 20

March 5.1956

69 K.V. m OOWENTON

ELIZAGETHTC

HODGENVILLE’ BEATTYVILL

MPBELLSVILLE _

- ?Y HORSE CAVE;r ^.. /-

EAST BERNSTA

b-- Goose ROCK

r---T CUMEIERLAND-

h

Revised March 5, 1956

EXHIBITB - FIRST REVISION

LIST OF TRANSMISSION LINES ANB ASSOCIATED SWITCHING FACILITIES TO BE CONSTRUCTEB OR ACQUIRED BY EAST EENTUCKY

R. E. C. C.

TRANSMISSION LINES -' Location Voltage

Summer Shade to Temple Hill 69,000 Temple Hill to Glasgow 69,000 Glasgow to Goodnight 69,000 Goodnight to Munfordville 69,000 Goodnightto Bonayr 69,000

tifordville to Stephensburg 69,000 22.3 Completed Stephensburg to Hodgenville 69,000 17.6 Completed Stephensburg to Elizabethtown 69,000 11.5 Completed Elizabethtown to Bardstown 69,000 26.6 Completed Bardstown to Springfield (REA) 69,000 16.0 Completed Springfield (REA) to Perryville 69,000 16.0 Completed

Springfield (REA) to Springfield (City) 69,000 69,000 Knob Lick to Summer Shade

Knob Lick to Greensburg Perryville to Newby Newby to Ford

69,000 69,000 69,000

Ford to Summer Shade via Windsor Phil-Highland Line to Peytons Store Windsor to Elihu Sewellton Tap Sewellton to Jamestown

Summer Shade to Albany 69,000 33.4 Completed Albany to Monticello 69, ooo 20.0 Completed Monticello to Whitley City 69, ooo 23.0 June 30, 1956 Whitley City to Gold Bug 69,000 18.0 Completed (1) Lebanon to Sulfur Creek 69,000 16.0 Jan. 1 ,I1960

Ford to Richmond Richmond to Berea Berea to Brodhead Ford to Hunt #l Circuit Hunt to Headquarters

- Headquarters to Murphysville 69,000 19.9 Completed Headquarters to Cynthiana 69,000 11.8 Completed Cynthiana to Renaker 69,000 10.0 Completed (1)

Renaker to Lees Lick Lees Lick to Scott Renaker to Berlin Renaker - Williamstown Sinai to Bonds Mill

New Liberty to Williamstown New Castle to New Liberty New Castle - Clay Village Bonds Mill to Vanarsdell - Ford to Lexington - Winchester Line Ford - Hunt #2 Circuit Hunt - stanton '

Hope - Hillsbo???

4.6 Completed (1) 13.4 Completed 17.0 Completed 33.0 Completed ILL.1 Completed (2)

69, ooo

~;~::: 6g:ooo 69,000

115.9 Completed 15.0 Completed 18.0 Completed 15.0 Completed 0.5 Completed,

g>;;; (3)

69: ooo 69, ooo 69, ooo

11.0 Completed 13.0 MY 31, 1~956 16.0 June 30, 1956

6.5 Completed 33.5 Completed

69, ooo

fg%: 6g:ooo 69,000

7.2 10.0 24.0 14.5 6.5

Completed Completed Completed 1)

i Completed 1) Completed

69,000 69,000 69,000 69,000 g,;;; (3)

6g:ooo

16.5 August 1, 19% lg.8 August 1, 1956 16.1 Completed

4.5 Completed 12.0 Completed

7-o (2) Completed 16.5 Completed

69,000 14.2 Completed 69,000 14.0 Jan. 1, :L960 M,~O 22.0 Completed

Miles Tentative Date

-of Completion

9.9 Completed 9.0 Completed (1) 5.8 Completed

15.9 Completed 9.0 Jan. 1, :Lg60

.

h

,

Revised March 5,' 19586 Sheet 2

EXHIBITB- FIRST REVISION

TRANSMISSION LINES (con'd)

Loca%ion Vol%age Miles

Tyner-McKee 69,000 10.0 Fall Rock - Manchester 69,000 6c.o Manchester - Goose Rock 69,000 6.0 Hillsboro - Charters 69,000 25.0 Stanton - zaehariah 69,000 1700 Zachariah - Bea%%yville 69,000 1300 Beattyville - Tyner 69,000 24c.o E. Berns%adt - Tyner 69,W

@woo) 28.5

Tyler - Fall Rock BridgepQr% Tap

~;~~:: 103

Iqan Tap 6g:ooo

2!,2 Nicholasville Tap 2,8 BonnievflIe Substation Tap-Double Cir, 69,000 Elizabethtown Tap-Double Cir. 69,000 ;e~g; 0

Total Miles 983.8

- SWITCHIN FACILITIES DESCRIPTION

Tentative Date of Completion

Completed (1) July 1, I.956 December 1, 1957 Completed (1) Completed Completed Completed Completed (1) Completed (1) Completed Completed Completed Completed Indefinite

Tentative Date of Completion

oil circuit Air Break O%her Breaker (4) Stitch(4) Location

Summer Shade Summer Shade Summer Shade Summer Shade Temple Hill

GOQdni&% Munfordvflle Bonnievilbe

(Temple Hill Line) 1 (Knob Lick Line9 1 (Columbia Line) 1 (Albany Line) 1

Completed Completed Completed Completed Completed 2

Comple%ed Completed

2

f (138 kv) 1 l-30 MVA )

138/69 KV I Comple%ed Autotransf.) .'

Completed Completed Completed Completed Completed

1 4

Bos%on Stephensburg Bardstown Springfield (EN) Knob Lick

Greensburg Perryville Newby

- Lancaster Highland

Liberty Tap Pain% Phil Windsor Windsor

Elihu Columbia Columbia Sewellton Sewell%on Junction

- Albany Monticello Whitley City Gold Bug Lebanon (Sulfur Creek Line)

Completed Complete~d Completed Completed Completed

2 Completed 2 Comple%ed 2 Completed 1 Completed

Completed Completed Completed Completed Completed

Completed Completed Completed Completed 1

1 Jan. 1, 1960.

,

SWITCHING FACILITIES (Con'd)

Iocation

Berea Brodhead Hunt (1st Circuit) Hunt (2nd Circuit)

rh;;:e; MBTc.h 5, 1956

EXHIBITB- FlRST,REVISION

‘DESCRIPTION Oil Circuit Air Break Tentative Bate

Sideview Headquarters Berlin Renaker (Williamstown and Lees

Lick Lines) Renaker (Berlin and Cynthiana Lines) Scott

Lee's Lick Colemansville Falmouth Tap Point williamstown

P New Liberty

New Castle Clay Village Bond's Mill Avon Tap Ford (Newby #l and Hunt #l Lines) Ford (Newby #2 Line) Ford (Hunt #51 -Line) Ford (Richmond Line) Ford (Lexington Line) Stanton Hope Hillsboro Goddard

Beattyville Tyner Tyner ED Bernstadt Fall Rock Manchester Horse Cave Corinth Owingsville

_- Zachariah Elizabethtown

Breaker (4)

Notes :

2 2

1

2 1 1 1 1 1

1

2

1

Swltch(41

2 1 3 1

2 3 2

2

2 2 1 2 1

2 1 2 1 (138 kv)

z 1 2

3 2 2

Other of Completion

Completed June 30, 19% Completed Completed

Completed Completed Completed

Completed (5) .Completed (5) Completed

Completed Completed Indefinite August 1.1 19% August l,, 1956

Completed August l,, 1956

To be acquired from local cooperative Second Circuit Initial operation at 69 kv, future 138 kv 69 kv unless indicated Supervisory control not operating at this time. Total Circuit Mileage Or at a later date to coincide with Ford Unit 3 operation

-

Completed Oct. 1, :1g57 (7) Completed Completed Completed Completed October l, 1957 (7) Completed Completed Completed Completed (1)

Completed Completed 1)

I Completed 1) Completeld (1) July 1, 19% July 1, 1956 Completed Completed Completed Completed Completed

i

EXHIBIT C - FIRST REVISION

LIST OF TRANSMISSION LINES AND ASSOCIATED SWITCHINGFACILITIESTOBE CONSTRUCTEiD

BY'KENTUCKYUTILITIESCOMRANY

TRANSMISSION LINES

Location

Lebanon to Springfield (REA Line) Lebanon to Campbellsville Campbellsville to Greensburg Stephensburg to Leitchfield Jamestown to Elihu Boston Tap Lexington to Avon Dix Dsm to N. Richmond N.*Richmond to Higby Mill Kenton Station to Sharon Tyrone-Georgetown Sharon to Berlin Georgetown to Scott Falmouth Tap Line New Liberty to Carrollton via mrsaw Bedford Tap Line Rosine to Leitchfield

TOTAL MILES 268.4

W FACILITIES

Voltage

2;~~~ :I t 69:oc~~ (1) 69,000 (1) g;,g: (2)

69:ooo (1) 69,000 (3)

69,000 34,500

Miles

15.0 30.0 10.0 18.0 27.0

4.0 11.0 22.0 20.0 32.0 19.4 9.0

14.0 5.0

29.0

2e:;

Revised March 5, 1956

Tentative Date of Completion -

March 15, 1956 Completed Completed Indefinite Indefinite Completed Oct. 1, 1957 (5) Indefinite (6) Completed Completed Completed Completed Oct. 1, 1956 Completed Aug. 1, 1956 Completed Completed

DESCRIPTION Oil Circuit Air Break

Switches (4) Other Location Breakers (4)

Elizabethtown Lebanon E 1) Bonnieville t 2 138 kv) Campbellsville Greensburg Jamestown Dix Dam (Richmond Line) 1 Higby Mill (Richmond) 1 Lexington 1 Avon Richmond 69 KV Switching 4 Richmond 69 KV (Dix Dam) 1 Georgetown 2

3 (34.5 W)

Tyrone 1 - Leitchfield Nicholasville (Dix Line) Brodhead Floyd Rockholds Richland Cumberland Rice Station Goidbug Murphysville Kenton Sta. (Sharon Line) 1 Sharon Clay Village

2 1 1

1 4

: l-20 MVA 69/34.5 KV Supv. Controls

1 2 1 3 2-34.5 KS7 2 1 2-34.5 KV l-34.5 KV 1 2

2 1

Tentative Date of Comp:Let ion

Indefiniite Completed Completed Completed Completed my 1, :~956 Indefinite (6) Completed Oct. 1, 1957 (5) Oct. 1, 1957 (5) Completed Indefinite (6) Completed

Completed Completed Completed Completed Completed Completed Completed Completed my 1, ~956 Completed Completed Completed Completed Aug. 1, 1956

SEP 2 7 1955

,. . Revised March 5> 1956 Sheet 2 .

- EXRIBIT C - FIRST REVISION

SWITCHING FACILITIES (Con'd) DESCRIPTION

Oil Circuit Air Break Switches (4) Location Breakers (4)

Taylorsville City Taylorsville REA Bridgeport New Liberty Carrollton 2 Bedford Tap Point Corinth Campbellsburg East Bernstadt Owingsville Beattyville

London 2 Lebanon 2 (138 kv)

-

1 (34.5 w

Other

1 1 1 3 1 1

- I

; 1 1 3 (34.5 Kv - 5 WA) (W34.5

Ke Auto j

ans. >

Tentative Date of Completion

Aug. 1, 1956 Aug. 1, 1956 Aug. 1, 1956 Aug. 1, 1956 Aug. 1, 1956 Sept. 15, 1956 Indefinite Sept. 15, 1956 Completed Completed Completed

Completed Jan. 1, 195'7

Replacing existing 34.5 KV facilities Replace conductor only Initial operation at 69 KV, future 138 KV , 69 KV unless indicated Or at a later date to coincide with Ford Unit #3 operation The parties hereto will jointly consider the economic feasibility and neces- sity of this project on, or immediately after, the date on which East Ken- tucky makes definite plans for additional generating capacity at its Dale Generating Station, beyond its Unit #3 or at any time that operating ex- perience shows defin%te need for this project. Kentucky Utilities reserves the rEght to construct this line at any tPme prior to the above date at its discretion.

. Revised March 5, 1956

EXKIBITD - FIRST REVISION

East Kentucky Owned Facilities to be Dispatched In Accordance with the Provisions of Paragraph 7 (6).

1. Transmission line from Ford to Summer Shade by way of Elizabethtown.

2. Transmission line from Springfield Coop Substation to City of Springfield.

3* Transmission line from Clay Village to New Liberty.

4, Transmission line from Ford to Murphysville by way of Headquarters.

5. Transmission line from Headquarters to New Liberty by way of Rena&r.

6, Transmission line from Scott to Berlin by way of Renaker.

7. Transmission line from Ford to Tyner by way of Beattyville.

8, Transmission line from Stanton to Goddard by way of Rope.

go Transmission line from Ford to Richmond.

10. Transmission line from Sewellton Junction to Jamestown by way of Sewellton. e 11. Transmission line from Ford to Summer Shade by way of Windsor.

12. Transmission line from Elihu to Windsor.

139 Transmission line from East Bernstadt to Manchester by way of Tyler.

14. Transmission line from Richmond to Brodhead by way of Berea.

15. Transmission line from Greensburg to Summer Shade by way of Knob Lick.

16. Transmission line from Ford to Avon Tap.

17. Transmission line fran Summer Shade to Gold Bug.

18. All switching devices in the above lines and at their terminals, except at Ford.

EKHIBITE - FIRST REVISION

Member Cooperative Load Centers Connected to Kentucky Utilities Transmission System

Bedford Nicholasville Taylorsville

Bridgeport Rice Station Vanarsdell

Csmpbellsville Richland Cumberland

Lebanon Rockholds Floyd

Logan

Campbellsburg

Sinai Camp Ground

Athertonville (Sulfur Creek)

The kilowatt-hours delivered to the above load centers shall be used to determine the wheeling charge to be paid by East Kentucky pursuant to Section 8 (h) provided that during the period, defined below, kilowatt-hours on which East Ken- tucky pays the wheeling charge for the above load centers in any month shall not be more than 132$ of the kilowatt-hours delivered to the Kentucky Utilities load centers listed on Exhibit G, as amended. Should such deliveries to the load cen- ters during any month of the period, defined below, exceed the said 132'$ as stated, payment shall be limited as though deliveries had remained at the 136 level.

/-4 The period referred to in the preceding paragraph shall begin March 1

and shall continue until such date as the sum of the maximum (undiversified 1 1956, de-

mands of the load centers of Kentucky Utilities listed on Exhibit G, as amended from time to time, shall, within any calendar yesr, amount to 11,730 kw plus the normal increase, as hereinafter defined. The "normal increase" shall be computed by applying seven per cent(@) per year increase to said amount of 11,730 kw for each year after 1954. Said seven per cent shall be applied on a compounded basis.

A load center near Winchester to serve the East Kentucky office will be con- nected to the Kentucky Utilities transmission system. The kilowatt-hours delivered to it and to any other new load center of East Kentucky which may be hereafter con- nected to the transmission lines of Kentucky Utilities (other than a load center re- sulting solely by reason of a division of one of the above listed load centers) will be excluded from the provisions of the 132$ limit stated above.

This Exhibit must be amended to reflect the future addition or removal of Member Cooperative load centers connected to Kentucky Utilities transmission lines in the area of the interconnected transmission system shown on Exhibit A.

--

-

SEP 2 1195s

.

h h

.- Revised March ‘5, “I.956

EXHIBITF - FIRST REVISION

Member Cooperative Ioad Centers Connected to East Kentucky Transmission System

Tyner

Fall Rock

Beattyville

E. Bernstadt

Brodhead

Springfield

Columbia

Phil

Iancaster

Perryville. - Peytons Store

Highland

Temple Hill

New Castle

Clay Village (Benson Road)

Bardstown

Cynthiana

Four Oaks

Goodnight ~-yr Knob Lick

Munfordville

Williamstown

Newby

Berea (Hickory

Berlin

Headquarters

c01emansville

Lees Lick

Sideview

Hunt

Elizabethtown

New Liberty

Scott (Penn)

McKee

Hodg@nville

This Exhibit must be amended to reflect the future addition or removal of Member

Goose Rock

Stephensburg

Monticello

Windsor

Sewellton

Murphysville

Plains) Albany

Whitley City

Charters

Hillsboro

Stanton

Frenchburg

Hope

Greensburg

Somerset

South Fork

Zachariah (Campton)

Wyoming

Sand Lick

Cooperative Ioad Centers connected to East Kentucky transmission lines

of the intWXOMeCted transmission system shown on Exhibit A.

-

in the ares

.

Revised March sL 1956 7

EXHIBITG - FIRST REVISION

Kentucky Utilities Ioad Centers Connected to East Kentucky Transmission System

Cave City F&mouth

Horse Cave Owingsville

Munfordville Liberty

Boston Whitley City

Columbia

Beattyville

Mackville

This Exhibit must be amended to reflect the future addition or removal of Kentuck;y

Utilities Load Centers connected to East Kentucky transmission lines in the area Iof

the interconnected transmission system shown on Exhibit A. -

.

. .

c . .

agree to substitute

EXRIBITA-

EXHIBITB -

h

EXHIBIT c -

EXHIBIT D -

EKRIBITE -

FXRIBITF-

EXHIBITG-

- .

. r

. .

MODIFICATION OF EXHIBITS

This modification is made as of June 12, 1956, to the agreement dated February 1,

1954, between East Kentucky Rural Electric Cooperative Corporation (East Kentucky)

and Kentucky Utilities Company (Kentucky Utilities).

East Kentucky and Kentucky Utilities accept the following revised exhibits and

said revisions for those attached to the original contract:

Map of Kentucky Utilities Company and East Kentucky

Rural Electric Cooperative Corporation. Existing and

Proposed Transmission Lines. Dated March 5, 1956, Re-

drawn and Revised May 1, 1956.

FIRST REVISION. LIST OF TRANSMISSION LINES AND ASSOCIAI!ED

SWITCHING FACILITIES TO BE CONSTRUCTED OR ACQUIRED BY EAST

KENTUCKY R, E. C. Ci Revised March 5, 1956.

FIRST REVISION. LIST OF TRANSMISSION LINES AND ASSOCIATED

SWITCHING FACILITIES TO BE CONSTRUCTED BY KENTUCKY UTILI-

TIES COMPANY. Revised March 5, 1956.

FIRST REVISION. East Kentucky Owned Facilities To Be

Dispatched In Accordance With the Provision of Paragraph

7 (4. Revised March 5, 1956.

FIRST REVISION. Member Cooperative Load Centers Connected

to Kentucky Utilities Transmission System. Revised June 11,

19%.

FIRST REVISION. Member Cooperative Load Centers Connected to

East Kentucky Transmission System. Revised March 5, 1956.

FIRST REVISION. Kentucky Utilities Load Centers Connected

to East Kentucky Transmission System. Revised March 5, I-956.

. . . .

. , .

h h

. . .

Modification of Exhikits' Sheet 2

Copies of said revised exhibits are attached hereto.

IN WITNESS WHEREOF, the parties hereto have caused their names to

be hereunto subscribed by their representatives thereunto duly authorized as

of the day and year first written above.